Tag Archives: Developers

Mosgiel pool site options —muddy water from mainstreet businesses

At the public forum before Monday’s Council meeting, the Taieri Community Facilities Trust (aka TCFT or ‘pooling together’) turned up in the guise of Irene Mosley, its chairwoman. Her only visible means of support was Bill Feather, ex Mosgiel-Taieri community board chairman.

Ms Mosley put up images of two site options (see graphics below), however nobody in the public gallery could read them. A previous round of public consultation had determined that 127 people favoured Site A, the site of the existing pool beside the Silver Stream. And 17 favoured Site B, at the township’s Memorial Gardens.

Ms Mosley is lobbying for the build being at the Gardens, a site (B) more likely to flood. Site A, the existing pool site, is higher; and the flood banks to the Silver Stream are doing their job.

We were trotted the line that the (rearguard) push for Site B was entirely down to the Otago Regional Council (ORC) because they have issues with Site A, that construction could potentially destabilise the flood bank. Phooey. Pure folly, Ms Mosley! Besides, ORC has no particular jurisdiction over the siting.

Ms Mosley carefully emphasised that a second round of public concultation on site options was for “transparency”. Hmm. Although she told Councillors there’s lots of positive support for the new pool, we’re not too sure who Ms Mosley has asked lately. We doubt the “positive support” is people with spare millions to give away on her trust’s “Logic” (loaded commercial term) dream.

All we know is business owners in central Mosgiel want the pool located closer to them, thus why Site B is being PUSHED by the trust. What a lot of fines there are, swirling about in the local water supply.

Mosgiel resident Peter Sim said he would oppose Site B. Green space was “at a premium” in Mosgiel and the DCC was “nibbling away” at it. “It’s time it bloody well stopped.”

### ODT Online Tue, 13 Dec 2016
Pool locations not ‘perfect’
By Shawn McAvinue
The two possible locations for a new aquatic facility in Mosgiel were revealed yesterday, along with a concession that “neither site is perfect”. At a Dunedin City Council meeting, Taieri Communities Facility Trust chairwoman Irene Mosley revealed the possible footprint of both sites … “We have decided we need to go back to the community and explain there is no perfect site … we just want to get it right.”
Read more


 
From the pool trust’s website [click to enlarge]:

mosgiel-pool-site-options-a-b

█ More information at http://www.poolingtogether.org.nz/

Related Posts and Comments:
● 23.7.16 Mosley’s Pond now a Dunedin Community ‘asset’ to fund
● 26.11.15 DCC report: Mosgiel Pool Future Aquatic Provision
● 16.9.15 DCC Please Explain —Mosgiel pool design to Warren & Mahoney
● 10.9.15 Tale of two pools … #Mosgiel #Wanaka
● 7.8.15 MOU DCC and TCFT New Aquatic Facility #MosgielPool
● 24.7.15 Hands off Mosgiel Memorial Gardens
● 23.7.15 Dunedin ratepayers —Green Island best site for city pool users…
● 22.7.15 DCC Long Term Plan 2015/16 – 2024/25
● 19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
17.5.15 Cr Vandervis on DCC project budgets
● 4.5.15 DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’
● 7.5.15 DCC Draft LTP 2015/16-2024/25 —public submissions online
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
25.3.15 DCC Long Term Plan: Green-dyed chickens home to roost
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
14.1.15 DCC Draft Long Term Plan: more inanity from Cull’s crew pending
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

This post is offered in the public interest.

22 Comments

Filed under Architecture, Business, Construction, DCC, DCTL, Democracy, Design, District Plan, Dunedin, Economics, Finance, Geography, Highlanders, Infrastructure, Media, Name, NZRU, OAG, Ombudsman, ORC, ORFU, People, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Sport, Tourism, Town planning, Travesty, Urban design, What stadium

New pool —Or, SAFE electricity network for Dunedin and Central Otago

mosley-mcduck-dives-into-opm-disney-at-hellokids-com-tweaked-by-whatifdunedin

THE BULLSHIT METER is off the Scale:

At a Mosgiel Community Board meeting on Tuesday, Mrs Mosley said research revealed the community was willing to give up to $7.5million for the project.

### ODT Online Thu, 24 Nov 2016
Get your togs on, Mosgiel
By Shawn McAvinue
A date to get your “togs on” and make a splash in a new Mosgiel aquatic facility has been set and a decision about location is down to two sites. Taieri Communities Facility Trust chairwoman Irene Mosley said a timeline to build the facility had been made and people should prepare to enjoy a dip in November 2019. The trust had worked with the Dunedin City Council to identify two sites in Mosgiel to build the facility. […] The announcement of the sites would be made in the Otago Daily Times before Christmas so the public could provide feedback to the trust over summer.
Read more

Oh Yeah! Let’s consult on the site for a new ‘4-pool’ complex [DO NOT mention the $$$$$$$$] while EVERYONE IS AWAY ON HOLIDAY. That way we the pool trust (using submissions from our pet Unmonied stakeholders) can easily shove it through Council, led and supported by Cull, Staynes and the new Lord of Finance…. who together, will never see large AURORA/DELTA DEBTS looming for Dunedin City Council ie for the Ratepayers and Residents of Dunedin and Central Otago.

BTW
WE the ratepayers, on behalf of DCC, DO NOT accept unsecured pledges from the Pool Trust– that’s a Stadium mugs’ game we CAN’T AFFORD to play anymore.

Comment from Jacob
Fri, 25 Nov 2016 at 11:23 a.m.
Did anybody bother to read the ODT front page propaganda from Irene Mosley ‘Get your togs on, Mosgiel’ ? Research had revealed the community was prepared to throw $7.5million, and might even want to make it $10million. Yeah Right. Then reported in the Taieri Times the same day, the Mosgiel food bank declared that earlier this year demand was at a 10-year high, and was to have a collection to ensure that nobody goes hungry over Christmas. Sounds to me like an awful lot of people out Mosgiel way can’t even afford to buy togs, let alone donate twice for a pool – once through their rates, and again through a donation.

Received from snorkel
Thu, 24 Nov 2016 at 12:43 p.m.
It’s an interesting ODT story, but let’s read between the lines. No transparency (not wanting to be up front with the sites – maybe a landowner with close connections to the trust, will get an inflated price). The timing of the new pool will suit Mike Lord as he’s made his intentions clear that he’ll run for Mayor next time.

█ Report: MOSGIEL POOL FUTURE AQUATIC PROVISION
30 November 2015
Department of Parks, Recreation and Aquatics
https://www.dunedin.govt.nz/__data/assets/pdf_file/0009/526248/ma_council_r_MosgielPool_2015_11_30.pdf (49 pages)

*OPM – Other People’s Money

Related Posts and Comments:
● 26.11.15 DCC report: Mosgiel Pool Future Aquatic Provision
16.9.15 DCC Please Explain —Mosgiel pool design to Warren & Mahoney
● 7.8.15 MOU DCC and TCFT New Aquatic Facility #MosgielPool
● 24.7.15 Hands off Mosgiel Memorial Gardens
● 23.7.15 Dunedin ratepayers —Green Island best site for city pool users…
● 22.7.15 DCC Long Term Plan 2015/16 – 2024/25
● 19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
17.5.15 Cr Vandervis on DCC project budgets
● 4.5.15 DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’
● 7.5.15 DCC Draft LTP 2015/16-2024/25 —public submissions online
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
25.3.15 DCC Long Term Plan: Green-dyed chickens home to roost
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
14.1.15 DCC Draft Long Term Plan: more inanity from Cull’s crew pending
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

This post is offered in the public interest.

11 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, District Plan, Dunedin, DVL, DVML, Economics, Electricity, Finance, Geography, Health, Hot air, Housing, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Queenstown Lakes, Resource management, Tourism, Town planning, Transportation, Travesty, What stadium

Has DCC Delta stupidly bought into another Pegasus . . . . #notquite

Updated post
Wed, 28 Sep 2016 at 12:51 a.m.

Why has our Dunedin City Council decided to have anything to do with Infinity via council owned company Delta ? Which Infinity ? Infinity Investment Group Holdings Ltd ? Infinity Yaldhurst Ltd ? And who is Infinity Finance and Mortgage Ltd, of a bedroom at 12A Fovant St, Russley ? Is ‘Infinity’ a front for Gordon Stewart’s Noble Investments Ltd ? We delve…. meanwhile, here’s Infinity’s slow-troubled-road Pegasus.

Pegasus was a dream town, invented by a former infomercial salesman who believed wholeheartedly in his vision. Ten years on, it looks remarkably different. –The Press

pegasus-bob-robertson-with-the-scale-model-martin-hunter-fairfax-nzBob Robertson with scale model of Pegasus [Martin Hunter/Fairfax NZ]

pegasus-bob-robertson-ce-of-infinity-investment-group-with-large-scale-model-of-pegasus-town-feb-2006-teara-govt-nzRobertson, chief executive for Infinity Investment Group [teara.govt.nz]

pegasus-golf-and-sports-club-spans-nearly-80ha-stuff-co-nzPegasus golf and sports club spans nearly 80ha [Stuff.co.nz]

pegasus-town-pegasus-town-co-nzPegasus Town – not the vision…. [pegasustown.co.nz]

pegasus-300-chinese-model-makers-spent-6-months-crafting-1-to-100-scale-model-nzgeo-com300 Chinese model makers crafted the 1:100 scale model [nzgeo.com]

### Stuff.co.nz Last updated 05:00, June 4 2016
Life in Pegasus, the dream town yet to fly
By Charlie Mitchell – The Press
It’s rare to meet the inventor of a town. Even more so to shake his hand. It’s an odd sensation many experienced on a single day in 2006, when a former infomercial salesman clutched a microphone, took to the stage, and sold $122 million worth of property before the sun went down. Bob Robertson had developed property before, but nothing like this. He was dreaming of a town called Pegasus, a master-planned community in a swampy, coastal corner of North Canterbury. It would be the first master-planned town in New Zealand. It would appear fully-formed, as if dropped from the sky.

pegasus-artists-impression-of-planned-entertainment-and-retail-precinct-infinitypegasus-artists-impression-of-planned-hotel-and-retail-centre-infinityPlanned entertainment and retail precinct [Infinity]

pegasus-town-centre-stuff-co-nzArtist’s impression of the planned town centre [Stuff.co.nz]

There was something Utopian about the idea. At the time, Robertson said: “For Pegasus, I’m acutely keen to create what I would like to consider would be as close as possible to an ideal town.” He claimed to be the ultimate test-subject; he planned to create the town he’d want to live in, one built for “the traditional Kiwi family”.

