Tag Archives: ORC

Regional state of emergency lifted in Otago (incl Dunedin & Waitaki)

Otago’s state of emergency has been lifted.
Emergency Management Otago this morning lifted the state of emergency which existed since deluges and heavy wind battered Otago’s eastern coast over the weekend. The region has now officially entered a recovery phase with teams moving on to assessing the damage and checking on the needs of those affected by the devastating floods. Emergency Management Otago group controller Chris Hawker, in Dunedin, said the move towards recovery did not signal any reduction in effort.

● Dunedin City Council (03) 477-4000
● Federated Farmers 0800 FARMING (0800 327 646)
● Otago Rural Support Trust 0800 787 254
http://www.rural-support.org.nz

****

DUNEDIN CITY COUNCIL

Dunedin July Severe Weather update
10.45am Monday 24 July 2017

State of Emergency lifted

The Dunedin State of Emergency was lifted at 9am today. Under the Civil Defence Emergency Act 2002 we are now operating under a Notice of Local Transition Period as we move into the recovery phase.
The transition period is in force for 28 days (expires 9am 21 August) unless extended or ended earlier. The notice still gives the local authority powers to carry out essential emergency-related work.
More information about the work happening as part of the recovery phase will be provided today. The work will be led by Dunedin City Council Recovery Manager Simon Pickford.

Evacuation map – Upper Taieri Pond (PDF, 3.3 MB)
Mill Creek ponding area (PDF, 2.3 MB)

██████ DCC TWITTER FEED AUTOMATICALLY UPDATING

Continue reading

64 Comments

Filed under Business, Central Otago, DCC, Dunedin, Emergency services, Fire and Emergency NZ, Health & Safety, Housing, Infrastructure, Media, New Zealand, North Otago, NZTA, ORC, People, Police, Property, Public interest, Queenstown Lakes, South Dunedin, Transportation

DCC ORC : Heavy rain warnings preparations #PublicNotice

See new post : Regional state of emergency declared in Otago in support of Dunedin & Waitaki

██████ DCC TWITTER FEED AUTOMATICALLY UPDATING

****

(sp) Oturehua, Ida Valley, Central Otago

****

At Facebook:

### ODT Online Fri, 21 Jul 2017
Storm hits: what you need to know

Oamaru
Oamaru and surrounds are bearing the brunt of the storm, with widespread surface flooding and some homes flooded.

Mosgiel
There is surface flooding in Mosgiel, which is being closely monitored.

Sandbags
Mosgiel people concerned about rising water can access sandbags and sand from the Memorial Park car park beside the stadium/Mosgiel Memorial Gymnasium.
Sandbags are also available in South Dunedin at the car park behind St Clair Tennis Club, Victoria Road.
Where possible, people should bring a shovel to fill the bags, although contractors are available on-site at both locations to assist with filling and loading.

Information centres
As a precaution the council has opened information centres in South Dunedin, in The Mercy Room, Catholic Social Services, 42 Macandrew Rd, and at Mosgiel Fire Station Theatre, 3 Cargill St.

Freedom Campers
Due to the weather the Dunedin City Council recommends all freedom campers find alternative accommodation rather than staying at either of the council’s two freedom camping sites tonight.

Roads
NZ Transport Agency has issued road warnings for surface water and flooding across Otago, including SH1 from Waipahi to Waitaki Bridge.
Warnings are also in place for SH88 from Dunedin to Port Chalmers, SH 87 from Kyeburn to Outram.
SH83 from Pukeuri to Duntroon is also affected by flooding and is closed between Gray Rd And Horse Gully Rd.
In Canterbury SH 82 Waimate To Kurow is closed.
SH1 is now closed between Pukeuri to Morven

Rivers
The Kakanui, Shag and Taieri Rivers, the Silver Stream, Water of Leith and the Lindsay Creek are all rising steadily.

Flights cancelled
Flights to and from Dunedin Airport have been cancelled this afternoon.
The cancelled flights include Air New Zealand flights to and from Auckland and Christchurch.
The Jetstar flight from Dunedin to Auckland at 4.15pm has been cancelled.
Air New Zealand is advising customers booked to travel to and from Dunedin to consult the arrivals and departures information on our website here for up to date schedule information.

Sports grounds
The Dunedin City Council has closed all sports grounds for the weekend because of the weather.
The club rugby semi-finals may still go ahead at Hancock Park on Saturday depending on the weather. The decision will be made by the Otago Rugby Football Union.

Power cuts
There are reports of power cuts in Oamaru. In Dunedin power has been cut to about 100 customers in Green Island, Fairfield and Abbotsford suburbs of Dunedin after a power line came down.
Aurora Energy says it has a response crew working to fix the fault and power was expected to be restored by 5pm.

General preparedness
The Dunedin City Council is encouraging all residents and businesses across the city to make their own preparations.
Residents in low-lying areas who feel concerned should make plans to self-evacuate themselves to stay with friends or family who live on higher ground should it be required later on.
Check on neighbours, particularly if they are vulnerable.
Check spoutings and drainage channels for blockages and clear them if necessary
If your basement is prone to flooding lift items that could be damaged by water off the floor. Be sure garden sprays and other chemicals won’t be affected
Check grates near your house for blockages and keep them clear of leaves and other debris to avoid water building up and affecting your property.
https://www.odt.co.nz/regions/storm-hits-what-you-need-know

Continue reading

22 Comments

Filed under Business, DCC, Dunedin, Health & Safety, Housing, Infrastructure, ORC, Property, Public interest, South Dunedin

TOMMYROT from ‘academic’ local authorities…. #SouthDunedin it’s PUNCH BACK TIME

At Facebook:

More in tomorrow’s newspaper.

****

Chairman of the Otago chapter of the Property Council New Zealand Geoff Thomas says policymakers need to be careful not to damage property development opportunities in South Dunedin.

### ODT Online Wed, 10 May 2017
Policy could hold back South Dunedin
By Margot Taylor
Residential property development in South Dunedin could be “squashed” by the Dunedin City Council’s overly cautious natural hazards policies, the Otago branch president of the Property Council New Zealand warns.
Geoff Thomas said a proposal under the proposed second generation Dunedin city district plan (2GP), to require all residential properties in the area to be movable, could stymie the replacement of housing stock. The proposed policy ignored costs associated with residential development, including land, compliance costs and construction materials. “Making residential housing relocatable doesn’t make sense. I, personally, have sold a 1980s house with aluminium joinery for $1 to be moved.” If approved, the proposal would result in either more substandard houses, or houses that would be “very expensive” to build, he said. The natural hazards policies did not adequately consider current and potential technologies to manage sea-level rise and floods. “I think South Dunedin is full of opportunity. A lot of the housing stock is from a day gone by. It is an opportunity to do something with the area and our concern is we don’t want to end up with a caravan park out there.” Water drainage was a clear issue. A more reasonable approach to protect the economic viability of the area could be taken to address it.
Read more

Posted by Elizabeth Kerr

This post is offered in the public interest.

16 Comments

Filed under Architecture, Baloney, Business, Climate change, Construction, Corruption, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Geography, Health & Safety, Heritage, Hot air, Housing, Infrastructure, LTP/AP, Media, Name, New Zealand, NZIA, NZPI, NZTA, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, SFO, Site, South Dunedin, Stadiums, Structural engineering, Technology, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design

Dunedin’s second generation district plan (2GP) —notes on Natural Hazards

Received from Neil Johnstone
Wed, 3 May 2017 at 7:19 p.m.

Message: Last Thursday (27 April) I presented the remainder of my submission on Natural Hazards. Notes attached in case they might help anybody’s further efforts.

{The notes from Mr Johnstone are public domain by virtue of the consultative 2GP hearing process. -Eds}

****

2GP PRESENTATION NOTES: LANDSLIDES
Neil Johnstone

I have no property interest in any landslide hazard area (although I did previously), nor in the Water of Leith catchment, nor in South Dunedin. My main purpose in appearing at this stage is to bring to the panel’s attention that the expert (so-called) opinions received from Otago Regional Council’s (ORC) natural hazard analysts are often deficient to the detriment of the 2GP process and the city’s residents.

I am a long-term resident of Dunedin and am highly experienced in flood control issues and solutions. I am appearing here on my own behalf, therefore not strictly as an Expert Witness in this instance, although I have done so in past years both in both the High Court and the Environment Court. I also acted as lead technical advisor to the NZ Govt investigation into the massive 1999 Clutha flood. My detailed investigations have ranged from simple issues such as the Water of Leith (as Investigations Engineer at Otago Catchment Board and ORC) to the entire Clutha catchment (in varying roles). These investigations have often incorporated the construction and operation of accurate, properly verified models.

I am now semi-retired MIPENZ, but still running my own consultancy on a reduced basis. I am a highly experienced expert in flood issues, I am much less so wrt landslide identification and mitigation (but I know a nonsensical report when I read one). ORC hazard analysts responsible for the landslide buffer zones originally imposed across my former property (and many others) need to accept that their approach was seriously flawed, and far from expert. Paul Freeland has mentioned to me in a recent phone conversation that Dunedin City Council (DCC) should be able to have confidence that ORC hazard analysts are expert. I have no strong criticism of Mr Freeland, but those days have passed – in this region at least – when expertise was based on proven performance, and not on a position’s title. A property previously owned by my wife and me in Porterfield Street, Macandrew Bay was quite ridiculously misrepresented in ORC’s landslide report of September 2015. The landslide hazard zone on that property has apparently now been removed, but uncaring damage has been done to us, and no doubt to many others. The Hazard 2 zone was reportedly imposed without site inspection, or without anybody properly reviewing output or checking accuracy of references.

[Reason for submitting: Natural Hazards section of 2GP dominated (undermined) by ORC hazards staff input and DCC failure to verify/review; DCC presumption that ORC “experts” do/should have appropriate expertise. We appear to be witnessing a proliferation of Hazard Analysts in NZ Local Government with little relevant experience or skill.]

****

2GP PRESENTATION NOTES: SOUTH DUNEDIN
Neil Johnstone

The comments re South Dunedin flood hazard contained in my original written submission were written prior to DCC’s producing its inaccurate flood reports in respect of the South Dunedin flooding of early June 2015 in which high groundwater levels were held to blame. These DCC reports were eventually released in late November 2015 and April 2016 respectively. My analyses (well after my original submission) demonstrated that the prime cause of widespread flooding in South Dunedin was DCC’s failure (in order of probable significance) to utilise the bypass facility at Tahuna Wastewater Treatment Plant, to fully utilise its stormwater pumping capacity at Portobello Road, and to maintain its stormwater infrastructure (mudtanks etc). Inflow of “foreign” water from the St Clair catchment added to the depth of inundation in some areas. All these can be remedied by a diligent Council. Some have already been remedied, as positively demonstrated in the admittedly rather over-hyped rain event of the subtropical cyclone remnant around this past Easter.

