Category Archives: Transportation

Commercial residential, 143-193 Moray Place : ODT bias, ignores arguments of opposing legal experts

THUS we gather that the owners/editorial team of the Otago Daily Times have deemed Anthony Tosswill’s proposal for a tall fat Moray Place apartment building (commercial residential) is worthy of being built. Ra Ra ODT.

If you (ODT) want to print half the story, presume away…. to Not be the independent courier of what is public information contrary to the arguments of the greying Mr Page, Counsel for Mr Tosswill’s NZ Horizons Hospitality Group Ltd (widely suspected as a vehicle for Asian finance, yet to bring even one of “12 hotels” on his South Island wish list out of the ground – funny that).

For your attention :
The legal submissions of Ms Semple, Counsel for Millennium and Copthorne Hotels New Zealand Ltd (owner of the 3 star Kingsgate), an affected party.

Ms Semple maintains that the application cannot be lawfully unbundled.

Legal Submissions on behalf of the Millennium and Copthorne Hotels
Casebook for the Millennium and Copthorne Hotels

The legal submissions of Mr Hardie, Counsel for Misbeary Holdings Ltd are not yet available online at the DCC website.

[click to enlarge]

LOLOL

At Facebook:

If the independent commissioners agree with Mr Page then it’s “See you in Court, Buster”.

Posted by Elizabeth Kerr

This post is offered in the public interest.

5 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Finance, Heritage, Housing, Infrastructure, Media, Name, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

Stupid ORC Bus Hub : DCC notifies requirement for designation #Dunedin

Proposed ORC Bus Hub, Great King St – concept image [supplied]

CALL FOR PUBLIC SUBMISSIONS

DIS-2017-1 – Central City Bus Hub
Open for submissions. Closes 5pm 18 August 2017

Public notice of requirement for a designation
Sections 168 and 169 of the Resource Management Act 1991

The Dunedin City Council has received notice of a requirement for a new designation from the Otago Regional Council.

Notice of Requirement No: DIS-2017-1

The requirement is for: A Central City Bus Hub for Dunedin’s transport network, and includes all buildings, structures and associated facilities and activities for the carrying out of the public transport system by the Otago Regional Council. With the exception of no public parking, the designation will not prevent the use of Great King Street, between Moray Place and St Andrew Street, being used as a public road.

The designation is to provide for the establishment, operation, maintenance and upgrading of the Central City Bus Hub for Dunedin public transport service purposes and will provide public transport services described in the Otago Regional Council’s Public Transport Plan, and to provide for any site works, buildings or structures, integral and ancillary to the Dunedin public transport system, including but not limited to: Bus shelters and seating; timetable and information displays; bus stops; public amenities, including toilets; landscaping including structures; pedestrian footpaths and accessways; drainage; technology; lighting; security; vehicle priority; signage; passenger comfort initiatives and facilities; passenger information facilities; and all other structures and facilities associated with, or incidental to, a comprehensive facility for the performances of functions of the Central City Bus Hub and support of the Dunedin Public Transport Network for the Otago Regional Council.

The nature of the functions is that these activities will initially occur from approximately 05:30am to 12:30am, 7 days a week, year-round.

The sites to which the requirement applies are as follows:
● Great King Street Road Reserve, between Moray Place and St Andrew Street, Dunedin;
● Moray Place Road Reserve (part of);
● 12.4m² (approx.) within 157 St Andrew Street, legally described as Lot 1 DP 486801;
● Two areas within the Countdown car park adjoining Great King Street – one comprising 58.8m² and the second comprising 50.4m² (approx.) legally described as Lots 2 and 3, DP 6552 and Section 29, Town of Dunedin.
● 19.5m² (approx.) within the Countdown car park adjoining Moray Place, legally described as part Sections 27 and 28, Block XVI, Town Survey District;
● 63m² (approx.) within the Community House car park at 301 Moray Place, legally described as part Town Section 26, Block XVI, Town of Dunedin; and
● 60.8m² (approx.) within the Wilsons car park at 30-36 Great King Street, legally described as Lot 2 DP 338932.

The Notice of Requirement, plans showing the extent of the requirement, and the assessment of environmental effects may be inspected at the following locations:
● City Planning Enquiries, Customer Services Centre, Ground Floor, Civic Centre, 50 The Octagon, Dunedin
● The Dunedin Central Public Library
● The Mosgiel Service Centre
Online

Please contact Paul Freeland on 477 4000 if you have any questions about the Notice of Requirement.

█ Go to this DCC webpage for all the information pertaining to the Notice of Requirement (NoR):
DIS-2017-1 – Central City Bus Hub
Closing date for submissions: Friday 18 August 2017 at 5pm.
http://www.dunedin.govt.nz/your-council/district-plan/district-plan-changes/dis-2017-1-central-city-bus-hub

****

█ Supplementary Reading
From the ‘RMA Quality Planning Resource’ (NZ):

Notices of requirement and requiring authorities

To begin the process of designating land, a requiring authority must serve a notice of requirement on the relevant territorial authority (s168 of the RMA) or lodge it with the Environmental Protection Authority (EPA) (s145(3)).  A notice of requirement is a proposal for a designation. 

The notice of requirement has an interim effect, in that it protects the land for the designated purpose until the designation is confirmed and included in an operative district plan (s178).  If the designation is confirmed it overrides the provisions of the district plan so the project or the works may be implemented by the requiring authority in accordance with that designation and any conditions attached to it.  However, the underlying plan provisions continue to apply if the land is used for a purpose other than the designated purpose.

When processing a notice of requirement Part 8 of the RMA requires the territorial authority to consider the requirement and any submissions received (if the requirement was notified), and then make a recommendation to the requiring authority. The territorial authority is only able to make a recommendation to the requiring authority and the requiring authority has the final decision on the matter. Refer to the flowchart for steps in the new designation process.

An alternative process is available under Part 6AA of the RMA for notices of requirement that are for proposals of national significance. Sections 198A – 198M of the RMA also provide for the direct referral of notices of requirement to the Environment Court for a decision.  The direct referral provisions under the RMA allow for requiring authorities to request that notified notices of requirement be directly referred to the Environment Court for a decision, instead of a recommendation by a territorial authority and a decision by a requiring authority.

The designation provides for the long-term ‘approval’ of the work. Because details of the work may not be known at the time of lodging the notice of requirement, s176A provides for further detail or subsequent changes and updates to the work through an outline plan. An outline plan is required to be submitted to the territorial authority, showing details of the work or project to be constructed on the designated land.

As for the notice of requirement process, the territorial authority only has a recommendation role for outline plans. The territorial authority is only able to request changes of the requiring authority and cannot turn down an outline plan. 

A notice of requirement and an outline plan describing the works proposed can be served/submitted at the same time. This approach can be helpful to allow the territorial authority to understand the designation, and can speed up the overall process allowing works to begin sooner. Alternatively, the requirement for an outline plan can be waived by the territorial authority if sufficient information was submitted with the notice of requirement.

Read more: http://www.qualityplanning.org.nz/index.php/plan-development-components/designations/overview/notices-of-requirements

****

All we want is …. [possibly?]

No highly coloured tarseal or paving materials not in keeping with Dunedin’s built environment.

NO Bus Hub in Great King St.

And….
smaller more frequent shuttle buses, suburban areas properly serviced with well-spaced bus stops and shelters, easy transfer cards, on-board EFTPOS card top-ups ($5 minimum), digital readouts for next bus at all stops, wifi buses, direct pick-up drop-off in George and Princes streets, well serviced peak hours and school runs, bus inspectors, highly trained drivers, mechanically well serviced buses, plenty of mobility access for all comers.

Or to just call an affordable version of Uber or Lyft.

Posted by Elizabeth Kerr

This post is offered in the public interest.

[whatifdunedin]

2 Comments

Filed under Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Health & Safety, Heritage, Infrastructure, LTP/AP, New Zealand, OAG, Ombudsman, ORC, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

Apartment hotel proposal has FATAL Flaws : ODT offers Flimsy Poll

Updated post.
Tue, 7 Aug 2017 at 2:58 p.m.

We (Dunedin) are confronted by a poorly detailed, plonk-down apartment building proposal that we suspect is fronted by an agent for Asian developers –it would not be unusual for such a proposal to be offered on the strength of tainted money looking for safe haven in the South Pacific.

Our gullible country.
The gullible shiny pants Grow Dunedin partnership.
Our ever so gullible city council under the leadership of cull-cat Cull.

A massively over-height apartment building with a frilly hard-to-read podium base is proposed —a building that may never see a five star hotel as the anchor tenant (never believe unquantified/unqualified pitches from used car salesmen, if all they offer is a Price plucked from the air).

Not so long ago large tracts of New Zealand land were bought and sold for glass beads and muskets.

A lot can happen between resource consent being granted and a deathly, failing, improperly costed build.

Is Dunedin City Council about to find out.

Beware the gift horse.
It turned out Dunedin disliked the hocks of the last one (41 Wharf St), ridden by a little cardigan-wearer. The local suits were paid to make the waterfront tower seem generous, rousing and necessary. Ha-haaa.

At ALL times, the Dunedin City Council MUST stay acutely awake despite its needful dependence on independent commissioners and independent professional advisors – the latter advisors, along with some council staff, appear to have greatly missed the Fact that the minimal concept plans presented for 143-193 Moray Place DO NOT provide a workable building; or a building compliant with district plan objectives, policies, rules, and anticipated environmental results ….or prevailing traffic standards.

Oh dear. ‘So much’ [$$$] for the independent advice. Yes, expensive use of expert and staff time to massage the applicant dream – to no convincing or winning effect.

Further, Dunedin City Council MUST be prepared to APPEAL the outcome of the decision-making process should it wish to AVOID being left with another expensive DEBT VEHICLE in the form of one unfinished and or leaky building …..as the collapsed companies, and dusty heels of run-away developers and construction personnel disappear back to Asian shores, far away from Lake Tekapo ….. dangerously constructed, whole or in part, as a further burden on beleaguered Ratepayers of this fair city.

“What a stupid thing to assume!” you thunder.
“How? On what grounds?”, you chide.
“Dunedin NEEDS a five star hotel!”, imperiously.

You think it’s that simple ??
You’re about to be done over, Buds.

The inference being, oh great apartment hotel supporters, that all that glistens in green-tinted glass is gold, or might be a five star hotel. Yeah right.

It never was. The gold, I mean.
The five star hotel, I mean.
A hoover-up of NZ cash to offshore parties who remain anonymous throughout planning and consenting, and construction and building operation; all supported by the errant notion of immigrant labour and (imperfect) imported materials.

You might as well ask now, How MUCH will the Dunedin economy make ($$$) on this “slap in the face” to the community owned district plan (statutory), and the (strategic) spatial and the central city plans which are publicly consulted policy directions informing the city council’s annual and long term plans.

Not much.

****

During five days of evidence and submissions, one knowledgeable submitter, Mr Russell Lund – well up on construction management, hotel building costs, the visitor accommodation market and investment patterns, and the risk and liability to local authorities in consequence – carefully outlined the quandaries which for various councils around New Zealand have become money-losing Unalterable Fact.

In the original written submission for himself and Suzanne Lund (affected property owners), Mr Lund asserted:

The “assessment of effects” is hollow and of no substance. Under the Act, the assessment of effects is required to be just that, an assessment of effects on the affected properties and tenants. Incredibly, the assessment makes no attempt to examine the effects on all the affected parties.

This, of course, is echoed in independently written and voiced submissions by many opposing the application; and curiously, it is underlined in evidence given by Mr Don Anderson (planning consultant) and Mr David Compton-Moen (urban design, visual amenity consultant), for the applicant.

My own submission to hearing states:

We can’t take what is offered [from the applicant] on trust, because it is incomplete and imprecise; therefore the assessment of effects is difficult to pin down to anything concrete and remains unhelpfully superficial – this was “the work” the applicant was to table for us, we thought, to generously persuade us that moving beyond the ‘norms’ of height in this Dunedin location has measurable benefits against other sites or, through strong honest examination of design alternatives for this site.

I am open to being persuaded. It is expensive to do that persuading. However, it has to happen in other city centres in this country. For an expensive building, isn’t it worth doing the budgeting for preparation of your case – to get the result you want, which is consent to subdivide and build. These are open questions but they lie at the heart of A for architecture as the practical art and science of building economics and professional practice. Behind and in front of the commercial facades, that must have depth of delivery. […] And so I come to the white building model here [a 3D-printed solid plastic model of the proposed building, of hand-held size, put into evidence by Christchurch architect Thom Craig], and the drawings presented by the applicant. There appears to have been too much time spent on merely diagrammatic ‘entreaties’ to architectural form and texture without hacking into 3D investigation. There is not one clear drawing of the way the podium can work for the public or the ‘retailers’ or ‘exhibitors’ – or indeed the people staying at the hotel, servicing the building functions and or using vehicles on site. We get an idea ‘about it’, a not convincing one, there is too much guesswork to do. And so the commissioners’ questions have been rather intense.

****

Now, back to the points the Lunds are making. In their original submission on the application, Mr Lund says:

7. I have serious concerns about the expertise and amount of resource that has gone into assessing the feasibility of the project. In the last year, the Otago Daily Times advised the developer, Mr Tosswill of Horizon Hospitality, had indicated that the cost of the project, which was then 200 rooms and 52 apartments was $50-75M. The proposal now is for 210 rooms and 66 apartments, which is not substantially different. The car parking and front of house areas are similar to the original application. The application confirms the hotel has a gross floor area of 20,835 m2.
In my opinion this hotel will be not built for anything less than around $100M, and this casts serious doubts over the viability of the scheme.
Evidence of this is found for the building costs of the much simpler 200 room 4 star Novotel Hotel being built at Christchurch airport after a competitive tender process (and utilising an Asian fabricated structural steel structure). It is well known in the building industry that the tender costs received for that very regular and efficient 7 level hotel were $4,500-5,000 per m2. The Novotel is a filing cabinet design, that is, it is a completely regular rectangular structure which provides the most efficient floorplates and the best wall to floor ratio, ie the least amount of exterior wall enclosing the maximum possible amount of interior space. The Novotel has no balconies.
The applicant’s proposal is far less efficient, and therefore more costly per m2, as it is effectively three blocks grouped around a central core, but the blocks themselves are not rectangular, but have recesses, and there is a significant amount of extra cost with most rooms having screened “smokers” balconies, which entails effectively, 2 exterior systems, one for the rooms, and another enclosing the balconies.