Ten years later, Pegasus has come to life. It’s not quite what anyone envisaged; certainly not what Robertson dreamed. Pegasus, ultimately, was built somewhere between the vision promised in Robertson’s model and a messy reality, blighted by earthquakes and a global financial crisis. The promised developments struggled to keep up with the schedule. What did arrive was promising – the golf course and the lake are almost unanimously praised. But more basic facilities, such as a supermarket, or even mail delivery, were conspicuously missing.

pegasus-housing-not-all-endless-rows-of-boxes-david-walker-via-stuffpegasus-housing-teara-govt-nzpegasus-row-of-houses-stuff-co-nzPegasus housing [Stuff.co.nz] with render [teara.govt.nz]

By 2012, it was clear Pegasus would never become what was promised. Shortly afterwards, the developer defaulted on a $142 million payment and went into receivership. It was sold to Todd Property, owned by New Zealand’s wealthiest family. Pegasus no longer belonged to Robertson. The town’s new developers, Todd Property, are keenly aware of the promises made by its former owner. Since January 2013, about 30 people a month have steadily arrived to live in Pegasus. About 2500 people live in Pegasus, well short of the 7000 predicted by Robertson. When describing Todd’s vision for the town, the first word used is “realistic”. Another is “achievable.” A sharp turnaround from the rhetoric used by Robertson, who sold dreams, not property.
Read more

Other stories via Stuff:
22.8.16 Opinion: Pegasus – a ‘vibrant village’ where people know nature…
10.12.15 Posthumous award for Pegasus developer, Gough also honoured
● 11.6.15 Former Pegasus owner leaves $100 million debt
25.4.13 Todd family paid $66m for Pegasus – report
6.12.12 Todd family takes Pegasus Town reins
17.8.12 Pegasus town developer in receivership

█ Welcome to Pegasus Town | www.pegasus-town.co.nz

Via LGOIMA response to Elizabeth Kerr:
Screenshot of Pegasus Town detail from Attachment B to the DCHL Report to Council (1 Aug 2016) — see Noble/Yaldhurst Village Update.
Highlighted by whatifdunedin, the last line is interesting.

[click to enlarge]
noble-yaldhurst-village-update-2016_08_01-final-pegasus-detail-p15

Related Posts and Comments:
26.9.16 Delta #EpicFail —Epic Fraud #14 : The Election and The End Game…
● 22.9.16 DCC : Delta deal 1 Aug 2016 Council meeting (non-public) #LGOIMA
18.9.16 Delta #EpicFail —Epic Fraud #13 : Councillors! How low can you Zhao ?
26.8.16 Delta #EpicFail —EpicFraud #12 : The Buyer Confirmed
24.8.16 Delta peripheral #EpicFail : Stonewood Homes —Boult…
8.8.16 Delta #EpicFail —Epic Fraud #11 : The Buyer
1.8.16 Delta #EpicFail —The End Game according to CD
31.7.16 Delta #EpicFail —Epic Fraud #10 : The Beginning of the End : Grady Cameron and his Steam Shovel

█ For more, enter the terms *delta*, *infinity*, *noble* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

4 Comments

Filed under Architecture, Business, Construction, Design, Economics, Finance, Geography, Housing, Infrastructure, Media, Name, New Zealand, People, Pet projects, Project management, Property, Public interest, Resource management, Site, Town planning, Transportation, Travesty, Urban design

Whiley, buying the mayoralty with Dunedin Ratepayers’ money ?

Much hoo-haa over a very expensive community pool.
Who pays for it.

Andrew Whiley probably loves former Greater Dunedin candidate Irene Mosley (Taieri Community Facilities Trust aka Pooling Together) who appears to support taking major projects off DCC to project manage privately….
[Carisbrook Stadium Trust tricks].

Or, does the mayoral and council hopeful love – So Much – For Votes – the residential developers carving up Taieri paddocks with bunker-style housing on cul-de-sacs, who might or might not say no to a ‘greater Dunedin’ rates-funded pool complex over their back fence. Dunno.

Would Professional Rugby rather its own pool complex at the Logan Park sport and recreation hub ?? Since Mosgiel is far flung, and all that’s really needed is an upgrade to the township’s existing pool !!

Now, about targeted rates for the Taieri Area population to afford their Expensive Four-Pool Complex.

What Should happen.
Consider very carefully who you rate when voting.

Received today:

whiley-sign-11-9-16-2

█ For more, enter the terms *mosgiel*, *taieri* and *pool* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

19 Comments

Filed under Baloney, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Dunedin Amenities Society, Economics, Finance, Fun, Geography, Health, Housing, Infrastructure, OAG, Ombudsman, People, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Sport, Town planning, Travesty, What stadium

Mosley’s Pond now a Dunedin Community ‘asset’ to fund

duck-in-pond [shortzilla.com] 1

Taieri Times 13.7.16 (page 1)

Taieri Times 13.7.16 p1

Taieri Times 20.7.16 (page 8)

Taieri Times 20.7.16 p8

blacknwhiteswim [dadvmom.com] 1

Taieri Times 20.7.16 (page 7)

Taieri Times 20.7.16 p7 (1)

Epitaph. Prudence said she couldn’t swim in the DCC pool at Mosgiel, nor Moana, they both drowned.

Related Posts and Comments:
● 26.11.15 DCC report: Mosgiel Pool Future Aquatic Provision
● 16.9.15 DCC Please Explain —Mosgiel pool design to Warren & Mahoney
● 10.9.15 Tale of two pools … #Mosgiel #Wanaka
● 7.8.15 MOU DCC and TCFT New Aquatic Facility #MosgielPool
● 24.7.15 Hands off Mosgiel Memorial Gardens
● 23.7.15 Dunedin ratepayers —Green Island best site for city pool users…
● 22.7.15 DCC Long Term Plan 2015/16 – 2024/25
● 19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
17.5.15 Cr Vandervis on DCC project budgets
● 4.5.15 DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’
● 7.5.15 DCC Draft LTP 2015/16-2024/25 —public submissions online
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
25.3.15 DCC Long Term Plan: Green-dyed chickens home to roost
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
14.1.15 DCC Draft Long Term Plan: more inanity from Cull’s crew pending
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

Election year. This post is offered in the public interest.

*Images: shortzilla.com – duck in pond | dadvmom.com – blacknwhiteswim

9 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Sport, Town planning, Transportation, Travesty, Urban design, What stadium

Curtains for Dunedin City Council ? *gulp —October elections [grey area]

Received. [spoof or sting] . . . . . w o r r i e d
Thu, 2 Jun 2016 at 8:20 a.m.

mickey_mouse___take_a_bow__by_melmike_threadless-d5ynfw5 [all-comic.com][all-comic.com]

Urgente: Annoucemente’

The first June meeting will be held on the first of June, the first.

Minutes: Of the last meeting.

“Cull de Mare”

OK Good Idea!

Agenda: Item 22, Delete Item 21- Agreed unanimously or unani(kleinefieldmausly) as you would.

The Question:

Is there a wait for Meals on Wheels?

No not only is there no weight, but also no taste, no colour, no nutrition and no hope of any for 15 years and lets hope no right of renewal!

Question Der:

Postulate: In a letter received Tuesday last, a Miz Dr, Prof. Mc El Hone suggested that the main reason for de sea level rise is now steam.

Steam is gumming up the atmosphere and so the cold weather we have been receiving lately is now unable to get away causing bloody cold weather now described as “Global Cooling”.

Dr Professor Earl, Count and Pons Hagfish, the owner of a large number of scenic hotels in de districk and manager of a number in serious question in de Pacific has written and questions the Comite’ thus: My business is suffering, all of my marketing and advertising has been geared towards the concept of Dunedin and the Peninsula as the new Sunny Gold Coast. Sunny because of the “Global Warming” mantra and Gold coast because the expected sea level rise would take the shoreline to Clyde, the Shotover river and Bendigo abandoned goldfields!

Now your Comite’ is debunking the sea level rise as a giant furphy and that the climate is actually so cold as to suggest “Global Cooling” I am now forced to market Dunedin, as in the past, a place where refrigerators are not required, a meat safe will do!

This is a huge capital saving for Scenery hotels, as we do not have to place a minibar in each room and if we leave out the window glass the meat never defrosts! Wines are cold and at room temperature of -20 degrees, no ice machine is necessary.

There are some problems however.

Patrons are found frozen stiff in the hallway and in the foyer. Ice skates are necessary for trips to the car park. Chains are necessary on delivery trucks and cabs to and from the airport. The planes have skis and the pilots wear balaclavas.

In order to improve this I have a very important and well considered plan to eliminate “global cooling”.

M’sieur Rollande de Gurgelars, VC and Public bar, International medaille D’ore, Croix de G.U.R and house bar stands with open hands and speaks.

M’sieur de Hag-fish, your commente’ is much desired, your wisdom and more importantly your desire for a quid are legionarre’s disease throughout Aotearoa.

Please sally forth and unburden yourself.

Hag-Fish replies, Le Comte, Sally was the fifth, not the fourth, but not to worry, I will commence from the finish.

We the Secenery Circle propose that a law be imposed, firstly on all households in the greater Dunedin area including Kate Wilson’s fiefdom and Cr Noone’s rurality, Cr. Hall’s trucks and Mayor Cull’s uncleaned mudtanks, to ban, eradicate, censure, drop off the perch and if necessary obliterate and immolate all items which could be roughly described as Kettles.

Kettles will include any item capable of boiling water to steam, whether working operational or not! This includes but is not limited to Railway Steam Engines, Pots, Pans, Kettles, Hot Water cylinders, Zips, Teesmade, Coffee machines, Lawrence Yule and headmasters.

Headmasters?

Oui, they are always letting off steam, particularly the dean of Kings High.

In this way, we believe that the absence of steam will enable the cold air around Dunedin, Christchurch, Wellington and Auckland to escape and we can get back to comfortable “Global Warming” and Dunedin can be the Riviera of the southern hemisphere again, just like it was in February. Our marketing campaign featuring bikini clad sealions, brown skinned natives, (cabbage) Palm trees, Coconuts etc. will again be relevant and we can turn on the air conditioning at Forsyth Banned to ensure noone dies of heatstroke!

Is Cr. Noone dying of heatstroke?

No not now, that is the problem we are trying to rectify!

Le Comte, rises, thanks Earl Hag-Fish and whispers into his Iphone to Craig’s Investment partners ….

Sell Briscoes! Sell Coffee Club, Sell Starbucks.

Pam Demonia reigns.

The Curtain comes down.

[ends]

Related Posts and Comments:
18.5.16 Measuring sea level at Dunedin #DUD
1.5.16 Hospital food according to Gurglars
25.2.16 CELEBRATE !!! Greater Dunedin has DIED #boombustcycle
11.1.16 Un hôtel. Dunedin.
5.6.15 WEATHER is not climate change; this is not the 100-year flood

Posted by Elizabeth Kerr

Election Year —this post is offered in the public interest.

black curtain question [clockhousetheatre.com][clockhousetheatre.com]

█ In a spot . . . . .

2 Comments

Filed under Democracy, Dunedin, Economics, Finance, Health, Heritage, Hot air, Hotel, Housing, Infrastructure, LGNZ, New Zealand, People, Pet projects, Politics, Project management, Property, Public interest, Stadiums, Tourism, Travesty, What stadium

Un hôtel. Dunedin.

Douglas Field Published Jan 11, 2016 | Republished Aug 17, 2016 | Updated

Dunedin looks – yet again at another new hotel. Trouble is they always get it wrong – last one was a doozy – this one ain’t shaping up too well either.
All very cloak and dagger.