ORC natural hazard analysts were probably responsible for the origin of the groundwater myth as a cause of the South Dunedin flooding in their Coastal Otago Flood Event 3 June 2015 report. Reference was made there to “elevated” ground water levels. They followed up with a contentious report (The Natural Hazards of South Dunedin, July 2016). This opens by stating that the June 2015 flooding was caused by heavy rainfall and high groundwater levels, with no mention of mudtanks, or pumping failures (plural). Such reporting cannot be treated as balanced, nor its authors credible. Elsewhere, ORC essentially conceded the groundwater myth in Rebecca Macfie’s excellent NZ Listener article entitled Flood Fiasco (June 11, 2016).

Shortly after, however, ORC produced the aforementioned South Dunedin Hazards report (backed up by an embarrassingly inaccurate video presentation) that seems to reflect a desire to preach doom rather than convey a balanced defendable scientific analysis of South Dunedin realities and solutions where needed.

One of the worst features of the report and subsequent video was the depiction of projected permanently inundated areas of South Dunedin based on ORC modelling of rising sea level effects. These depictions made front page news in the Otago Daily Times with flow-on reporting nationally. The mapped areas of inundation are actually taken from an earlier ORC report entitled The South Dunedin Coastal Aquifer and Effect of Sea Level Fluctuations (October 2012). The modelling was based on limited information, and the findings would therefore be expected to be of limited reliability. The 2012 report essentially confirms this, noting that modelling of existing conditions overestimates actual groundwater levels (by the order of half a metre in places). Figure 2 (Scenario 0) of that report shows significant permanent ponding for current conditions. None exists in reality. Almost lost (in Section 3.8) are the following (abbreviated, and amongst other) concessions:

• Uncertainty of input data
• Potential inaccuracy of model predictions
• High level of uncertainty
• Groundwater system is poorly to moderately well characterised
• Aquifer properties are poorly understood or quantified
• Each of these uncertainties could have the effect of overestimating the groundwater ponding in the current setting.

The reader is advised to read the full Section 3.8 to ensure contextual accuracy. In my view (as an experienced modeller), a study that cannot even replicate known existing relationships is imperfectly calibrated and unverified. It cannot therefore be relied on. Strictly speaking, it does not qualify as a model. The relationship between possible sea level rise and consequent groundwater impact remains highly uncertain.

Unfortunately, the 2016 ORC South Dunedin Hazards report (and video) chose to reproduce the 2012 ponding predictions using more recent data (but without any better appreciation of aquifer characteristics), but the predictions are similar. It is noted that no Scenario 0 mapping is included in the latter report, nor are the model’s inherent weaknesses described. No admission of the potential modelling inaccuracies is presented other than the following note in Section 4.1: “Further discussion of the original model parameters, model calibration and potential pitfalls is included in the ORC (2012a) report, which can be accessed on the ORC website”. I believe that all parties were entitled to know unequivocally that the modelling was unreliable and unverified.

The 2016 report also makes reference to the fact that dry-weather ground water levels at the Culling Park recorder are at or below mean sea level. This is attributed by the authors to leakage of ground water into the stormwater and wastewater sewers. If that is correct (I would reserve judgement as to whether there may be other factors), then we are witnessing just one example of how an engineered solution could be utilised to dissipate increasing depth of groundwater. Such solutions are canvassed in the BECA report commissioned by DCC several years back.

To summarise, South Dunedin’s exposure to flood (current or future) is poorly described by ORC hazard analysts. The 2GP process seems to have seen these analysts “adopted” by DCC planners as their experts. I consider that to be an inappropriate approach to the detriment of our citizens.

The proposal to require relocatable housing in South Dunedin seems premature, and based on highly questionable information. The proposal for relocatable housing in South Dunedin also rather pre-empts the currently-planned DCC study of overseas approaches to sea level rise solutions.

Requiring relocatable houses will likely simply mean that aged houses that should in time be replaced will be repaired instead. Who is going to build a new relocatable house if they have nowhere to relocate to and probably insufficient money to acquire the requisite land? The proposal to require relocatable housing is ill-considered and premature in my opinion.

With respect to ground water issues across South Dunedin, the 2016 Hazard Report presents –

The reason for my pointing out these facts is to encourage Commissioners to take a step back from the current hysteria surrounding South Dunedin. Had the 2015 flooding extent been restricted (as it should have been) to that which occurred in a slightly larger rainfall event in March 1968, the event would have already been forgotten. Seemingly, at least partly as a result of that hysteria, the proposal to require relocatable housing in South Dunedin seems premature, and based on highly questionable information. Just as ORC floodplain mapping contradicts its in-place flood protection philosophy, so does the proposal for relocatable housing in South Dunedin also rather pre-empt the currently planned DCC study of overseas approaches to sea level rise.

Requiring relocatable houses will simply mean that aged houses that should in time be replaced will be repaired instead. Who is going to build a new relocatable house if they have nowhere to relocate to and probably no money to acquire the requisite land? The proposal for relocatable housing is ill-considered and premature in my opinion.

****

2GP PRESENTATION: URBAN STREAM HAZARDS
Neil Johnstone

Urban Stream Comment re Leith and Lindsay Streams:

ORC’s mapping is said to be of residual flooding (post-flood protection works of the past 80-plus years), but actually represents what might have been envisaged many decades back in something considerably greater than the record 1929 flood with none of the very significant channel works of the 1930s, 1940s and 1960s; or even those lesser improvement of the 2010s in place. The ORC 2GP mapping includes areas that didn’t get flooded in 1923 or 1929. I agree with some potential dangers of stream blockage (especially in Lindsay Creek, and to a lesser extent at Clyde Street and Rockside Road), but one can only consider locations of feasible blockage in today’s conditions. Furthermore, accepted professional practice for flood plain mapping requires detailed hydrology, probability analyses, climate change allowance, hydrograph routing, in-channel modelling (allowing for stream capacity variability), and overland flow modelling. ORC’s flood mapping incorporates none of these fundamentals; instead, it reads as little more than a colouring-in exercise, when a professionally researched technical document is required. In short, ORC’s hazard analysts have carried out no fit-for-purpose analysis for a District Plan process.

Interestingly, the concerns expressed by ORC hazard analysts re channel blockage are entirely inconsistent with ORC’s own design philosophy and consent application evidence for the recent Flood protection scheme (so called). Design Philosophy minimises the issue.

Very briefly, the mapping is challenged for the following reasons (inter alia):

No descriptions of the effective flood protection initiatives (OHB -1920s and 1930s, DCC -1940s, OCB -1960s) are included. These works have ensured that overtopping is practically impossible in the George Street to Cumberland Street reach, the Clock Tower reach and Forth Street to Harbour reaches. Flood protection in these areas are all built to a much higher hydraulic standard than the so-called ORC scheme of the past decade, and to a far, far higher standard than existed pre-1929.

It is further noted that ORC’s own Design Philosophy Report (OPUS for ORC, 2005) for the proposed Leith/Lindsay flood protection scheme is adamant that debris traps recently (then) constructed at Malvern Street and Bethunes Gully would further mitigate any debris problems. Refer paras 7.7 and 10.6 of that document.

Ponding is mapped where water couldn’t even reach in 1929 (peak flood currently estimated at 220 cumecs, and predating flood protection measures) in the wider CBD area. Flows along George Street in the 1920s only occurred south as far as about Howe Street, then re-entered the river. Nowadays, the accelerating weir above George Street and the structural high velocity channel immediately downstream provide much more clearance than existed in 1929. [Most outflow then from the river occurred much further downstream.] In those downstream reaches, many of the bridges have been replaced or upgraded. Possible remaining points of interest are the hydraulically insignificant extension (circa 2015) of the St David Street footbridge, the historic Union Street arch footbridge, and the widened (circa 2012) Clyde Street road bridge. The flimsy St David Street bridge would not survive any hydraulic heading up so there would likely be of little flood consequence, and backing up upstream of Union St would be largely inconsequential because of the height of the Clock Tower reach banks immediately upstream. The Clyde Street bridge is acknowledged as being lower than optimum, but it has not created any issues in its half century existence. Any overtopping there could only impact on a limited area between the bridge and the railway line.

Overland lows beyond (east of) the rail line remain highly improbable because of the ongoing blocking effect of road and rail embankments. Flows as far as the railway station to the west of the rail line are also highly improbable nowadays as only the Clyde Street area could conceivably contribute.

The 1923 photograph showing ponding along Harrow Street is presented by ORC with an unfortunate caption stating that the water is sourced from the Leith. Some undoubtedly was, but the whole of the city was subject to “internal” stormwater flooding from Caversham tunnel, across South Dunedin to the CBD and beyond. To illustrate further, a NIWA April 1923 flood summary (accessible online) provides a summary of some of the information more fully described in technical reports and newspaper accounts, including:

• Portions of Caversham, South Dunedin, St Kilda, the lower portions of central and northern areas of the City and North East Valley were completely inundated.
• Water in South Dunedin was waist deep.
• The Water of Leith rose considerably and burst its banks in many places, causing extensive damage along its banks and flooding low-lying areas.

Today’s stormwater infrastructure is rather more extensive and effective (when maintained), and DCC has a continuing legal obligation to provide to maintain that service.

The levels plotted across Lindsay Creek seem highly pessimistic. Levels are shown to be of the order of 2 metres above North Road in some locations at least. I have [no] knowledge of any such levels ever having been approached. Care must be taken not to include unfloodable areas in the mapping. I don’t however discount localised channel blockage, and the channel capacity is substandard in many areas. The valley slope ensures that overland flow will achieve damaging velocities. Such velocities are noted in the NIWA summary.

Of greater concern to me, however, is that ORC’s mapping appears to have seriously underestimated the significance of potential Woodhaugh flood issues:-

The river channel through here is both steep and confined. The influences of Pine Hill Creek (immediately upstream) and Ross Creek (immediately downstream) add to turbulence and bank attack. The area was ravaged in 1923 and 1929, and there have been evacuations in some much lesser events in later decades. These areas are at considerable risk in a 50- to 100-year plus event. Hardin Street, Malvern Street had houses evacuated in the 1960s flood. High velocity, rock laden flows and mudslides can all be anticipated, and difficult to counter. Area below camping ground / Woodhaugh was overwhelmed in floods of the 1920s – a focus for flooding depth and velocity.

If the 2GP process is to include urban flood maps, these should be diligently derived, based on historical record and appropriate modelling. The mapping should reflect the real flood risks (including likelihood, velocity and depth). The decreasing flood risk from Woodhaugh (potentially high impact) through North East Valley (moderate impact) through to the main urban area south of the Leith waterway (localised and of little-to-zero impact) should be reflected in the mapping.

[ends]

2GP Hearing Topic: Natural Hazards
https://2gp.dunedin.govt.nz/2gp/hearings-schedule/natural-hazards.html

█ For more, enter the terms *johnstone*, *flood* and *south dunedin* in the search box at right.

Related Posts and Comments
6.6.16 Listener June 11-17 2016 : Revisiting distress and mismanagement #SouthDunedinFlood
10.6.16 “Civic administration” reacts to hard hitting Listener article

[DCC Map differs from what was notified]

Posted by Elizabeth Kerr

This post is offered in the public interest.