8. The application confirms there are 16,136 m2 of above ground (habitable or hospitality space) and 4,687 m2 of below ground, back of house / car park space. At a cost of $2,200-2,500 per m2 for the below ground floors, and $5,500 per m2 for the above ground space, the proposal has a construction cost of over $100m, excluding land, furnishings, design marketing, et al. The total budget excluding GST will be around $130M. A feasibility study will typically have to include a development margin of at least 20 %, preferably 25 %, if any sort of lender is involved. This means the end value of the project will need to be at or over $160M. If the best case scenario is adopted and Mr Tosswill is able to convince Chinese or other overseas investors to pay the current market value in Queenstown for premium, new managed hotel rooms and apartments of $10,000 per m2 – for a hotel with an unproven demand in Dunedin, it is still not enough.
Selling all the apartments and hotel rooms will yield about $90M, which is a long, long way from the $160M end value needed. The parking and lower public floor spaces on a yield basis will have a value of around $10M, that might get the project to $100M. Mr Tosswill in earlier reports stated that the value was around $90M, so while there is broad agreement on the likely end value, the estimate of the cost is not close to reality. Mr Tosswill may be planning to bring in a Chinese construction company who will park a retired cruise ship at the waterfront for the duration of the project and have their workers stay there, but they will be subject to the same minimum wage laws, working conditions and health and safety requirements that local companies face, which will dramatically reduce any cost benefit from using overseas labour. (The idea of having a cruise ship accommodating Chinese workers is not fanciful – the Chinese government offered to repair the damaged sections of SH1 after last year’s Kaikoura earthquake using that same method, and did not require any New Zealand labour resources, but the Government decided that this was politically unacceptable). One hopes it would be also unacceptable to have a Council endorsed project built using essentially, forced labour.

9. There is sufficient doubt around the financial viability of the project that the applicant should provide some evidence that the entire scheme is not in fact fanciful, but makes economic sense, and provide details about the proposed ownership model, which is highly relevant to Council, in light of their liability which is discussed below.

10. Mr Tosswill may think he is able to make savings from current building costs by utilising Chinese products, but many Local Authorities around New Zealand are very wary of various untested products as there have been many failures for which Local Authorities ultimately end up bearing the cost of.
This raises another issue which is the massive liability that the building control division of the Dunedin City Council will be exposed to, in relation to its building consent approval and compliance monitoring. The experience of the QLDC in recent years is extremely relevant : A large number of hotel and apartments have been built in Queenstown and the individual hotel rooms and apartments are sold off individually. A body corporate is then responsible for repairs and maintenance. The developer has no long term or permanent stake in the completed structure, and therefore no incentive to specify materials and pay for quality standards with the long term in mind. As Warren Buffet has said, “show me the incentive and I will show you the result”, and the result for QLDC has been an ongoing series of legal actions brought by Body Corporates against Council, alleging that Council was at fault in some form, and as they are the “last man standing”, the Council have inevitably had to pay substantial figures. [I have] experience of several of these, having repaired one major complex in Queenstown at a cost of several million dollars, and provided cost evidence in regard to two others, also in Queenstown in the last year. It should be remembered that QLDC has a 7 metre height limit, but despite this, on complexes less than a quarter of the size of the proposed hotels, the cost to repair has run to millions. QLDC has advised this year in the Otago Daily Times that it has now completely drained its reserve fund for remedial building work, and any further costs will need to come directly from ratepayers. It has spent $3.6M just on legal fees for remedial building liability cases, which will rise to close to $4M by the end of this year.

11. At the Hearing, in submission, some proposals will be presented to show how the design liability and weathertightness risk to Council and ratepayers can be mitigated in the unlikely event that the proposal is given consent and such consent is upheld in the Environment Court.

Proposal 1 : A bond be posted with Council to cover sufficient funds to get the building to completed weathertight envelope and have the podium and all external works completed in the event the project is halted.

Proposal 2 : The applicant provide a Owners Protective Professional Indemnity, and have DCC named as an insured party on the policy. This is to protect indemnify the DCC against any claims brought against them in relation the building consent process, compliance monitoring or any matter for which they are liable for.

****

The applicant tabled NEW evidence at the hearing, from Infometrics. At its website, Infometrics (NZ) says it “provides industry, regional, and general economic analysis and forecasts that assist organisations in making their planning, policy, and strategic decisions”.

In the Lunds’ submission to hearing under the subheading ‘Dunedin Hotel Economic Impacts – Ongoing GDP Effects’, Mr Lund says:

….Infometrics assume that the 64 apartments will all be in the hotel pool, but acknowledge this is unclear. This significantly increases the GDP contribution as it raises the income of the hotel by around 40%, assuming conservative tariff rates of $250 per night and $350 per night per apartment. Infometrics also assume that there will be no “crowding out” of the existing activity, ie ALL guests would otherwise have not come to Dunedin had this hotel not been there. This is an unrealistic assumption.
In my opinion this report is an example of tailoring assumptions to achieve the desired outcome.
At Section 2, the “impact” of the construction phase is estimated at $45.6M in total, but based on the “key assumption” that there is capacity in the construction sector to build the hotel without crowding out other investment”. This appears to mean that if other projects are delayed, there is in fact no benefit at all because $63M of other projects will simply be displaced by the alleged $63M cost of this project. History shows that in Dunedin, Clients such as the DCC, University and some private clients keep a close eye on the state of the market. Many Ministry of Education projects have strict cost guidelines, and will not proceed if they are over budget. There have been examples of work deferred in Dunedin when the market is busy, and the Post Office Hotel is one of them. The Owner Mr Geoff Thompson, deferred the construction of the hotel for several years when he first owned the property citing the overheated construction market, due to the construction of the $220M Milton Prison project in 2005-2007.
At the present time, there is a high level of commercial construction activity at present, witnessed by the fact that there are main contractors from outside Dunedin performing the 2 largest projects in Dunedin (The Dental School and the University Science 3 project). There is every likelihood some projects will be delayed due to the high level of activity.
The report assumes that 21.1M of the $63M, or a third of the cost, will flow into the local Dunedin economy. This would be on the basis that local companies and suppliers are employed, but this is far from clear, given the estimated cost of $63M. The only way the cost could be anywhere near this level is if virtually all of the materials were low cost imports, and quite likely a proportion of the labour cost component.
The only significant material that will be made locally is concrete, and it is only the basement levels that will be predominantly a concrete structure. If out of region companies were employed for work to do such trades as painting and carpentry, as they were at the Forsyth Barr stadium, then that figure will not be accurate.
Infometrics then ascribe $16.1M to the “second round of economic effects” but acknowledge there is some “leakage of spending outside the city”. If an outside main contractor, or even an overseas contractor completes the work, they will very likely bring with them their out of town networks of subcontractors and suppliers and there will be much less than the $16.1M as the second round of effects. Having completed many projects out of Dunedin, I have first hand knowledge of the negligible economic effect of construction on the region concerned. Generally, goods and services are sourced from habitual suppliers with whom there is an ongoing relationship, and only the small consumables are sourced from local suppliers.
Mr Tosswill should clarify what the intention is regarding the construction of the hotel, and if that is not forthcoming, then he should at least confirm what type and form of construction contract will be used as that perhaps more than anything will determine whether there is the possibility of a meaningful local business component.

On ‘Construction Cost’, Mr Lund refers the commissioners to the Lunds’ original submission, continuing with:

Further facts about construction
Examples of risk from imported products
FCC (Fletcher) budgeted to use Chinese sourced bathrooms in the Novotel Christchurch projects. Did not work. Has cost FCC $2M extra (unbudgeted) to get prefab bathrooms built locally in Canterbury. The cost is $26,000 per bathroom.
Chinese steel : there are 2 major CBD projects underway in Christchurch that are steel structures using Chinese fabricated steel. On one project the steel is 12 weeks late and on the other it is 16 weeks late. The Chinese suppliers had committed to make the steel, then out-sourced it to another firm without advising the contractor, and the delays have resulted. On one of these projects there is now legal action between the Engineer and contractor because of the nature of the steel does not conform to the specification.
There is a further major dispute litigation on another major project now completed due to extreme delays with the steelwork and external cladding. The project was around 10 months late, and the Owner lost the anchor tenant (The Government) due to the delay. That project was tendered on the basis of using a large degree of imported materials from China in association with a large state run Chinese construction company, but the project was so disastrous (financially and in terms of market perception), involving a loss of 8-15M on a $50M project, it has caused the company to withdraw from large scale commercial construction and focus on project management.
External Cladding : There are only a very small number of NZ firms with the capability to design and build the curtain walling, and they have a huge backlog and extremely onerous business terms that will not be acceptable to any funder or main contractor, so the Owner will probably need to contract with them direct, and take on this risk.

These important matters aside, the legal submissions brought to hearing by Ms Lauren Semple (for Millenium & Copthorne Hotels) and Mr John Hardie (for Misbeary Holdings Ltd) blew the application out of the water; so did the transport evidence to hearing by Mr Andy Carr (for Millenium & Copthorne Hotels) to which Commissioner Mr Stephen Daysh responded by asking if the problems (such as summit points, swept paths, access to basement parking, onsite coach travel, and truck travel as well as loading access) pointed out by Mr Carr in his assessment of the proposed building’s perimeter road were “fatal flaws”? Yes, was the direct reply. Refer article: Traffic problems at hotel (ODT 3.8.17)

The hearing is adjourned until 17 August.

All ODT can do is offer a flimsy and inconsequential readers’ poll.
Not Based On Reality. Go ODT! LOL

█ All application documents, reports, evidence and submissions for 143-193 Moray Place – Non-complying activity – LUC-2017-48 & Sub-2017-26 at this link.

Related Posts and Comments:
● 11.7.17 “Fat” gawky Hotel and Apartment building : Questionable design even with 4 floors lopped off
● 14.5.17 RNZ reports July hearings for proposed hotel apartment building [comments by Mr Tosswill]
● 4.5.17 Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building
● 7.4.17 Proposed hotel *height and design* —the very least of it #sellingoursouls
● 5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

█ The following images are taken from Appendix 6 – Consultant Urban Designer’s Report – Appendix plans (PDF, 1.5 MB).

They comprise
● 2 cross sections – originally provided as applicant evidence by Thom Craig Architects Ltd, and
● 7 photomontages of anticipated views – originally provided as applicant evidence by Paterson Pitts Group (surveying, planning, engineering)

– to which new height levels have been added in the evidence provided by independent Urban Design consultant Garth Falconer for Dunedin City Council.

[click to enlarge]








7 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Events, Finance, Heritage, Hot air, Hotel, Housing, Infrastructure, Media, Name, New Zealand, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Town planning, Transportation, Travesty, Urban design, What stadium

Delta #EpicFail and Metiria Turei : How Could This Be?

Received from Christchurch Driver [CD]
Fri, 28 Jul 2017 at 11:44 p.m.

Readers, I can hear the rumblings already – is your correspondent so bereft of new information that he has to tailgate the exploding Turei benefit scandal to catch some attention ? Is this the equivalent of Sérgio Mendes & Brasil ’66, who started well but could only survive by making instrumental covers of Beatles’ hits? (I admit, Day Tripper is a particular favourite…)

Get in behind, readers. Have yourselves a draught of Bells, and let me untangle the web that starts with the inexplicable antics of Ms Turei.

Any sentient citizen must be, by now, aware that Ms Turei attempted to make political capital out of her long term benefit fraud last week to assist in marketing the Green Party’s new welfare policy. Sadly for Ms Turei, a thing called the internet means that her previous fictions about the circumstances around her early solo parent years are all easily discoverable, and the Whale Oil blog has done a telling summary of Ms Turei’s various mendacities. (Thanks Cameron).

Overwhelmingly, the Kiwiblog and other commentariat have excoriated Ms Turei’s inexplicable move, but again, Whale Oil offered the most penetrating analysis (and no, I am not a Whale Oil subscriber, or have ever been in contact with Cameron Slater…). Mr Slater made the interesting points, repeated by Barry Soper and others, that not only was Ms Turei guilty of benefit fraud, but also received a study grant as well. Ms Turei refused to name the father of her baby to WINZ, who has now been subsequently revealed as Paul Hartley, son of Ann Hartley, former Mayor of North Shore. Consequently, no child support has ever been received from Mr Hartley. Ms Turei confirmed that “Grandma” (Ms Hartley) provided support – very likely including financial support, which undoubtedly has not been declared.

One of the unfortunate unintended effects of the whole affair is that this will be red meat to many right wing types of a particular gender and particular demographic to start a predictable chorus of “Welfare Queens” abusing the system. Middle aged guys, this was old (and not true) even when Ronald Reagan used it to get elected in 1980. As noted in the comments below, the amount of white collar fraud that goes unprosecuted is about 30 times the estimated amount of benefit fraud, so to the white collar industries of accounting and law that seek to advise on the fine line between tax “minimisation” and tax “avoidance” : let those without sin cast the first stone.  

While all this is very interesting and will lead to the certain demise of Metiria Turei after the election, if not before as the Green’s poll numbers continue to stagnate or decline, the commentariat has missed the bigger issue which is “What Did The Law Society Know and What Did They Do About It ?”.

Ms Turei initially declined to say if the fraud was disclosed to the Law Society in her 1999 interview to determine if she was “a fit and proper person” to be admitted to the bar, but then decided immediately afterward that refusing to comment would put her on a par with Jonathan Coleman and Todd McLay, so confirmed on July 26 that she had been “upfront” to the Law Society, and there had been a “long conversation” about it.

What is fascinating about this, and an extreme concern for anyone who has had to rely on or transact with lawyers, is that the Law Society, the body tasked with determining who is a fit and proper person to become a lawyer – to uphold the law – then on Ms Turei’s version of events confirmed to Ms Turei that this dishonesty did not matter.  

Readers, I too spilt Bells all over the sofa when I read that the Law Society had known about this for nearly 20 years and been complicit in Ms Turei’s dishonesty. How could it be that the profession dedicated to upholding the law could decide that some didn’t apply to them ? Following on from this if the Law Society did not think it was relevant or significant that a prospective lawyer had engaged in several years’ worth of benefit fraud, then what is the situation regarding her first employer, Simpson Grierson (one of the largest law firms in the country). Either they were lied to about the fraud, or they also had a relaxed attitude towards employing law graduates indulging in benefit fraud.

As we have often remarked in the Delta Epic Fraud series, truth is indeed stranger than fiction, and the facts of the matter are that the Law Society have previously allowed struck-off lawyers with convictions resulting from dishonesty to be reinstated to the bar.