Posted by Elizabeth Kerr

26 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, DVML, Economics, Enterprise Dunedin, Fun, Geography, Heritage, Hot air, Hotel, Infrastructure, Media, Name, New Zealand, People, Politics, Project management, Property, Proposed 2GP, Resource management, Site, Tourism, Town planning, Urban design, What stadium

Uglies: Black-tie at 715 George

Habitable rooms, 715 George St cnr Regent Rd blot 1715 George St, corner Regent Rd, Dunedin

█ Clan Construction Commercial Ltd
http://www.companies.govt.nz/co/4013678

### ODT Online Thu, 10 Dec 2015
Student apartments going up
Construction has begun on six new student apartments at the corner of George St and Regent Rd, Dunedin. The 962sq m triangular-shaped site is owned by Straits International Ltd, and was the site of a service station for about 80 years. The Dunedin City Council has given resource consent for the company to construct four residential units in a two-storey building (block 1) and two residential units in a three-storey building (block 2), thereby creating 22 habitable rooms. Construction is expected to be completed next year.
ODT Link

Comments at ODT Online:

Student apartments
Submitted by Barnaby on Thu, 10/12/2015 – 6:35pm.

No! This was not a service station site for 80 years. There was a beautiful two-storey substantial brick heritage house on this site until about the 1970s. This is just another step in the incremental loss of North End heritage. This shows very poor planning from DCC, making this part of town, and the main street in this case, an ever expanding precinct of badly designed cheaply built high density housing. These will add to the stock of other similar structures forming “North Dunedin’s slums of the future”. Ratepayers’ will probably end up funding the future purchase of such cheap accomodation to mitigate associated social problems and the appalling visual amenity. Very poor city planning indeed.

Habitable room disasters
Submitted by ej kerr on Fri, 11/12/2015 – 12:43pm.

Prominent George St corner sites are being trashed by the banal. More habitable rooms – No emphasis on good contemporary design, no flair.
This one’s built right to the footpath on the main street, with little modulation and no hint of garden or vertical planting possible, except something to the corner part-screened by the witless bus shelter shoved on its concrete pad.
Given the rich inheritance, where has Dunedin street architecture gone? Where are the design professions? Why so much visual erosion? Where is the NZ Institute of Architects? Why no City Architect Office and independent Urban Design Panel to uphold design values for Dunedin residents and ratepayers?
Ugh! DCC planning fail. DCC urban design fail. DCC district plan fail. When will DCC grow up – to promote sympathetic edgy contemporary architecture and design for major city axials, at the very least. A step up from turning Dunedin into bog city with tawdry gateway approaches.

Related Posts and Comments:
[distasteful]
6.1.14 George Street: Two new uglies (thanks DCC, no City Architect…)

[sensitive]
9.1.14 Facadism: 3%, 10%, 50%, 75%, 99.9% (how much is enough) | University of Otago warps Castle Street

Posted by Elizabeth Kerr

*Image: misted lettered tweaked by whatifdunedin

3 Comments

Filed under Architecture, Business, Construction, DCC, Design, District Plan, Dunedin, Economics, Heritage, Hot air, Infrastructure, Media, Name, New Zealand, NZIA, ORFU, People, Politics, Project management, Property, Resource management, Site, Town planning, Transportation, University of Otago, Urban design, What stadium

DCC report: Mosgiel Pool Future Aquatic Provision

█ Full Council Meeting Monday 30 November 2015 at 1:00 p.m.
Council Chamber, Municipal Chambers, The Octagon

Agenda – Council – 30/11/2015 (PDF, 39.6 KB)

Other Reports to be tabled.

Item 16

Report – Council – 30/11/2015 (PDF, 7.1 MB)
Mosgiel Pool Future Aquatic Provision

[Extract]

Council 30 November 2015
MOSGIEL POOL FUTURE AQUATIC PROVISION
Department: Parks, Recreation and Aquatics

EXECUTIVE SUMMARY
1. This report presents high level concept design options and associated capital and operating costs for a new aquatic facility in Mosgiel. A decision is required on which, if any option should be progressed to developed design stage to enable more detailed operating costs, capital costs and whole of life cost options to be developed.

2. Staff have conducted a robust process, assisted by aquatic facility development and operation experts, using architects and quantity surveyors with substantial aquatic experience (including Selwyn) and with the input of Sport New Zealand. Despite this, and whilst reaching agreement on a preferred site, there is a fundamental difference between the staff position and that of the Taieri Community Facilities Trust (the Trust).

3. Council staff consider they can deliver a high quality aquatic facility containing two bodies of water that provide for casual recreation (leisure), casual fitness (lap swimming) and learn to swim that will be valued by the Mosgiel community. The Trust does not agree.

4. The estimated total capital cost for this option is approximately $14.4m, based on benchmarking, which can be refined and reduced through developed design, value management and procurement processes.

5. The Trust position is that for the same amount of money, ie approximately $14.4m, a four-pool proposal, as presented in 2014, can be delivered. The staff assessment of this position is that the capital cost is more likely to be approximately $18-20m, based on feedback from Sport New Zealand and the quantity surveyor.

RECOMMENDATIONS
That the Council:
a) Decides that Site A, located adjacent to the existing Mosgiel Pool is the preferred site for the development of a new aquatic facility.

b) Directs officers to progress the option of two bodies of water, delivering leisure, lap and learn to swim activities through to developed design including further refinement of capital costs, operating costs, and the development of whole of life facility costs, and report back to Council in May 2016.

c) Notes the estimated capital cost of the current concept for two bodies of water is $10,458,000 (buildings, siteworks and infrastructure) plus $2,379,500 (fees, consents, furniture and equipment) plus $1,567,000 (project contingency and ground improvement provision); a total of $14,404,500.

d) Notes that the estimated capital cost excludes an escalation provision, currently estimated at 2.8% per annum for the three years until the Council funding is available.

e) Acknowledges the continued commitment of the Taieri Community Facilities Trust to the project, through their participation in the steering group and input into the concept design process.

Author: Jendi Paterson, Parks and Recreation Planning Manager
Authoriser(s): Richard Saunders, Group Manager, Parks, Recreation and Aquatics; Ruth Stokes, General Manager, Infrastructure and Networks

DUNEDIN CITY COUNCIL PROPOSED TAIERI AQUATIC CENTRE – MOSGIEL
19 October 2015
Feedback on Taieri Community Facilities Trust Feasibility Study (November 2014), Warren & Mahoney Architects (WAM) and Barnes Beagley Doherr (BBD) Master Plan and Cost Estimate (September 2015).

[Extracts]

1. General observations – There is universal acceptance that the existing Mosgiel Community Pool is an asset at the end of its usefulness and fit with existing and future community needs. The Taieri Community Facilities Trusts (the Trust) Feasibility correctly establishes that historical reports, information and recommendations along with DCC support this view. What is unclear or fully evidenced in the study is:
– What needs assessment and demand are evident and directly related to the size, scale and component mix for the facility required? E.g. need for a FINA certified 10 lane competition pool.
– Confirmation of the likely and sustainable catchment that the centre will serve?
– The impact of the proposed facility on the existing aquatic network?
– What is the projects full capital cost and whole of life affordability for the community?

3. Site and location – It is agreed that Memorial Park is the preferred site for the development of a new aquatic centre. The Feasibility Study promotes the use of a site that impacts significantly the existing Memorial Park Gardens. This option seems unnecessary given the other options available at the park to DCC. Of the subsequent locations within the park proposed by Warren and Mahoney Architects (20.09.15) those sites favoured are those that enable the existing pool to operate during any development period, impact adjacent residents the least, provides multiple points of entry, maximises existing car parking and allows for future expansion should be considered. In this context Site A and Site B are favoured. Site A may offer the opportunity to upgrade and integrate the Caravan Park operation into the new facility, management model and provide a positive revenue stream for the centre.

6. Funding Strategy – the expectation placed on the Trust to raise 50% ($7.5m) of the capital cost of the project is considered unrealistic and unfair. Despite the optimism of the Trust would be unachievable by the second half of 2016 as identified in the Trusts timeline for achieving the pledged funding target. Undoubtedly, this would place extreme pressure of exiting funding agencies and fundraising organisations delivering alternative community outcomes and services for some time. One needs to ask the question – is the same expectation places on communities of interest to raise 50% of funding for developments of public libraries, community halls, sport parks and other public amenities?

Conclusion, the size scale and complexity of the proposed aquatic centre seems to address the wants rather than the needs of the community. Justification of the overall component mix, the need for 10 v’s 8 lanes, competitive aquatic sport needs v’s wider community recreation, wellness and entertainment (youth and older adults) would benefit from closer consideration given the significant level of investment under consideration. The size and extent of the projected catchment population may be inflated and with minimal consideration given to the impact of the new centre on the existing aquatic network of facilities and in its current form designed to compete rather than compliment Moana Pool. The assessment of capital cost seems consistent based on similar south island projects and assessment of construction rates without due consideration to those costs currently excluded. The projected operating budget is not inclusive of all relevant costs (debt repayments and depreciation) nor does it consider the whole of life costs for the assets which will require the need for an ongoing level of operational subsidy.

[screenshots – click to enlarge]

Mosgiel Pool - Trust selected sites

Mosgiel Pool - Sites Analysed by Architects

Mosgiel Pool - Site Option A

Mosgiel Pool - Brief Matrix

Mosgiel Pool - Brief Study 2B

Mosgiel Pool - Brief Study 3B

Mosgiel Pool - Brief Study 4B

Related Posts and Comments:
16.9.15 DCC Please Explain —Mosgiel pool design to Warren & Mahoney
● 7.8.15 MOU DCC and TCFT New Aquatic Facility #MosgielPool
● 24.7.15 Hands off Mosgiel Memorial Gardens
● 23.7.15 Dunedin ratepayers —Green Island best site for city pool users…
● 22.7.15 DCC Long Term Plan 2015/16 – 2024/25
● 19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
17.5.15 Cr Vandervis on DCC project budgets
● 4.5.15 DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’
● 7.5.15 DCC Draft LTP 2015/16-2024/25 —public submissions online
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
25.3.15 DCC Long Term Plan: Green-dyed chickens home to roost
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
14.1.15 DCC Draft Long Term Plan: more inanity from Cull’s crew pending
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

34 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, Dunedin, Economics, Geography, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Politics, Pools, Project management, Property, Site, Sport, Town planning, Transportation, University of Otago, Urban design, What stadium

DCC confidential report on Industrial Land (March 2004)

Received today.

This leak in regards to DCC’s establishment of a new industrial zone bordered by Dukes Road (Industrial Variation 9B)…. is an unsubtle reminder of the number of Council-issued claims over the years about the extent (or lack of) industrially zoned land at Dunedin, particularly for argument in evidence (or was it lies and hearsay) at very significant plan change hearings.

Interpretations please!