8 Comments

Filed under DCC, Democracy, District Plan, Dunedin, Education, Geography, Health & Safety, Housing, Infrastructure, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, South Dunedin, Town planning, Urban design

DCC leases space for South Dunedin community hub at Cargill Enterprises

How many years has this taken DCC
It’s still only “temporary” accommodation….

South Dunedin has been waiting for a public library since the time of borough amalgamation.

Dunedin City Council – Media Release
Home found for South Dunedin pop up hub

This item was published on 02 May 2017

A home has been found for the South Dunedin pop up community hub. The Dunedin City Council this week signed a two year lease to set up a temporary hub in part of the Cargill Enterprises premises at 199 Hillside Road.

[screenshot – click to enlarge]
DCC Webmap – 199 Hillside Rd, South Dunedin JanFeb 2013

Group Manager Arts and Culture Bernie Hawke says, “We are delighted to have a confirmed location for the pop up hub. This is a well known, central location and we look forward to providing a range of services on site for local residents.”

The DCC is leasing about 200sq m, which includes space for community activities, meeting areas, DCC service centre and library activities, and kitchen and toilet facilities. The hub will also provide access to Gig wifi for the South Dunedin community. It is hoped the pop up hub will be open about mid year. As well as providing access to DCC services, the hub will provide an opportunity for the community to have input into the development of the permanent South Dunedin Community Hub. While the opening hours for the pop up hub are still to be confirmed, the hub is expected to be open about 25 hours a week, across five days and including one evening and Saturday morning.

Cargill Enterprises Chief Executive Geoff Kemp says, “Cargills are thrilled to be in a position to accommodate the city’s South D interim hub initiative. “A community centre and library adjoining the main facility will give our 94 staff easy access to the many services planned, particularly the opportunity to explore a wide range of reading material and multimedia. We view the hub as complementing our employer-led numeracy and literacy training programme. Very exciting!”

Mayor of Dunedin Dave Cull comments, “The establishment of the pop up hub shows the Council’s commitment to South Dunedin and is a key part of a much wider engagement with the South Dunedin community and agencies working in the area.”

DCC Chief Executive Officer Dr Sue Bidrose says, “When the pop up hub has been established, we will turn our attention to the location and development of the permanent hub. The signing of a lease for the pop up hub is an important step in this process. In addition to the pop up hub development, our Community Development team has been working alongside groups within South Dunedin to look at the social and economic needs and strengths of this community. As part of this, on 18 May we are organising a number of local community-based groups and individuals to meet to see if a collective action plan to support improved social and economic wellbeing can be created within the South Dunedin area.”

Contact DCC on 03 477 4000.
DCC Link

Posted by Elizabeth Kerr

This post is offered in the public interest.

8 Comments

Filed under Business, DCC, Dunedin, Economics, Education, Finance, Infrastructure, People, Pet projects, Politics, Project management, Property, Public interest, Site, South Dunedin, Technology, Town planning, Transportation, Urban design, What stadium

Regional council builds Palace, refuses help to dredge Otago boat harbour

The ironies are Most Apparent.

The Otago Regional Council contributed $30m to the stadium roof (an activity beyond its local authority mandate), yet the council has no intention of helping the Otago Yacht Club to maintain the city’s marina, the Otago Boat Harbour.

[click to enlarge]
DCC Webmaps – Otago Boat Harbour at Mouth of Leith JanFeb 2013

Otago Yacht Club’s origin dates back to 1892, making it one of the oldest yacht clubs in Otago. The club caters for a range of sailing interests from keelboats to trailer yachts and centreboarders. The club also operates keeler haul-out facilities and welcomes visiting boats. The club manages a full events programme during summer, including harbour, coastal and ocean races. On Sunday mornings in the season the club runs ‘learn to sail’ and ‘learn to race’ programmes which cater for all ages. The clubhouse is a popular venue for private functions and for local organisations to hold meetings and events. Within walking distance of the city centre, the clubhouse offers showers, laundry facilities, email connections etc. The resident caretaker-manager will usually manage to accommodate requests for berthage for boats up to 50 feet. The alongside mooring facilities consist of several large punts inside a walled boat harbour. Due to silting, access to the boat harbour has only been tenable approximately two hours either side of high tide for boats with 2m draft. The Otago boat harbour was last dredged in 1995.
Source: otagoyachtclub.org.nz

****

### ODT Online Thu, 20 Apr 2017
Club gets go-ahead to dredge boat harbour
By David Loughrey
The Otago Boat Harbour is about to get its first dredging in more than 20 years, after the facility reached such a state rescue vessels could not leave the harbour at low tide. The work, expected to start soon, has been described as a major achievement by the Otago Yacht Club, which leases the boat harbour. Club vice-commodore Blair McNab said the cost of the project – more than $300,000 – was being paid for from grants and club membership fees. […] The club recently received resource consent from the Dunedin City Council for the work. The consent allowed the club to deposit dredged sediment and soil on land in Magnet St, behind the club, for drying. Mr McNab said once the dredged material had been dried, which took about two weeks, it would be taken to the nearby Logan Point quarry. The consent said once the work was completed, about 100cu m would remain on the grass area at Magnet St to form a barrier around its perimeter, and provide better drainage. The consent decision said the boat harbour was in such a state that at low tide, craft used for harbour rescues could not get out. […] The club had hoped the Otago Regional Council might help with the cost of the dredging, as alterations to the Water of Leith meant more spoil was coming from the nearby mouth of the stream. Mr McNab said it appeared the council was not going to help.
Read more

The Star April 2014 via Otago Yacht Club. Also at ODT Online 22.4.14

****

The Otago Regional Council’s “special consultation” over its Dunedin headquarters is flawed, writes former councillor Gerrard Eckhoff.

### ODT Online Tue, 18 Apr 2017
Review needed in lieu of proper consultation
By Gerrard Eckhoff
The Otago Regional Council’s annual plan is now open for public consultation. Implicit in the word consultation is the opening of a meaningful dialogue with the public. It would be entirely disingenuous for any local authority to enter into discussion on their annual plan by merely informing the public of council intent without showing a willingness to accept “the wisdom of crowds”.
….This year’s ORC annual plan contains four lines on “Dunedin building review” in its feedback document which could easily be missed at first reading. To its credit, the council has finally accepted its statutory obligation for “special consultation” on this $30million major project.
….The last time the council ventured forth on a new building project without any prior special consultation, it cost the ratepayers upwards of $3million for the concept design and drawings alone. The cost of that proposal was well over $30million and it was never built. It is, therefore, hard to reconcile how the new building/s is going to be around the projected $20million mark, unless building costs have halved in Dunedin from eight years or so ago. The potential cost of a new car park building must also be factored in, so the ratepayers could soon be the lucky owners of two new buildings, as well as a difficult-to-sell ORC headquarters building in Stafford St.
Read more

DCC Webmap – Dowling St carpark JanFeb 2013, ORC office site starred

Related Posts and Comments:
9.1.17 ORC $wimming in it —SHOULD afford more Otago environmental…
15.8.16 ORC : Official complaints show integrity
22.6.16 ORC New HQ : Reminder, fiduciary duty and core responsibilities
● 9.6.16 ORC empire building again : Consultants give questionable options…
11.8.12 ODT editorial (spot on!) — ORC temporary headquarters
26.6.09 ORC headquarters [incl news items to present day]

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Images: Otago Yacht Club except where stated otherwise.

14 Comments

Filed under Business, DCC, Democracy, Dunedin, Economics, Education, Finance, Geography, Heritage, Infrastructure, Media, Name, New Zealand, ORC, People, Perversion, POL, Politics, Project management, Property, Public interest, Resource management, Site, Sport, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

Mosgiel Pool site options, survey twists

At Facebook:

****

### ODT Online Mon, 27 Mar 2017
Delay in approving pool site irks trust
By John Lewis
The Taieri Community Facilities Trust has made a decision on the preferred site for the new Mosgiel pool, but will have to wait another two weeks before it is considered by the Dunedin City Council …. [Trust chairwoman Irene Mosley] said the trust voted about 10 days ago to ask the DCC to go with an amended Site A, which was near the existing pool. “The trust had 447 responses; 52% were for Site B (Memorial Gardens), and 40% were for Site A …. However, once the comments were taken into consideration, along with the actual votes, the trust discovered that many of those in favour of Site B were in favour because of concerns about the existing pool being closed during the new pool build, potential parking issues and road safety concerns at the proposed entrance off Gordon Rd. The trust believes by locating the new pool further into the existing caravan park, and moving the park towards the Reid Ave side of the fields, these concerns can be mitigated.”
Read more

****

Old footage / older survey:

Channel 39 Published on Aug 13, 2015
Proposed Mosgiel pool site submissions being analysed
More than three hundred public submissions on the proposed Mosgiel pool site are being analysed. The city council’s earmarked four possible locations for a new swimming complex. And a clash with existing assets is upsetting some residents.

Related Post and Comments:
14.12.16 Mosgiel pool site options —muddy water from mainstreet businesses

█ For more, enter the term *mosgiel pool* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

47 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Finance, Geography, Health, Hot air, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, People, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Sport, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

JimmyJones deflates *mad utterings* of Prof Emer Jim Flynn

Received from JimmyJones
2017/03/17 at 7:43 pm

Prof Flynn, Emeritus Professor in Politics, deserves much criticism for his use of fake facts to support his presentation to the DCC councillors on Monday. He is said to have a good understanding of scientific methodology and so he should have known better than to use spindoctored, hyper-exaggerated data. Perhaps it was deliberate. Remember that he is a red-to-the-core Lefty, having been an initiating member of the New Labour Party and the Alliance Party. He was an Alliance electoral candidate for a few elections and was #4 on the Alliance list near the end. Here is what he got wrong:

● the sea level at Dunedin isn’t the ludicrous 10mm/year, it’s not the fake 3.5mm/yr, it’s only 1.3mm/yr (source- Statistics NZ). That means that 25cm of sea level rise will take 192 years not the 17 years that the panicky professor said.

● the 25cm danger level seems to be his own creation – the ORC LIDAR data shows that South Dunedin is mostly over 1.0 metre above sea level and only a handful of properties are below 500mm. Probably there are no houses within 25cm of sea level; he says there are 1932. For the sea level to increase by 1.0 metre will take 769 years. Put it on your calendar.

● fear-monger Flynn tells us about the “huge erosion of polar ice” that started in 2014 – unfortunately he didn’t check the sea-level data which shows us that nothing unusual has happened to the sea level since 2014.

● Prof Flynn tried to scare us by saying that insurance companies are unlikely to cover sea-level rise in their policies in future (ODT- Flynn’s sea level figures disputed), but it turns out that even now, none of us are insured for sea-level rise. There has never been cover for gradual damage. He’s talking crap.