One such lawyer is one Chris Gilbert, upon whom the fortunes of the Christchurch City Council (and indirectly, the DCC), rest in terms of the liability for the Yaldhurst Noble subdivision debacle, in the latest litigation. In reinstating Mr Gilbert to the bar, the Law Society ignored the opposition of three lawyers and two branches of the Law Society, including the Otago branch, who said the gravity of the offending made him unsuitable for reinstatement. Mr Gilbert “misappropriated” $44,000 of client funds in 1987 and 1988. Compounding this, a few years later, Mr Gilbert appeared to think that the Society’s rules were all overrated anyway and proceeded to sign legal documents on the fiction that he was still in fact a lawyer ! Brandishing a wet bus ticket, the Law Society warned Mr Gilbert “there would be no third chances !”.

Readers, like you I regard law firms as a bunch of parasitic sharks, and yes there are plenty of law firms with lawyers you would cross the street to avoid. But Mr Gilbert is not one of those. Mr Gilbert….is the legal services manager at the Christchurch City Council and was offered a job by the CCC with full knowledge of his dishonesty. NZ Herald (2004)

Readers, two hands on the cup : The Christchurch City Council actually said that Mr Gilbert “was the best candidate for the job”. This was rather against the advice of the Waikato Law Society, where Mr Gilbert committed his first fraud: they said in an affidavit Mr Gilbert was not a “fit and proper person” to be a lawyer.

Now place the cup down – you won’t cope with this : The Law Society gave Mr Gilbert his “third chance” on the basis that he could only work for the CCC. In other words, he wasn’t allowed to act for private individuals who had the choice to take or leave his services and make complaints if warranted. Instead he could be responsible for issues involving huge amounts of ratepayer funds, because the Law Society appeared to think that position required a much lower standard of integrity.

Readers, why would the Christchurch City Council employ Mr Gilbert ? Readers, feel free to draw your own conclusions. The most incredible fact of this rather incredible tale is that Mr Gilbert was no short-term stopgap to tide the CCC over a tight staffing spot. Mr Gilbert has been the team leader of legal services at CCC for 13 years. He seems to be part of the institutional furniture, and appears to be indispensable.

Your correspondent is advised that in relation to the Noble Yaldhurst litigation, Mr Gilbert is not surprising the plaintiffs with bursts of even-handedness.  

This perhaps is one reason why the pace of the Christchurch rebuild is glacial – Minister Brownlee and the Government would be fully justified in having serious reservations about the competence of the Christchurch City Council, and not just in the building control division.

Readers, tonight’s conclusion is surprising – we as Dunedin ratepayers can look with relief at Mr Gilbert and know that within the DCC itself (although NOT Delta and Aurora) this would never occur under the present management.

[ends]  

****

Welfare fraud targeted more than tax evasion
White collar criminals get a better deal than welfare fraudsters because the system is biased before they even get to the courts, a lawyer says. Research by Victoria University shows 10 times more welfare fraudsters were prosecuted than tax evaders even though tax evasion costs the economy 33 times more. The research shows tax evasion amounts to at least $1 billion a year compared with $30 million for welfare fraud, but the courts are much harsher in their treatment of welfare fraudsters. RNZ News (2016)

Disclaimer: The site owner is not responsible for the currency or accuracy of content of contributed comments; and the inclusion of the information provided does not imply endorsement by the site owner.

Posted by Elizabeth Kerr

This post is offered in the public interest.

 

26 Comments

Filed under Aurora Energy, Business, Commerce Commission, Construction, DCHL, Delta, Democracy, Economics, Finance, Hot air, Housing, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Politics, Project management, Property, Public interest, Resource management, SFO, Town planning, Transportation, Travesty

Christchurch City Council : Highly Dubious Entity #YaldhurstSubdivision

Subject: Ongoing Property Dispute at Yaldhurst Subdivision

Christchurch City Council held a full council meeting on 27 July 2017.

Readers, the CCC meeting video of Agenda item 26, about Yaldhurst Subdivision, is recommended viewing/listening.

Legal advice to Council is given by Rob Goldsbury, CCC Head of Legal Services – an atrociously lacklustre, unjust and obstructive performance.

The Council stupidly steps itself into (again!) the Constructive Fraud Action being progressed at the Christchurch High Court by Residents/Caveators of the Yaldhurst Subdivision. Although, we see that Councillors supposedly have no idea they’re already in it up to their eyeballs through the actions of Council staff and issues of non-compliance. Interesting.

Christchurch City Council Published on Jul 26, 2017
Christchurch City Council VIDEO
27.07.17 – Item 26 – Yaldhurst Village Subdivision – Dedication of Road – Sir John McKenzie Avenue

The video continues at about 1:26 after a preliminary silence [muted blue screen] – keep watching. The quality of picture is poor throughout. The discomfort of those seen in the public gallery is most perceptible.

Meeting Agenda and Unconfirmed Minutes follow here below – minus Attachment A, Yaldhurst Village Lots 601,613 Plan.

The Council did not vote unanimously.

The Halswell-Hornby-Riccarton Community Board motion was lost.

With the second motion, in short, the Council resolved that Lots 601 (residential) and 613 (commercial) on LT 448725 will be dedicated under Section 349 of the Local Government Act 1974 as a road, in order for the road to vest.

The resolution goes against the Residents’ private property rights.

See the previous post to refresh on the Residents’ situation.

Note, by the votes for, the dishonesty and incompetence present.

Note, by the votes against, the integrity of those supporting the Community Board and members of their community: the private property owners (the Residents), in their protracted, brave and courageous fight against an unjust malevolent council staff working in cahoots with unscrupulous developers.

Vicki Buck is a class act.
Rob Goldsbury, an utterly shameful man.

****

Christchurch City Council
Agenda

Notice of Meeting:
An ordinary meeting of the Christchurch City Council will be held on:

Date: Thursday 27 July 2017
Time: 10.05am
Venue: Council Chambers, Civic Offices,
53 Hereford Street, Christchurch

….

[agenda item]
Halswell-Hornby-Riccarton Community Board

26. Yaldhurst Village Subdivision – Dedication of Road – Sir John McKenzie Avenue ………. [page] 529

[the report]
Council
27 July 2017

Report from Halswell-Hornby-Riccarton Community Board  – 13 June 2017
 
26. Yaldhurst Village Subdivision – Dedication of Road – Sir John McKenzie Avenue

Reference: 17/733313
Contact: Richard Holland richard.holland@ccc.govt.nz 941 8690
 
Note that this report was left to lie on the table at the Council meeting on 6 July 2017.
 
1. Staff Recommendations
 
That the Halswell-Hornby-Riccarton Community Board recommend to the Council:

1. That Lots 601 (residential) and 613 (commercial) on LT 448725 will be dedicated under Section 349 of the Local Government Act 1974 as a road, in order for the road to vest.

2. Note that a Deed of Indemnity will be executed by Infinity Yaldhurst Limited which will indemnify and keep indemnified the Council from all actions, proceedings and claims made by any land owner in relation to the Council accepting the dedication of Lots 601 and 613 on LT 448725, as road.

3. Also note that the Council shall not be required to issue a Section 224(c) Certificate under the Resource Management Act 1991 in respect to Lots 601 and 613 on LT 448725 until all the safety audit requirements as specified by the Council, and included in the Variations of the subdivision consent, have been physically built to the Council’s satisfaction.

4. That the General Manager City Services be delegated authority to negotiate and enter into on behalf of the Council, such documentation required to implement the dedication.
 
2. Halswell-Hornby-Riccarton Community Board Recommendation to Council
 
Part A

That the Halswell-Hornby-Riccarton Community Board recommend to the Council:

1. Option 2 of the staff report, namely, That the Council not agree to a dedication process and inform Infinity Yaldhurst Limited to pursue the matter through the Courts in accordance with the Property Law Act.
 
2. That the Council agree to meet with the adjoining property owners to discuss options on a way forward regarding the Yaldhurst Village Subdivision.
 
Vicki Buck and Anne Galloway requested that their votes against the above decision, be recorded.
 
Attachments
There are no attachments for this report.
Continue reading

26 Comments

Filed under Baloney, Business, DCHL, Delta, District Plan, Events, Finance, Housing, Infrastructure, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Resource management, SFO, Site, Town planning, Transportation, Travesty

Regional state of emergency lifted in Otago (incl Dunedin & Waitaki)

Otago’s state of emergency has been lifted.
Emergency Management Otago this morning lifted the state of emergency which existed since deluges and heavy wind battered Otago’s eastern coast over the weekend. The region has now officially entered a recovery phase with teams moving on to assessing the damage and checking on the needs of those affected by the devastating floods. Emergency Management Otago group controller Chris Hawker, in Dunedin, said the move towards recovery did not signal any reduction in effort.

● Dunedin City Council (03) 477-4000
● Federated Farmers 0800 FARMING (0800 327 646)
● Otago Rural Support Trust 0800 787 254
http://www.rural-support.org.nz

****

DUNEDIN CITY COUNCIL

Dunedin July Severe Weather update
10.45am Monday 24 July 2017

State of Emergency lifted

The Dunedin State of Emergency was lifted at 9am today. Under the Civil Defence Emergency Act 2002 we are now operating under a Notice of Local Transition Period as we move into the recovery phase.
The transition period is in force for 28 days (expires 9am 21 August) unless extended or ended earlier. The notice still gives the local authority powers to carry out essential emergency-related work.
More information about the work happening as part of the recovery phase will be provided today. The work will be led by Dunedin City Council Recovery Manager Simon Pickford.

Evacuation map – Upper Taieri Pond (PDF, 3.3 MB)
Mill Creek ponding area (PDF, 2.3 MB)

██████ DCC TWITTER FEED AUTOMATICALLY UPDATING

Continue reading

64 Comments

Filed under Business, Central Otago, DCC, Dunedin, Emergency services, Fire and Emergency NZ, Health & Safety, Housing, Infrastructure, Media, New Zealand, North Otago, NZTA, ORC, People, Police, Property, Public interest, Queenstown Lakes, South Dunedin, Transportation

Rainy Day reading —The Spinoff : Ministry of Transport fraud case

The ever-deepening storm centred on the Joanne Harrison fraud case just became a hurricane. Yesterday’s State Services Commission investigation report is likely to trigger a new chain of events that could extend well beyond embattled Auditor General Martin Matthews, writes Peter Newport

### thespinoff.co.nz July 21, 2017
Politics
The Ministry of Transport fraud case: Why the rot goes deeper than Joanne Harrison
By Peter Newport | Contributing writer
The State Services Commission investigation, published yesterday, makes one thing very clear: Joanne Harrison influenced the exit of four fellow Ministry of Transport employees who tried to tell their bosses that she was a fraudster. She managed to hire friends and steal over $700,000 from the ministry despite numerous staff attempting to call attention to her actions. This all happened while she was reporting directly to then-chief executive Martin Matthews, who is now our auditor general – albeit on temporary leave. The Commission has now apologised and is offering compensation to those former staff members. Its report also highlights many other issues at the Ministry, arguing that the 17-year-old legislation that covers whistleblowers needs to be changed and improved.

A second investigation, into whether Martin Matthews is a suitable person to continue as auditor general, is due from Sir Maarten Wevers in the coming days. Matthews is currently constructing his response to the unpublished, but complete, Wevers investigation. He has been given until the end of this week to complete it.

The Harrison case has some similar dynamics to the Todd Barclay drama. It’s become less about the initial problem than how it was handled. Who told the truth and who tried to obscure or even bury the truth. The difference with the Harrison situation is that she is now in jail and the truth is coming out – fast.

The Spinoff has been looking at exactly who did what, and when. That job has been made easier by a new, recent MOT whistle-blower who has produced and provided to us a detailed timeline noting all the evidence, which we publish here, utilising material released by the Ministry of Transport and available to view here. The same whistle-blower has shared a bizarre insight into Martin Matthews’ statements during his time at the Ministry of Transport.

But first, a quick tour of the jigsaw puzzle of documents that reveal a picture of Martin Matthews being given not clues, or hints, but what appear to be multiple solid facts that highlighted Joanne Harrison as a Grade A con artist and thief.
Read more

Founded in 2014, The Spinoff is New Zealand’s fastest growing media startup, amassing a monthly New Zealand audience of over 500,000 in less than three years.
We’ve assembled a team of agenda-setting journalists and critics, working across text, audio and video to create a true 21st century media brand. In just two years, The Spinoff has been nominated for 24 Canon awards, winning six. Our growth has been driven by a creative editorial style and innovative business model, emphasising long-term relationships with like-minded brands and a close connection with a young, educated and urban audience. Duncan Greive won both NZ Marketing Magazine‘s Editor of the Year as well as the People’s Choice title for Editor and Media Visionary in their media issue, July 2017. The Spinoff also claimed the title for Digital Media Brand of the Year as well as the People’s Choice title for the same award.

****

Comment received from russandbev
2017/07/21 at 10:52 am

The recent revelations about what happened to the whistleblowers in the Ministry of Transport have, I’d suggest, application in Dunedin. Think of the parallels. In the MoT case a manipulative person with a barely-hidden track record of fraud and vindictiveness as well as a well developed sense of entitlement goes about systematically defrauding a government department of close on 3/4 million dollars. Not through some incredibly complex fraud, but one of simply creating business that didn’t exist and creating invoices from them for services that were never provided. Not exactly something that would take a lot to investigate.

Whistleblowers blow the alarm whistles to their managers and nothing happens and the further up the chain the questions were asked, the more dismissive the denials became. Meantime the fraudster moves against the whistleblowers. The Head of the Ministry moves on to even more wondrous things as Auditor General (is that ironic or is that ironic?) and the Minister dismisses all suggestions of wrong-doing. Even the Speaker of the House who employs the Auditor General doesn’t want to get involved.

Now found that the whistleblowers were entirely vindicated by their concerns and they get private and public apologies and a confidential settlement to, in part, recompense them for their treatment by both a fraudster and by management and governance failures. The Protected Disclosures Act [2000] is supposed to protect whistleblowers in BOTH public and private sectors.

Now, I don’t think anyone is suggesting fraud in the case of Aurora/Delta and that should be made plain. However look at the track record of these companies. A fearful record of stupid property speculation costing many many millions which is still going on thanks to Yaldhurst. A willingness to go along with borrowing to supply dividends to the DCHL and the DCC. Decades of ignoring maintenance on the Aurora network closely linked to the governance requirements to minimise costs, maximise profits and supply dividends to build vanity projects by the owners and now the spendup of northwards of 3/4 billion dollars on urgent maintenance bought about these years of neglect.

And then think of the years and layers of denials that these things happened over. When Richard Healey found he could no longer keep working in the company because of all that was being hidden, he gets vilified by EVERYONE that should have listened. EVERYONE is in denial including his past Managers who continued to receive their grossly inflated salaries and those in governance – many of whom refused to even sit down with him and discuss his concerns.