[click each page to enlarge]

DCC Confidential Report INDUSTRIAL LAND Peter Brown 29 March 2004 p1DCC Confidential Report INDUSTRIAL LAND Peter Brown 29 March 2004 p2DCC Confidential Report INDUSTRIAL LAND Peter Brown 29 March 2004 p3DCC Confidential Report INDUSTRIAL LAND Peter Brown 29 March 2004 p4

█ Download: DCC Confidential Report – Industrial Land 29 March 2004
(PDF, 1 MB)

Related ODT stories:

### ODT Online Mon, 12 Oct 2015
Property sales loss $1.07m
By Chris Morris
The Dunedin City Council has spent $5.6 million buying up houses, and even a farm, to smooth the path for industrial development on the Taieri. The purchases were detailed in documents released to the Otago Daily Times, which also showed the council has lost $1.07 million after on selling many of the properties for significantly smaller sums.
Read more

### ODT Online Mon, 12 Oct 2015
Council’s treatment of couple criticised
By Chris Morris
A retired couple forced to fight for five years to sell their farm to the Dunedin City Council were left with “a noose around their necks”, Cr Kate Wilson says. William and Fiona Smeaton owned the 15 ha farm sold to the council for $1.725 million in December last year.
Read more

ODT got led down the garden path by this couple, it appears. It’s out that they don’t have to meet the rates increase while they’re farming – only on conversion to industrial use would the land owner pay $10,000 pa, you say? The poor things had to work more jobs to meet the rates demand, yeah right – TUI.

A quick look at DCC Webmaps for 91 Dukes Road shows (linked to the rates account) the land use as “12 Rural Industry : Stock Finishing”, Total Annual Rates $4,596.60…. tsk tsk.

More at this thread: DCC considers sale of “149 properties”

Posted by Elizabeth Kerr

20 Comments

Filed under Business, DCC, Democracy, Dunedin, Economics, Geography, Hot air, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Site, Town planning, Transportation, Urban design, What stadium

DCC Please Explain —Mosgiel pool design to Warren & Mahoney

This is Dunedin City Council, Cr Jinty MacTavish (Chair, DCC Community and Environment Committee), Mosgiel Taieri Community Board, and the Taieri Community Facilities Trust (TCFT) keeping Dunedin ratepayers and residents THOROUGHLY INFORMED.

Read all about it at NBR, why not. [thanks Anon Anon]
Corruption, backroom deals, vested interests, Anyone?

National Business Review
Warren & Mahoney clinches three big sports contracts
Chris Hutching · Friday September 11, 2015

Today’s sports centres accommodate a diverse range of disciplines under one roof and are social hubs and health centres. “Their design should have clarity of access, and a welcoming pathway which encourages maximum participation in recreation. The scale of the recent commissions varies. At the Mosgiel Aquatic Centre, the $14 million budget is earmarked for lane swimming, as well as pools for learners, leisure and warm water.

http://www.nbr.co.nz/article/warren-mahoney-clinches-three-big-sports-contracts-ch-178407

[screenshot – click to enlarge]

NBR 11.9.15 W&M clinches three big sports contracts [screenshot tweaked]

Related Posts and Comments:
● 7.8.15 MOU DCC and TCFT New Aquatic Facility #MosgielPool
● 24.7.15 Hands off Mosgiel Memorial Gardens
● 23.7.15 Dunedin ratepayers —Green Island best site for city pool users…
● 22.7.15 DCC Long Term Plan 2015/16 – 2024/25
● 19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
17.5.15 Cr Vandervis on DCC project budgets
● 4.5.15 DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’
● 7.5.15 DCC Draft LTP 2015/16-2024/25 —public submissions online
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
25.3.15 DCC Long Term Plan: Green-dyed chickens home to roost
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
14.1.15 DCC Draft Long Term Plan: more inanity from Cull’s crew pending
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

22 Comments

Filed under Architecture, Business, Construction, CST, DCC, DCHL, DCTL, Democracy, Design, Economics, Enterprise Dunedin, Geography, Hot air, LGNZ, Media, Name, New Zealand, NZRU, OAG, OCA, Ombudsman, ORFU, People, Politics, Pools, Project management, Property, SFO, Site, Sport, Stadiums, Town planning, University of Otago, Urban design, What stadium

Tale of two pools & very different community boards #Mosgiel #Wanaka

ODT 8.9.15 (page 8)

ODT 8.9.15 Letter to editor Miller p8[click to enlarge]

The Mosgiel Taieri Community Board is heading for disestablishment. (tick)

Related Posts and Comments:
● 7.8.15 MOU DCC and TCFT New Aquatic Facility #MosgielPool
● 24.7.15 Hands off Mosgiel Memorial Gardens
● 23.7.15 Dunedin ratepayers —Green Island best site for city pool users…
● 22.7.15 DCC Long Term Plan 2015/16 – 2024/25
● 19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
17.5.15 Cr Vandervis on DCC project budgets
● 4.5.15 DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’
● 7.5.15 DCC Draft LTP 2015/16-2024/25 —public submissions online
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
25.3.15 DCC Long Term Plan: Green-dyed chickens home to roost
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
14.1.15 DCC Draft Long Term Plan: more inanity from Cull’s crew pending
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

6 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, Economics, Geography, Media, Name, New Zealand, NZRU, ORFU, People, Politics, Pools, Project management, Property, Site, Sport, Town planning, Urban design, What stadium

MOU DCC and TCFT New Aquatic Facility #MosgielPool

In previous weeks, with receipt of the DCC Long Term Plan 2015/16 – 2024/25, contributors to What if? Dunedin seized upon the fact (page 166) that the Council has somehow (if by political vote-catching, deception and or undemocratic business method?) — facilitated by the Mayor of Dunedin — taken on the whole cost of the proposed ‘Taieri Aquatic Centre’ for Mosgiel, to be loaded onto UNSUSPECTING Dunedin ratepayers.

This is contrary to what was discussed, and understood, at the time of the draft LTP hearings.

[click to enlarge]
DCC LTP 2015-16 to 2024-25 p166DCC LTP Section 3 – Forecast Financial Statements (PDF, 877.9 KB)
Forecast Financial Statements (financial statements, gross debt chart, accounting policies, 10 year capital expenditure programme, prospective information, significant forecasting assumptions, inflation adjusters, reserve funds, long term plan disclosure statement)

In reference to page 166, Bev Butler (23 July) emailed all Councillors about the figures for Aquatic Services new Capital Expenditure: Mosgiel Pool $410,000 in 2016/17 and $14.478 million in 2018/19.

In email reply, Cr Richard Thomson, chair of the Finance Committee, noted an asterisk:
‘you will see that the figure is asterixed and that this references back to notes that these are projects which have “full or partial external funding”. In this case the pool is subject to the community fundraising their share but that is included in the capital spend. you will see a similar situation with the cricket lights at Logan park where $2.2m is being spent but Council has approved up to $1m of its money only…’

This is what ODT reported on 22 May:

ODT: Mosgiel pool wins support
Dunedin City councillors have thrown their support behind a Mosgiel aquatic facility, despite a staff warning about council missing its debt targets. Councillors at yesterday’s long-term plan hearings voted in favour of building a facility “in principle”, subject to a number of conditions.
● Taieri Community Facilities Trust to raise $7.5 million towards project.
● Council has allocated a placeholder budget of $6 million for the facility in the 2018-19 financial year.
● Budget of up to $300,000 approved for council staff to investigate project costs, design options and site location
● Staff to report back to council by April next year, at which point councillors would decide whether to proceed with the project and how.
● Councillors voted that council staff and the trust develop a new memorandum of understanding.

Without building a Mosgiel pool, debt was forecast to be at $223 million in 2021, $7 million below the council’s self-imposed $230 million target. (ODT)

Now read the following chain of correspondence.

Received from Lee Vandervis
Fri, 7 Aug 2015 at 8:22 a.m.

█ Message: I believe it is in the pubic interest for the points below to be made public. Kind regards, Lee

—— Forwarded Message
From: Lee Vandervis
Date: Fri, 07 Aug 2015 08:18:32 +1200
To: Dave Cull, Jinty MacTavish
Cc: Chris Staynes, Kate Wilson, Richard Thomson, Aaron Hawkins, Neville Peat, Mike Lord, David Benson-Pope, Andrew Whiley, Andrew Noone, John Bezett, Hilary Calvert, Doug Hall, Richard Saunders [DCC], Jendi Paterson [DCC], Sue Bidrose [DCC], Sandy Graham [DCC]
Conversation: MOU DCC and TCFT New Aquatic Facility
Subject: Re: MOU DCC and TCFT New Aquatic Facility

Dear Mayor Cull,

Thank you for your helpful suggestion which I intend to take up especially when DCC file evidence is available which can confirm many allegations made to me by members of the public.

I do wonder that you seem to think so little of an MOU statement of intent that apparently commits Council to “the development of a new Aquatic Facility Complex“ when Council has not yet made any final Pool Complex decision and in any case has not got the financial resources or even a sufficiently large place holder budget to achieve building the proposed Pool Complex. At the risk of boring our public as you suggest, I will do what I can to let them know.

The claim by Cr. McTavish below “that the phrase “new aquatic facility complex” covers everything from a refurbishment of the existing (which is the base level of service required for the aging, arguably beyond useful life, asset)…” is not credible in commonly understood usage of the words used, but I hope that wide publication of this particular interpretation will reduce the misrepresentation that I believe the Mosgiel Aquatic MOU currently represents.

Regards,
Cr. Lee Vandervis

———————————

On 7/08/15 6:29 AM, “Dave Cull” wrote:

Lee
Rather than boring an even wider audience with your laughable brew of ignorance and malice, how about developing some testicular fortitude and going public, as you have been requested to, with the evidence behind the other far more serious accusations and insinuations you have made?
Dave

———————————

From: Lee Vandervis
Sent: Thursday, August 06, 2015 10:49 PM
To: Jinty MacTavish
Cc: Dave Cull; Chris Staynes; Kate Wilson; Richard Thomson; Aaron Hawkins; Neville Peat; Mike Lord; David Benson-Pope; Andrew Whiley; Andrew Noone; John Bezett; Hilary Calvert; Doug Hall; Richard Saunders; Jendi Paterson; Sue Bidrose; Sandy Graham
Subject: Re: MOU DCC and TCFT New Aquatic Facility

Dear Jinty,

Your response below is not acceptable to me as an elected representative.
Your being ‘comfortable’ is no reason to assume Council decision-making status.
Who is this executive that you speak of who are apparently authorised to trump Council decisions as you would have them?
If you insist on acting beyond Council resolutions, I will have little alternative but to go public.

Regards,
Cr. Lee Vandervis

———————————

On 6/08/15 10:43 AM, “Jinty MacTavish” wrote:

Kia ora Lee,

Many thanks for your feedback. You raise two concerns:

A. Specific wording of paragraph.

Council’s resolution at LTP time included the following:

“That the Council agree to:
1 support in principle the development of a new aquatic facility complex for Dunedin in Mosgiel.”

The executive’s view is that the that the phrase “new aquatic facility complex” covers everything from a refurbishment of the existing (which is the base level of service required for the aging, arguably beyond useful life, asset), with “efficient” recognising the whole of life cost associated with any option. In the context of there having been a lengthy discussions between staff and the Trust to get to the point where both parties are comfortable with the wording, and given our executive’s interpretation, I am comfortable that the paragraph allows for a wide range of outcomes. A range of options will be brought back to Council in October for consideration and a decision on which to progress to detailed design with.

B. Sign off process

The sign-off on this document was delegated to chair C&E by a resolution of the Committee.
Jinty MacTavish

{Phone number deleted. -Eds}

———————————

On 6/08/2015, at 9:31 am, Lee Vandervis wrote:

Re: MOU DCC and TCFT New Aquatic Facility
Dear Jinty,

The Intent paragraph of the proposed MOU is unacceptable to me in its present form.