● The Otago Regional Council has had groundwater sensors at South Dunedin for several years and they tell us that there is no detectable increase in groundwater level (no increasing trend).
In fact, there is no reason for a rising sea to cause rising groundwater. There is no connection, except for some places which are close to the shoreline. Also, the South Dunedin groundwater level is about 600mm above sea level and so it is mostly not affected by the sea, since water doesn’t flow uphill. Have a look for yourself: the ORC has recently given us (almost) live groundwater sensor graphs for South Dunedin and other places – thanks ORC. There are four South Dunedin groundwater sites:

http://water.orc.govt.nz/WaterInfo/Catchment.aspx?r=Dunedin

Of the four groundwater sensors only the one closest to the shoreline shows a tidal influence. Other places similarly close to the sea are likely to have some tidal influence on their groundwater level. Further inland there is no effect.

[ends]

****

At Facebook:

whatifdunedin says: Here is DCC and ORC’s outlandish and mythical project, designed to put Ratepayer Funds into the hands of private sector consultants for no good reason, and on it goes. Your elected representatives agreed to this rort:

Related Post and Comments:
14.3.17 Brightness panicked [#effect]

Posted by Elizabeth Kerr

This post is offered in the public interest.

81 Comments

Filed under Business, Climate change, Construction, Corruption, Democracy, Dunedin, Economics, Finance, Geography, Health & Safety, Heritage, Housing, Infrastructure, Media, Name, New Zealand, People, Perversion, Politics, Property, Public interest, Resource management, South Dunedin, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

Mr Trump, help !!! [councils gunked up on Mythical man-made climate change, Again] #!$%^&!@#

D R A I N ● T H E ● S W A M P ● A T ● D U D

drain-by-branco-2016-comicallyincorrect-com-via-trumparmy-net-1-tweaked-by-whatifdunedin[trumparmy.net] branco 2016 at comicallyincorrect.com (abbrev.)

****

Dunedin City Council – Media Release
International review of rising groundwater protection options

This item was published on 02 Mar 2017

International experience in managing rising groundwater is being reviewed as part of a broad project on the future of South Dunedin.

The Dunedin City Council and the Otago Regional Council are preparing a programme of work that will develop possible options to mitigate or manage the effects of rising groundwater in South Dunedin. Any options developed will have to be investigated further and discussed with the community.
DCC Group Manager Water and Waste Laura McElhone says, “To help us with this overall project, we want to have a better understanding of how communities elsewhere in the world have managed the challenge of rising groundwater, particularly in areas that have similar social, economic and environmental settings to South Dunedin.”
The two councils have jointly contracted global environmental specialists Golder Associates to carry out an international review of places where protection options have been, or are being, put in place to manage rising groundwater. Golder Associates, which has a strong New Zealand presence, will be working with not-for-profit organisation Deltares, based in the Netherlands, which has international experience in this field. The two councils will pay an equal share of the $36,000 contract.
ORC Director Engineering, Hazards and Science Gavin Palmer says many cities around the world are facing the same issue of rising groundwater so much can be learned from experience elsewhere. “This review will incorporate what protection options have been used elsewhere, what has worked and lessons learnt. This information, along with our own science and monitoring, will help us and the community to identify viable options for South Dunedin.”
The contract was awarded last month and the work is expected to take about 10 weeks. The DCC and ORC are working together to develop and deliver a programme that responds to the climate challenges facing South Dunedin, while recognising the broader impacts across Dunedin and the wider region. The Otago Regional Council released a report in July 2016 outlining the hazards facing South Dunedin. The report pulls together information and analysis gathered over seven years, particularly regarding the increased likelihood of surface flooding associated with rising sea level. This was followed up by drop-in public information sessions held jointly with the DCC. The two councils are also collaborating with other groups and agencies in South Dunedin to develop more effective communication channels.
Dr McElhone says, “We are at the beginning of a long term project to plan for climate change. Once we have a lot of this technical information together, we will be able to discuss next steps with the community.”

Contact Group Manager Water and Waste on 03 477 4000.

DCC Link

****

K E E P ● T H E ● F A R K I N G ● P I P E S ● M A I N T A I N E D

man-made-global-warming-is-a-lie-usbacklash-org[usbacklash.org]

Posted by Elizabeth Kerr

This post is offered in the public interest.

9 Comments

Filed under Baloney, Business, Construction, Corruption, DCC, Democracy, Dunedin, Economics, Finance, Geography, Health, Hot air, Housing, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Politics, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

DCC hideous ‘Adam of your labours’

ODT 28.1.17 (page 30)

2017-01-28-20-33-02[phoneshot scribbled – click to enlarge]

DCC is rubbish governance.

Comparing the two territorial authorities, ORC and DCC, ODT says “the regional council has been a wiser council-company owner”.

Ain’t that the sheer truth with bells on, oversewn with screaming sirens and flashing red lights.

Stuff that up your blood-soaked jumper, Dunedin City Council.

DCC takes the knife to Ratepayers’ private wealth, there’s no sign of let up. Blunt force trauma, gushing blood and the decimated entrails of a city once thriving.

The squalid recent history of Dunedin City Council is one of incompetence and worse : failed schemes, massive overburden of debt, inability to prioritise, budget and project manage, crippling levels of deferred maintenance and upgrades for essential infrastructure, unprosecuted thefts, corruption in certain of the CCOs and serious questions about the holding company (last year, a ‘partial audit’), Otago power network assets burnt off (no safety and security of supply), a dead loss-making stadium and associated companies clawing $20million per annum off ratepayers (no valid explanation, just mindless spin), destruction of high class Taieri soils for housing sprawl initiated by city councillor with a private profit motive, trite succession of gormless city councillors lining own pockets/inflating egos at the council table – leaches and nematodes have more credibility. On it goes at DCC.

Otago Regional Council is debt free.

### ODT Online Sat, 28 Jan 2017
Editorial: City and ORC merger unlikely
OPINION Any progress towards one or more unitary authorities in Otago will be difficult, largely because of the region’s geography. The Dunedin City Council this week ordered a report into a possible merger between it and the Otago Regional Council, and it would be surprising if proposals which might emerge make much headway with the Local Government Commission.
….Since 1988, the [ORC] has received a total of $148.9million in dividends and special payments from Port Otago. How the city must covet that cash. Given the city’s pressures on Delta/Aurora for dividends and the regional council’s hands-off attitude to the Port Company, it would seem, however, the regional council has been a wiser council-company owner.
Read more

Posted by Elizabeth Kerr

This post is offered in the public interest.

Leave a comment

Filed under Agriculture, Aurora Energy, Business, Central Otago, Citifleet, Construction, Corruption, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Events, Finance, Geography, Health, Heritage, Housing, Infrastructure, Media, New Zealand, OAG, Ombudsman, ORC, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Stadiums, Tourism, Town planning, Transportation, Travesty

ORC $wimming in it —SHOULD afford more Otago environmental protection

….not a new office palace at Dunedin.

Spending figures on flood protection and river management, particularly on the Leith and Taieri systems, and public transport, are heavily weighted towards Dunedin.

### ODT Online Mon, 9 Jan 2017
‘Dunedin-centric’ ORC gets roasting
By David Williams
Michael Laws’ already poor appraisal of the Otago Regional Council just gets worse. Official council figures provided to the Otago Daily Times detail the council’s $56million in reserves, its plans for spending up to $24million on a new Dunedin headquarters and a breakdown of spending in the Queenstown Lakes, which is affected by lake snow. Mr Laws, who was elected to the council’s Dunstan ward in October, said: “It’s worse than we thought, to a degree. They’ve got a huge amount of money and they spend very little.”
….He accused the council of having a very hands-off policy towards Dunstan issues and particularly Queenstown and the lakes over the past five years. “It’s withdrawn staff from the area, it’s not monitored the lakes which is its basic statutory responsibility, it’s spent very little money dealing with pests, whether flora or fauna, and I think personally that the reason in large part is if you don’t live in an area you don’t properly understand it.”
Read more

****

L A K E ● S N O W

10.6.16
The alga called Cyclotella, or recently renamed by algologists as Lindavia intermedia, is related to the ‘rock snot’ alga didymo. The recent appearance of lake snot is associated with the emergence and dominance in Cyclotella, according to a team of scientists from the University of Otago, Landcare Research and Université Laval (Canada).
–Erica Mather, Sciblogs: Southern NZ lakes congested with algal snot

lake-snow-stuff-co-nzLake Snow [stuff.co.nz]

ORC – Lake Snow
In recent years, a slimy substance called ‘lake snow’ has been found in Lake Wanaka, Wakatipu and Hawea. Otago Regional Council (ORC) is working with stakeholders and researchers to find out more about where lake snow comes from, what influences it, and how it could be managed. Read more

Lake snow brochure (PDF, 1 MB)

QLDC – Lake Algae
For a number of years the Lake Wanaka water supply has been affected by the presence of algae. The algae is not harmful from a health perspective, but has had an effect water filters, irrigation fittings, new appliances and other equipment. The algae is not noticed at all the properties in Wanaka and no pattern has been found. In mid-2016 QLDC began receiving reports of algae build-ups in a number of water filters around Queenstown that take water from Lake Wakatipu. It has been identified as the same algae that has affected the water system in Wanaka for the past eight years or so.
Identifying and managing lake algae

In 2004 Didymosphenia geminata, a diatom commonly known as didymo or rock snot, was discovered in New Zealand, the first time it was found in the Southern Hemisphere. To restrict its spread, the whole of the South Island of New Zealand was declared a controlled area in December 2005. All items, such as boats, fishing gear, clothing, and vehicles, that have been in a stream, river or lake, must be cleaned before they enter another waterway.
Wikipedia: Didymo in New Zealand

****

### Stuff.co.nz Last updated 12:14, Sep 1 2016
Fears lake snow could make Lake Wakatipu ‘unfishable’
By Jo McKenzie-McLean
An experienced fishing guide fears Lake Wakatipu could end up “unfishable” with the invasive spread of the algae bloom, lake snow, and warns Lake Dunstan could be next. Queenstown fishing guide Stu Dever, armed with his rod and reel, voiced his concerns about the presence of lake snow in Lake Wakatipu to Otago Fish and Game committee members at a meeting in Cromwell last month. His rod was clogged with the thick globules of algae after only one day’s fishing on the lake … The mucous-like substance is produced by the algae cyclotella has now been observed in three South Island lakes.
Read more

### Stuff.co.nz Last updated 12:49, Nov 4 2016
Lake snow discovered in Hawea as algae spreads through southern lakes
The nuisance algae known as lake snow has been confirmed in Lake Hawea as it continues to spread through the southern lakes. Officially known as Cyclotella bodanica, it has been present in Lake Wanaka for several years and has this year been confirmed in Lake Wakatipu, Queenstown. It has also been found in Lake Coleridge in Canterbury. It does not present a health risk but can block water filters on commercial premises and residential appliances such as dishwashers and washing machines.
Read more 

### Stuff.co.nz Last updated 11:13, Dec 19 2016
Laws calls for Otago Regional Council to apologise over Lake Snow ‘inaction’
By Jo McKenzie-McLean
The Otago Regional Council needs to “apologise and atone” for its “grossly inadequate” action over the Lake Snow problem in the alpine lakes, newly-elected Otago regional councillor Michael Laws says. “Lake snow was notified to the Otago Regional Council in 2008. It did nothing until September 2016, and in that time the algae and its effects have taken a firm grip on Lake Wanaka and now spread to other lakes. As with the invasive weed lagorosiphon [oxygen weed], the ORC’s inertia on lake snow stands as an object lesson of what can go wrong when you react, and react late, rather than research. There are some massive lessons for our governance here. We dropped the ball big time and need to accept, apologise and atone.” Cr Laws said there needed to be a significant financial investment in the southern lakes and that any delay would only make the problems less manageable and more expensive. “The Otago Regional Council has no debt, and $56 million in reserves. It wants to spend $25 million on a new HQ in Dunedin. I say those priorities are dead wrong: The lakes and our waterways – along with pest destruction – must be our prime responsibilities.”
Read more

****

Dr Schallenberg and other scientists have been frustrated by rejected funding applications on research into lake snow, and the Otago Regional Council only stepped up monitoring last year, although it has paid for some research on Lake Wanaka’s health.