Am I the only one to see the parallels in how a Ministry or a City company deals with whistleblowers? I wonder if we will ever see similar end results in the case of Richard Healey?

{Link added. -Eds}

Reply from Elizabeth
2017/07/21 at 1:02 pm

Not involving Aurora:

Charges of Constructive Fraud have been brought, by joinder, against Delta Utility Services Ltd in the Christchurch High Court by the caveators (original property owners of the Noble Subdivision) at Yaldhurst. The case proceeds.

****

[decisionmaker.co.nz] formatted by whatifdunedin

Transparency International New Zealand
http://www.transparency.org.nz/

Related Posts and Comments:
19.7.17 Southern Police : Nothing changed since Tom Lewis wrote Coverups & Copouts
18.7.17 Delta | Infinity | CCC staff collude to defeat Yaldhurst residents (again)
23.5.17 Topical debates on Corruption in New Zealand
22.2.17 Some Councils/CCOs get cleanup from FRAUD and CORRUPTION #NotAll
9.12.16 Auckland corruption charges proved —ring any bells? #South
28.1.16 New Zealand local government T-shirt #haze #corruption
20.9.15 Corruption serious threat to New Zealand #CAANZ
14.9.15 Screening tonight: Paradigm Episode 2! Local Government Corruption in NZ #Sky #YouTube
23.7.15 Publicise: laudafinem.org
13.5.14 Stuff: Colin Espiner usefully defines Corruption

Posted by Elizabeth Kerr

This post is offered in the public interest.

1 Comment

Filed under Aurora Energy, Business, Commerce Commission, Construction, Corruption, Crime, Delta, Democracy, Dunedin, Economics, Education, Finance, Hot air, Housing, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Police, Politics, Project management, Property, Public interest, SFO, Transportation, Travesty, What stadium

Delta | Infinity | CCC staff collude to defeat Yaldhurst residents (again)

Yaldhurst Subdivision (former Noble Subdivision)

S T A T E ● O F ● P L A Y

Christchurch City Council is failing to ensure compliance with the subdivision consent and is then assisting the developer Noble/Delta – Infinity/Delta, to screw the Yaldhurst residents.

[click to enlarge]

****

About five of the affected Yaldhurst residents gave deputations to the full meeting of the Christchurch City Council on Thursday, 6 July 2017.

Prior to the meeting, the Infinity Joint Venture of which Delta is a majority partner (with its $13m gift investment from Dunedin City Council) had convinced CCC staff to sway Christchurch City councillors to vote for the dedication of private roads as opposed to vesting ownership in the Council. This in the attempt to first defeat land covenants the affected residents have over the property registered in 2003 to protect their inclusion in any subdivision. However, Land Information New Zealand (LINZ) cannot accept roads vesting in ownership with the Council when there are any encumbrances on the land – such as the residents’ covenants.

For the residents, Colin Stokes, at the council meeting, distributed to councillors a review of what CCC staff have done over the years.

Of course, as the facts flow they continue to entwine around Delta.

The residents are fighting to protect and enforce their rights in the subdivision consent; and to halt Delta and their Southern associates’ onslaught against them.

****

Received from Colin Stokes (Yaldhurst resident and caveator)
Wed, 12 Jul 2017 at 9:16 a.m.

Thanks for your ongoing support Elizabeth

Chris Hutching’s piece (The Press 10.7.17) is weak and void of facts that present our case.

● We have Land Covenants registered over all the land in 2003 to protect our inclusion in any subdivision – our specific Access Lot road has to be formed and vested to Christchurch City Council standards with CCC as a term of extinguishment of the covenants.
● The encumbrance on the land prevent vesting of roads as LINZ won’t allow roads to vest with the council with them on.
● Infinity/Delta behind closed doors with CCC staff came up with a scheme to dedicate the roads under old rules (not compliant with the RMA and the subdivision consent) so as to circumvent our covenant protection.
● The real story is that CCC is breaking rules and NOT requiring compliance with the subdivision consent so as to cheat the residents of their protection and their interests protected by that protection so as CCC and the developer can cut them out of the subdivision.
● CCC and the developer Noble/Delta – Infinity/Delta have taken conditions out of the consent, varied the consent, and permitted non-complying undersized infrastructure that makes our part of the subdivision impossible – specifically stormwater pipes and basins required on the lower lying developers’ land which is where the consent (and physical topography and site layout) requires our stormwater to go.
● CCC failing to enforce the conditions of the consent as the law requires means our Access Lot road cannot be formed, meaning we can not subdivide.
● Delta with the misuse of mortgagee powers passed the property to itself, or at least part of the property ($13.4m of an $18.35m “sale” = 73% of which $12.5m was left in the property in passing it to Infinity in the orchestrated “sale”).

[ends]

****

Prepared Summary and Review with subdivision plans as tabled at Christchurch City Council’s meeting (6 July), to assist understanding:

███ D 2017 07 04 Summary and Review of Circumvention of Covenants for Councillors Yaldhurst (16 pages)

1 Plan RMA92009135

2 Plan RMA92009135 hlite

The coloured plan shows the residents’ Access Lot between green lines going from Yaldhurst Rd and then dog-legging east to west. What is inside the yellow border is what is within the Subdivision Consent (note there is an internal yellow small 2 sites that are NOT in the consent – and 3 other of the residents’ lots in common ownership on the NS leg are not included in the consent).

It is this east west leg of the Access Lot that requires widened roading to enable the Lots each side to be subdivided pursuant to:-
– 2002 Agreements for sale and purchase (and 2008 further agreement)
– 2003 Registered Land Covenant Protection [see Summary and Review, page 1 para 2 for terms of extinguishment]
– 2009 Subdivision Consent (Condition 5 and stormwater Conditions for it 9.) [see Summary and Review, page 5 para 12]

The problem is
– the Security Sharing Joint Venture (Noble/Delta/Gold Band) SSJV designed and constructed their part of the subdivision such that it made the East West Access Lot owners (residents) parts of the subdivision impossible AND that the Council permitted this.

– Undersized stormwater infrastructure was corruptly installed without consent to NOT include the residents’ subdivisions (all the while falsely assuring residents it did).

– The stormwater is required to be on land the residents transferred to the developer in return for this stormwater and other provisions. It is required to be there for numerous reasons including physical and legal reasons;
* Residents transferred the land in return for this provision
* 2003 Land Covenants protect this land for that provision (required for the Access Lot Road to be formed and vested)
* 2009 The Subdivision Consent requires it to be on the developers’ land (Condition 9.5 which “disappeared”) [see Summary and Review, page 5 para 12 and page 10 email 16 Feb 2010]
* Residents that are part of that subdivision consent have the legal rights to the stormwater (s134 RMA) – the Council is refusing to enforce the conditions of the consent; and permitted the developer to NOT comply with the conditions.
* Land topography and layout physically requires it to go there. The land slopes High NWest to SEast Low

– Delta went ahead and constructed the infrastructure without legal consent – [see Summary and Review, page 10 email 22 Aug 2012]
* This is akin to a builder building a house without consent.
* Council failed to issue an abatement notice for works being complete without consent, and to non-complying standards.

For all the Council staff failings, and the consent holders and JV partners’ failings and corruption of making the residents parts of the subdivision impossible:-
– Delta/Infinity and Council staff are recommending to the Elected Council to vote to circumvent the residents’ Land Covenants so:-
* the residents roading and subdivisions will no longer be protected and will be impossible;
* the JV Infinity/Delta will make more profit by not having to comply with the conditions of the consent that requires the residents’ roading and inclusion (as above)
* Council staff “mistakes” and wrongdoing of permitting non-complying works and not enforcing the conditions of the consent (as required by law) will be covered up.

– Delta and DCC was the facilitator of transferring the property from the Delta/Gold Band/Noble Joint Venture to the Delta/Infinity Joint Venture.
– Delta (illegally) owned 67.5% of the 1st mortgage and controlled Gold Band through their Security Sharing JV.
– Delta’s assurances it had nothing to do with the mortgagee sale is a lie.
– Delta refused to allow Gold Band to accept offers to redeem the 1st mortgage (illegal under s102 & s103 Property Law Act).
– DCC refused to allow redemption of the 1st mortgage.
– DCC (and Delta) refused to accept assignment of the 1st mortgage when Colin Stokes and another (as parties with interests in the land entitled to redeem) offered it to them
* had they done, Delta could have registered about an additional $16m in agreements to mortgage they were sitting on
* all that was required in return was “our little road” which is a LEGAL REQUIREMENT of the subdivision consent in any event.

[ends]

As reported by The Press, the eight-year dispute involving the stalled Yaldhurst subdivision has now gone to mediation between the property owners and the developers.
The dispute has been aired in several High Court cases between the private landowners and the developers, which are continuing.

Related Post and Comments:
11.7.17 Delta has deep fingers into 8-year subdivision dispute at Yaldhurst

█ For more, enter the terms *delta*, *aurora*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

17 Comments

Filed under Business, Construction, Corruption, DCC, DCHL, Delta, Democracy, Design, Dunedin, Economics, Education, Finance, Geography, Housing, Infrastructure, Media, Name, New Zealand, OAG, People, Politics, Project management, Property, Public interest, Resource management, Site, Stadiums, Town planning, Transportation, Travesty, What stadium

“Fat” gawky Hotel and Apartment building : Questionable design even with 4 floors lopped off

What environmental considerations, Mr Page?

More than minor.

[Everyone will remember the learned Mr Page from the Betterways hotel and apartment building application for 41 Wharf St at the waterfront, not so long ago.]

Mr Bryce (independent planner): …a “key concern” for submitters…the building would block sun from reaching the Regent Theatre and surrounds from 3pm at winter solstice. “At this time of year, the proposal will effectively remove all remaining access to sunlight received over [the] southern end of the western side of the Octagon.” (ODT)

Mr Page (the developer’s ‘Brief’): The “potential shading effect” was acknowledged, but Mr Page was confident the hotel’s benefits “will far outweigh” those concerns. (ODT)

Mr Page, again : The hotel’s “tall, slender built form” minimised the impact on those living closest to the hotel project site… (ODT)

Good heavens.

Source: Application documents

At Facebook:

### ODT Online Tue, 11 July 2017
Hotel developer still confident
By Chris Morris
Dunedin’s latest five-star hotel bid will “not be viable” if the developer is forced to reduce the building’s height, it has been claimed. But the man behind the project, Tekapo businessman Anthony Tosswill, remains confident the hearings panel set to decide the project’s fate can yet be swayed by the hotel’s benefits. The comments came from Phil Page, the lawyer acting for Mr Tosswill, days after the public release of an independent planner’s report running the ruler over the hotel proposal.
The report by Nigel Bryce concluded consent be declined unless Mr Tosswill agreed to a “substantial reduction” in the building’s height, by four storeys, to bring it down from 60m to 45.5m.
Read more

****

Resource Consent Application LUC 2017-48 and SUB 2017-26, 143 – 193 Moray Place, Dunedin (Proposed Hotel)

The hearing will be held on Mon 31 Jul, Tue 1 Aug, Wed 2 Aug, Thu 3 Aug and Fri 4 Aug 2017 in the Edinburgh Room, Municipal Chambers (off the Octagon). The hearing will commence at 9.30 am each day.

Consultant Planner’s Section 42a Report (PDF, 4.3 MB)

[excerpt]

SUMMARY OF RECOMMENDATION
[5] For the reasons set out in paragraphs 72 to 334 below, I consider that the Proposal in its current form, will not promote the sustainable management of natural and physical resources in accordance with Part 2 of the Resource Management Act 1991 (RMA or the Act).
[6] The Development promotes a contemporary design, which is considered acceptable within this setting and articulates sufficient design interest and modulation through the facades and its pinwheel like form expressed in the tower component of the building. The building’s design incorporates a base building or podium, which allows the structure to have an active street frontage to Moray Place and Filleul Street, which is considered a positive design response.
[7] The Development will be ‘juxtaposed’ against a backdrop of the heritage buildings located to the east of Moray Place, including the Town Hall and St Paul’s Cathedral when viewed from the west and St Paul’s Cathedral and the Municipal Chambers when viewed from the south (including from the Octagon).
[8] The building’s overall height is considered to generate an over-dominance on properties to the north and west of the Site, and will have more than minor adverse effects on the amenity values of residential properties to the west of the Site. This is largely due to the significant change in scale introduced by the Development and the lower scale built environment that currently exists to the west and north of the development site, comprising predominantly two to three storeys in height.
[9] The Development will adversely impact upon the townscape values of the TH02 Octagon townscape precinct under the Operative Dunedin City District Plan (Operative Plan), including loss of sunlight penetration into the Octagon during the Winter Solstice and will adversely impact upon the setting and pre-eminence of existing heritage buildings such as the St Paul’s Cathedral and the Municipal Chambers building when viewed from the Octagon.
[10] The Development is considered to result in more than minor visual amenity and shading effects on Kingsgate Hotel to the south of the Site. The Kingsgate Hotel will experience prolonged and more sustained loss of light over a wider part of the property and associated buildings over the critical morning period during the Equinox and Winter Solstice periods (or collectively over ¾ of the year). This conclusion has been reached having regard to the potential for the Site to be developed up to a maximum height of 11 metres with a building erected against all boundaries (the ‘controlled activity building outline’).
[11] For the scale of the building to be mitigated to an acceptable level, and to maintain and enhance the amenity values of the City Centre and wider environs, Council’s urban design consultant, Mr [Garth] Falconer recommends reducing the proposed building height by four levels to bring the total height down to nine storeys (Level 13, +157,500 (datum level) on Drawing Section AA). This reduction would provide for a maximum height of 45.6 metres from existing ground level, or a maximum height breach of 34.4 metres (including the lift shaft). This mitigation response would not remove any of the 210 visitor accommodation rooms (hotel rooms), and would maintain supporting facilities including licensed premises, retail, conference, meeting facilities and on-site amenities, parking, and servicing areas. I note, for completeness, that the Applicant is not currently proposing to reduce the height of the Development.
[12] In its current form, it is my recommendation that the proposal should be declined.

More about Garth Falconer, DCC’s consulting urban designer:
LinkedIn profile: https://nz.linkedin.com/in/garth-falconer-a0699bb3
Owner and Director, Reset Urban Design Ltd: http://reseturban.co.nz/

Take a glimpse of the ‘urban form’ at Takapuna, North Shore Auckland (his home turf), to know Mr Falconer is likely missing any handle on building height for a heritage city like Dunedin.