“The intent of the parties is to give effect to a Community/Council partnership for the development of a new Aquatic Facility Complex for Dunedin in Mosgiel in accordance with the LTP resolutions referred to in paragraph 3.4 and with the object of Council delivering an efficient modern complex that caters for all sectors of the community.”

These are weasel words which can easily be understood to mean that Council has resolved to deliver an efficient modern Aquatic Facility Complex in Mosgiel when I do not believe Council has made such a resolution. My understanding is that despite the absurdly arrived at $6 million ‘placeholder budget’, Council has asked that the Aquatic complex in Mosgiel be thoroughly mutually investigated, and that Council has not decided to give effect to the development, as stated above.

I strongly object to any such MOU INTENT being signed off by you or anybody else, and I am deeply concerned by process irregularities and the unprecedented fast-tracking of this project past many others that have been long awaited, the South Dunedin Library/Community Complex in particular.

The INTENT as I understand it, is for the parties to give effect to a Community/Council partnership to further EXPLORE the development detail of a new Aquatic Facility Complex for Dunedin in Mosgiel in accordance with the LTP resolutions referred to in paragraph 3.4 and with the object of Council then being able to decide whether it can or wishes to deliver an efficient modern complex that caters for all sectors of the community.”

Regards,
Cr. Lee Vandervis

———————————

On 5/08/15 10:20 AM, “Jinty MacTavish” wrote:

Kia ora koutou,
Please find attached a copy of a draft MOU between the DCC and the Taieri Community Facilities Trust. As it stands, both staff and the Trust are supportive of the document. As per the Council resolution, I’ve been asked to sign it off as C&E chair but would value any feedback from you before close of business tomorrow should you have concerns.
Thanks very much,
Jinty

—— End of Forwarded Message

[ends]

Related Posts and Comments:
24.7.15 Hands off Mosgiel Memorial Gardens
● 23.7.15 Dunedin ratepayers —Green Island best site for city pool users…
● 22.7.15 DCC Long Term Plan 2015/16 – 2024/25
● 19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
17.5.15 Cr Vandervis on DCC project budgets
● 4.5.15 DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’
● 7.5.15 DCC Draft LTP 2015/16-2024/25 —public submissions online
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
25.3.15 DCC Long Term Plan: Green-dyed chickens home to roost
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
14.1.15 DCC Draft Long Term Plan: more inanity from Cull’s crew pending
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

36 Comments

Filed under Architecture, Business, COC (Otago), Construction, DCC, DCHL, DCTL, Democracy, Design, Economics, Hot air, Name, New Zealand, OAG, ORFU, People, Politics, Pools, Project management, Property, Site, Sport, Stadiums, Town planning, Urban design, What stadium

Dunedin ratepayers —Green Island best site for city pool users #Mosgielfarce

DUNEDIN RATEPAYERS AND RESIDENTS | HAVE YOUR SAY

The best option is to upgrade and maintain the existing Mosgiel Pool, rather than give Taieri (sprawl) housing speculator-developers and main street businessmen a pool to help their privateering (and professional rugby/training connections). Larger numbers of rate-paying Dunedin residents will benefit from a long-term (funded) aquatic centre sited at Green Island. However, the Stadium is still costing ratepayers +$20 million per annum…..

It looks like Greater Dunedin, through the Mayor and MacTavish, are keen to foster the Mosgiel proposal as a vote catcher in next year’s local body elections.

Dunedin City Council – Media Release
Feedback Sought on Mosgiel Pool Options

This item was published on 23 Jul 2015

Consultation opens today on four shortlisted sites for a new aquatic centre in Mosgiel….

Over the next fortnight, the Dunedin City Council, in partnership with the Taieri Community Facilities Trust, is seeking community feedback on the four sites. One of the options is to use the existing pool site on Gordon Road and the other three options are different locations within Memorial Park and the Mosgiel Memorial Gardens.
Since the Council decided to allocate a placeholder of $6 million for the project in the Long Term Plan 2015/16 to 2024/25, work has begun to progress investigations around the proposed facility. The first step of these investigations involves identifying a preferred site.
The work is being led by a steering group, comprised of three Councillors, three Trust members and a member of the Mosgiel community. The group has been given the mandate to work to develop the proposal to the point where there is a preferred site, plans and costings for a new aquatic centre in Mosgiel. These stages are to be reported back to the Council by 30 October.
Mosgiel Aquatic Facility Steering Group Chair Cr Jinty MacTavish says the four sites out for consultation have been shortlisted by the steering group from identified options, including those in the original feasibility study.

“Site selection is an important part of the design process. We’re looking forward to hearing the community’s thoughts on the site they think would be best.”

The DCC is working with the Trust to ensure the reports needed for Council decisions are completed on time. Trust Chair Irene Mosley says, “The community gave a very clear indication during the Long Term Plan process that they wanted a new pool facility in Mosgiel. Now that the DCC has allocated some funding for this project we need to go back to the community and make sure they have the opportunity to comment on the shortlisted sites.”

Feedback must be received by Friday, 7 August.

For more information and to fill in a questionnaire visit http://www.dunedin.govt.nz/mosgielpool-consultation or http://www.poolingtogether.org.nz. Hard copy information is also available at the Mosgiel Library and Service Centre

Contact Cr Jinty MacTavish, Chair, Mosgiel Aquatic Facility Steering Group on 027 277 5631. DCC Link

█ Someone else to YELL at besides Jinty Mactavish:
Irene Mosley
Chair, Taieri Community Facilities Trust [aka Pooling Together]
Phone 021 231 9197

Taieri Aquatic Centre —proposal [Images: Baker Garden Architects]Pool 4Pool 2Pool 5Pool 6Pool 7

Correspondence received.
Thu, 23 Jul 2015 at 12:20 p.m.

From: Bev Butler
To: Lee Vandervis, Dave Cull, David Benson-Pope, Hilary Calvert, John Bezett, Doug Hall, Aaron Hawkins, Mike Lord, Jinty MacTavish, Andrew Noone, Neville Peat, Chris Staynes, Richard Thomson, Andrew Whiley, Kate Wilson
Sent: Thursday, 23 July 2015 11:05 AM
Subject: LTAP and Mosgiel Pool

Dear Mayor Cull and Councillors

I recently received a copy of the LTAP and noticed on page 166 of the new LTAP, Aquatic Services new Capital Expenditure: Mosgiel Pool $410,000 in 2016/17 and $14.478 million in 2018/19.

However, when referencing the ODT report on 22 May 2015:
http://www.odt.co.nz/news/dunedin/343130/mosgiel-pool-wins-support
It is reported:
“Council allocated a placeholder budget of $6 million in the 2018-19 financial year for the facility.”

So at what point did the $6 million reported in May change to $14.478 million? I couldn’t find any reference to the change in ODT. Maybe I missed it.
I have also looked up the Council meeting minutes but can find no reference there either.

Would someone please tell me the date when this $14.478 million was approved by Council and preferably send me a copy of the minutes or point me in the direction to find them.

Many thanks
Bev Butler

————————

Date: Wed, 22 Jul 2015 23:17:09 +0000
From: Richard Thomson
To: Bev Butler; Lee Vandervis; Dave Cull; David Benson-Pope; Hilary Calvert; John Bezett; Doug Hall; Aaron Hawkins; Mike Lord; Jinty MacTavish; Andrew Noone; Neville Peat; Chris Staynes; Richard Thomson; Andrew Whiley; Kate Wilson
Subject: Re: LTAP and Mosgiel Pool

Bev,

you will see that the figure is asterixed and that this references back to notes that these are projects which have “full or partial external funding”. In this case the pool is subject to the community fundraising their share but that is included in the capital spend. you will see a similar situation with the cricket lights at Logan park where $2.2m is being spent but Council has approved up to $1m of its money only..

Richard [Thomson, Cr]

Related Posts and Comments:
22.7.15 DCC Long Term Plan 2015/16 – 2024/2025
19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
● 18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
20.3.15 DESTROYED, beautification project —Railway corridor, Gladstone Road
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

7 Comments

Filed under Business, Construction, CST, DCC, Democracy, Design, Economics, Geography, Hot air, Media, Name, New Zealand, NZRU, OCA, ORFU, People, Politics, Pools, Project management, Property, Site, Sport, Town planning, Transportation, University of Otago, Urban design

Mosgiel pool trust conflicts of interest #bigfishsmallpond

CARBON COPY OF SELWYN POOL
PONT WANTS $750,000 FROM DCC TO INVESTIGATE A REPLICA !!!!
Funny that, given his connections………………

Selwyn Aquatic Centre [engenium.co.nz]Selwyn Aquatic Centre [xypex.co.nz]Selwyn Aquatic Centre

{Original correspondence sighted and filed. Ratepayer name removed. -Eds}

Received from Cr Lee Vandervis
‎Tue‎, ‎19‎ ‎May‎ ‎2015 at ‎2‎:‎02‎ ‎p.m.

From: Lee Vandervis
Sent: ‎Tuesday‎, ‎19‎ ‎May‎ ‎2015 ‎2‎:‎02‎ ‎p.m.
To: ██████████
Cc: Elizabeth Kerr [What if? Dunedin]

Dear ██████████ ,

Thank you for raising the Mosgiel Pool design and Shaun Pont conflict of interest issues which have been highlighted on the ‘What If?’ site.
I was disappointed that the ODT did not report my direct challenge to Mr Pont’s claimed need for $750,000 of rates funding to pay for initial Mosgiel pool design work, when the pool they want has already been designed, and built [by local contractors Calder Stewart] in Selwyn.
We were told repeatedly at the Mosgiel meeting that the desired pool complex was a “carbon copy of the Selwyn pool”, making the requested $750,000 for initial design potentially the most expensive bits of carbon copy paper in local government history.
As I saw it, Mr Pont not only failed to declare his glaring conflict of interest at the Mosgiel meeting, but he failed to account for the claimed $750,000 cost of an initial pool design needed, saying that there were different ground conditions [both level alluvial plains], different parking requirements [there is an existing car park next door], and different more efficient heat-pump system planned [this detail not needed for initial design].
My question as to ‘why 90% of the speakers listed as wanting to present in person to the Mosgiel meeting did not show up?’ was not answered satisfactorily. It was suggested that there was a problem with advising people of the date of the Mosgiel meeting, yet more Councillors managed to show up than local people wanting to speak in support of the Pool project.

Kind regards,
Cr. Vandervis

On 18/05/15 10:46 AM, “ ██████████ ” wrote:

Hi Lee,

I was at the LTP Plan submission hearing in Mosgiel and heard Shaun Pont of the pool trust asking for $750,000 from Council for further investigation work on pool design etc. I believe there is a vested interest here as Shaun Pont is a director of Logic Group and stands to gain financially from this money if Council is stupid enough to grant it. He also appears to be affiliated with Arrow International, and we know how they benefited from the stadium.

You are the only one on Council I can trust to speak up if I am correct, and can see through the spin doctoring of the pool trust. Best of luck and keep up the good work.