### ODT Online Sat, 7 Jan 2017
Editorial: The lake snow threat
It is past time to drive action on “lake snow” (“lake snot”). The slime produced by an  algae in Lake Wanaka — it is also in Lake Coleridge and was found last year in Lakes Hawea and Wakatipu — is unsightly and a significant nuisance. More importantly, it could have long-term and unknown ecological impacts.
….It was first noticed in Lake Wanaka about 2004 as those fishing spoke of fouled lines and blocked engine intakes. Washing machine and other filters in Wanaka began to become clogged because the town water supply comes from the lake. […] The same algae had also been found in another relatively unpolluted lake in Seattle in the United States. Just like didymo (“rock snot”), under certain conditions cyclotella secretes large amounts of mucus. This can all join together to form a mat. Just why it appears is still a mystery.
Read more

### ODT Online Sat, 7 Jan 2017
Lake snot costs hit six figures
By Guy Williams
Queenstown hotels are being forced to install expensive filtration systems to prevent lake snot (also called lake snow) damaging or blocking their water systems. Sofitel Queenstown Hotel manager Vincent Macquet said a self-cleaning filter identical to one operating at Dunedin Hospital was installed at the hotel five weeks ago at a cost of “hundreds of thousands” of dollars. Lake snot began clogging its water system last winter, causing hot-water valves to fail and reducing water pressure. […] Macquet said it was a “touchy subject” with hoteliers, with representatives from seven hotels meeting Queenstown Lakes District Council staff about a month ago to express their concerns.
Read more

didymo-hawea-landcareresearch-co-nzDidymo, Hawea [landcareresearch.co.nz]

Didymo (aka rock snot) [jrn.com via knownews.com]

Posted by Elizabeth Kerr

This post is offered in the public interest.

9 Comments

Filed under Architecture, Business, Central Otago, Construction, Democracy, Design, Dunedin, Economics, Finance, Geography, Infrastructure, Media, OAG, Ombudsman, ORC, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Tourism, University of Otago, What stadium

Mosgiel pool site options —muddy water from mainstreet businesses

At the public forum before Monday’s Council meeting, the Taieri Community Facilities Trust (aka TCFT or ‘pooling together’) turned up in the guise of Irene Mosley, its chairwoman. Her only visible means of support was Bill Feather, ex Mosgiel-Taieri community board chairman.

Ms Mosley put up images of two site options (see graphics below), however nobody in the public gallery could read them. A previous round of public consultation had determined that 127 people favoured Site A, the site of the existing pool beside the Silver Stream. And 17 favoured Site B, at the township’s Memorial Gardens.

Ms Mosley is lobbying for the build being at the Gardens, a site (B) more likely to flood. Site A, the existing pool site, is higher; and the flood banks to the Silver Stream are doing their job.

We were trotted the line that the (rearguard) push for Site B was entirely down to the Otago Regional Council (ORC) because they have issues with Site A, that construction could potentially destabilise the flood bank. Phooey. Pure folly, Ms Mosley! Besides, ORC has no particular jurisdiction over the siting.

Ms Mosley carefully emphasised that a second round of public concultation on site options was for “transparency”. Hmm. Although she told Councillors there’s lots of positive support for the new pool, we’re not too sure who Ms Mosley has asked lately. We doubt the “positive support” is people with spare millions to give away on her trust’s “Logic” (loaded commercial term) dream.

All we know is business owners in central Mosgiel want the pool located closer to them, thus why Site B is being PUSHED by the trust. What a lot of fines there are, swirling about in the local water supply.

Mosgiel resident Peter Sim said he would oppose Site B. Green space was “at a premium” in Mosgiel and the DCC was “nibbling away” at it. “It’s time it bloody well stopped.”

### ODT Online Tue, 13 Dec 2016
Pool locations not ‘perfect’
By Shawn McAvinue
The two possible locations for a new aquatic facility in Mosgiel were revealed yesterday, along with a concession that “neither site is perfect”. At a Dunedin City Council meeting, Taieri Communities Facility Trust chairwoman Irene Mosley revealed the possible footprint of both sites … “We have decided we need to go back to the community and explain there is no perfect site … we just want to get it right.”
Read more


 
From the pool trust’s website [click to enlarge]:

mosgiel-pool-site-options-a-b

█ More information at http://www.poolingtogether.org.nz/

Related Posts and Comments:
● 23.7.16 Mosley’s Pond now a Dunedin Community ‘asset’ to fund
● 26.11.15 DCC report: Mosgiel Pool Future Aquatic Provision
● 16.9.15 DCC Please Explain —Mosgiel pool design to Warren & Mahoney
● 10.9.15 Tale of two pools … #Mosgiel #Wanaka
● 7.8.15 MOU DCC and TCFT New Aquatic Facility #MosgielPool
● 24.7.15 Hands off Mosgiel Memorial Gardens
● 23.7.15 Dunedin ratepayers —Green Island best site for city pool users…
● 22.7.15 DCC Long Term Plan 2015/16 – 2024/25
● 19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
17.5.15 Cr Vandervis on DCC project budgets
● 4.5.15 DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’
● 7.5.15 DCC Draft LTP 2015/16-2024/25 —public submissions online
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
25.3.15 DCC Long Term Plan: Green-dyed chickens home to roost
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
14.1.15 DCC Draft Long Term Plan: more inanity from Cull’s crew pending
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

This post is offered in the public interest.

22 Comments

Filed under Architecture, Business, Construction, DCC, DCTL, Democracy, Design, District Plan, Dunedin, Economics, Finance, Geography, Highlanders, Infrastructure, Media, Name, NZRU, OAG, Ombudsman, ORC, ORFU, People, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Sport, Tourism, Town planning, Travesty, Urban design, What stadium

Our loss-making public bus system, as for the colours *spew

Inner city Dunedin is NOT a freaking circus or Disneyland.
Obviously, the bozos at ORC/DCC think differently.

Here is something CHEAP-NASTY-like:

Troughing consultants, transportation planners and those who purport to be ‘urban design’ from both councils appear to be barely out of grade school —my god, it shows (see video).

PRIMARY SCHOOL
Colouring in, by non-learned non-contextualists —who manage do it so very BADLY. This is absolute proof that Landscape Architecture at Dunedin is DEAD, BANKRUPT and bloody SMELLY. My cardboard box of pet maggots could design “the interchange” better. They could: swiftly, cleanly, without the disease that is ‘the carnival-scathed’ at local government.

Junior short-term work experience only, no proven local body management expertise or ‘factory floor’ experience whatsoever, now make for ‘team leader’ placements at Dunedin. That’s how tragic the workpool is. Low shoulder-tapping at the tertiary institution is no substitute for a smart council workforce, not that we have a hope in hell of attracting one.

Business leaders need to Take Dunedin!
By Storm, from the doughbrains at local government.
But Business leaders, Entrepreneurs and Investors now have the Largest, most IMMENSE PROBLEM.

At this un-populous sinking town :
At the productive, growth-generating Central Otago and Queenstown Lakes :
THERE IS NO AFFORDABLY SAFE AND SECURE POWER SUPPLY
None! This is All down to leaders, councillors, directors and executives at DCC, DCHL, Delta and Aurora.

And ORC/DCC think the sorry ratepayers and residents can afford an improved, convenient and efficient bus system. Ho. Ho. Ho.

Apart from or because of the buses making losses….

Clearly, the proposed changes to the bus system are NOT designed to embrace the Accessible Journey —to enhance the experience of city travel for mobility impaired citizens.

The Regional Public Transport Plan 2014 and the Dunedin City Integrated Transport Strategy 2013 DO NOT anticipate the growth of Uber, new technology or ‘other’ vehicular modes of travel, or indeed anything that is the future of transport at (Our Place) Dunedin.

The proposed changes are NOT subject to ANY ECONOMIC STUDIES to safeguard businesses, vehicle users, and the users of public transport, city-wide. None! So Predictable. So Deficient. So Grossly Negligent.

Coloured road markings, a Fun Distraction when there’s a MASSIVE POWER BLACKOUT at Dunedin.

*Note: DCC does not have a spare ONE BILLION DOLLARS in the bank to right Aurora/Delta’s wrongs.

The Otago Regional Council says:

Dunedin Bus Interchange (hub)
Dunedin’s public transport is changing. Since the adoption of the Regional Public Transport Plan (RPTP) in 2014, Otago Regional Council (ORC) has been rolling out network wide changes to create an affordable and connected public transport system in Dunedin. While many of these changes focus on implementing direct and stable bus routes with regular frequencies, we are also looking to improve the accessibility of the bus services, information, and infrastructure. As part of these changes we are providing a bus interchange (hub) in the city centre to make your bus journey better.

█ To find out more and how to make submissions, go to http://www.orc.govt.nz/Information-and-Services/Buses/Bushub/

There are several things the ORC can do immediately to signal its serious intent in improving services to its ratepayers. (ODT)

### ODT Online Wed, 7 Dec 2016
Editorial: Bus hub challenges
OPINION Public transport is essential in any major centre and now Dunedin faces its own challenges with the release of the long-awaited central-city bus hub plans. The Otago Regional Council is seeking community feedback on the hub planned for Great King St, near the central police station. It includes five parking bays on each side of the street. […] The idea of a Great King St hub cannot be taken seriously if people are going to be forced off one bus and on to another in quick time. […] Dunedin’s central area is the Octagon and the regional council needs to recognise the need to keep buses flowing through the Octagon.
Read more

****

Bus hub part of $3million transport project, including “super stops”. 38 car parks lost from Great King St between Moray Pl and St Andrew St.

### ODT Online Mon, 5 Dec 2016
Dunedin bus hub details released
By John Gibb
The Otago Regional Council has unveiled its long-awaited central Dunedin bus hub plans and is seeking community feedback. The bus hub, also termed the “bus interchange”, is, as previously signalled, in Great King St, near the central police station. It includes five parking bays on each side of the street. […] The size and style of bus shelters are partly dependent on public feedback, and also on any negotiations required with owners of nearby land, to be undertaken early next year. It is also proposed to use paints or other coloured materials, including on part of the street, to give the hub area a more lively appearance.
Read more

Posted by Elizabeth Kerr

This post is offered in the public interest.