****

Agenda and all documents including Submissions at:

http://www.dunedin.govt.nz/council-online/notified-resource-consents/notified-applications-pending/luc-2017-48-and-sub-2017-26

****

At Facebook [see comments]:

### ODT Online Sat, 8 Jul 2017
Reject hotel bid: planner
By Chris Morris
A planner has recommended rejecting Dunedin’s latest five-star hotel bid, unless the developer agrees to a “substantial reduction” in the building’s height. The recommendation to decline consent came in a report by independent consultant Nigel Bryce, made public yesterday, ahead of the public hearing beginning on July 31. In his report to the panel of independent commissioners, Mr Bryce said the hotel development would “visually dominate” its surroundings, including the town hall, St Paul’s Cathedral and the Municipal Chambers. It would be the tallest building in the central city and would cast a shadow over the Octagon, as well as the nearby Kingsgate Hotel, during winter. Together with other impacts, the development was considered to be “non-complying” under the city’s district plan rules. It would only be acceptable if the building was reduced by four storeys, lowering its overall height from 60m to 45.6m, which was still well above the existing 11m height limit for the site, his report said.
Read more

[initial coverage]
7.7.17 ODT: Decline hotel consent: report

### ODT Online Wed, 28 Jun 2017
Two from North Island on hotel hearings panel
By Chris Morris
The panel to decide the fate of Dunedin’s latest five-star hotel bid features one familiar face and two from the North Island. Tekapo businessman Anthony Tosswill’s bid to build a 17-storey hotel and apartment tower in Dunedin would be considered over five days, beginning on July 31, it was confirmed yesterday. […] The panel of three would be headed by chairman Andrew Noone, now an Otago regional councillor, acting in his role as an independent commissioner. […] Alongside him will be fellow independent commissioners Stephen Daysh, of Napier, and Gavin Lister, of Auckland.
Read more

Related Posts and Comments:
● 14.5.17 RNZ reports July hearings for proposed hotel apartment building [comments by Mr Tosswill]
● 4.5.17 Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building
● 7.4.17 Proposed hotel *height and design* —the very least of it #sellingoursouls
● 5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

Source: Application documents

15 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Enterprise Dunedin, Finance, Geography, Heritage, Hot air, Hotel, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, Otago Polytechnic, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

#freedomcamping not enforced at Warrington, summer 2016/17

ODT 21.6.17 (page 12)

Reply to letter to editor (snippet):

█ For more, enter the terms *warrington* and *freedom camping* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

17 Comments

Filed under DCC, DCC Bylaws, Democracy, District Plan, Dunedin, Economics, Education, Freedom camping, Geography, Health & Safety, Hot air, Infrastructure, Media, OAG, Ombudsman, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Tourism, Town planning, Transportation, Travesty

Draft bylaw and ADVERSE EFFECTS of freedom camping at Dunedin parks and reserves will be Consulted

FREEDOM CAMPING IS YOUR COUNCIL DELIBERATELY SETTING ITSELF UP TO COMPETE WITH COMMERCIAL CAMPSITE PROVIDERS

WHAT BENEFITS – THERE ARE NONE

We take it Mr Mayor does not live next door to a freedom camping site and does not lease out the council owned Santa Fe on his driveway to roofless young strangers with bad toilet and littering habits passing through the peninsula area.

Dunedin City Council – Media Release
Community’s views to be sought on freedom camping

This item was published on 09 Jun 2017

The Dunedin City Council will seek the community’s views on issues related to freedom camping, says Mayor of Dunedin Dave Cull. Council discussion on a report to its 30 May 2017 meeting which recommended public consultation to amend the current Camping Control Bylaw, was delayed pending information from a national freedom camping forum and new guidelines on self-contained vehicles. The proposed bylaw amendments were to allow for further sites to be considered for vehicles that are not self-contained. Mr Cull says that given the wide range of views expressed both formally and informally by the community and Community Board members in relation to the report, and on wider issues related to freedom camping over the last season, it was appropriate to revisit the DCC’s approach.

“Freedom camping is an extremely complex issue which draws impassioned comments from both sides of the debate. It is therefore appropriate to take this opportunity to formally engage with the public on the wider issues around freedom camping; looking at all the pros and cons, costs and benefits.”

A staff report would be presented to the 27 June Council meeting recommending a special consultative process on whether the current bylaw should be amended to restrict freedom camping to certified self-contained vehicles only, or whether it should continue to make provisions for vehicles not certified as self-contained and look at adding a range of further sites where these vehicles could be accommodated.

Mr Cull says the DCC’s current Camping Control Bylaw adopted in 2015 is a very good bylaw.

“At a national level it is regarded as a best practice bylaw by the National Responsible Camping Forum. However, overcrowding has been a major issue at the two unrestricted sites at Warrington and Ocean View, resulting in widespread concern in the community. We therefore need to understand from the community whether, firstly, they think the city should continue to make provisions for non self-contained freedom campers at all, and, if so, at what other sites around the city could these types of freedom campers be accommodated to ease the pressure at Warrington and Ocean View.”

Subject to Council approval on 27 June, staff would complete the public consultation, including hearings if required, and then report back to Council prior to the start of the 2017/18 camping season with a recommendation for further consideration. The current Bylaw will remain in force until that process is completed.

Contact DCC on 03 477 4000. DCC Link

****

### ODT Online Sat, 10 Jun 2017
Petition against freedom camping proposal
By David Loughrey
Residents living beside Rotary Park in Dunedin are the latest up in arms over a council proposal to provide three new freedom camping sites. The residents say the park could be “taken away from the locals”, and become the realm of freedom campers instead of local children. They have also raised concerns about noise from campers parking close to their homes, and potential damage to reservoirs, a pumping station, and telecommunications equipment at the park. In response to opposition to proposed camps at Rotary Park, Puddle Alley, near Invermay on the Taieri, and outside the Brighton Surf Life Saving Club, Mayor Dave Cull yesterday promised to consult the public before the council made any decisions. […] Waverley resident Sharon Weir said a meeting was held on Wednesday night with about 15 residents, and a petition to oppose the proposal had been started.
Read more

****

The only reason “Overcrowding had been a major issue at Warrington and Ocean View, resulting in widespread concern.” is because the Dunedin City Council decided to NOT manage the Warrington Domain. This to take away problems from ‘metropolitan’ areas.

DISGUSTING COUNCIL TREATMENT OF RURAL COMMUNITIES AND THEIR PUBLIC GREEN SPACE.

Warrington residents have had to deal with this:

Wrecked, the state of the domain after the camping season closed:

A Warrington resident worked out that, in the season, Dunedin Ratepayers had been subsidising the roughly 85–100+ freedom campers at the Domain each night at $10 per head.

CONSIDER A BAN ON FREEDOM CAMPING AT DUNEDIN

Related Post and Comments:
● 9.6.17 Council says “bag it” —we can help with that
● 30.5.17 The Boil Over : DCC and Freedom Camping, Reserves and Beaches bylaws
● 13.5.17 Condition of Warrington Domain screwed by DCC lack of enforcement #CampingControlBylaw23
● 1.2.17 “Fake news” from DCC boffins & Community Board re freedom camping at Warrington Domain #TheBlight

█ For more, enter the terms *warrington* and *freedom camping* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

Leave a comment

Filed under Business, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Freedom camping, Geography, Health & Safety, Hot air, Infrastructure, Media, New Zealand, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

#OldHat Dunedin bus system hard to use and unaffordable

Lynley Hood is a positive advocate for her area, no doubt – but hopefully she can think more widely than Corstorphine, to the provision of fair and equitable public transport for The Many, wherever they live in Dunedin, who struggle to pay standard fares or top up the ‘dumb’ Go Card —or who have no bus service to their streets at decent intervals with timely transfer options for necessary travel destinations [the currently ‘immovable’ ORC system].

Or thank god, there’s hail apps.

[Is Otago Regional Council up with the technology about to change public transport @ New Zealand —thereby cancelling any profit from the ill-thought diesel-breathing bus hub planned for Great King St in Central Dunedin.]

Black car service [uberinternal.com]

When a new flexible bus ticketing system is introduced early next year in Dunedin and the Queenstown area, consideration would be given to introducing a lower $5 top-up for Go Cards for online payments. –ORC

### ODT Online Tue, 6 Jun 2017
Bus discounts asked of ORC
By John Gibb
Kew resident Lynley Hood is urging the Otago Regional Council to introduce a community services card bus discount to help “transport disadvantaged” people in Dunedin. “Public transport is important for all sorts of reasons, certainly for inclusiveness and giving everybody a chance,” Dr Hood said. If you’re going to proceed with education and get a job, you’ve got to have transport. It’s got to be attractive to everybody, so it works for the people who need it.” She often saw bus users checking their small change to see if they could afford to use the bus, and clearly not everyone could. She has been suggesting this extension of the bus discount system, and other improvements in the Corstorphine bus service, for several years, and made a detailed submission to the council in 2014. More Corstorphine residents would be encouraged to switch to Go Cards by providing the suggested discount for community services card holders, and cutting the minimum Go Card top-up payment from $10 to $5, she said.
Read more

Radiohead Published on Jun 2, 2017
Radiohead – I Promise
I Promise is one of 3 previously unreleased tracks from the album OK Computer OKNOTOK 1997 – 2017.

****

“Transportation companies compete for customers, and ultimately it is the consumer who makes the choice.” –Chicago’s Department of Business Affairs and Consumer Protection

“Were the old deemed to have a constitutional right to preclude the entry of the new into the markets of the old, economic progress might grind to a halt,” Judge Richard Posner wrote in the 7th Circuit decision. “Instead of taxis we might have horse and buggies; instead of the telephone, the telegraph; instead of computers, slide rules.”

### usatoday.com 4:47 p.m. ET 5 Jun 2017 | Updated
Chicago cabbies say industry is teetering toward collapse
By Aamer Madhani
CHICAGO — Operators of the nation’s second-biggest taxi fleet are now accelerating toward their long-rumoured extinction, edging towards becoming virtual dinosaurs in the era of ride-sharing monsters Uber and Lyft. Cabbies have long grumbled that the sky is falling as they lose ground to ride-sharing companies. Now, cabbies in Chicago are pointing to new data that suggests the decline could be speeding up. About 42% of Chicago’s taxi fleet was not operating in the month of March, and cabbies have seen their revenue slide for their long-beleaguered industry by nearly 40% over the last three years as riders are increasingly ditching cabs for ride-hailing apps Uber, Lyft and Via, according to a study released Monday by the Chicago cab drivers union. More than 2,900 of Chicago’s nearly 7,000 licensed taxis were inactive in March 2017 — meaning they had not picked up a fare in a month, according to the Cab Drivers United/AFSCME Local 2500 report. The average monthly income per active medallion — the permit that gives cabbies the exclusive right to pick up passengers who hail them on the street — has dipped from $5,276 in January 2014 to $3,206 this year. The number of riders in Chicago hailing cabs has also plummeted during that same period from 2.3 million monthly riders to about 1.1 million. Declining ridership for Chicago’s taxi industry comes as foreclosures are piling up for taxi medallion owners who aren’t generating enough fares to keep up with their loan payments and meet their expenses.
….Chicago cabbies aren’t alone in feeling the pinch. In New York, ridership in the city’s iconic yellow cabs has fallen about 30% over the last three years. Last year, San Francisco’s Yellow Cab — the city’s largest taxi company — filed for Chapter 11 bankruptcy protection. Los Angeles taxi ridership fell 43%, and revenue was down 24%, between 2013 and 2016.
Read more

Medallion Report (FINAL)

[watch video] Fox 32 : Chicago taxi drivers: Industry is teetering toward collapse
Posted: Jun 05 2017 09:50PM CDT | Updated

New York, the new normal….

Motherboard Published on May 27, 2016
Is Uber Killing the Yellow Taxi in New York City?
As Uber’s stranglehold over the taxi industry increases, some New York yellow cab dispatchers have found themselves in an unprecedented predicament: sitting on millions of dollars worth of medallion yellow cabs, but not enough drivers to drive them.

█ Wikipedia: Taxicab regulation

Related Post and Cimments
8.12.16 Our loss-making public bus system, as for the colours *spew
20.11.16 Dunedin Buses – Route planners don’t consider effects on local business
11.8.16 Tesla Motors to open new location every four days #electrictravel
21.3.16 Uber travel

Posted by Elizabeth Kerr

This post is offered in the public interest.

10 Comments

Filed under Business, Democracy, Design, Dunedin, Economics, Education, Finance, Geography, Hot air, Infrastructure, Innovation, Inspiration, Leading edge, Media, Name, New Zealand, People, Politics, Project management, Public interest, Technology, Tourism, Transportation, Urban design

ODT updates mayoral vehicle serious injury crash information

### ODT Online Sat, 3 June 2017
Mayoress recovering
By Margot Taylor
The wife of Dunedin Mayor Dave Cull is slowly recovering after being seriously injured in a crash which wrecked a new mayoral car. Joan Wilson was driving a 2016 Hyundai Santa Fe when she crashed near Roxburgh in late December. Documents obtained under the Local Government Official Information and Meetings Act (LGOIMA) by blog “What if? Dunedin” reveal the $55,659 vehicle had been in use for just five days before the crash. In a statement to the Otago Daily Times Mr Cull said his wife sustained “serious injuries” in the crash. “Joan was the sole occupant in the vehicle. Fortunately, she is making a gradual recovery and I would like to take this opportunity to thank the emergency services and members of the public who provided assistance at the scene,” Mr Cull said. The accident was a “private matter” and no further comment would be made, Mr Cull said. […] Mrs Wilson was an authorised driver. Insurers had not identified the cause of the accident, and no other vehicles were involved.
Read more

Comment at ODT:
Dakota Sat, 03/06/2017 – 9:34am #
If this has cost ratepayers three grand, how is it a private matter?

****

New Zealand Transport Agency
NZTA manages the Crash Analysis System (CAS) – New Zealand’s primary tool for capturing information on where, when and how road crashes occur. The system provides tools to analyse and map crashes and enables users to identify high-risk locations and monitor trends and crash sites. This information helps inform transport policy, design and prioritise road safety improvements and monitor their effectiveness. CAS is used by a range of organisations all with the broad aim of improving road safety. It is an essential tool in supporting Safer Journeys and its vision of a ‘safe road system increasingly free of death and serious injury’. It enables the transport sector, over the long term, to improve road safety through knowledge, research and the measurements of the effects of changes to the network and network user behaviour.
https://www.nzta.govt.nz/safety/safety-resources/crash-analysis-system/

Ministry of Transport
Motor vehicle crashes in New Zealand is an annual statistical statement on road crashes in New Zealand. The crash data are derived from Traffic Crash reports completed by Police who attend fatal and injury crashes. As well as road crash statistics, motor vehicle crashes in New Zealand includes national hospital, breath and blood alcohol, road user behaviour and comparative international statistics which relate to road crashes.
http://www.transport.govt.nz/research/roadcrashstatistics/motorvehiclecrashesinnewzealand/

NZTA road death statistics
New Zealand road death toll statistics covering road fatalities and fatal crashes, updated daily. Road fatalities update | Fatal crashes update | Update road deaths by local government region | More detailed data
https://www.nzta.govt.nz/resources/road-deaths/toll.html

****

Postscript
The driver of the 2016 Hyundai Santa Fe is understood to have fallen asleep at the wheel resulting in the serious injury road crash as reported; their spouse was said to have been following in another vehicle at the time of the crash.