Regards
██████████

Taieri Aquatic Centre —proposalPool 4Pool 2Pool 5Pool 6Pool 7

Related Post and Comments:
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . . [see other links]

Posted by Elizabeth Kerr

*Images: Selwyn Aquatic Centre – engenium.co.nz (exterior); xypex.co.nz (interior) | Proposed Taieri Aquatic Centre – scanned renders by Baker Garden Architects, from TCFT feasibility report (Jan 2015)

42 Comments

Filed under Architecture, Business, COC (Otago), Construction, CST, DCC, Democracy, Design, Economics, Events, Geography, Highlanders, Hot air, Name, New Zealand, NZRU, OAG, People, Politics, Project management, Property, Site, Sport, Town planning, Urban design

NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .

Taieri Community Facilities Trust project manager Shaun Pont called on councillors to allocate $750,000 to the design phase of the new facility for the next financial year.

### ODT Online Tue, 12 May 2015
Mosgiel residents make plea for pool
By Vaughan Elder
Mosgiel residents made an impassioned call for Dunedin City councillors to give a multimillion-dollar aquatic facility the “green light” sooner rather than later. In recognition of the level of interest in a $15 million four-pool aquatic facility the council held part of yesterday’s long-term plan hearings at Mosgiel’s Salvation Army Hall.
Read more

Pool 7

Taieri Community Facilities Trust (aka Pooling Together)
http://www.poolingtogether.org.nz/

By December [2014] we will have completed a thorough feasibility study, ready for presentation to Council. The feasibility study for a new aquatic complex on the Taieri is now complete and has been lodged with Council.

Shaun Pont [arrowinternational.co.nz]There has been an amazing amount of work done in a short amount of time, and we want to acknowledge the stellar effort by Shaun Pont of the Logic Group.

http://www.poolingtogether.org.nz/the-project/

http://www.poolingtogether.org.nz/study-results/
In presenting this report, the Taieri Community Facilities Trust (Trust) is conscious of the Dunedin City Council’s twin objectives of city growth and strong fiscal management. It recognises that growth is both economic and social, and that the two are correlated. If Dunedin is to grow then it needs investment both in economic development and in facilities that enhance the city’s quality of life. A city is defined by its people. So as a city, if we are to grow and prosper then the community must stand beside Council. Only by working together can we both grow as a city and reach the Council goals for financial stewardship.

Community-based organisations are key to solving some of the most difficult neighbourhood issues. It is therefore important from the outset to understand that a swimming pool is not just about a place but about our people. Pools help to bind communities together and meet the challenges of building social inclusion within a community. They help to address the health issues within a community as we endeavour to meet national obesity and activity targets. A swimming pool is more than just somewhere to swim. It is a meeting place and heart for the community and a conduit for many activities.

The full report is available for download here: Taieri Aquatic Facility Report.pdf. The funding capability report is available here: Compton Report.

█ Other mentions at Pooling Together:

http://www.poolingtogether.org.nz/the-project/
For design we have engaged the Logic Group, who are working in partnership with award-winning architects Baker Garden and quantity surveyors Flanders Marlow.

http://www.poolingtogether.org.nz/who-we-are/
Support and Presentation Team…. Janice Pont

█ Public submissions on DCC Draft Long Term Plan (LTP):

Shaun Pont (Organisation – Logic group):
http://www.dunedin.govt.nz/your-council/draft-long-term-plan-2015-2016/public-submissions/single-view-2015?id=492518
[excerpt] 14. Unfunded Mosgiel Aquatic Facilities – Yes; 14a. – Unfunded Mosgiel Aquatic Facilities Four new pools

Janice Pont:
http://www.dunedin.govt.nz/your-council/draft-long-term-plan-2015-2016/public-submissions/single-view-2015?id=494071
[excerpt] 14. Unfunded Mosgiel Aquatic Facilities – Yes; 14a. – Unfunded Mosgiel Aquatic Facilities Four new pools

Who is the Logic Group?

http://www.logicgroup.co.nz/index.htm
We provide specialist property advice and development management leadership.

(southern office) Level 4, Forsyth Barr House, 165 Stuart Street, PO Box 5857, Dunedin 9058

█ NZ Companies Register:

Search: Shaun David PONT

LOGIC GROUP SOUTHERN LIMITED (5072961) Registered
1 of 3 directors:
Shaun PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025
Samuel CADDEN, 110 Thomas St, Waikouaiti 9510
Richard WEBB, 15 The Terrace, Mount Pleasant, Chch 8081
1 of 1 shareholding:
Shaun PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025

LOGIC GROUP NZ LIMITED (3993939) Registered
2 of 2 directors:
Shaun PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025
Richard WEBB, 15 The Terrace, Mount Pleasant, Chch 8081
2 of 2 shareholdings:
Shaun PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025
Richard WEBB, 15 The Terrace, Mount Pleasant, Chch 8081

LOGIC FM LIMITED (3933199) Registered
3 of 3 directors:
Shaun PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025
Samuel CADDEN, 110 Thomas St, Waikouaiti 9510
Richard WEBB, 15 The Terrace, Mount Pleasant, Chch 8081
1 of 1 shareholdings:
Shaun PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025

LOGIC COST CONSULTANCY LIMITED (5627311) Registered
3 of 3 directors:
Barry LYNCH, 32 Dormer St, Papanui, Christchurch 8053
Shaun PONT: 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025
Richard WEBB, 15 The Terrace, Mount Pleasant, Chch 8081
3 of 3 shareholdings:
Shaun PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025
Richard WEBB, 15 The Terrace, Mount Pleasant, Chch 8081
LOGIC GROUP NZ LIMITED, Pwc, 5 Sir Gil Simpson Dr, Chch 8053

SPX 2 CONSULTING LIMITED (2075048) Registered
1 of 1 directors:
Shaun David PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025
2 of 2 shareholdings:
Shaun David PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025
Sarah Peggy PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025

ZERO PLUS NZ LIMITED (3993918) Registered
1 of 1 directors:
Shaun David PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025
1 of 1 shareholdings:
Shaun David PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025

ARROW STRATEGY LIMITED (2120916) Struck off
Former director:
Shaun David PONT, 137 Neville St, Spreydon, Christchurch 8024
Appointment Date: 21 May 2008
Ceased date: 28 Dec 2012

STILLWATER SOLUTIONS LIMITED (5685008) Registered
2 of 2 directors:
Shaun David PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025
Marcus John Lee STUFKENS, 89 Gardiners Rd, Bishopdale, Chch 8051
2 of 2 shareholdings:
Shaun David PONT, 220h Kennedys Bush Rd, Kennedys Bush, Chch 8025
SIBERIAN TRUSTEES 2 LIMITED, 89 Gardiners Rd, Bishopdale, Chch 8051

Search: Janice PONT – family(?):

PONT DEVELOPMENTS LIMITED (2299866) Registered
2 of 2 directors
Janice Mary PONT, 2 Fenty Pl, Mosgiel 9024
Russell David PONT, 2 Fenty Pl, Mosgiel 9024
2 of 2 shareholdings:
Janice Mary PONT, 2 Fenty Pl, Mosgiel 9024
Russell David PONT, 2 Fenty Pl, Mosgiel 9024

Related Posts and Comments:
17.5.15 Cr Vandervis on DCC project budgets
● 4.5.15 DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’
● 7.5.15 DCC Draft LTP 2015/16-2024/25 —public submissions online
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
25.3.15 DCC Long Term Plan: Green-dyed chickens home to roost
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
14.1.15 DCC Draft Long Term Plan: more inanity from Cull’s crew pending
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

*Images: arrowinternationalco.nz – Shaun Pont; scanned pool render by Baker Garden Architects – presented in TCFT project report during pre-draft DCC LTP meetings January 2015. [public domain]

6 Comments

Filed under Architecture, Business, COC (Otago), Construction, CST, DCC, Democracy, Design, Economics, Geography, Highlanders, Hot air, Name, New Zealand, NZRU, OAG, ORFU, People, Politics, Project management, Property, Site, Sport, Town planning, University of Otago, Urban design

DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’

Updated post Mon, 4 May 2015 at 5:39 p.m.

█ This afternoon an anonymous caller told What if? Dunedin that people asked to speak at the Pool meeting (initially scheduled for a different time and venue), and who were unable to attend then, have not been emailed with the new meeting information below. They haven’t been asked to re-visit their options…. DCC/Mayor Cull should clear up whether they will be re-invited to speak.

On the strength of public submissions received, the DCC will hold a meeting at Mosgiel that prevents many Dunedin ratepayers and residents from attending.

This is how DEMOCRACY works, DCC-style at Dunedin.

The email below was sent to those who are registered submitters ONLY on the city council’s Draft Long Term Plan (draft LTP) item, ‘Unfunded Mosgiel Aquatic Facilities’. A second email from DCC explained that the first had been sent to me in error.

Elizabeth Kerr, exercising some independence, specifically did not submit on the POOL RORT that is being perpetuated against the Ratepayers and Residents of Dunedin and which multimillion-dollar project appears to be supported by Mayor Liability Cull as a political ticket for himself.

Received from Dunedin City Council
[sent to Elizabeth Kerr, in error]

From: Lynne Robins [DCC]
Sent: ‎Monday‎, ‎4‎ ‎May‎ ‎2015 ‎2‎:‎36‎ ‎p.m.
To: No recipients
Subject: Dunedin City Council Long Term Plan

Thank you for your submission to the Dunedin City Council Long Term Plan 2015/16 – 2024/25 on the Unfunded Mosgiel Aquatic Facilities section.

In your submission you indicated that you wished to speak to the topic.

Due to the number of submissions received on the proposed Aquatic Facility, it has been decided to set aside a session for Councillors to hear the submissions on this subject only.

The meeting will be held on

Monday 11 May 2015
4.00 pm – 6.00 or 7.00 pm (depending on the number of submissions to be heard)
Salvation Army Hall, 4 Lanark Street, Mosgiel.

The meeting will be opened with representatives from the Taieri Community Facilities Trust presenting their submission first.
This will be followed by other submitters speaking to their submissions on the proposed Aquatic Centre.

If you are unable to attend the meeting and wish to be heard at another time please contact either Wendy Collard, Jo Tiszavari
or myself on 477-4000 or by replying to this email and we will schedule you with another speaking time.

Please note that if you have submitted on many items, we will send you a separate speaking time to speak to the other items on your submission.

Kind Regards

Lynne
Governance Support Officer
Dunedin City Council

Comment received from Jacob
Submitted on 2015/05/04 at 12:08 pm | In reply to Mick.

Calvin. When you place your bets on the pool, make sure you only back for a place. After reading the ODT article on submissions, it would appear that the trust has been as deceitful as ever.
Remember they claimed that they had over 2000 supporters to their online survey.
Well when the push comes to shove, it would appear that only 1030 have made submissions to the LTP, and that includes those apposed to the pool.
What has happened to the other 1000+ that they claimed to have the support for the pool. Just like the $7.5 million they claim that the Mosgiel community are supposed to be fronting up with. In both cases, the pool support and the community money they claim, does not stack up. Because they are unable to back up their claims. Just cheap talk and deceitful, a copy of the stadium debacle all over again.

[ends]

Related Posts and Comments:
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
● 1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC: Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
● 11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

17 Comments

Filed under Architecture, Business, Construction, Democracy, Design, Economics, Events, Geography, Hot air, Name, New Zealand, NZRU, OAG, ORFU, People, Politics, Project management, Property, SFO, Site, Sport, Town planning, Urban design, What stadium

Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex

PROPOSAL — TAIERI AQUATIC COMPLEX, AND GYMNASIUM
Cr Mike Lord supports added gymnasium (not costed)

NOT ENOUGH MONEY OR PEOPLE IN MOSGIEL CATCHMENT TO HOLD UP PROPOSAL INITIATED BY HOUSING DEVELOPERS, HIGHER PERFORMANCE SPORT/RUGBY AND MOSGIEL BUSINESS

NOW CALL GOES OUT TO DUNEDIN RATEPAYERS….

TCFT Pooling Together advert ODT 11.4.15 p30 bwODT 11.4.15 (page 30) —TCFT advert, bidding on DCC LTP

Dunedin City Council estimates the pool will cost $18.2 million, with an ongoing yearly shortfall of $2.3 million to run a four-pool complex.

### ODT Online Sun, 12 Apr 2015
Call to support new pool
By Timothy Brown
The Taieri Communities Facilities Trust hopes the wider Dunedin community will support its push for a new aquatics centre in Mosgiel. The trust hopes Dunedin residents will join with the Taieri and make submissions in favour of the $15 million pool during consultation on the Dunedin City Council’s draft long-term plan. The project is included for consultation as an unfunded item.
Read more

Related Posts and Comments:
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
20.3.15 DESTROYED, beautification project —Railway corridor, Gladstone Road
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

45 Comments

Filed under Architecture, Business, Construction, CST, DCC, Democracy, Design, Economics, Geography, Highlanders, Hot air, Media, Name, New Zealand, NZRU, ORFU, People, Politics, Project management, Property, Site, Sport, Town planning, Urban design, What stadium

‘Pooling Together’ (TCFT) loses chairman, resigns

Pool 7Proposed pool complex at Memorial Park, Mosgiel —now, Cr Mike Lord wants to add a gymnasium. Image: Baker Garden Architects

Received from Maurice Prendergast
Wed, 1 Apr 2015 at 3:15 p.m.

█ Message: Letter below was sent to ODT editor some weeks ago. I have received by way of response an absolutely stony silence.

PS: Have just heard that Michael Stedman has resigned [from the Taieri Community Facilities Trust]. It seems that by coincidence, Russell Sim in speaking to Stedman yesterday was told that Stedman had had a letter ‘from Prendergast’ referred to him by ODT for his comment. I understand that he added, “I can’t reply.” E&OE

{See this comment from earlier today. -Eds}

From: Maurice Prendergast
Sent: Friday, 13 March 2015 12:19 p.m.
To: ‘editor@odt.co.nz’
Subject: Proposed Pool/funding

Editor ODT
Dunedin

Sir

I was stunned when reading the letters to the editor recently to see a caption which read ‘Questions about Pool asked and answered’.

An incisive clutch of questions follow from a Mr R Sim, but Mr Stedman (chairman of the Pool Trust) in deference to that part of the inferred head line ‘Questions answered” answered none of Mr Sim’s questions. This is the more disappointing by the fact that Mr Sim, rather than asking ‘sprawling questions’, asked clearly focused questions (presumably) to make it simple for Mr Stedman to answer.

In deference to answering these clearly structured questions, Mr Stedman embarked on a rambling attack on the man who had asked the questions, and answered none of his questions. Instead, he offered a clutch of inane statements; the most inane of which was this continuing absurdity that the Taieri Community will contribute a sum of $7.5M upfront to this fanciful project. Mr Stedman and his Trust have offered nothing to support this absurd claim. At a personal level, I am amongst those who would love a new pool; in the same way that I would love to own a Lamborghini. The reality is that I cannot afford a Lamborghini in the same way that I can’t afford the impact that a further debt ‘funded’ project will have on my rates bill.

Sincerely

Maurice Prendergast
Wingatui

Related Posts and Comments:
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

3 Comments

Filed under Architecture, Business, Construction, CST, DCC, Democracy, Design, DVML, Economics, Geography, Media, Name, New Zealand, NZRU, ORFU, People, Politics, Project management, Property, Site, Sport, Town planning

Snaky Stedman —not answering basic questions Dunedin ratepayers must ask

R. J. Sim of Mosgiel is asking the RIGHT QUESTIONS

Note the acute resemblance Mr Stedman has to Malcolm Farry when trying to sell the Stadium project. When backed into a corner on spurious claims, turns nasty and defensive. Boardroom games and hissy fits. Can’t wait until “Pool Guy” trots out the Hi-Vis vest, little black pants and a white hard hat, just like Malc! Assuming DCC and the GOBs duckshove the project through.

ODT 12.3.15 (page 14)ODT 12.3.15 Letter to the editor R. J. Sim (page 14) 1

██ Two of the speeches made at the Stop The Stadium public meeting, Dunedin Town Hall, on 29 March 2009:
Michael Stedman
Dave Cull

Related Posts and Comments:
● 11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

Leave a comment

Filed under Architecture, Business, Construction, CST, DCC, Democracy, Design, Economics, Highlanders, Hot air, Media, Name, New Zealand, NZRU, ORFU, People, Politics, Project management, Property, Site, Town planning, Urban design, What stadium

Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’

Received from Rob Hamlin
Wed, 11 Mar 2015 at 10:56 a.m.

Another gem from the ODT today on the Mosgiel Pool repeating the ‘community is willing to pay $7.5 million’ mantra:

Community urged to push for Mosgiel poolhttp://www.odt.co.nz/news/dunedin/335835/community-urged-push-mosgiel-pool

I posted the following comment:

Michael Stedman 2 [cicc.tv]Mr Stedman says:

“The issue of funding is significant … although the community is willing to put in $7.5 million, or 50%, it certainly doesn’t mean it is close to being a done deal…”

As I have said previously there is no reliable public evidence that this ‘community’ is prepared to put in this money. The Pool Trust’s previously secret, but publicly funded, research report relies upon a small group of wealthy people to contribute nearly all of this money, with less than 100 individuals contributing the lion’s share, and one unnamed individual expected to donate $1.5 million.

In fact, the wider ‘community’ cum catchment in question has yet to be properly defined, which is a necessary precursor to reliable research based upon systematic sampling to gauge their opinions and specific intention to donate to and use this facility. Until this is done, any statement that the “community is willing to donate $7.5 million” is conjecture.

I have noted this lack of support on numerous occasions, and I am very concerned that the Otago Daily Times continues to repeatedly print this very specific sounding but currently unsupported assertion unqualified and unchallenged – pretty much as a statement of fact.

There is a well-known adage that if you repeat something often enough and loudly enough then it will become the truth, regardless of its actual veracity. This is unfortunately an observable phenomenon as far as public perception is concerned, but reality can only be repelled for so long before it rudely intrudes upon such pleasant reveries.

The assertion that this undefined ‘community’ is prepared to pay $7.5 million for a pool facility, when reinforced by the Otago Daily Times’ repeated publication of it, may lead to a ‘deal being done’ on the basis of a misconception created in the minds of our councillors and the community – whoever that community may actually be.

Reality, if it is different from the assertion, may only intrude after such a deal is done – which would be unfortunate if the Council gets itself and its ratepayers hooked on some commitment to pay into this proposal before this reality-intrusion occurs.

This damage would only be increased by any commitment by the Council to underwrite ‘the Community’s’ own fundraising for $7.5 million without further research to establish the community’s (either the wider Mosgiel or narrower rich groups’ intentions to donate this amount).

Underwriting fundraising is actually impossible, as the very act of underwriting a specific fundraising figure means that those funds have then been raised, and everybody involved in such fundraising, both donors and fundraisers, can put their feet up and wait for the underwriter to cough up the full underwritten amount. Councils have been caught this way before.

I am too much of a realist to believe that any further research on the extent of the Mosgiel community’s FISCAL support for this project will be done before a ‘deal is done’. Recent statements by the Mayor to the effect that something is going to happen in the next five years are inconsistent with the Mosgiel Pool remaining as an unfunded item in the long-term (10 year) plan, and that suggests that a funding ‘deal’ of some sort is imminent.

Given that a deal may well be happening quite soon, and that further research seems unlikely, the Council can actually control the risks to the ratepayers of any such deal, by insisting on certain specific conditions as part of it. Here they are:

1) The Council will make no commitment to fund construction until a design for the pool is finalised, reliable estimates for construction are in place, and (ABOVE ALL) a site for the pool has been agreed upon, secured, all necessary zonings are in place and consents have been issued.

2) The Council will not commit funds unless the total identified and unfunded costs of the project at the point of commitment are $15 million or less.

3) Absolutely no variations to the agreed pool plan/site will be allowed once funds are committed.

4) The Council will agree to pay in $7.5 million subject to the above conditions, but absolutely no money will be paid, and no legally binding commitment of the above nature will be made by the Council until the Pool Trust can deliver legally binding third-party funding commitments of the correct specification that total more than $7.5 million.

5) The Pool Trust must acquire legally binding commitments (pledges) to pay, subject to the proviso that these commitments (pledges) only become binding once:

a) The total raised by the Pool Trust exceeds $7.5 million on or before a date that is common to all such commitments (pledges).

b) Conditions 1-3 above are met by the Pool Trust and the Council commits to pay its $7.5 million on a (later) date that is common to all pledges.

So how will this work? Well let’s say that the Pool Trust’s pledge contracts name a date of 31 December 2016. If the Pool Trust’s pledged sum at 4.55pm on that day stands at $7,499,995, then at the stroke of 5.00pm, the private pledges and Council commitment all become void, and the deals with both donors and Council have to be renegotiated – Hard, but fair.

However, if at 4.59pm Mrs Buggins pledges an additional ten bucks, then the sum at the stroke of 5.00pm will stand at $7,500,005. Mrs Buggins, all the other pledgers and the Council are at that moment committed, subject to the Pool Trust meeting conditions 1-3 defined by Council by the second date (say 31 December 2017).

If conditions 1-3 have not already been met and acknowledged by the Council then everybody is fully committed at this point, and the fully funded proposal can then proceed. If conditions 1-3 are not met at this point, and the project subsequently relocates, falls over or blows out in some other way, then once again all potential donors are off the hook if the Council does not finally commit before 5.00pm on 31 December 2017.

I consider these conditions to be reasonable, and for the Council not to insist upon them as a requirement for funding, with or without further research, would in my opinion be an act of recklessness.

These conditions should also be perfectly acceptable for the Pool Trust. If they are truly confident that the ‘Mosgiel Community’ will give them $7.5 million, and they can build this facility where they say they are going to for $15 million, then they should be equally confident of meeting these Council funding conditions without difficulty, and of then proceeding with the construction of this facility as planned.

[ends]

Related Posts and Comments:
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

*Image: cicc.tv – Michael Stedman, chair of the Taieri Community Facilities Trust (“the Mosgiel pool trust”), tweaked by whatifdunedin

31 Comments

Filed under Architecture, Business, Construction, CST, DCC, Democracy, Design, Economics, Highlanders, Media, Name, New Zealand, NZRU, ORFU, People, Politics, Project management, Property, Site, Sport, Town planning, Urban design, What stadium

Propaganda from trust for Taieri pool project #Mosgiel

Updated post Sat, 7 Mar 2015 at 1:54 p.m.

██ RE: Market research and commercial feasibility
Dr Rob Hamlin, in a comment published early this morning at ODT Online and at What if? Dunedin, has offered his services to DCC, to conduct a referendum for the “entire Mosgiel community” to help determine the commercial feasibility (affordability) of the proposed Taieri Aquatic Centre.

Men who swim [kpbs.org] 1Men who swim [kpbs.org] —professional rugby boys growing into role?!

MODEL ADOPTED BY TAIERI COMMUNITY FACILITIES TRUST (TCFT):
STADIUM 2 (CSCT)*

From DCC information available, the proposed pool complex will cost a lot more than the $15M that trust chairman Michael Stedman cites. Council staff have produced comparative figures showing the pool trust has VASTLY underestimated costs including operationals.

For every one million dollars expended there is a consequential 1% rise in rates. This in a city plagued by rate increases running ahead of inflation (presently at 1%).

The Mayor of Dunedin has no particular mandate to speak on Council’s (unknown) position in regards to the pool proposal at this time, given there are insufficient facts to base decisions on. The Mayor has stated on local television that a new swimming pool complex at Mosgiel is likely to be developed within the next five years.

The Mosgiel-Taieri and Dunedin Communities have NOT been canvassed with the full financial impacts known. Rebel-rousing with interest groups and an online survey that most people don’t know about is NOT full community consultation.

Proposed Location: Memorial Park, Mosgiel. Is this the best location for the city’s resident southern population (demographics) requiring pool services? Don’t think so.

There is NO EVIDENCE WHATSOEVER that the Community can foot $7.5M towards the unknown capital cost of the pool build.

*Carisbrook Stadium Charitable Trust, still active – headed by Malcolm Farry

“The issue of funding is significant . . . although the community is willing to put in $7.5 million, or 50%, it certainly doesn’t mean it is close to being a done deal.” –Stedman, TCFT

### ODT Online Fri, 6 Mar 2015
Residents urged to continue push for Mosgiel pool
By Shawn McAvinue
Taieri residents need to continue making their voices heard if they want a $15 million pool facility in Mosgiel to proceed, Taieri Communities Facilities Trust chairman Michael Stedman says. […] Mr Stedman received more than 100 letters of support from sports groups and organisations and was “blown away” by about 2500 people completing an online survey on the pool.”
Read more

Related Posts and Comments:
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

18 Comments

Filed under Business, Construction, DCC, Democracy, Design, Economics, Highlanders, Hot air, Media, Name, NZRU, ORFU, People, Politics, Project management, Property, Site, Sport, Town planning, Urban design, What stadium

DCC: Mosgiel Pool private workshop Tuesday (tomorrow)

Updated post Wed 4 Mar 2015 at 7:55 p.m.

According to Mayor Cull all on his lonesome….

### dunedintv.co.nz March 4, 2015 – 7:03pm
Mosgiel pool development expected within five years
A new swimming pool complex at Mosgiel is likely to be developed within the next five years. That’s the expectation of Dunedin Mayor Dave Cull, following a planning workshop on the proposal. He says there’s likely to be a crucial decision made even sooner.
Video

Pool 7Proposed Taieri Aquatic Centre [click to enlarge]

Taieri Community Facilities Trust (aka ‘Pooling Together’) — Who we are

### ODT Online Sun, 1 Mar 2015
Workshop to discuss Mosgiel pool options
Source: The Star [primary: DCC media release 24.2.15]
Dunedin City Councillors and the Taieri Communities Facilities Trust (TCFT) will hold a workshop on Tuesday to discuss proposals to build a new pool in Mosgiel. Mayor Dave Cull said the workshop, on March 3, would be an opportunity to discuss the framework around which the decision-making process needs to be based.
During Long Term Plan (LTP) discussions last month, the council agreed to include information on two-pool, three-pool and four-pool Mosgiel Pool options as unfunded options in the LTP consultation document for public feedback in March and April.
Read more

RESPONSE
Submitted to ODT Online. Not published.

Private facilities trust
new
Submitted by ej kerr on Sun, 01/03/2015 – 6:24pm.

TCFT is a private trust, its trustee board has not been democratically elected; the trust does not represent the Mosgiel-Taieri community or indeed the Dunedin community, comprising all residents and ratepayers.

Based on two reports from the trust to DCC (here and here, the second being a revision), both dated 21.01.15, there appears to have been no thorough community consultation whatsoever. The reports, as reviewed by council staff, appear to hold little credence in terms of identified issues and options, and that old chestnut, affordability (or not).

Critically accurate budget costings are not provided.

Projected figures would need to be realistic before full and proper community consultation occurs – but which ‘community(s)’ is it for canvass?

At this stage, to emphasise, the figures appear to be both contrived and substantially deficient. But there are wider matters too, for our collective consideration, affecting the future of the Mosgiel-Taieri area in relation to the greater city area which are sidestepped or completely omitted.

The idea that the trust (with help of council politicians and old boy networks?) is bulldozing to get a pool project budget line into the Long Term Plan is all rather previous, given their lobbying appears to be based on very poor homework akin to winks nudges between self-interested cronies, including Mosgiel-Taieri housing developers (effecting sprawl) and the local business association (mainstreet impresarios).

This ‘much of a fuss’ politicking isn’t helped by recent statements coming from trust chairman Michael Stedman, and the explicit two party / three party confusions of the latest council media release. Mr Stedman knows full well the mounting pressures of the stadium project on council debt levels and service delivery, with consequent erosion of ratepayers’ private wealth as our local population ages. Yet, was he ecstatically happy to compound all that by mustering those who would dive into a pool project for (only guessing) ‘elites’, without checking depth or other safety considerations for the already lumbered Dunedin community. Ah, the true mark of a leader.

█ The trust’s initial intention to meet with members of the Mosgiel-Taieri Community Board? Invitation lost in the mail.

Related Posts and Comments:
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.14 Dunedin City Councillors invited to Secret Meeting #Mosgiel
21.1.15 Dunedin City Council to set rates WAY ABOVE….
15.1.15 Did the pool trust reply, Dr Hamlin?
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Pool 2Pool 4Pool 6Pool 5

Posted by Elizabeth Kerr

*Scanned images: These renders by Baker Garden Architects were presented in a project report from the Taieri Community Facilities Trust to the Council during pre-draft Long Term Plan 2015/16 meetings in January. Extra copies were provided for the public gallery. [public domain]

18 Comments

Filed under Architecture, Business, Construction, CST, DCC, Democracy, Design, Economics, Events, Geography, Hot air, Media, Name, New Zealand, ORFU, People, Pics, Politics, Project management, Property, Site, Sport, Town planning, Urban design, What stadium

Taieri Aquatic Centre: Second try for SECRET meeting —hosted by Mayor

Remember this?
█ 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel

How that SECRET meeting was abandoned after being exposed by What if? Dunedin…
█ 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather

The email of 13 February indicated the next meeting would include the public: “The benefits of council and the community talking to each over major initiatives can’t be over stated.”

Men who swim [kpbs.org] 1

The latest email (below) suggests a change of tactics.

This is evidence of a ‘new’ SECRET meeting, at the instigation of Mayor Cull !!
(What if? received two copies of the email, leaks….)

A public-excluded workshop for a +$17 million pool complex, a facility designed to line the pockets of private developers (responsible for unfettered housing sprawl on the Taieri) and the good old boys’ whose businesses line the Mosgiel mainstreet —with lashings of Otago Rugby training time and hydrotherapy sessions. To be at Ratepayers’ expense, entirely.

Why is Mayor Cull involved in organising this workshop at 6pm. Will Council staff be paid overtime for their attendance. Why is Mayor Cull involved in this at all when it appears there’s no Council funding in the Long Term Plan (LTP) for new pools at Mosgiel. What’s going on.

We all know how public private partnerships (PPP) fail at the expense of ratepayers and taxpayers. This is well documented nationally and internationally. Be warned. The sleazy Mosgiel/Dunedin crew are hardly honest venture philanthropists; and Dunedin City Council is a lie a minute in the care and presentation of its annual reports.

Email received.
Fri, 20 Feb 2015 at 8:36 p.m.

From: Monique Elleboode [DCC]
Sent: Friday, 20 February 2015 12:56 p.m.
To: Community Board – Mosgiel Taieri 2013-2016
Subject: Taieri Community Facilities Trust – workshop – Tuesday 3 March, at 6pm, Plaza Conference Room

Dear All

The Mayor, together with the Chair of the Taieri Community Facilities Trust, invite you to a workshop with members of the Taieri Community Facilities Trust to discuss the decision making frame work (sic) around the proposed Mosgiel Aquatic Facility.

Council staff will give a presentation covering areas including the Spatial Plan, Council Strategic framework, New Zealand Aquatic facility development guidelines and implications for Mosgiel, options and financial implications.

This workshop takes place on Tuesday 3 March at 6pm, in the Plaza Conference Room, on the Ground Floor of the Civic Centre Building, the Octagon, Dunedin.

Please confirm your attendance back with Monique, 474 3855, or monique.elleboode @dcc.govt.nz
Thank you
Monique
Monique Elleboode
Personal Assistant to the Mayor of Dunedin
Dunedin City Council

Related Posts and Comments:
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

*Image: kpbs.org – Men who swim

34 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, Economics, Events, Hot air, Name, New Zealand, ORFU, People, Politics, Project management, Property, Site, Sport, Stadiums, Town planning, Urban design, What stadium

‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather

Received Fri, 13 Feb 2015 at 5:43 p.m.
BLACK FRIDAY with screwy light

From: Bill Feather [Mosgiel-Taieri Community Board]
Sent: Friday, 13 February 2015 1:19 p.m.
To: Blackie Catlow; Martin Dillon; Sarah Nitis; Grace Ockwell [DCC]; Maurice Prendergast; Mick Reece [DCC]; Mark Willis; Kate Wilson [Councillor];
Subject: FW: Invitation to discuss the Spatial Plan meeting date to be rescheduled

—– Forwarded Message
From: Michael Stedman
Sent: Friday, 13 February 2015 10:15 a.m.
To: Bill Feather
Subject: Fwd: Invitation to discuss the Spatial Plan

The meeting with the Taieri Community Facilities Trust to discus (sic) the Spatial Plan ands it’s (sic) potential impact of the proposed Aquatic Centre on the (sic) Tuesday the 17th is to be rescheduled and broadened.

After extremely useful discussions with Mayor Dave Cull we have agreed to reschedule and expend (sic) the scope of the meeting.

Dave, and I agree, felt a wider and fuller discussion about the proposal would assist everyone. To that end Dave will ask Staff to prepare a presentation on all the areas that need to be discussed and considered.

I am delighted at the prospect of a wider discussion. The benefits of Council and the Community talking to each over major initiatives can’t be overstated and continues the immensely valuable relationship the Trust has established with both Councillors and Staff.

The proposed date will be sometime in early March.

Regards
Michael Stedman
Chair [Taieri Community Facilities Trust]
—— End of Forwarded Message

*Italics and brackets added by whatifdunedin

Related Posts and Comments:
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

7 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, Economics, Hot air, Name, New Zealand, ORFU, People, Politics, Project management, Property, Site, Sport, Stadiums, Town planning, Urban design, What stadium