24 Comments

Filed under Aurora Energy, Business, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Dunedin, DVL, DVML, Economics, Electricity, Finance, Geography, Highlanders, Infrastructure, Media, NZRU, NZTA, OAG, OCA, Ombudsman, ORC, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

Dunedin Buses – Route planners don’t consider effects on local business

citibus-dunedin-low-floor-designline-wmc-buswatchnz-blogspot-co-nz-1[buswatchnz.blogspot.co.nz]

With a new central city bus hub proposed for Great King St and further route changes planned, how extensive has council consultation been with local businesses and retailers? We suspect ‘minimal’ if not at all.
Don’t mention car parking.

In the absence of sound economic modelling carried out in public domain – the collective study of cause and effect – ‘top-down’ imposed route changes are the death knell to small business operators and their livelihoods, wrecking the local retail economy, slaying the fabric, busyness and potential diversity of our town centres. Improper unconsulted changes to the bus system problematise or completely sever established movement patterns between our points of congregation. Affordable options for transit and visitation across the city are smashed and disappear. Everybody loses.

█ How much more harm can Otago Regional Council and Dunedin City Council inflict upon the Community of South Dunedin?

Less foot traffic in South Dunedin since changes to bus services.

### ODT Online Sun, 20 Nov 2016
New routes hurting business: retailers
By Greta Yeoman – The Star
Changes to Dunedin’s southern bus routes are affecting business in South Dunedin, shop owners say. The changes to the Mosgiel-Taieri bus routes in June last year led to buses from Green Island being rerouted to travel along the Southern Motorway into the Octagon rather than through South Dunedin. Grey Power Otago president Jo Miller said the new routes meant it was more difficult for customers to get to South Dunedin. […] Other updates to the bus service in August this year had also affected southern bus users. The Ross Creek to Ocean Grove service now travelled directly down Andersons Bay Rd instead of King Edward St. […] When approached by The Star for comment about businesses being affected by the bus routes, Otago Regional Council support services manager Gerard Collings said “that matter hasn’t been raised with us directly”.
Read more

● Gerard Collings [LinkedIn] is the multifarious ‘go-to’ at Otago Regional Council. Mr Collings is experienced in local body administration and community board representation. His profile shows no tertiary qualifications or accredited work experience in urban economics, business development or placemaking.
The Council has provided Mr Collings with a ‘management’ role for public transport planning and operations. He is a national certificate holder (NZTA approved proposal evaluator) – refer to NZTA Procurement Manual, sections 10.19 Qualifications of proposal evaluators and 11.2 Performance measurement and monitoring framework.

Posted by Elizabeth Kerr

This post is offered in the public interest.

26 Comments

Filed under Business, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Geography, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, ORC, People, Politics, Project management, Proposed 2GP, Public interest, Resource management, South Dunedin, Tourism, Town planning, Transportation, Travesty, Urban design

Dunedin Voting Paper Returns

dcc-election-returns-to-8-oct-2016-as-at-11-26am-screenshot

Daily return of voting papers for Dunedin City Council

Daily return of voting papers for other 2016 Local Elections

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

*Image: screenshot tweaked by whatifdunedin – click to enlarge

79 Comments

Filed under Business, Democracy, Dunedin, Geography, New Zealand, People, Politics, Public interest

‘Focus on getting the right people elected here’ #Dunedin

ODT 3.10.16 (page 8)

odt-3-10-16-letter-to-editor-forbes-p8

Election candidates’ names and profiles:

DCC & Community Boards
http://www.dunedin.govt.nz/your-council/electoral-information/elections-to-be-held-and-nominations-dunedin-city-council

ORC
http://www.dunedin.govt.nz/your-council/electoral-information/elections-to-be-held-and-nominations-orc

Voting Paper Returns
Since voting opened information on numbers of votes returned each day has been made available:

Daily return of voting papers for Dunedin City Council

Daily return of voting papers for other 2016 Local Elections

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

1 Comment

Filed under Business, DCC, Democracy, Dunedin, Economics, Finance, Media, Name, People, Politics, Public interest, What stadium

DCC Voting Paper Returns

Voting Paper Returns – check these out daily

Once voting opens information on numbers of votes returned each day will be available:

Find out the daily return of voting papers for the Dunedin City Council

Find out the daily return of voting papers for other 2016 Local Elections

Check out election candidates’ names and profiles here:

DCC & Community Boards
http://www.dunedin.govt.nz/your-council/electoral-information/elections-to-be-held-and-nominations-dunedin-city-council

ORC
http://www.dunedin.govt.nz/your-council/electoral-information/elections-to-be-held-and-nominations-orc

vote2016_logo

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

*Image: electionz.com

Leave a comment

Filed under Business, DCC, Democracy, Dunedin, Geography, New Zealand, ORC, People, Politics, Public interest

DCC & ORC Electoral Officer on Voting

### channel39.co.nz Wed, 22 Aug 2016
Nightly Interview: Pam Jordan
Most residents should have received their local body elections voting packs in the mail by now. Tonight we’re joined by Dunedin City Council and Otago Regional Council electoral officer Pam Jordan, who’s going to explain the ins and outs of voting.

Channel 39 Published on Sep 21, 2016

█ Check out election candidates’ names and profiles here:

DCC & Community Boards
http://www.dunedin.govt.nz/your-council/electoral-information/elections-to-be-held-and-nominations-dunedin-city-council

ORC
http://www.dunedin.govt.nz/your-council/electoral-information/elections-to-be-held-and-nominations-orc

On the STV voting system
Go to this post and comments to read more about STV – note comments by STV advocate Steve [Stephen Todd of Wellington]:

26.8.10 In defence of STV

█ For more, enter the term *candidate* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

3 Comments

Filed under DCC, Democracy, Dunedin, Media, Name, ORC, People, Politics, Public interest

The Bus Saga #Dunedin

Dave Cull is up to his tricks again with campaign signs on the back of buses.

In 2013 Greater Dunedin had as part of their campaign signage, the back of two buses (the electoral return invoices show artwork for 2 buses).

In Dave’s return he showed a donation from the bus company of a space on the back of a bus (note one space not 2).

The Greater Dunedin returns show no donations to the group, despite the entire group being on the back of the buses.

greater-dunedin-mobile-hoarding1-via-facebook-2013

So how come Dave didn’t show the value of both buses?
How come the rest of Greater Dunedin showed no donations of any bus space?

The Electoral Act makes it an offence (sec 207M) not to keep records of donations over $300, and not to declare the donations (under the return in sec 205K).

These offences involve fines of up to $40,000.

dave-cull-mobile-hoarding-2013-via-facebook-1

Maybe Dave Cull will say when he said one bus, he meant 2.

Maybe Greater Dunedin will say that per person the donation was not over $300, although their return includes 3 out of the 8 expenses notified that are under $300 per candidate.

Maybe somehow a bus company giving Greater Dunedin 2 free back of bus spaces did not seem important to Greater Dunedin.

Apart from the possible breaches of the Electoral Act, several of the Greater Dunedin group have been avid proponents of the transfer of Dunedin buses from the ORC to the DCC.

Coincidence?

At the very least Greater Dunedin should have declared an interest in being ‘in charge of local buses’, having arranged a freebee from one of the bus companies during their 2013 election campaign.

Dave is on the back of a bus again in 2016. Is this another freebee? And if so what does the bus company expect in return?

go-bus-cull-moving-billboard-7-9-16-new-world-cumberland-st-1-sm1

[Text supplied]

Early in 2012 the Council indicated an interest in investigating the transfer of powers for planning and operating public transport in Dunedin to the Dunedin City Council (DCC). A study was completed late in 2013 by MRCagney and NZ Institute of Economic Research (NZIER) which recommended that the DCC should pursue the transfer of powers because it offers significant benefits in terms of co-ordination, responsiveness and public interest. […] At the Dunedin City Council meeting on 15 May 2014, a decision was made ‘in principle’ to pursue the delegated responsibility for public transport in Dunedin, subject to completion of further work. This report explains that while the proposed changes to the public transport system outlined in the draft Otago Regional Public Transport Plan 2014 (RPTP) are very positive, the potential impact of the draft RPTP on public transport funding may be significant and limited information is available about how it will affect the cost of operating the system. In light of these recent findings it is recommended that the [Infrastructure Services] Committee approach the ORC regarding a deferred timeframe with a target date for possible transfer of powers of 1 July 2017.

Source: Report – ISC – 24/07/2014 (PDF, 120.6 KB)
Public Transport Governance Update

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

*Images: electionads.org.nz – Greater Dunedin and Dave Cull bus-backs (2013); whatifdunedin – Dave Cull bus-back (2016)

15 Comments

Filed under Business, DCC, Dunedin, Economics, Finance, Geography, Infrastructure, Name, New Zealand, People, Perversion, Pet projects, Politics, Project management, Public interest, Tourism, Town planning, Transportation, Urban design, What stadium

Johnstone on ORC report : ‘The Natural Hazards of South Dunedin’ (July 2016)

The Natural Hazards of South Dunedin – July 2016 [read online]
Otago Regional Council
ISBN: 978-0-908324-35-4
Report writers:
Michael Goldsmith, ORC Natural Hazards Manager
Sharon Hornblow, ORC Natural Hazards Analyst
Reviewed by: Gavin Palmer, ORC Director Engineering, Hazards and Science
External review by: David Barrell, Simon Cox, GNS Science, Dunedin

Received from Neil Johnstone
Sun, 29 Aug 2016 at 8:17 p.m.

Message: Misinformation on the causes of the June 2015 South Dunedin flood have abounded since the event. As if the victimised residents haven’t suffered enough from others’ inactions (before and during the event), they are now being subjected to a hazards discovery process whose vigour appears to be exceeded only by its own recklessness. Following are a commentary of the hazards approach adopted by the Otago Regional Council (ORC), and a summary of my investigations into the flood event that I commenced after the publication of Dunedin City Council’s first flood report back in November 2015.

You can download Neil Johnstone’s report or read it below (formatted slightly differently to suit the WordPress template).

█ Download: A REVIEW OF ORC REPORT THE NATURAL HAZARDS OF SOUTH DUNEDIN (1) (PDF, 587 KB)

AN APPRAISAL OF RECENT REPORTING OF SOUTH DUNEDIN HAZARDS

N.P JOHNSTONE, BEng (Civil), MIPENZ

1. Introduction

There is some irony that DCC and ORC should be planning “drop in” sessions for residents in respect of South Dunedin hazard issues during September 2016, some 15 months after the major flood. The prime cause of flooding in June 2015 was DCC’s failure to maintain its infrastructure (not just mudtanks), and its failure to operate its pump stations to their intended capacities. The subsequent spread of misconceptions (i.e. groundwater levels, rainfall significance etc) surrounding the flood causes was at least partly due to inaccurate ORC analyses and reporting.

Repetitive and new doubtful information emanating from ORC via its latest report has been noted. Presentations and an over-simplistic video production have been observed. A footnote covering these observations is included at the end of this appraisal.