Related Post and Comments:
24.4.17 LGOIMA vehicle (DCC) : Hyundai Santa Fe (2016) written off Jan 2017

Posted by Elizabeth Kerr

This post is offered in the public interest.

Hyundai NZ Published on Apr 8, 2016
Five seats, or seven? | Hyundai NZ

20 Comments

Filed under DCC, Democracy, Dunedin, Economics, Education, Finance, Health & Safety, Media, Name, New Zealand, NZTA, People, Police, Politics, Property, Public interest, Transportation

Oh noes! One adverse slip of the pen and it’s Over Rover #warehouseprecinct

Property investment, gentrification and residential activity in city blocks ain’t all it’s cracked up to be with businesses and local authorities in cahoots. This ‘sell-out’ happens the world over —welcome to market economics and no protection. Economic development, baby!

PUBLIC ALERT – GOOD ONE, HAMISH MCNEILLY

About “CAR PARKS” and military precision *eheu

### Stuff.co.nz Last updated 17:55, May 31 2017
Dunedin students may leave vibrant area after parking spaces cut
By Hamish McNeilly
Students may be driven away by parking changes designed to make Dunedin’s warehouse precinct more vibrant. Otago Polytechnic student Nick Mowat is angry over changes to short-term parking on Vogel St this week. Earlier this year, the Dunedin City Council announced it would cut the number of all-day parks from 75 to 37, and increase the number of short-term parks to 108. None of the remaining all-day parks would be on Vogel St though, which was home to an annual street party celebrating the area’s rejuvenation. Mowat said many students flatted in the old warehouses and were part of the revitalisation of the area. They were disappointed about the parking changes. Despite opposing the changes, residents were issued with a notice from the council saying the changes would go ahead. Council safety team leader  Hjarne Poulsen said: “The parking changes are designed to make the area safer and more dynamic for residents and visitors, and to make it easier for people to get to local businesses.”
Read more

****

[click to enlarge]
DCC Webmap JanFeb 2013

[click to enlarge]

Warehouse Precinct Revitalisation Plan (PDF, 3.6 MB)
This Plan seeks to support the revitalisation to ensure the important historic Warehouse Precinct area becomes a vibrant and successful part of the central city, once again. [DCC weblink]

LGOIMA warehouse precinct investment (2)
Response received from DCC by email attachment on 19 May 2017

[click to enlarge]

Posted by Elizabeth Kerr

This post is offered in the public interest.

12 Comments

Filed under Architecture, Business, Democracy, Design, Dunedin, Economics, Education, Finance, Heritage, Housing, Infrastructure, Media, OAG, Ombudsman, Otago Polytechnic, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Resource management, Site, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

The Boil Over : DCC and Freedom Camping, Reserves and Beaches bylaws

At Facebook:

### ODT Online Tue, 30 May 2017
Freedom camping overflows
By David Loughrey
Three new freedom-camping sites are proposed for Dunedin, as the two already provided by the Dunedin City Council have reached capacity. Sites at Rotary Park in Highcliff, a reserve at Puddle Alley near Invermay on the Taieri, and outside the Brighton Surf Lifesaving Club has been put forward as proposed in a report to a council meeting today. The idea has already run into opposition from the Mosgiel-Taieri Community Board, which says the council should not spend money on non-self-contained freedom camping. The explosion of freedom-camping tourism in New Zealand has caused tension as locals deal with overrun campsites, litter and human waste. Sites at Ocean View, and in particular Warrington, have sparked complaints from some residents, while others have been supportive of the visitors. The report said there was an increase of 37% in vehicles using the Warrington site during February and March this year, compared with the year before. There were 157 vehicles there at Waitangi weekend.
Read more

****

There was a full meeting of the Dunedin City Council held today, preceded by a Public Forum.

[follow business at the DCC video when published at YouTube]

View the Agenda at: https://infocouncil.dunedin.govt.nz/RedirectToDoc.aspx?URL=Open/2017/05/CNL_20170530_AGN_539_AT_WEB.htm

Items to note:

2.3  Public Forum – Freedom Camping
Rhys Owen wishes to address the meeting concerning freedom camping.

2.4  Public Forum – Freedom Camping
Geraldine Tait, Waikouaiti Coast Community Board wishes to address the meeting concerning Freedom Camping.

Reports:

13. Reserves and Beaches Bylaw 2017
Recommendation    Minute   
Bylaw Hearings Recommendations
Implementation Plan
Beach Access Points for Horses and Boats
Ecologically Sensitve Beach and Reserve Areas
Reserves and Beaches Bylaw 2017

14. Review of Camping Control Bylaw 2015
Recommendation    Minute   
Survey Results
Warrington Map
Sites Identified by Community Board and Staff
Potential New Sites
Draft Camping Control Bylaw amendments
Statement of Proposal

At 14. above, I have linked to the freedom camping survey results requested MONTHS AGO via LGOIMA, from the scrubbers who guarded them from our ‘prying eyes’ – the results are pretty much illegible to the naked eye (nearly the smallest font size possible) but use your onscreen magnifier. Good grief pull your socks up, people: “Communicate clearly!”

At Channel 39 tonight, news presenter Craig Storey said issues with the DCC’s proposed three new freedom-camping sites reached boiling point at the Council meeting.

See tomorrow’s Otago Daily Times for more.

ODTtv June 7 2016
Someone in the video isn’t coping with the notion of freedom camping, and this was before things got really out of control at Warrington Domain over summer 2016/17 when the irresponsible DCC decided it would not enforce its camping control bylaw 23.

[btw….how delightful that the Green Party’s list has FEW Southern candidates – think on that DCC followers lol]

Related Posts and Comments:
● 13.5.17 Condition of Warrington Domain screwed by DCC lack of enforcement #CampingControlBylaw23
● 9.4.17 DCC obfuscates : Open slather for freedom campers at Warrington
● 16.3.17 WE have the information, unreasonable delay providing it #LGOIMA
● 15.2.17 Warrington : DCC dictates loss of community’s grassed recreation reserve to freeloaders
8.2.17 Hands Off Enjoyment of OUR Beaches #DCC
● 6.2.17 Uncontrolled freedom camping at Warrington Domain this weekend —DCC ‘hell model’ [no enforcement]
● 1.2.17 “Fake news” from DCC boffins & Community Board re freedom camping at Warrington Domain #TheBlight
10.2.16 Dunedin freedom camping #DCC #enforcement
16.12.14 DCC: Freedom Camping issues
7.12.09 Coastal protection zones

Posted by Elizabeth Kerr

This post is offered in the public interest.

9 Comments

Filed under DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Freedom camping, Geography, Health & Safety, Infrastructure, Media, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

Wharf Hotel and the former Gregg’s Coffee Factory, Fryatt St

Today Otago Daily Times columnist Dave Cannan kindly provided lift-off for a little social history project that’s dear to my heart.

At Facebook:

The call for information also appears at page 2 of today’s print and digital editions of the newspaper and at the ODT Facebook page.

We need STORIES – can you help?

Dave and I will be sharing information for publication.

We will take any stories people have, from any era – people can write a couple of paragraphs only if they want (email The Wash), or phone Dave with details.

I welcome a catchup with people hosting larger stories and more complex memories.

Contacts for Dave Cannan:
phone: (03) 479 3519
email: thewash@odt.co.nz
tweet: @thewashodt
http://www.facebook.com/thewashodt

The photograph of the ‘Glenlora’ at Dunedin Wharf was taken circa the 1890s. Glenlora was an iron barque of 764 tons, built in 1864 in Liverpool. Owned by Shaw Savill Line, the ship brought several thousands of immigrants to New Zealand between 1874 and 1895. Photographer: David Alexander De Maus, 1847-1925. D.A. Maus Collection – Alexander Turnbull Library.

Posted by Elizabeth Kerr

This post os offered in the public interest.

1 Comment

Filed under Architecture, Business, Design, Dunedin, Economics, Education, Events, Finance, Fun, Geography, Heritage, Infrastructure, Inspiration, Media, Name, New Zealand, People, Politics, Property, Public interest, Site, Tourism, Transportation, Urban design

Profligate behaviour : MYTH paraded as fact…… just like Aurora Energy’s propaganda campaign

Council infrastructure and networks committee chairwoman Cr Kate Wilson said last night the project would go ahead “regardless”. There was funding for three years, she said, and the fourth year’s funding would be part of next year’s long-term plan, and the one after that. The project was needed for safety reasons to prevent vehicles driving into the harbour and climate change making the road undriveable. (ODT) *Emphasis by whatifdunedin

Yeah right.

### ODT Online Fri, 26 May 2017
Botched cycleway estimate short by $13m
By David Loughrey
A bungled Dunedin City Council cost estimate to complete safety improvements and a cycle/walkway on Otago Peninsula has left the project more than $13 million short. The council announced yesterday an estimate for the project on Portobello Rd and Harington Point Rd that includes a cycle/walkway from Taiaroa Head to the city had risen from $20 million to $49 million. The earlier estimate, drawn up  in 2011, did not include parts of the cycleway to be built, land that had to be bought and a contingency fund to cover unforeseen expenses. […] Despite the cost rise, the council will start construction this year, with a shared cycle/walkway design.
Read more

****

Powerlines at sunset [garp.com]

Meanwhile WE will be paying for our Otago power network TWICE, at a crippling cost to business and residential power consumers well into the future —thanks to Dunedin City Council’s unsatisfactory governance of the companies Aurora Energy / Delta Utility Services and Dunedin City Holdings and, above all, the Council’s unfettered use of public funds to realise the dream of the Tartan Mafia and Professional Rugby to build the now frequently empty and under-utilised Forsyth Barr Stadium. (three concerts by Ed Sheeran in highly doubtful acoustic conditions inside ‘the roof’ does not a Christmas make).

All this because the Council conveniently fails to ensure it covers the infrastructural basics (in this instance: the safe, secure and continuous supply of electricity) – affordably – for the static if bearly stable City of Dunedin, and the sparcely populated Otago region in the mode of fast pumping growth. (There are simply too few permanent ratepayers to uphold ‘big bloated dreams’ and money siphoning on the rates take).

The Council did not ensure that Aurora Energy / Delta Utility Services were sufficiently well structured to Avoid profligate spending, making subvention payments to the stadium companies, or borrowing to pay dividends to the Council. (Probably the least of it).

There have been YEARS of dangerous neglect, embellishing the lack of repair and upgrade to the Community of Otago’s electricity network.

The Council is not well enough controlled (corporate and financial oversight) in order to Avoid its own profligate spending —so to protect, support and upgrade Otago’s power network as the solid basis for regional economic development and SAFE living —with CERTAINTY and SECURITY OF SUPPLY.

Instead, The People will now be plunged into further debt by the circus wheel of local body politicians and the morally thin and rather malevolent boards of directors (masters of spin) controlling the companies.

It’s time the People of Dunedin and Otago took control of their power infrastructure. Resolving, if they will, to adopt a different ownership and delivery model – one option is to form a democratically elected Community Power Trust to own and oversee the network; this is a sound regional model that is proven to work in other jurisdictions, with all due care.

WE have to Safeguard our future.
Not leave decision-making to unvetted members of the Tartan Mafia.
Especially not those in thrall to the likes of Gordon Stewart and his ilk (a vague reference to Delta’s speculative dealings at Yaldhurst, Christchurch – Delta is presently in a discovery process via an action brought to the Christchurch High Court by Caveators claiming Constructive Fraud).

DO NOT sell the ‘fragments remaining’ of the Otago Power Network (as bleated by some in power who can’t/won’t maintain a local body balance sheet – like you trust them, already?!) – to overseas corporates who will hike power prices disastrously to satisfy their shareholders.

Proceed carefully, OTAGO.

ASK QUESTIONS. RESEARCH. DO YOUR SUMS.
DON’T BE TOLD WHAT TO DO. ACT RESPONSIBLY FOR THE FUTURE PROSPERITY OF YOUR KITH AND KIN.
DO NOT PLACE FAITH IN OLD SPIN MAESTERS AND THEIR DEPUTIES.

We’ve seen them all before and have the new $1+ BILLION ‘invoice’ from Aurora Energy to prove it. Yes, we thought we had already paid over that amount in electricity and lines dues.

The suited ones bringing the clamour are looking after themselves – not US, not OUR COMMUNITY.

This is now a ransom.

The UGLY sister companies remain joined at the hip : Delta is Aurora Energy’s “preferred contractor”. And Steve is new, so don’t blame him! ….Really?

****

[propaganda – Aurora Energy]

After facing unrelenting pressure to up its game, Aurora Energy says it has stepped up to the challenge.

Sat, 27 May 2017
Dawn of a new Aurora era
By Vaughan Elder
Aurora chairman Steve Thompson said it had been under the “spotlight and the heat lamp” since accusations broke last October that it was endangering the public and workers by leaving its network, and in particular power poles, to deteriorate. That pressure turned ugly at times and workers had been verbally abused, including while out doing their supermarket shopping. Mr Thompson blamed the abuse on what he described as unfair criticism and media coverage. But Mr Thompson said in the face of adversity, Aurora and its sister company Delta had achieved a “hell of a lot” in a short space of time. The two companies were well on their way to splitting up in a divorce which Mr Thompson said would cost money in the short-term but reap huge benefits in the long-term. Aurora was also mid-way through an ambitious accelerated pole replacement programme and this week announced a $720million plan to upgrade its ageing network.
….Mr Thompson said its actions should help renew the public’s faith in both companies, but emphasised he believed that faith had been unfairly shaken by what he described as over-the-top criticism in the past seven months. He said safety concerns about the 2910 red-tagged poles across Dunedin, Central Otago and Queenstown Lakes had been overblown. At the same time, Delta and Aurora’s efforts to confront the problem, both before and after the story broke in October, had been under-reported, he said.
….Despite his anger at the way Aurora had been treated by critics and in the Otago Daily Times, he was under no illusion the network was in top shape, saying it was the second oldest network in New Zealand and acknowledged major work was needed to improve it in the next 10 years. But he would not be drawn on whether the situation had come about as a result of decades of underinvestment, which has been one of the main criticisms levelled at Aurora since October. He said he was not in a position to comment given he only started midway through last year.
Read more

CRITICAL ABHORRENCE FOR TOP CHAPS IN THE AURORA / DELTA / DCHL ‘EXECUTIVE’ (PAST AND PRESENT) WILL CONTINUE UNABATED IN THE PUBLIC SPHERE UNTIL THEY AND THEIR FRIENDS ARE OUSTED AND MADE ANSWERABLE TO HIGHER AUTHORITIES.