Long-delayed DCC reports on causes of the South Dunedin flooding have already been strongly criticised by the author. Specifically discredited are misrepresentations of sea level, groundwater and rainfall ranking. Accepted now by DCC as factors (somewhat grudgingly, and depending on the audience) are mudtank blockage and Portobello Road pump station failures (plural); still to be fully acknowledged are the failures at Musselburgh Pumping Station.

Attention is now turned to significant parts of hazard reports produced by the Otago Regional Council and utilised by DCC.

2. Coastal Otago Flood Event 3 June 2015 (ORC, published October 2015)

This report deals with a wider area than South Dunedin. It is apparent that ORC staff never visited the flooding areas of South Dunedin on 3 June, but took advantage of fine weather to take some water level readings the following day. The opportunity for useful progressive surface water level recording was thus lost. Levels were collected at some 150 points on 4 June. ORC’s main conclusion was that “localised variations in topography were probably the main driver of flood depth”. Or, put another way, water depth was deepest where the ground was lowest. This seems hardly surprising, and even trivial. No attempt was made to explain the photographic images presented of extensive ponding remaining well after the rains had ceased. The phenomena of blocked mudtanks and unutilised pumping capacity went seemingly unnoticed.

The report does usefully reference ORC’s four borehole recorders of groundwater, but makes the somewhat misleading assessment that groundwater levels were “elevated” prior to the rainstorm. This misinformation was seized upon by agencies such as DCC and the Office of the Parliamentary Commissioner for the Environment to highlight climate change impacts.

Having obtained the actual groundwater level data from ORC via the LGOIMA process, the author was able to reveal this “groundwater fallacy” in reviews from February 2016, but it was not until the publication of NZ Listener’s article (June 11-17, 2016) entitled ‘FLOOD FIASCO’ that ORC admitted that pre-flood groundwater levels were in fact “just a little bit above average”. ORC now seems intent on resurrecting this fallacy.

The ORC report fails to address the real and key issues of pumping station failures (Portobello Road and Musselburgh), or comparisons with much lesser flood impacts in the larger rainfall event of March 8/9 1968.

The report states that the 2015 24-hour rainfall was the largest since 1923. This was patently incorrect, but again was utilised by DCC to divert blame from their role in the disaster.

3. The Natural Hazards of South Dunedin (ORC, published July 2016)

The report states unambiguously in its Opening Summary that the major flooding of June 2015 was “a result of heavy rainfall, surface runoff, and a corresponding rise in groundwater”. By now, most people are aware that the causes of the flooding’s disastrous impact were failure to optimally operate pumping stations, failure to clear mudtanks, and failure to deploy staff to key areas during the event. Again, none of these factors is addressed in ORC’s report.

The report presents a table on its second page entitled “Factors Which Can Influence Flood Hazard”. Examples of exaggerated negativity include:

1. Heavy Rainfall:
– Many recorded instances of rainfall leading to surface flooding.
– Heavy rainfall events have occurred frequently over the last decade.

Comment: These conclusions do not appear to be supported by the report’s text, and are vague, factually challengeable and alarmist. Prior to 2015, no major flooding had occurred in South Dunedin since 1968, and even that was minor by comparison.

2. Sea Level:
– Groundwater level fluctuates (by up to 0.5m near the coast) on a twice-daily cycle in response to normal ocean tides.

Comment: All of South Dunedin is near the coast; most of the area does not experience such large fluctuations. This should have been made clear by the inclusion of groundwater data from all 4 ORC sites across the plain, not just from Kennedy Street.

3. Seismic:
– Large earthquakes could result in increased flood hazard on the South Dunedin plain, due to liquefaction-related land subsidence or direct, sudden, changes in land elevation relative to sea level.

Comment: All areas of NZ have some susceptibility to earthquake damage. Dunedin is amongst the areas at lowest risk; no incidences of even minor liquefaction have ever been reported in South Dunedin, and little or no clearly liquefiable materials have been identified (Refer GNS, 2014*). Continue reading

27 Comments

Filed under Baloney, Business, Climate change, DCC, Democracy, District Plan, Dunedin, Economics, Finance, Geography, Health, Heritage, Housing, Infrastructure, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

South Dunedin mainstreet Hub : no direct relevance to distant Gasworks

as well as (pre-Election)
DESPICABLE DCC / ORC CLIMATE CHANGE MASSAGE

[click to enlarge]
DCC Webmap - South Dunedin Hub area incl gasworks museum JanFeb2013DCC Webmap – GREAT DISTANCE except by computer or Segway….
South Dunedin | from King Edward St (red) to Gasworks Museum (blue) via Lorne and Braemar Sts (green) – colour overlays by whatifdunedin.

█ DCC doesn’t need Athfield Architects to justify the LONG DURATION need and solution. No disrespect to colleague, the late Ian Athfield —or the current firm (love them heaps).

DCC, DO NOT OVER THINK THIS, FOR CRISSAKES
Give South Dunedin a community facility as was Promised YEARS AGO. Leave the goodie-two-shoes Gasworks Museum lobbyists out of it, or very much to the side. They mean well, but for too long they’ve been praying on the feckless DCC, soaking up Ratepayer dollars with little justification, and they keep wanting more.

COLLECTIVELY, WE HAVE LOCAL SOLUTIONS – WE DON’T NEED TO BE HELD BY THE HAND TO SET UP SOMETHING SO INCREDIBLY SIMPLE AS AN ECONOMICAL WELL-CRAFTED COMMUNITY HUB IN KING EDWARD STREET

How many people is this “out of control” Dunedin City Council wanting to Massage – BEFORE the October Local Body Elections.

VOTE BUYING
The CULL Stench around this is SO DISGUSTING.

Dunedin City Council – Media Release
Drop-in sessions start of community conversation on South Dunedin’s future

This item was published on 22 Aug 2016

A series of drop-in information sessions hosted by the Dunedin City Council and Otago Regional Council early next month are the start of a community conversation around South Dunedin’s future. The sessions will be at the Dunedin Gasworks Museum on Thursday, 1 September and Friday, 2 September.

DCC chief executive Sue Bidrose will be presenting information about what happened in the 2015 flood, how the current stormwater system works, and how the DCC plans to invest and work with the community in the future.

Ms Bidrose said that it was important to plan carefully for South Dunedin’s changing environment. It was also important to take the time to involve the community in the decision making along the way, rather than to just do things on their behalf.

“Addressing the challenges of the future requires the DCC and ORC starting to have conversations with the community about the challenges, and the expectations and options for what can be achieved. The rest of Dunedin’s population needs to be involved as well. There is a great opportunity to turn some of the challenges into opportunities and give confidence for long-term investment in the area. These drop-in sessions are the beginning of the process. The DCC will be actively seeking local people’s thoughts on these issues and working with the ORC on what the long-term responses might be. I’m looking forward to seeing as many people as possible from the South Dunedin area at the sessions.” –Bidrose [employed by ????]

ORC director of stakeholder engagement Caroline Rowe said the drop-in sessions were part of a wider South Dunedin community engagement plan, aimed at developing a conversation with locals and groups about managing the risks associated with the changing environment. Ms Rowe said they follow the recent release of the ORC’s Natural Hazards of South Dunedin report. The [BULLSHIT ORC] technical report pulls together information and analysis gathered over the past seven years on natural hazards facing the area, particularly the increased likelihood of surface flooding associated with rising sea level. [FALSE AND MISLEADING BULLSHIT]

Presentations, with accompanying video, will be at each session and people will have an opportunity to talk individually to staff from both councils. The hour-long sessions will be repeated several times, with Thursday sessions starting at 10am, 11.30am, 1pm, 4.30pm and 7pm. The Friday sessions will start at 10am, 11.30am, and 1pm.

Ongoing engagement planned for the next few weeks also includes briefings for support service agencies and other specific interest groups such as the South Dunedin Business Association, the Otago Chamber of Commerce, and school and early childhood centres.

Contact Sue Bidrose, chief executive DCC on 03 477 4000.

DCC Link

█ Feedback on the proposal can be provided online on the council’s website at http://www.dunedin.govt.nz/council-online/currently-consulting-on/current-consultations/south-dunedin-community-hub

The feedback period runs from Saturday, 20 August until 4pm on Monday, 29 August.

****

Mon, 22 Aug 2016
ODT: South D hub proposal unveiled
The Dunedin City Council is calling for feedback from residents on its preferred option for a library and community hub in South Dunedin before a report is presented to councillors next month. Council services and development general manager Simon Pickford and architect Jon Rennie, of Athfield Architects, presented the council’s preferred option to about 50 people at the Dunedin Gasworks Museum on Saturday morning. Under the $5.25 million proposal, a library would be built in the former BNZ building in King Edward St and the facility linked to the Gasworks Museum through Lorne St. Some facilities, such as a café, would be based at the museum. Mr Pickford said residents had until August 29 to provide feedback to the council on the proposal.

█ For more, enter the terms *south dunedin*, *flood*, *hazard*, *vandervis* (sane) and *cull* (VOTE Cull OUT) in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

40 Comments

Filed under Architecture, Business, Climate change, Construction, Cycle network, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Events, Finance, Geography, Health, Heritage, Hot air, Housing, Infrastructure, Media, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

ORC : Official complaints show integrity

Gerry Eckhoff (ORC) 1### ODT Online Mon, 15 Aug 2016
Two complaints laid against ORC
By Simon Hartley
Complaints against the Otago Regional Council have been laid by Cr Gerry Eckhoff with the Ombudsman and also the Office of the Auditor-general over exclusion of the public from a recent meeting. A decision was publicly released by the regional council late on Friday, from an in-committee, meaning non-public, non-media meeting on Wednesday, which the ORC yesterday defended on the basis the decision could be appealed.

The regional councillors voted in favour of accepting commissioners’ recommendation that a minimum water flow be set for the Lindis River catchment in Central Otago.

Mr Eckhoff released a statement yesterday outlining his complaints, and in an interview said not having the issue aired in public revealed a “grossly inappropriate process”. […] Council staff made the recommendation to hear the Lindis matter in public exclusion after seeking legal advice on matters where a decision by the council is open to an appeal in a court or tribunal, [ORC chief executive Peter Bodeker] said.
Read more

█ ORC : Combined Council Agenda 10 August – Public.pdf

Go to PART D – EXCLUSION OF PUBLIC
See Item 14 Recommendations of the Hearing Committee on the Proposed Plan Change 5A (Lindis: Integrated water management) to the Regional Plan: Water for Otago.
In relation to item 14, this resolution is made in reliance of section 48(1)(d) of the Local Government Official Information and Meetings Act 1987.

█ Otago Regional Council http://www.orc.govt.nz/

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

1 Comment

Filed under Agriculture, Business, Democracy, Geography, Media, Name, New Zealand, OAG, Ombudsman, ORC, People, Politics, Public interest, Resource management, Travesty

ORC, DCC continuing Deceptions : Natural Hazards for #SouthDunedin

W H A T ● P L A N ?

ORC stakeholder engagement director Caroline Rowe said the sessions were part of a wider “South Dunedin community engagement plan”.