Otago people must busy themselves.
Time for formal inquiries. Time to REMODEL.

Related Post and Coments:
24.5.17 SCANDAL : Aurora Energy Ltd set to burden Otago ratepayers and residents with massive rates increases

█ For more, enter the terms *aurora*, delta*, *epic fraud*, *poles*, *healey* or *dchl* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

9 Comments

Filed under Aurora Energy, Business, Central Otago, Climate change, Construction, Cycle network, DCC, DCHL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Events, Finance, Geography, Health & Safety, Infrastructure, LTP/AP, Media, Name, New Zealand, NZTA, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Site, Sport, Stadiums, Technology, Tourism, Town planning, Transportation, Travesty, Urban design

Garrick Tremain GOLD #housing

23 May 2017

In a statement provided to the Otago Daily Times Mr  Cull said it was not the council’s place to lead discussions, but it would be happy to take part in  Government-led discussions.

### ODT Online Sat, 20 May 2017
Affordable housing hitch
By Vaughan Elder
Dunedin Mayor Dave Cull has declined a request from local MPs and social agencies for the Dunedin City Council to lead a crisis meeting over a lack of affordable housing. This comes as a group of social agencies, including the Salvation Army and Presbyterian Support, agreed to a statement saying the situation was reaching or had reached “crisis point”. The group said rising rents were making it hard and sometimes impossible for people on low incomes  to find affordable rental properties. “We are seeing a trend of landlords ending and not renewing leases, which forces tenants into a rental market they often cannot afford.” Waiting lists for social housing were growing and more families were living in cars and garages or being put up in motels while they waited for social housing. The group, led by Dunedin South MP Clare Curran, called on the council to co-ordinate a city meeting focused on identifying the problems and finding short-term solutions. “We believe the Dunedin City Council can play a strong role given it provides social housing and that housing quality and availability is an objective of its social wellbeing strategy.” They also believed the  Government was not doing enough to remedy the problem and that it should be involved in finding a local solution to the problem.
Read more

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: An idea promoted by the mayor: relocatables for managed retreat [Shadow Man 2013 – Matakishi’s tea house (detail) via matakishi.com]

5 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, Dunedin, Economics, Education, Finance, Housing, Infrastructure, Media, Name, New Zealand, People, Politics, Project management, Property, Public interest, Resource management, Site, Technology, Town planning, Transportation, Travesty, Urban design, What stadium

thoughts and faces #loosematerial

My father [never a follower of the FedUp Farmers, as he deemed them; always the campaigner for removal of farm subsidies, to enhance production and market competition] had ‘stock’ phrases with which to judge the faces of female adversaries, those with little brain or spine in politics, pretenders. One adept phrase that sticks in my mind is “like a horse eating thistles” —so I look on the following with my tinted lens, and laugh, rurally (ruefully). No one target.

On 19 May @StuFleming tweeted: “Spend $200k, revenue projections of $2.4M to others, 10% margin yields say $240k net”
[minus ODT news photo of face]

[DUD ‘money hype’ typically depends on false multipliers, anechoic silences, and arrogant self-belief —this (yes) bleak statement applies across a broad range of proposed deals and associated marketing detritus in the city, especially to events, conferences, sport, hospitality and accommodation, and even the re-use (Not conservation) of truly rare and precious instances of historic heritage] Here’s to all the fricking horses out there, including hypocritical colleagues and friends with blinkers like demo balls prepared to squeeze the last dollar and pass us to Hell. Anyway, back to “the business”…. cargo cult tourism. The wider effects of tourism are like those of dairying. Too many eggs in one basket and everybody (I mean, everybody) ends up doing it badly —killing Our Place for generations. Greed, like endorphins, like a running addiction, binds them up. They think they’re bright, they think they’re enablers (read risk takers/investors centred on their own gains only), they think they’re entrepreneurs, better than others (but because I for one will tell you things you don’t want to hear, you’ll say “I’ll ring you tomorrow”, that silence again) but they’re just funneled, tunneled sheepybaas – doing it wrong. Like cows, deer, Chinese gooseberries (Kiwifruit!), wines, stadiums….. or ‘getting a room’ behind the poorly remembered, heavily made-up, Disney’d facade of our city and nationhood. The worst kind didn’t, or didn’t bother to, ‘grow up’ here. They get desperate, create mess, import other yes men. Ring you like nothing happened, their exploits —not to ask deeply madly who and how you really are.

### ODT Online Sat, 20 May 2017
Trenz prompts high aspirations
By David Loughrey
Next year’s Trenz conference in Dunedin is set to cost ratepayers $200,000, but the long-term pay-off should run well into the millions.
The Dunedin City Council will next week be given an idea of the costs to the city of hosting the conference from May 7 to 10, and also the estimated benefits. The city learned last week it would host the tourism industry event next year, bringing up to 1200 international travel and tourism buyers, media and New Zealand tourism operators to Dunedin. It will be the first time the event, run by Tourism Industry Aotearoa (TIA), has come to Dunedin and the first time it has been hosted outside Auckland, Rotorua, Christchurch or Queenstown since it began in the 1960s. Trenz is an opportunity for New Zealand tourism operators to sell their product to buyers, effectively overseas travel agents who put together itineraries for overseas tourists. Attracting more than 350 buyers to experience the tourism products on offer here is considered a huge coup. On average, each buyer sends 4000 visitors a year to New Zealand, totalling 1.5 million. It comes as figures show New Zealand’s tourism market is expected to continue to grow strongly, topping $15 billion by 2023. Tourism contributes more than $690 million to Dunedin’s economy every year.
Read more

Meanwhile, although we (‘our stock’ NZ) and the UK farm gate look pretty much the same……

‘Herdwick Shepherd’ aka James Rebanks (@herdyshepherd1) farms Herdwick sheep in the English Lake District. Author of bestselling memoir, The Shepherd’s Life:

### ODT Online Saturday, 20 May 2017
OE to Britain set to get tougher
Prime Minister Bill English says the Conservative Party’s new plans to clamp down on immigration will sting New Zealanders wanting to live in the United Kingdom, including on the traditional OE, but there is little he can do until Brexit is completed. The British party’s election manifesto includes plans to drastically cut net migration from 273,000 to less than 100,000 by targeting students and those on working visas. It proposes cutting the number of skilled migrants to get visas, higher levies on employers who take on migrant workers and tripling the National Health Service immigration health surcharge from £200 to £600 ($NZ380 to $NZ1130) a year for those in the UK on visas of more than six months and 450 for international students. That surcharge increase will also affect those on the traditional OE, although there is no mention of scrapping the two-year youth mobility visa which allows young New Zealanders to get a two-year visa to work and travel in the United Kingdom. Mr English said the changes would affect those on their OE but they would have to grin and bear it until Brexit was completed. NZME.
Read more

Super City mayor Phil Goff has a plan for getting money from tourists – it bears some similarity to that of the Mongrel Mob……

### NZ Herald Thu, 18 May 2017
Winston Aldworth: Seeking the smart money
OPINION What do Phil Goff and the Mongrel Mob have in common? As hundreds of travel industry figures from all around the world gathered in Auckland for last week’s Trenz conference, one of the many topics up for discussion was the Auckland mayor’s enthusiasm for a hotel bed tax on visitors to the city. Meanwhile, up north at Ahipara on Ninety Mile Beach, three German tourists were approached by two local Mongrel Mob members who told them that they were on Maori land, and had to pay koha. They also told the tourists they’d be taking a few of their cigarettes. A tobacco tax, if you will. Perhaps their plan for putting heavy taxes on visitors was inspired by the Super City mayor. Goff’s bed tax is about as blunt an instrument as the Mob’s shakedown. “Look there’s a foreigner! Let’s get a couple of bucks off them.” The airport tax introduced by John Key a year ago is equally clumsy. It’s a travesty that these tariffs are the best we can come up with for making money out of tourism. Yes, other countries put dull levies on visitor arrivals, but that’s no reason to follow suit. We New Zealanders pride ourselves on being innovators, so let’s find innovative ways to get more money out of the tourism sector. Both Goff and Key were ministers in governments that did everything they could to remove tariffs from the dairy trade. Today, the best and brightest marketing wallahs of Goff’s inner circle are putting forward a plan no more sophisticated than one devised by two Mongrel Mob members standing on a Northland beach. I’m not against making money out of tourists — quite the opposite, in fact. I think it’s terrific that our country can be boosted by an industry that encourages us to care for our environment, celebrate the things that make our culture unique and spreads revenue quickly and efficiently to the regions. But how about instead of putting a dumb tax on the visitors, we upsell them? Take their money at the gate for sure, but give them something special in return.
Read more

Enough randomising. More rain and ice falls.

Posted by Elizabeth Kerr

This post is offered in the public interest.

24 Comments

Filed under Architecture, Baloney, Business, Carisbrook, Central Otago, COC (Otago), Concerts, Construction, Corruption, Crime, CST, Cycle network, Democracy, Design, Dunedin, Economics, Education, Electricity, Enterprise Dunedin, Events, Finance, Freedom camping, Geography, Health & Safety, Heritage, Highlanders, Hospital, Hotel, Housing, Infrastructure, Media, Music, Name, New Zealand, NZRU, OAG, Offshore drilling, ORFU, Otago Polytechnic, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Public interest, Queenstown Lakes, Resource management, SDHB, SFO, Site, South Dunedin, Sport, Stadiums, Technology, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design

Cumulative DCC rates rise; council boffins continue ruse of ‘found savings’

At Facebook:

****

The council had engaged with the public well, and arrived at a figure under the 3% limit. It was pleasing to keep faith with the community, and keep that promise. –Mayor Cull

### ODT Online Wed, 17 May 2017
2.99% Dunedin rates rise
By David Loughrey
Despite an extra $100,000 of spending approved this week, the Dunedin City Council scraped in under its self-imposed 3% target for rates rises for the next financial year. The council approved a budget that will see ratepayers asked for an extra 2.99% for 2017-18. Annual plan deliberations ended yesterday, after councillors spent a day and a-half discussing spending for the year ahead. The only major changes affecting ratepayers were an extra $100,000 approved for two projects, changes that came after staff found a further $100,000 in savings. […] Mr Cull said some people had reservations about the annual plan process, which featured feedback meetings rather than formal submissions this year, before full submissions are brought back for the long-term plan next year.
Read more

****

### ODT Online Wed, 17 May 2017
DCC approves $1m for artificial turf
By David Loughrey
Dunedin is set to get two artificial turf sports fields at Logan Park late this year or early next, after a proposal set to cost the city $1 million won unanimous approval yesterday. The move has delighted Football South, which had asked for the money to be provided urgently to attract available funding from Fifa. The Dunedin City Council annual plan deliberations meeting supported the proposal despite concerns from Cr Aaron Hawkins there had been no official public submissions this year, and others had been discouraged from suggesting new projects until next year’s long-term plan.
Read more

****

We’re not interested in (thank god) ex Cr Jinty MacTavish’s or the Green Party’s vision (what vision). DCC’s job IS to look after the environment together with infrastructure service provision. No further strategy is needed. Note the contradictions and hypocrisy contained in this item (italics by whatifdunedin):

The council moved the decision to give the strategy $200,000 to continue work towards making Dunedin a zero carbon, healthy environment.

### ODT Online Tue, 16 May 2017
Funding set for strategy
By Margot Taylor
The environment, bus governance and pool admission fees dominated discussions at the first day of Dunedin City Council annual plan hearings yesterday. The absence of public submissions was a notable difference at the hearing. The public had a chance to voice their opinions on the 2017-18 draft annual plan at public forums and drop-in sessions from March 30 to May 1, rather than at annual plan hearings as in previous years. Dunedin’s environment strategy received 26 comments during the consultation. Mayor Dave Cull said the comments provided “a pretty clear response” about funding for the initiative.
Read more

CUMULATIVE RATES INCREASES –
NO FAITH IS KEPT AT ALL EXCEPT THAT MAYOR CULL HAS TO GO

Posted by Elizabeth Kerr

This post is offered in the public interest.

51 Comments

Filed under Aurora Energy, Business, Central Otago, DCC, DCHL, DCTL, Democracy, District Plan, Dunedin, Economics, Electricity, Finance, Geography, Health & Safety, Infrastructure, LTP/AP, Media, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, South Dunedin, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

@whatifdunedin tracks the International Space Station #ISS

Ignazio Magnani (@IgnazioMagnani), residing in Reggio Emilia, Italy, keeps his followers posted about the visibilty of the International Space Station and the composition of the crew aboard the spacecraft in orbit. His Twitter ID is a painting of Russian pioneer of space flight Yuri Gagarin, the first man to have done (12 April 1961) a space flight. Ignazio’s Twitter profile is a tribute to space exploration and the research to improve our quality of life.

****

Dunedin-based astronomer and dark skies proponent Ian Griffin (@iangriffin) keeps an eagle eye out for happenings overhead, often with superb and astonishing camera results. To obtain these shots of the overhead pass Ian used a 9.25inch Celestron with a Sony A7S2 camera.

****

Intl. Space Station (@Space_Station) is NASA’s page for updates from the International Space Station, the world-class lab orbiting Earth 250 miles above. For the latest research, follow @ISS_Research.

****

In other news….

Inmarsat-5 F4 Mission
SpaceX’s Falcon 9 rocket will deliver Inmarsat-5 F4, a commercial communications satellite, to a Geostationary Transfer Orbit (GTO). As the industry leader and pioneer of mobile satellite communications, Inmarsat has been powering global connectivity for more than three decades. SpaceX is targeting launch of Inmarsat-5 F4 from historic Launch Complex 39A (LC-39A) at NASA’s Kennedy Space Center in Florida. The 49-minute launch window opens on Monday, May 15, at 7:21 p.m. EDT, or 23:21 UTC. A backup launch window opens on Tuesday, May 16, at 7:21 p.m. EDT, or 23:21 UTC.

Posted by Elizabeth Kerr

This post is offered in the public interest.

2 Comments

Filed under Business, Design, Dunedin, Education, Events, Fun, Geography, Innovation, Inspiration, Leading edge, Media, Name, New Zealand, People, Pet projects, Public interest, Technology, Transportation, What stadium

RNZ reports July hearings for proposed hotel apartment building

Image: Paterson Pitts Group

Image: Thom Craig Architects

### rnz.co.nz Wed, 10 May 2017 at 6:13 p.m.
RNZ News: New Zealand / Business
Hotel plans prioritise visitors over residents – objectors
By Lydia Anderson – Otago/Southland reporter
Residents above the proposed site for Dunedin’s first five-star hotel say it’s not right their view of the city will be blocked so tourists can have a better one. The 17-storey ‘Electric Thistle’ Moray Place design would sit behind the city’s heritage buildings in the Octagon. More than 200 submissions on the project have been filed – three quarters of them in opposition. The hotel’s height and modern design has some residents worried – at about 64m high it would be significantly taller than the current 11m limit imposed on the chosen site, which is currently a carpark.
….The proposed hotel would feature 210 hotel rooms plus apartments, cafe, a wine club, public hot pools and conference rooms.
….The hotel’s developer [?]* Tony Tosswill, who represented Horizon Hospitality Group, said the hotel was being built high rather than wide out of consideration for the views of people living in the city rise area. To meet international five-star standards the hotel needed views and around 200 rooms, he said.
….Public hearings on the submissions will take place in July.
Read more

● Full application: 143-193 Moray Place – LUC-2017-48 and SUB-2017-26
View all submissions

****

The applicant is NZ Horizon Hospitality Group Limited http://www.companies.govt.nz/co/5876487

The name of the building developer/financier hasn’t been announced. Asian finance is suspected as being needed but likely not obtained yet; New Zealand’s Australian-owned banks aren’t providing credit on speculative developments at this scale.

Pullman Hotels is fêted as the hotel manager.

█ Spokesman for the (unnamed) developer is Anthony Tosswill of Tekapo, NZ. Mr Tosswill is not the developer, as may have been construed from MSM news items.

****

The following comments from Mr Tosswill were received for publication by What if? Dunedin in late April. Links to the threads where they appear are provided here:

2017/04/24 at 9:37 pm
Anthony Tosswill
In reply to Elizabeth.
why do you wish to destroy employment in Dunedin, why do you want to prevent creating Jobs and more revenues for the Community and supporting Tourism and local Business?
Why do you wish to keep subsidizing Dunedin venues when they can support themselves with the Services that this Hotel can offer.
Why dont you disclose who you are so People can judge you and your motives. The Jobs that Cadburys will make redundant are you able to give them Jobs or the new Students ending there education.
When was the Last New Hotel Built in Dunedin? Dunedin None Queenstown 6, Queenstown 26,000 Dunedin 126,000.
How about supporting Development, and Jobs or are you one of those that just as you say destroy everything before its starts.
Who am I, I am a spokesman for the Developer

2017/04/24 at 9:46 pm
Anthony Tosswill
In reply to Elizabeth.
Great Video, it suggests you are supporting Terrorism. Is that amusing blowing up things. It also suggests you want to stop Jobs, supporting local Business. preventing People attending Events and Venues, dislike tourism and dont want a venue that supports Dunedin. I suggest you at least remove the Blowing up of the Developments its in very bad taste.
When reading comments on this site its easy to see why it has so little support.
I am a spokesman for the Developer, who are you?

2017/04/25 at 4:58 pm
Anthony Tosswill
In reply to Peter.
I would like to point out that Residents in Londo complained about the about the Shard in London and the London Eye yet, Yet Today we Recognize London for these 2 Buildings as they are also Top Tourists sites as is the Palace. Hindsight is marvelous
Do you recall the complaints when the stadium prior to been Built now its recognized as one of the Top 20 in the World. Dunedin be proud.
One may tell us of Identical Buildings so we can learn from your expertise.
The Design relates to minimizing views from residents behind plus maximizing views of Tourists that want to appreciate Dunedin and its Harbour we believe in our design and concept.
Retrospective opinions are great if you are trying to stop the future progress of Dunedin, if your view point is taken seriously its Dunedin’s loss.
Spokesman for the Developer.

2017/04/25 at 5:28 pm
Anthony Tosswill
In reply to Elizabeth.
Hi Elizabeth,
you made several comments. Architectural design.
a) Design and the Changes,
In Response, I respectfully point out that does not relate to commercial facts or results, hence for any 5 Star Hotel and in Particular in Dunedin our view is very different but it is for this type of Development whats been Built in All Cities around the World, we are one of the 99% (Not the 1%)
b) We have incorporated a Design that shows off Dunedin, with new Technology that is expected today by 5 Star Guests. Dunedin is the Showcase, the Development is to provide Access to the City not be the City~
You suggest and refer to your time and Resources “What are They”?
It Also appears that you think Asians are also different or at least there Money is, maybe you should complain also about the contribution made by Asians that go to Otago University is their money bad? I like Asian People, I married to one.
Love to know more about whatever Cargo Growth is? Are you a Supporter of Cadbury Factory Closure as well? Is that not a local Resource?
400 Persons Daily Spending Money in New 5 Star Hotel in Dunedin is Growth to Dunedin, please re add up the equation since you have an alleged financial background your sums should add up one cold think,
Good on you Farmer for having an independent view point congratulation is this Elizabeth’s Blog its appears to be!
Spokesman for the Developer

Related Posts and Comments:
● 4.5.17 Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building
● 7.4.17 Proposed hotel *height and design* —the very least of it #sellingoursouls
● 5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

14 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Enterprise Dunedin, Finance, Geography, Heritage, Hot air, Hotel, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, Otago Polytechnic, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

Democracy, a little strange looking here and there

ODT 12.5.17 (page 16)

Not sure the above is the “nature of democracy”.
Ownership more often than not has rights to what Democracy might be, for better or worse. Democracy is the dull moving target around traction of tolerance and accommodation, alternately characterised by recklessness, drilling, handholding, gutless audacity and full oppositional war. And finally, perhaps, it is Comedy of Errors (the big CE) – to do with pique, vanity, providence, chess-like cunning, ill temper and quarrelsome kicks, artful dodging, strange bed fellows, lousy cracks at definition, ruthless assaults and incursions, “Territory”, chiming disgust, stiff ultimatums, the surrender to power, corruption or fraud…..and all notions, wagons, bonfires that encircle ‘the final word’ and last stands, angry trumpet votes to Brexit, chaste lookalikes, injury, ill health….. Jesus weeps.

### ODT Online Wed, 12 Apr 2017
Hospital rebuild: back off but don’t back down
By Hilary Calvert
OPINION If we asked Otago people what they most want from health services it would likely be health service delivery in the province at least as good as the rest of New Zealand. For example, whatever qualifies for an operation here should be the same that qualifies those up north. The Dunedin School of Medicine is vital to us as well. […] What if harassing of the Government in an imagined party political fashion just makes the Government determined to not give us what we want, since we will likely vote two local Labour people into Parliament this year? If we concentrate on telling the Government what we most want, and stop trying to tell it how it should deliver the services, we have a much better chance of getting the best result.
Read more

Comment to What if? Dunedin:

Diane Yeldon
April 14, 2017 at 11:10 pm
“Harassing of the Government in an imagined party political fashion.” Well said by Hilary Calvert. Spot on!
Here’s the meeting video for 21 Feb. Starting from 1.58.24 into the video, you can watch the discussion on the resolution which authorised the [Dunedin Hospital SOS] campaign. This was the Notice of Motion put forward by Cr Benson-Pope and seconded by Cr Hawkins.
There was no information in the agenda about how much the ‘asking for support’ would cost or how the ‘asking for support’ would be carried out. Nor did any councillors ask questions about this. Their attention was focused solely on discussing the rights and wrongs of the hospital siting (with only a couple of councillors saying they didn’t think it was any of their business.)
I can’t help wondering if many of the councillors did not understood that this ‘asking for support’ would result in unleashing a full-blown advertising campaign with leaflet drop, website and newspaper ads costing so far $12,000! I wonder if the motion had been taken in two parts with the second part only about the campaign and its full extent and costs disclosed the majority would have still voted in favour.

Dunedin City Council Published on Feb 26, 2017
Dunedin City Council – Public Forum + Council Meeting – 21 February 2017
Minutes, agendas and reports related to this meeting can be found at https://goo.gl/Eis3sK

[decisionmaker.co.nz] formatted by whatifdunedin

Related Posts and Comments:
● 8.4.17 Questions over Council’s Dunedin Hospital SOS campaign
● 6.4.17 ODT editor comments strongly #tick —Dunedin Hospital rebuild
● 27.3.17 Site Notice #DunedinHospital
● 26.2.17 Dunedin Hospital Redevelopment
● 6.2.17 Let the Ombudsman recommend for democracy at SDHB
● 24.1.17 SDHB/Govt : Physio Pool GRIEF
● 9.1.17 Audit NZ admonishes commissioner Grant and SDHB #Health
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
20.11.16 Delta at Dunedin Hospital #worseluck
7.11.16 SDHB #FAILS with Healthcare Communication and Governance

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: batmanrobin by Mike Luckovich 2016 @njc.com [via truthdig.com] tweaked by whatifdunedin

32 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Geography, Health, Health & Safety, Heritage, Hospital, Hot air, Infrastructure, LTP/AP, Media, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, SDHB, Site, Technology, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

Condition of Warrington Domain screwed by DCC lack of enforcement #CampingControlBylaw23

Freedom campers are ignoring closed signs at Warrington Domain.

Photographs and accompanying letter received from a Warrington resident (name withheld) on Monday, 8 May 2017 at 10:52 a.m.

All comments to the photographs are by whatifdunedin.

APPALLING
Dunedin City Council trashes Warrington ratepayers’ and residents’ recreational amenity asset:

Warrington Domain 2 May 2017, ground condition before the domain closed.

Damage to the village green is all down to the deliberate decision by Dunedin City Council to allow uncontrolled freedom camping at the Domain over the 2016/17 summer period (read no enforcement of Camping Control Bylaw 23); this for reduction and avoidance of freedom camping happening in metropolitan Dunedin. Out of sight, out of mind. The Warrington community receives no proper help from the scrubbers on the politicised local community board, to protect the asset.

It’s a bloody scandal – someone (plural) should lose their job.

In these photos freedom campers continue to park outside the closed domain totally ignoring the DCC signage but with apparently no repercussions:


Due to email file size limits a video recording was not forwarded to What if? Dunedin. Hopefully this will come available shortly via YouTube.

Warrington resident receives no reply to their polite yet pointed email sent to Waikouaiti Coast Community Board (WCCB) and DCC. How surprising!

From: [Warrington resident]
Sent: Saturday, 6 May 2017 8:50 p.m.
To: Waikouaiti Coast Community Board; Dunedin City Council Customer Services; Ashley Reid [DCC]; Jendi Paterson [DCC]
Subject: Freedom campers ignore closed signs

Hi DCC and WCCB,

I became aware there are freedom camper vehicles outside the domain this evening from their music and the noise of car doors.

FYI 13 non-self-contained freedom camper vehicles are parked outside the Warrington domain tonight and a 14th is parked in the surf club carpark.

When asked they denied seeing the signs that clearly state the domain is closed to camping.

Our points are:
– the freedom campers are clearly ignoring your signs
– there doesn’t seem to be anyone controlling the area at night
– it is unreasonable for local residents that the freedom campers choose to park wherever they like

Regards
[Warrington resident]

****

Dunedin City Council
23. Camping Control Bylaw 2015 (PDF, 2.5 MB)
The purpose of this bylaw is to protect, promote, and maintain public health and safety by regulating freedom camping within the district; and restrict freedom camping in public places within the district. Link
Date approved: 01 November 2015

DCC 23. Camping Control Bylaw 2015dcc-bylaw-23-camping-sites-warrington-recreation-reserve

Related Posts and Comments:
● 9.4.17 DCC obfuscates : Open slather for freedom campers at Warrington
● 16.3.17 WE have the information, unreasonable delay providing it #LGOIMA
● 15.2.17 Warrington : DCC dictates loss of community’s grassed recreation reserve to freeloaders
8.2.17 Hands Off Enjoyment of OUR Beaches #DCC
● 6.2.17 Uncontrolled freedom camping at Warrington Domain this weekend —DCC ‘hell model’ [no enforcement]
● 1.2.17 “Fake news” from DCC boffins & Community Board re freedom camping at Warrington Domain #TheBlight
10.2.16 Dunedin freedom camping #DCC #enforcement
16.12.14 DCC: Freedom Camping issues
7.12.09 Coastal protection zones

Posted by Elizabeth Kerr

This post is offered in the public interest.

2 Comments

Filed under Baloney, Business, Corruption, DCC, DCC Bylaws, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Freedom camping, Geography, Health & Safety, Hot air, Infrastructure, New Zealand, OAG, Ombudsman, Other, People, Perversion, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Sport, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

TOMMYROT from ‘academic’ local authorities…. #SouthDunedin it’s PUNCH BACK TIME

At Facebook:

More in tomorrow’s newspaper.

****

Chairman of the Otago chapter of the Property Council New Zealand Geoff Thomas says policymakers need to be careful not to damage property development opportunities in South Dunedin.

### ODT Online Wed, 10 May 2017
Policy could hold back South Dunedin
By Margot Taylor
Residential property development in South Dunedin could be “squashed” by the Dunedin City Council’s overly cautious natural hazards policies, the Otago branch president of the Property Council New Zealand warns.
Geoff Thomas said a proposal under the proposed second generation Dunedin city district plan (2GP), to require all residential properties in the area to be movable, could stymie the replacement of housing stock. The proposed policy ignored costs associated with residential development, including land, compliance costs and construction materials. “Making residential housing relocatable doesn’t make sense. I, personally, have sold a 1980s house with aluminium joinery for $1 to be moved.” If approved, the proposal would result in either more substandard houses, or houses that would be “very expensive” to build, he said. The natural hazards policies did not adequately consider current and potential technologies to manage sea-level rise and floods. “I think South Dunedin is full of opportunity. A lot of the housing stock is from a day gone by. It is an opportunity to do something with the area and our concern is we don’t want to end up with a caravan park out there.” Water drainage was a clear issue. A more reasonable approach to protect the economic viability of the area could be taken to address it.
Read more

Posted by Elizabeth Kerr

This post is offered in the public interest.

16 Comments

Filed under Architecture, Baloney, Business, Climate change, Construction, Corruption, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Geography, Health & Safety, Heritage, Hot air, Housing, Infrastructure, LTP/AP, Media, Name, New Zealand, NZIA, NZPI, NZTA, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, SFO, Site, South Dunedin, Stadiums, Structural engineering, Technology, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design