### ODT Online Tue, 9 Aug 2016
Sessions on natural hazards
By John Gibb
South Dunedin residents will be able to learn more about natural hazards facing the area through drop-in sessions to be held at the Dunedin Gasworks Museum early next month.
The Otago Regional Council is organising the September 1 and 2 sessions, in collaboration with the Dunedin City Council. The drop-in session on the first day will run from 1.30pm to 7pm, and on the second day from 10am to 2.30pm.
Last month the ORC released a report titled “Natural Hazards of South Dunedin”. This report consolidated information and analysis gathered over the past seven years on the natural hazards facing the area, particularly the “increased likelihood of surface flooding associated with rising sea level”.
Read more

W H A T ● R I S K S ?
Answer ……. M I S I N F O R M A T I O N via ORC Hazard Plans and Maps

F I G H T >>> To Protect Your Property Values

“In a report to be tabled at the ORC’s technical committee tomorrow, Ms Rowe said South Dunedin was “an integral part of the wider Dunedin community” and many people and groups had an interest in how its risks would be managed. The report said the ORC also planned several other communication activities over the hazards plan, this month and next.” –ODT

ORC : Combined Council Agenda 10 August – Public.pdf
● Go to Agenda Item 5 (pp 34-35)
2016/0988 South Dunedin Community Engagement Report
The report outlines the approach management is taking to the community engagement as was verbally communicated at the Technical Committee meeting held on 20 July 2016 where Council received the report entitled “The Natural Hazards of South Dunedin” and made the decision to “endorse further community and stakeholder engagement within a timely manner”.

[screenshot – click to enlarge]
ORC Report 4.8.16 South Dunedin Engagement Plan [ID- A924516]

General reading (Otago including Dunedin City District)
ORC : Natural Hazards

● Information coming to this ORC webpage: ORC committee report – natural hazards of the Dunedin district: technical documents

Natural Hazards of South Dunedin – July 2016

● See also, the DCC second generation district plan (2GP) hazard zone information and maps based on ORC data, via the 2GP Index page.

Related Post and Comments:
6.8.16 LGOIMA trials and tribulations with peer reviews #SouthDunedinflood

█ For more, enter the terms *flood*, *hazard*, *south dunedin* and *southdunedinflood* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

10 Comments

Filed under Baloney, Business, Climate change, Construction, Corruption, Democracy, Design, District Plan, Dunedin, Economics, Finance, Geography, Health, Heritage, Housing, Infrastructure, Media, New Zealand, OAG, Ombudsman, ORC, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

ORC New HQ : Reminder, fiduciary duty and core responsibilities

Land ● Water ● Air ● Coast ● Built Environment ● Biota ● Natural Hazards ● Energy ● Wastes and Hazardous Substances

The core business of the Otago Regional Council is environmental protection, not real estate investment. –Eckhoff

### ODT Online Tue, 21 Jun 2016
Environmental cost to building
By Gerrard Eckhoff
OPINION The decision the Otago Regional Council will have to make on a new administration block sometimes means deciding on the lesser evil. Whatever the decision, councils don’t get much thanks for avoiding one bad choice in favour of another. The option of leasing space in an existing building, thereby leaving a large amount of capital free for the ORC’s primary environmental functions, has been summarily dismissed by the chairman of the ORC. This is despite matters of “significant investment” (such as a new building) requiring special consultation with our ratepayers, who will in turn expect that their or any suggestion will not be so easily dismissed. […] The ORC’s failure to understand that environmental inaction simply transfers cost from this generation to the next and with a multiplier effect is inexcusable. What price must environmental imperatives pay for a new building? That is the real question the ORC must ask of itself.
Read more

● Gerrard Eckhoff, of Central Otago, is an Otago regional councillor.

Otago Regional Council meeting
█ [today] Wednesday, 22 June 2016 at 9:00 a.m.
Council Chamber, 70 Stafford Street, Dunedin
Members of the public are welcome to attend.

Download: Agenda includes minutes and reports (PDF, 2402 KB)

Go to Part C Item 7 (pages 68-70)
Report: ORC Head Office Accommodation Update. DCS, 16/6/16
The report provides an update on the Council and staff workshops held to help inform the next stage of the project.

[extract]

ORC 22.6.16 Council Agenda Part C Item 7 pp68-70

Related Posts and Comments:
● 9.6.16 ORC empire building again : Consultants give questionable options…
11.8.12 ODT editorial (spot on!) — ORC temporary headquarters
26.6.09 ORC headquarters [incl news items to present day]

Posted by Elizabeth Kerr

Election year. This post is offered in the public interest.

18 Comments

Filed under Agriculture, Architecture, Business, Construction, Democracy, Design, Dunedin, Economics, Education, Events, Finance, Geography, Heritage, Infrastructure, Media, Name, New Zealand, People, Pet projects, Politics, Project management, Property, Public interest, Resource management, Site, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

South Dunedin stormwater pipes —getting past the desktop ICMP

Dunedin City Council (website) on Stormwater:

Stormwater is rain or snow runoff that does not soak into the soil.
When an area is developed, stormwater generally increases due to runoff from impermeable surfaces (eg roofs, roads, carparks, or compacted soil). It flows naturally from higher to lower ground, and ultimately discharges into natural watercourses such as wetlands, creeks, rivers or the sea. Land development results in the creation of both private and public stormwater systems, which collect and transfer stormwater to lower ground more efficiently. The public stormwater system is a network of drains, gutters, pipes, mud tanks, detention ponds, stormwater reserves and other associated infrastructure.

At other threads (here and here), contributor JimmyJones has cited the South Dunedin Integrated Catchment Management Plan (ICMP) to draw attention to the actual or perceived state of the stormwater pipes at South Dunedin. He believes the type of pipeways and the deteriorating condition of the pipes contributed to the June 2015 South Dunedin “flood event”, and will require budgeted upgrade.

But is the South Dunedin ICMP correct about the underground pipes and their condition?

Largely, the ICMP was a desktop assessment carried out by consultants for the Dunedin 3 Waters Strategy. Namely, Opus International Consultants and URS New Zealand (now trading as Aecom) in association with Dunedin City Council.

South Dunedin ICMP – Integrated Catchment Management Plan
Sth Dunedin ICMP (PDF, 11.1 MB)
Sth Dunedin Mapbook (PDF, 12.0 MB)

Read more about the 11 ICMPs for Dunedin here.

DCC says ICMPs are used for planning and management of the stormwater system. For each stormwater management area, or catchment, issues are identified and prioritised, and solutions are identified and implemented. The ICMPs are mainly in the metropolitan Dunedin area (including Mosgiel and Port Chalmers). They inform investigation and planning decisions and help focus council priorities for future operational and capital works. Implementing the ICMPs is also a key requirement of DCC consents to discharge stormwater into the coastal marine area. Further information is available on the Stormwater monitoring page, see also the Stormwater responsibilities page.

The Pipes at South Dunedin
Local water and drainage experts familiar with the stormwater system say:

Received.
Sat, 18 Jun 2016 at 10:52 a.m.

The South Dunedin ICMP report has been read, it’s “ok”. But it’s also described as “…glossy and costly for the consultant(s). Basically, such reports tell the Council stuff they neither read nor understand, but would have mostly been trivial knowledge (where accurate)” to local experts familiar with the design and day-to-day workings of the stormwater system.

“You can believe any part of [the ICMP] or not. It’s a desktop study, which speculates on pipe condition. Robinson and Hendry have read it and obviously don’t agree. Pipes last for an eternity with limited maintenance (other than blockage removal) provided there isn’t ground movement or corrosion (these pipes are concrete).”

Listener, June 11-17 2016, pp22-29 (not yet available online):

[excerpt —click to enlarge]
Listener11-17 Jun 2016 pp26-27_0003

ODT 13.2.16
“Mr Hendry believed South Dunedin’s infrastructure, which he spent six years helping build as a surveyor in the 1960s, would have been good enough to prevent much of the damage had it been properly maintained. […] My view is that these people out here, a lot of them have got nothing. Now they have got a hell of lot less. It’s not fair on them. Nobody’s come out and said ‘we were wrong. Something wasn’t done right’.”

█ Come to the Public Meeting in South Dunedin on Monday evening, hosted by the South Dunedin Action Group.

Related Posts and Comments:
17.6.16 So we’re going to play it this way #SouthDunedinFlood
● 16.6.16 Public Meeting: South Dunedin Action Group #AllWelcome
10.6.16 “Civic administration” reacts to hard hitting Listener article
● 6.6.16 Listener June 11-17 2016 : Revisiting distress and mismanagement
● 4.6.16 Johnstone review … DCC Infrastructure Services meeting 26.4.16
3.6.16 DCC —godsakes, how did it get to this? #flood #property damage
● 19.5.16 Johnstone review of 2nd DCC report #SouthDunedinFlood
29.4.16 Vandervis emails batch 2 #Dunedin #infrastructure #flood #mudtanks
27.4.16 Vandervis emails batch 1 #Dunedin #infrastructure #flood #mudtanks
27.4.16 DCC meeting and apology NOT Enough— #SouthDunedinFlood
20.4.16 DCC Politics : Release of Infrastructure Report #SouthDunedinFlood
14.4.16 South Dunedin flood risk boosters #ClimateChangeCrap #PissOffPCE
31.3.16 DCC: Infrastructure report 2 pending —Mudtanks & stormwater…
● 8.3.16 Johnstone independent review of DCC report #SouthDunedinFlood
2.3.16 DCC compels extensions on LGOIMA requests #SouthDunedinFlood
26.2.16 Mudtanks and drains + Notice of Public Meeting #SouthDunedinFlood
21.2.16 DCC infrastructure … report (30.11.15) subject to ‘internal review’ only
● 13.2.16 South Dunedin Flood (3 June 2015): Bruce Hendry via ODT
4.2.16 2GP commissioner appears to tell Council outcome… #hazardzones
4.2.16 Level responses to Dunedin mayor’s hippo soup #Jun2015flood
30.1.16 DCC Rates: LOCAL CONTEXT not Stats —Delta and Hippopotamuses
● 25.1.16 DCC: South Dunedin Integrated Catchment Management Plan (ICMP)
19.1.16 Listener 23.1.16 (letter): South Dunedin #Jun2015flood
16.1.16 NZ Listener 16.1.16 (letter): South Dunedin #Jun2015flood
14.1.16 ‘Quaking!’ Dark day$ and tide$ to come #Dunedin #Jun2015flood
10.1.16 Infrastructure ‘open to facile misinterpretation’…. or local ignore
5.1.16 Hammered from all sides #fixit [dunedinflood Jun2015]
24.12.15 Site notice: posts removed
● 3.11.15 South Dunedin Flood | Correspondence & Debriefing Notes released by DCC today #LGOIMA

Downloads:
Kerr, Elizabeth LGOIMA Correspondence Hendry and Williams 2015
Kerr, Elizabeth LGOIMA Flood Debrief Notes 2015

█ For more, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

12 Comments

Filed under Business, Climate change, Construction, Democracy, Design, District Plan, Dunedin, Economics, Education, Events, Finance, Geography, Health, Heritage, Housing, Infrastructure, Media, Name, New Zealand, Ombudsman, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium