Category Archives: Central Otago

Regional state of emergency lifted in Otago (incl Dunedin & Waitaki)

Otago’s state of emergency has been lifted.
Emergency Management Otago this morning lifted the state of emergency which existed since deluges and heavy wind battered Otago’s eastern coast over the weekend. The region has now officially entered a recovery phase with teams moving on to assessing the damage and checking on the needs of those affected by the devastating floods. Emergency Management Otago group controller Chris Hawker, in Dunedin, said the move towards recovery did not signal any reduction in effort.

● Dunedin City Council (03) 477-4000
● Federated Farmers 0800 FARMING (0800 327 646)
● Otago Rural Support Trust 0800 787 254
http://www.rural-support.org.nz

****

DUNEDIN CITY COUNCIL

Dunedin July Severe Weather update
10.45am Monday 24 July 2017

State of Emergency lifted

The Dunedin State of Emergency was lifted at 9am today. Under the Civil Defence Emergency Act 2002 we are now operating under a Notice of Local Transition Period as we move into the recovery phase.
The transition period is in force for 28 days (expires 9am 21 August) unless extended or ended earlier. The notice still gives the local authority powers to carry out essential emergency-related work.
More information about the work happening as part of the recovery phase will be provided today. The work will be led by Dunedin City Council Recovery Manager Simon Pickford.

Evacuation map – Upper Taieri Pond (PDF, 3.3 MB)
Mill Creek ponding area (PDF, 2.3 MB)

██████ DCC TWITTER FEED AUTOMATICALLY UPDATING

Continue reading

64 Comments

Filed under Business, Central Otago, DCC, Dunedin, Emergency services, Fire and Emergency NZ, Health & Safety, Housing, Infrastructure, Media, New Zealand, North Otago, NZTA, ORC, People, Police, Property, Public interest, Queenstown Lakes, South Dunedin, Transportation

Southern Police : Nothing changed since Tom Lewis wrote Coverups & Copouts

Remember when Police bought up all the copies they could, and ‘disappeared’ public library lending copies….

Nothing has changed. No-one is policing the Police.
This is the New old news….

****

C L O S E ● T O ● H O M E

A 25-year-old woman says she filmed a police officer minutes before he attacked her.

### ODT Online Wed, 19 Jul 2017
Police assault allegation
By Rob Kidd
Police are investigating allegations an experienced Otago police officer subjected a woman to a vicious attack while he was off-duty. The 25-year-old complainant said she was at a fancy-dress birthday party on Saturday night when the alleged assault took place. She said the man, who was wearing a wig at the time, smashed her face into the bonnet of a car before dragging her down a driveway on her front. The pair had never previously met, she said. “He just lost it.” The Otago Daily Times has chosen not to identify the officer involved, the woman or the town where the alleged incident took place. A police spokesman said police were aware of a complaint about an off-duty officer early on Sunday. Police would not confirm whether the man remained at work.
Read more

****

Speaking of cover-ups….

After reading the Otago Daily Times (page 3) yesterday, it was interesting to google the name *Kallam Croudis* —there’s a name for Conflicts of Interest, past and present.

NZ Police should sack Croudis. What a corrupting and observable liability—

Det Snr Sgt Kallum Croudis has been criticised over his handling of a case which resulted in a woman’s confession being thrown out by the court.

### ODT Online Mon, 17 Jul 2017
Judge critical of senior officer
By Rob Kidd
A senior Dunedin police officer has been slammed by the court over his involvement in a case in which he had a conflict of interest. Detective Senior Sergeant Kallum Croudis spoke to a suspect at least three times without being part of the investigation team. Judge Michael Crosbie also criticised the officer’s record-keeping and his “casual approach”, which resulted in police obtaining an unlawful confession from the woman regarding the death of a Dunedin man. In his judgement ruling the confession inadmissible [Judge Crosbie] noted Det Snr Sgt Croudis was a friend of the dead man’s father. Southern district commander Superintendent Paul Basham said the comments of the court would be taken very seriously and “the issues raised in the judgement are of concern”. A spokeswoman later confirmed police would not pursue the prosecution against the woman. […] At the May hearing, [Croudis] said he spoke to the female defendant at least three more times before she had a “voluntary” interview at the station.
Read more

Back when, the same, the same….
ONE BAD COP AMONGST MANY

### Stuff.co.nz 01:43, Jan 31 2009
Judge lambasts top cops in damning report
via Sunday Star-Times
The actions of some of the country’s highest-ranking police have been criticised in a damning Independent Police Conduct Authority report due out later today. The report – released after a two-year investigation – makes adverse comments about 10 Dunedin police, including four inspectors, a detective senior sergeant and two detective sergeants. Justice Lowell Goddard is understood to criticise police for their involvement in private investigations of ACC clients – and for how they handled their subsequent inquiries into complaints. The inquiry was launched after conflict of interest allegations that Peter Gibbons – a former Dunedin CIB head who became a private investigator working for ACC’s fraud unit – used his police constable son-in-law to improperly obtain search warrants and seize property from ACC clients. The clients alleged that when they complained, senior police – including three of Gibbons’ former CIB colleagues – failed to act. […] Gibbons, who was a detective senior sergeant in the CIB in the 1990s, supervised three of the police criticised in the Goddard report Detective Senior Sergeant Kallum Croudis, Detective Sergeant Malcolm Inglis and Detective Sergeant Brett Roberts. A previous internal police inquiry showed Croudis assigned Henderson ACC-related cases knowing about his conflict of interest as Gibbons’ son-in-law. Inglis and Roberts conducted the initial inquiries into Van Essen’s complaints. Croudis, Inglis and Roberts have been involved in both the original inquiry and reinvestigation of the David Bain mass murder case. Croudis arrested Bain in 1995.
Read more

****

Peanut-brain danger man Jeremy Buis of Dunedin Police….

Stuff.co.nz Last updated 22:36, July 17 2017
Police officer convicted for harassing Dunedin businessman for years
By Jack Fletcher
Dunedin policeman Jeremy Buis was responsible for the more than two-year campaign of harassment of local businessman Daniel Pryde. Jeremy Fraser Buis, 39, was convicted on a raft of charges relating to the harassment of Daniel Pryde after a June 2012 parking dispute escalated. Suppression of his occupation was lifted in the High Court at Dunedin on Monday. [17 July 2017] …. In April, Buis was found guilty of criminal harassment, threatening to do grievous bodily harm and intentional damage. He was sentenced to 200 hours of community work and order to pay emotional harm reparation of $15,000. Buis’ name suppression was lifted on April 21, but his occupation remained suppressed until Monday.
Read more

****

Southern Police have a dreadful history including participation in the crimes and events described in Coverups & Copouts, for which no prosecutions have issued. Few street-wise people in Dunedin trust the thin blue line to do their job. Is it any wonder Buis, Croudis and their ilk exist, and what of the off-duty police thug who attacked the 25-year-old female complainant on the weekend?

For these men, Louise Nicholas doesn’t exist.

****

### ODT Online Wed, 19 July 2017
Integrity of police threatened
OPINION New Zealanders need to have faith in the police force, a belief that when bad things happen to them, someone will be on their side, helping to right a wrong. That faith has been sorely tested in past years when police officers themselves have decided they are above the law. At the extreme end of the spectrum, in the United States, there has been ongoing debate about the role of the police in the shootings of young black men, in particular. Now, a white Australian woman has been shot in a Minnesota alley after calling the police about a possible assault in the alley behind her home. Most New Zealanders will surmise those sorts of incidents will never happen in this country. But the line between upholding the law by men and women in uniform and them taking the law into their own hands is becoming increasingly blurred. This week, the Otago Daily Times has reported on two incidents which have shaken public confidence in the police to the core.
Read more

++++++++++++++++++++++++++++++++++++++++++++++++++++

[previously]

Comment by Elizabeth
2017/03/31 at 2:24 am

Calls for a Royal Commission of inquiry into historic child abuse have been rife these last weeks, inflaming social media and mainstream media (MSM) around New Zealand.

Bless their hearts, Lauda Finem, based offshore, banged out a post at their website yesterday that easily sums up the New Zealand ‘scene’. This is a must read.

LF’s introductory comments are provided here, with excerpts of relevance to Dunedin.

[begins]

March 30, 2017 1:14 am • Lauda Finem
Why Bill English & Nasty Nats find Child Abuse Royal Commissions Terrifying
For the past month or so Kiwi newspapers and other media outlets have been slowly publishing stories relating to the growing chorus of voices calling for a Royal Commission into historic child abuse.
The latest trigger seems to have been an open letter calling for the same, although, in our view, a very narrow, much less desirable version of the ‘Royal Commission Into The Institutional Responses to Historic Child Sexual Abuse’ that our Australian PM Julia Gillard was forced to initiate in 2013; which is only now beginning to release various stats and reports on some of the findings and the evidence that has been heard.
Bill English, the halfwit that National decided to replace John Key with, has of course avoided mentioning the apparent success of the Australian commission, noting only that it might come in handy for New Zealand’s state sector when it comes to lessons that might be learned.

[photo caption] Just how much sway has Police Commissioner Mike Bush had on a government that is clearly terrified of any inquiry

English is in fact completely out of touch with reality in almost everything he has said publicly on the subject; going so far as to claim that there is nothing to be gained or learned by New Zealand establishing a similar inquiry.
This is despite the success of the Australian model and the fact that both Ireland and the UK have also conducted national inquiries.
Not only is the National party Government determined NOT to hold such an inquiry, they are also, seemingly, equally determined not to even entertain the notion that the victims of historic child abuse, sexual, physical and emotional deserve an unreserved apology from the crown. They also deserve to see, where at all possible, their abusers convicted and serving prison sentences.
This fact alone should have every right thinking New Zealander appalled. More especially given the likely scale of the criminal offending, if the Australian Royal Commissions findings are anything to go by; there being absolutely no reason to believe that New Zealand’s statistics would be any different to those of Australia.
In fact, if one is to take the figures recently released by the Australian Commission, and then compare them with the suggested 1100 children that the Kiwis say have been sexually abused whilst in care historically, clearly, New Zealand has had a far more significant problem than Australia per capita.
In fact, New Zealand’s problem does not seem to have abated, the country is still in the grip of almost daily reports of contemporary offending; the only conclusion being that the problem is not only systemic but there may be continuing cultural or institutional causes for its existence.

Read more at http://www.laudafinem.org/2017/03/30/why-bill-english-nasty-nats-find-child-abuse-royal-commissions-terrifying/

● To view the open letter and petition go to http://www.neveragain.co.nz/

****

[excerpts – Lauda Finem]

The first thing that has to be said is that those who have only just arrived at this cause are only calling for an inquiry into children in State care. This is significantly less than the Australian model which has left absolutely no rock un-turned in its pursuit of perpetrators, cover-ups and the truth.

The beauty of the Australian model is that it has captured everything, the words “Institutional Response” powerful in who it captured. Cardinals, Bishops, Priests, Religious orders, schools, Teachers; state and private, police, social workers, the scope has been enormous….and rewarding, if the sheer volume of the Commissions results are anything to go by.

There is some anecdotal evidence that the New Zealand police have in fact been one of the primary reasons for the National Party Government, to date, being loathed to even consider a Royal Commission. First and foremost the absence of the religious organisations stands out like balls on a short haired dog. Second, the absence of the New Zealand police.

Does Bill English seriously believe that New Zealand Govt agencies, including the country’s systemically corrupt police force will learn anything from the published results of the Australian Royal Commission? Does any New Zealand politician seriously believe that for one minute? If they do then they should be pointed in the direction of a clinical psychologist for evaluation and treatment.

For both the New Zealand police and the country’s government it’s always been about harm minimisation, not for the unfortunate victims you understand, but rather for themselves.
Until recently, Police Association president for life, Greg O’Connor, was living breathing evidence that the New Zealand police force had gained absolutely nothing from either of the two Australian State crackdowns on police corruption. In fact, many of the gang rapes committed by New Zealand police remained concealed for years after both of those inquiries, some that we are aware of, indeed probably many more, remaining outside the public’s knowledge, the Police Commissioner and Prime Ministers dirty little secret.

Just how many of these men and woman suffered serious abuse at the hands of paedophiles and psychopaths working for New Zealand Govt agencies, including its police force?

In short, Bill English knows that once the scale of historic sexual physical and emotional harm to Kiwi children is known to the public the government will no longer be in control of the inquiry. Growing public anger will inevitably ensure that any Royal Commission gets what it needs, whether initially proposed and sanctioned or not, to aid in the job of ascertaining the enormous scale of the problem in New Zealand.

Evidence of these police and Government cover-ups is to be found here on Lauda Finem, it’s also to be found in a variety other places, libraries and online.
The work of Kiwi investigative journo Ian Wishart, in particular a special investigation Wishart conducted over a two year period, culminating in his 2007 accusations of New Zealand Police involvement in organised child sexual exploitation rings in both Christchurch and Dunedin. Accusations that were never properly investigated by police or the IPCA for quite obvious reasons.
Police behaviour that was at the time of the offending known to John Jamieson, then Christchurch District Commander and subsequently, as Commissioner of police (1984 – 1994), a man who the Catholic Church, following Jamieson’s brief and unremarkable political career, hired with the obvious intention of insuring that all accusations of historic child sexual abuse were mustered smoothly out the back door, much to the Arch Bishop’s benefit.

Prior to joining the Catholic Church John Jamieson, as Commissioner of Police, himself assisted in concealing, from the media and the public, allegations of rape, violence and corruption against serving police officers, one of whom escaped to South Africa with the aid of at least nine other serving Gisborne police officers.
In short, Bill English, without a shadow of a doubt, is fully cognisant of the scale of the historic problem in New Zealand, in particular the police involvement. He also likely knows that the scale of Historic child abuse in New Zealand is far greater than what has historically occurred in Australia, if only on a per capita basis.

New Zealand police have in the past used all sorts of skulduggery in efforts to thwart official inquiries into their unlawful practices and conduct, including sexual and physical abuses.

[photo caption] Two dirty cops: ex New Zealand police commissioners John Jamieson (L) and Howard Broad (R) Jamieson was certainly, without a shred of doubt, a master of the dark art of police corruption and cover-up

Lauda Finem have in the past written extensively on the existence of these practices and a secret police network, comprising ex police, some turned corrupt private investigators and others turned corrupt politicians, from local bodies right up to New Zealand’s Parliament.

See: New Zealand Police, ODESSA and just how they look after their own

See: New Zealand’s most powerful political force is?

We would also recommend that readers check out Ian Wishart’s article “To Serve and Protect”, also published in 2007, it’s an eye opener and gives readers some idea of what could be investigated had the New Zealand Government followed an identical path to that of the Australian Royal Commission into Institutional Responses to Child Sexual Abuse.

See: Ex police commissioner Howard Broad to head CYF inquiry

Like ex Commissioner Jamieson, Police Commissioner Howard Broad was implicated by Wishart in sordid events which had been exposed by ex Christchurch cop turned whistle-blower and author Tom Lewis.

[ends]

++++++++++++++++++++++++++++++++++++++++++++++++++++

Quick references:

August 14, 2007
Ian Wishart: To Serve & Protect: June 07
http://www.investigatemagazine.co.nz/Investigate/13956/to-serve-protect-june-07/

Tom Lewis: Coverups & Copouts (Hodder Moa Beckett, 20 March 1998)
The book written by ex senior police officer Tom Lewis traverses the seedy side of Dunedin during the eighties, including the infamous ‘Dunedin Sex Ring’ case.

[promo]
“There have been police enquiries in New Zealand and there has even been the odd exposé but there has never been a book like Tom Lewis’ COVERUPS AND COPOUTS. His story will shock the average New Zealander and shake the New Zealand police to the very core. Not only does the former detective sergeant describe in methodical detail some of the worst coverups in NZ police history, but he punctuates his story in the most compelling fashion. Tom Lewis actually dares to name names. From commissioners to constables, the truncheon isn’t spared. This book will not have won Tom Lewis any friends in the New Zealand Police, but it will finally lay bare to New Zealanders what most had never thought possible of our Police:
* Christopher John Lewis – the truth behind the royal assassination attempt
* Ron Jorgensen – alive and well – and living in Australia
* Dunedin sex ring – why the police copped out
and much more.”

More on police officer Tom Lewis and the Dunedin Sex Ring:
http://www.presscouncil.org.nz/display_ruling.php?case_number=2015
Case Number: 2015 Tom and Teresa Lewis Against Otago Daily Times | Press Council Meeting December 2007

++++++++++++++++++++++++++++++++++++++++++++++++++++

Posts by the New Zealand Police Conduct Association (NZPCA):

July 27, 2014
INVESTIGATEMAGAZINE.TV publish allegations
http://nzpca.co.nz/investigatemagazine-tv-publish-allegations/

July 27, 2014
Tom Lewis
https://nzpca.co.nz/tom-lewis/

July 27, 2014
“Cover ups and Cop outs” the book
https://nzpca.co.nz/cover-ups-and-cop-outs-the-book/

August 1, 2014
Police respond to allegations and possible publication
https://nzpca.co.nz/police-respond-to-allegations-and-possible-publication/

****

Other references:

http://www.kiwiblog.co.nz/2007/04/the_bazley_report.html

http://www.kiwiblog.co.nz/2007/05/pca_refuses_to_investigate_dunedin_police_claims.html

[ends]

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: deviantart.net – Behind my eyelids are islands of violence by feebeelu

8 Comments

Filed under Business, Central Otago, Corruption, Democracy, Dunedin, Education, Events, Finance, Geography, Media, Name, New Zealand, Ombudsman, People, Perversion, Police, Politics, Public interest, Queenstown Lakes, Travesty

Delta has deep fingers into 8-year subdivision dispute at Yaldhurst

Blind Justice (detail) by Beeler – Columbus Dispatch 2016 [caglecartoons.com]

****

### Stuff.co.nz Last updated 17:37, July 10 2017
Delta and Infinity’s Yaldhurst subdivision dispute at mediation
By Chris Hutching – The Press
An eight-year dispute involving developers and a group of property owners in a stalled Christchurch subdivision has gone to mediation. Late last year Dunedin City Council agreed to authorise its Delta Utilities company to refinance a $13.4 million outstanding debt to go ahead and complete the Yaldhurst development along with Wanaka-based developer, Infinity. To allow the development to proceed, Christchurch City Council staff recently recommended the unusual step of “dedicating” the access road rather than “vest” it with the council. But a representative of the private property owners, Colin Stokes, told city councillors that his group’s rights to compensation for land for the road had not been addressed. […] The dispute has been aired in several High Court cases between the private landowners and the developers, which are continuing. Most people who originally signed up to buy properties at the subdivision have pulled out and meanwhile Christchurch’s residential property market has cooled significantly.
Read more

****

Related Posts and Comments:
15.6.17 Site Notice : post(s) removal [we heard from Steve Thompson’s solicitors]
4.3.17 Christchurch housing : ‘If you build the right thing, buyers will still come’
17.2.17 Gurglars visits the Delta/Noble JV subdivision at Yaldhurst
2.2.17 Hilary Calvert complaint to Auditor-General #DCHL
30.12.16 Hilary Calvert on Deloitte report for Aurora/Delta
12.12.16 Deloitte report released #Delta #Aurora
7.12.16 Audit and Review, Deloitte
26.9.16 Delta #EpicFail —Epic Fraud #14 : The Election and The End Game revisited
22.9.16 DCC : Delta deal 1 Aug 2016 Council meeting (non-public) #LGOIMA
9.9.16 Calvert on DCC, ‘We could have a much more democratic and transparent operation of council’
2.9.16 Delta Yaldhurst : Local Opinion + Update from Caveators via NBR
18.9.16 Delta #EpicFail —Epic Fraud #13 : Councillors! How low can you Zhao ?
26.8.16 Delta #EpicFail —EpicFraud #12 : The Buyer Confirmed
24.8.16 Delta peripheral #EpicFail : Stonewood Homes —Boult under investigation
8.8.16 Delta #EpicFail —Epic Fraud #11 : The Buyer
3.8.16 LGOIMA requests to DCC from Colin Stokes #Delta #Noble #Yaldhurst
1.8.16 Delta #EpicFail —The End Game according to CD
31.7.16 Delta #EpicFail —Epic Fraud #10 : The Beginning of the End : Grady Cameron and his Steam Shovel
29.7.16 Delta #EpicFail —Epic Fraud #9 : The Long & Winding Road…. Leads Back to Delta’s Door
21.7.16 Delta EpicFail #8 : Cr Calvert goes AWOL, 23 Questions for Mr McKenzie —Saddlebags !!
19.2.16 Delta: Update on Yaldhurst subdivision debt recovery
17.7.16 Delta #EpicFail —Epic Fraud #7 : The Long & Winding Back Road
15.7.16 Delta #EpicFail —Epic Fraud #6 : What do you mean, Property Law Act ?
12.7.16 Delta #EpicFail —Epic Fraud #5 – Delta and the ghostly hand of Tom Kain
8.7.16 Delta #EpicFail —Epic Fraud #4 : Tales from the Courtroom….
30.6.16 Delta #EpicFail —Epic Fraud #3 : Security Sharing and not Caring….. who’s got that Constricting Feeling ?
27.6.16 Delta #EpicFail —Epic Fraud #2 : WWTKD – What Would Tom Kain Do ?
5.6.16 Delta #EpicFail —Noble Subdivision —Epic Fraud
13.3.16 Delta #EpicFail —Noble Subdivision : [rephrased] Conflict of Interest
11.3.16 Delta peripheral #EpicFail : Stonewood Homes and ancient Delta history
6.3.16 Delta #EpicFail —Nobel Subdivision : A Neighbour responds
29.1.16 Delta #EpicFail —Yaldhurst Subdivision ● Some forensics
21.1.16 Delta #EpicFail —Yaldhurst Subdivision

█ For more, enter the terms *delta*, *aurora*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

4 Comments

Filed under Business, Central Otago, Construction, DCC, DCHL, Delta, Democracy, Dunedin, Economics, Education, Finance, Geography, Housing, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Town planning, Travesty, Urban design, What stadium

Aurora Energy struggles to proofread #FastTrackPoleProgramme

At Facebook:

The ‘free’ publication didn’t arrive in letter boxes at lower Pitt St, Dunedin – some householders receive official mail through post slots in their front doors. Don’t tell me the mail distributors for Aurora – god, like Allied Press – refuse to deliver to door slots off the street (in clear safe public view) due to [their] perceived Health and Safety risks…. greater than dangerous poles ? [Unlike NZ Post, DX Mail and other Couriers who provide efficient direct service.]

****

[Old stats, who would guess Aurora’s in such a financial and corporate mess?]

Aurora Energy is an electricity distribution company in Otago, New Zealand. Aurora Energy is owned by Dunedin City Holdings Limited on behalf on the Dunedin City Council. Aurora Energy is New Zealand’s sixth largest electricity distributor. Wikipedia

Formerly called: Dunedin Electricity Limited (1990-2003)
Industry: Energy
Predecessor: Waipori Falls Hydroelectric Company Ltd
Founded: June 26, 1990 in Dunedin, New Zealand
Headquarters: Dunedin, New Zealand
Key people:
– Grady Cameron (CEO)
– Stephen Thompson (Chairman) [previously, Ian Parton]
Revenue: $99.5 Million USD (2015)
Net income: $8.1 Million USD (2015)
Total assets: $413.9 Million USD
Total equity: $182.55 Million USD (2015)
Owner: Dunedin City Council
Parent organisation: Dunedin City Holdings Limited

Website: http://www.auroraenergy.co.nz/
Fast Track: http://www.auroraenergy.co.nz/about/major-projects/current-projects/fasttrack/

****

Helterskelter Delta, solidly joined at Aurora’ hip, writes an open letter at page 3 of today’s ODT:

[click to enlarge]

Posted by Elizabeth Kerr

This post is offered in the public interest.

24 Comments

Filed under Aurora Energy, Business, Central Otago, Commerce Commission, DCC, DCHL, DCTL, Delta, Democracy, Dunedin, Economics, Education, Electricity, Finance, Geography, Health & Safety, Infrastructure, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Public interest, Queenstown Lakes, Resource management, SFO, Technology, Travesty, What stadium

RNZ Morning Report: Damning indictment of Aurora Energy #Listen

Aurora Energy has not maintained the lines utility because for years the company passed over lines profits in the form of dividends to DCC and subvention payments to cover Stadium debt servicing. Central Otago power users faced silly-huge increases in their lines charges. Otago power users, generally, having already paid for upgrades and renewals through their lines charges, have regrettably lost their safe and secure supply of electricity, and must now pay twice. The people responsible for this critical state of affairs need to explain and face the consequences.

How does this stack up for the Commerce Commission, the industry regulator ?

### rnz.co.nz Mon 12 Jun 2017
Morning Report with Guyon Espiner and Susie Ferguson
8:47 AM Many electric lines companies have outdated equipment -ComCom Link
A report by the Commerce Commission says many electric lines companies have outdated equipment that should have been replaced years ago. Our reporter Eric Frykberg has been looking into it.
Audio | Download: Ogg MP3 (3′29″)

****

Commerce Commission New Zealand
Media Release 9 June 2017

The Commerce Commission has published one-page summaries of key performance measures for each of New Zealand’s 29 electricity lines companies.
The summaries are designed to promote a better understanding of each lines company’s performance by providing high-level statistics such as profitability, capital and operating expenditure, asset condition, revenue and network reliability.
Commissioner Dr Stephen Gale said that the Commission has pulled together the data to make it easily accessible for industry, Government agencies and consumers, and to enable comparison across lines companies. The statistics are sourced from more detailed public disclosures.
“Electricity companies reach every New Zealand household and business so over time we want to make it easier for consumers to understand how their own lines company is performing year-on-year. The information in the summaries is still quite technical in nature, but we expect this kind of exposure will in itself help improve lines companies’ overall performance,” Dr Gale said.
“The summaries are a high-level snapshot of the lines companies and are not intended to represent a thoroughly detailed picture of performance. However, they suggest some differences between the performances of different lines companies, such as the health of assets including poles, lines and substation equipment. In cases of apparent poor performance, we will follow up with the companies to better understand their circumstances. We will also undertake further analysis in the future.”
The performance summaries are available on the Commission’s website.

****

Performance summaries for electricity distributors
Under Part 4 of the Commerce Act these 29 electricity distributors are required to publicly disclose information to help people better understand how the sector is performing.

Click areas on the [interactive map at the ComCom website] to download the distributors’ 2016 performance summaries.

[screenshot only]

The performance summaries provide high level statistics on each lines companies’ performance, including measures such as profitability, capital and operating expenditure, asset condition, line charge revenue and network reliability.

See more details in the documents below.
← Back to Performance analysis and data for distributors

Documents
Explanatory notes for electricity distributors’ performance summaries – May 2017
(PDF, 464 KB) Published on 31 May 2017

Total electricity distribution 2016 – June 2017
(PDF, 488 KB) Published on 06 June 2017

Performance summaries for electricity distributors – May 2017
(MS Excel Spreadsheet, 2.1 MB) Published on 31 May 2017

****

[screenshot, details]

Aurora Energy 2016 One Page summary

█ View Online: http://www.comcom.govt.nz/assets/Downloads/Aurora-Energy-2016-one-page-summary.pdf

█ For more, enter the terms *aurora*, delta*, *poles*, *healey* or *dchl* in the search box at right.

Disclaimer. The site owner is not responsible for the currency or accuracy of content of contributed comments; and the inclusion of the information provided does not imply endorsement by the site owner.

Posted by Elizabeth Kerr

This post is offered in the public interest.

18 Comments

Filed under Aurora Energy, Business, Central Otago, Commerce Commission, Construction, DCC, DCHL, Delta, Democracy, Design, Dunedin, Economics, Education, Electricity, Finance, Geography, Health & Safety, Hot air, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Stadiums, Structural engineering, Technology, Tourism, Town planning, Travesty, Urban design

#Aurora —“What was that?!” Huh? What?! [a council mutters, suddenly]

Really, we haven’t heard much lately from the DCHL chairman about the dwindling source of funds to the city council…. counting down to June 30 perhaps, with lawn mowing to look forward to in Spring. But what of an associate commissioner’s five-year term at the Commerce Commission.
A few things are not being said in ‘above Board’ fashion.

Around a billion dollars to retrieve Aurora, is it worth it and how?
By the beg, borrow and ‘TAX’ ratepayers method ?? When Otago power consumers have already paid their line charges to cover network upgrades and renewals that never happened. Look at this winding garden path, so much leafy cover and fat plums for the picking, but —WHERE did the money go and WHICH ENTITIES AND WHICH INDIVIDUALS are responsible for wrongful application of lines monies to other unrelated activities.
Thankfully, in this situation, a raft of New Zealand legislation (laws) and statutory regulation applies.

DCC’s budget resilience, helped by accelerated debt repayments and reduced debt-servicing costs, meant the council had “some room to move”….“we are already in a constrained situation and we’ve got some buffer in the system”.

Friday, 2 June 2017
DCHL dividends to council in doubt
By Chris Morris
The Dunedin City Council expects dividends from its companies to “flatline” as Aurora grapples with the $720million cost of rebuilding its electricity network. But Dunedin Mayor Dave Cull says improvements in the health of the rest of the council’s books means it is up for the financial challenge. His comments came after council chief executive Dr Sue Bidrose, speaking at this week’s council meeting, said the council faced fresh uncertainty over future dividends. […] The money helped ease the pressure for rates rises […] The change reflected the need to get DCHL’s books in order — after years of borrowing to pay dividends — and reinvest in Aurora’s network […] speaking this week, Dr Bidrose said the projected dividends were at risk because of Aurora’s investment plan. “We will be reviewing that, in light of the high level of asset maintenance required by Aurora. It seems it would be a fair assumption it will be at least longer before that dividend payment recommences,” Dr Bidrose said.
Read more

█ For more, enter the terms *aurora*, *delta*, *crombie*, *thompson*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble* or *yaldhurst* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

[pinterest] – shoes on line bricked by whatifdunedin

16 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, Economics, Education, Electricity, Finance, Geography, Health & Safety, Hot air, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, People, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Sport, Stadiums, Technology, Town planning, Travesty, Urban design

Profligate behaviour : MYTH paraded as fact…… just like Aurora Energy’s propaganda campaign

Council infrastructure and networks committee chairwoman Cr Kate Wilson said last night the project would go ahead “regardless”. There was funding for three years, she said, and the fourth year’s funding would be part of next year’s long-term plan, and the one after that. The project was needed for safety reasons to prevent vehicles driving into the harbour and climate change making the road undriveable. (ODT) *Emphasis by whatifdunedin

Yeah right.

### ODT Online Fri, 26 May 2017
Botched cycleway estimate short by $13m
By David Loughrey
A bungled Dunedin City Council cost estimate to complete safety improvements and a cycle/walkway on Otago Peninsula has left the project more than $13 million short. The council announced yesterday an estimate for the project on Portobello Rd and Harington Point Rd that includes a cycle/walkway from Taiaroa Head to the city had risen from $20 million to $49 million. The earlier estimate, drawn up  in 2011, did not include parts of the cycleway to be built, land that had to be bought and a contingency fund to cover unforeseen expenses. […] Despite the cost rise, the council will start construction this year, with a shared cycle/walkway design.
Read more

****

Powerlines at sunset [garp.com]

Meanwhile WE will be paying for our Otago power network TWICE, at a crippling cost to business and residential power consumers well into the future —thanks to Dunedin City Council’s unsatisfactory governance of the companies Aurora Energy / Delta Utility Services and Dunedin City Holdings and, above all, the Council’s unfettered use of public funds to realise the dream of the Tartan Mafia and Professional Rugby to build the now frequently empty and under-utilised Forsyth Barr Stadium. (three concerts by Ed Sheeran in highly doubtful acoustic conditions inside ‘the roof’ does not a Christmas make).

All this because the Council conveniently fails to ensure it covers the infrastructural basics (in this instance: the safe, secure and continuous supply of electricity) – affordably – for the static if bearly stable City of Dunedin, and the sparcely populated Otago region in the mode of fast pumping growth. (There are simply too few permanent ratepayers to uphold ‘big bloated dreams’ and money siphoning on the rates take).

The Council did not ensure that Aurora Energy / Delta Utility Services were sufficiently well structured to Avoid profligate spending, making subvention payments to the stadium companies, or borrowing to pay dividends to the Council. (Probably the least of it).

There have been YEARS of dangerous neglect, embellishing the lack of repair and upgrade to the Community of Otago’s electricity network.

The Council is not well enough controlled (corporate and financial oversight) in order to Avoid its own profligate spending —so to protect, support and upgrade Otago’s power network as the solid basis for regional economic development and SAFE living —with CERTAINTY and SECURITY OF SUPPLY.

Instead, The People will now be plunged into further debt by the circus wheel of local body politicians and the morally thin and rather malevolent boards of directors (masters of spin) controlling the companies.

It’s time the People of Dunedin and Otago took control of their power infrastructure. Resolving, if they will, to adopt a different ownership and delivery model – one option is to form a democratically elected Community Power Trust to own and oversee the network; this is a sound regional model that is proven to work in other jurisdictions, with all due care.

WE have to Safeguard our future.
Not leave decision-making to unvetted members of the Tartan Mafia.
Especially not those in thrall to the likes of Gordon Stewart and his ilk (a vague reference to Delta’s speculative dealings at Yaldhurst, Christchurch – Delta is presently in a discovery process via an action brought to the Christchurch High Court by Caveators claiming Constructive Fraud).

DO NOT sell the ‘fragments remaining’ of the Otago Power Network (as bleated by some in power who can’t/won’t maintain a local body balance sheet – like you trust them, already?!) – to overseas corporates who will hike power prices disastrously to satisfy their shareholders.

Proceed carefully, OTAGO.

ASK QUESTIONS. RESEARCH. DO YOUR SUMS.
DON’T BE TOLD WHAT TO DO. ACT RESPONSIBLY FOR THE FUTURE PROSPERITY OF YOUR KITH AND KIN.
DO NOT PLACE FAITH IN OLD SPIN MAESTERS AND THEIR DEPUTIES.

We’ve seen them all before and have the new $1+ BILLION ‘invoice’ from Aurora Energy to prove it. Yes, we thought we had already paid over that amount in electricity and lines dues.

The suited ones bringing the clamour are looking after themselves – not US, not OUR COMMUNITY.

This is now a ransom.

The UGLY sister companies remain joined at the hip : Delta is Aurora Energy’s “preferred contractor”. And Steve is new, so don’t blame him! ….Really?

****

[propaganda – Aurora Energy]

After facing unrelenting pressure to up its game, Aurora Energy says it has stepped up to the challenge.

Sat, 27 May 2017
Dawn of a new Aurora era
By Vaughan Elder
Aurora chairman Steve Thompson said it had been under the “spotlight and the heat lamp” since accusations broke last October that it was endangering the public and workers by leaving its network, and in particular power poles, to deteriorate. That pressure turned ugly at times and workers had been verbally abused, including while out doing their supermarket shopping. Mr Thompson blamed the abuse on what he described as unfair criticism and media coverage. But Mr Thompson said in the face of adversity, Aurora and its sister company Delta had achieved a “hell of a lot” in a short space of time. The two companies were well on their way to splitting up in a divorce which Mr Thompson said would cost money in the short-term but reap huge benefits in the long-term. Aurora was also mid-way through an ambitious accelerated pole replacement programme and this week announced a $720million plan to upgrade its ageing network.
….Mr Thompson said its actions should help renew the public’s faith in both companies, but emphasised he believed that faith had been unfairly shaken by what he described as over-the-top criticism in the past seven months. He said safety concerns about the 2910 red-tagged poles across Dunedin, Central Otago and Queenstown Lakes had been overblown. At the same time, Delta and Aurora’s efforts to confront the problem, both before and after the story broke in October, had been under-reported, he said.
….Despite his anger at the way Aurora had been treated by critics and in the Otago Daily Times, he was under no illusion the network was in top shape, saying it was the second oldest network in New Zealand and acknowledged major work was needed to improve it in the next 10 years. But he would not be drawn on whether the situation had come about as a result of decades of underinvestment, which has been one of the main criticisms levelled at Aurora since October. He said he was not in a position to comment given he only started midway through last year.
Read more

CRITICAL ABHORRENCE FOR TOP CHAPS IN THE AURORA / DELTA / DCHL ‘EXECUTIVE’ (PAST AND PRESENT) WILL CONTINUE UNABATED IN THE PUBLIC SPHERE UNTIL THEY AND THEIR FRIENDS ARE OUSTED AND MADE ANSWERABLE TO HIGHER AUTHORITIES.

Otago people must busy themselves.
Time for formal inquiries. Time to REMODEL.

Related Post and Coments:
24.5.17 SCANDAL : Aurora Energy Ltd set to burden Otago ratepayers and residents with massive rates increases

█ For more, enter the terms *aurora*, delta*, *epic fraud*, *poles*, *healey* or *dchl* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

9 Comments

Filed under Aurora Energy, Business, Central Otago, Climate change, Construction, Cycle network, DCC, DCHL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Events, Finance, Geography, Health & Safety, Infrastructure, LTP/AP, Media, Name, New Zealand, NZTA, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Site, Sport, Stadiums, Technology, Tourism, Town planning, Transportation, Travesty, Urban design

SCANDAL : Aurora Energy Ltd set to burden Otago ratepayers and residents with massive rates increases

At Facebook:

****

“Overall, the planning period will be characterised by the delivery of the largest work programme in Aurora Energy’s history.” –Steve Thompson

Read: The Otago power network is THAT DEGRADED – caused by various rugby supporting and clip-ticket gentlemen, whose names we all know so well. Described by civil words (not cuss words) that start with F and C.

The “laundry” was well and truly harsh, leaving the network in threadbare tatters…. while private pockets were filled. That’s One Billion Dollars worth of power asset the Otago ratepayers have had to pay for TWICE. Talk about ‘power’ and corruption, Bryce Edwards (?) – Dunedin in the last 30 years was built on it, solidly at source.

The “gents” might like to explain where all the money went, and how the hell they think they can make us pay for their near limitless mismanagement and fully reckless endangerment (to workers, citizens and the regional economy) over three decades …..without shoving them in deep at the NZ Court system —for processing.

█ Today an Aurora/Delta executive had the audacity (after spinning out their LGOIMA response to the 20th working day, following my request made 26 April) to want to charge me for official information at the vindictive “maximum charge” (their words) of $190.00. Shove that, boys. Other council owned companies have provided the information free of charge and very promptly and courteously.

Tuck it back in your pants Aurora/Delta, or be sliced.

At Facebook:

● Aurora will spend $347 million on asset renewal, including a total of 14,000 poles…..

### ODT Online Wed, 24 May 2017
Aurora plans $720m upgrade of network
By Vaughan Elder
Aurora Energy has unveiled a $720 million plan to upgrade its ageing electricity network over the next decade. The plan is a more than $300 million increase on the 10-year plan the Dunedin City Council owned company released last year. […] In a press release this afternoon, Aurora Energy said the plan would have an extensive impact on the region’s economy through job creation and spill-over benefits to other businesses. […] Other major projects included a new substation at Carisbrook, which would replace the 60-year-old Neville St substation by 2019 and a new Wanaka substation on Riverbank Rd, Wanaka. […] Aurora Energy chairman Steve Thompson said an additional $81 million would be spent on growth and security of supply projects to support the region. […] The remaining expenditure was tagged to maintenance and operating expenditure ($192 million), and capital expenditure primarily related to new consumer connections and safety and reliability ($101 million).
Read more

****

The vertiginous mountain of HEALTH AND SAFETY DANGERS due to Aurora mismanagement and neglect of the power asset across Otago.

And the WorkSafe option could be “…..an infringement notice”, possibly not PROSECUTION.

Hmm, have the good old boys been dealing in the way they usually deal ??? Is WorkSafe a soft touch. To date it certainly hasn’t been Acute. Or at all worried about the danger to electrical workers or the general public. What a damnably prolonged and sordid farce this is.

### ODT Online Wed, 24 May 2017
No decision to prosecute Aurora
By Vaughan Elder
Worksafe is yet to decide whether it will prosecute Aurora Energy over the state of its power poles. WorkSafe has been looking into Aurora and its sister company Delta since October over accusations dangerous power poles across Dunedin, Central Otago and Queenstown Lakes were putting the public at risk. The government entity gave fresh details about its audit of the two companies in response to an Official Information Act request from the Otago Daily Times. WorkSafe high hazards and energy safety general manager Wayne Vernon said it had completed an “initial” audit of a sample of the network’s assets and provided a report to Aurora. […] “WorkSafe has not to date made a decision to prosecute or not to prosecute Aurora over health and safety issues associated with the state of its poles.” Mr Vernon emphasised prosecution was one of many options available to it, which also included issuing instructions to remove or minimise the potential for danger and issuing an infringement notice.
Read more

█ For more, enter the terms *delta*, *aurora*, *epic fraud*, *poles*, *healey* or *dchl* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

15 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Health & Safety, Highlanders, Infrastructure, LTP/AP, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Site, Sport, Stadiums, Technology, Tourism, Town planning, Travesty, Urban design

thoughts and faces #loosematerial

My father [never a follower of the FedUp Farmers, as he deemed them; always the campaigner for removal of farm subsidies, to enhance production and market competition] had ‘stock’ phrases with which to judge the faces of female adversaries, those with little brain or spine in politics, pretenders. One adept phrase that sticks in my mind is “like a horse eating thistles” —so I look on the following with my tinted lens, and laugh, rurally (ruefully). No one target.

On 19 May @StuFleming tweeted: “Spend $200k, revenue projections of $2.4M to others, 10% margin yields say $240k net”
[minus ODT news photo of face]

[DUD ‘money hype’ typically depends on false multipliers, anechoic silences, and arrogant self-belief —this (yes) bleak statement applies across a broad range of proposed deals and associated marketing detritus in the city, especially to events, conferences, sport, hospitality and accommodation, and even the re-use (Not conservation) of truly rare and precious instances of historic heritage] Here’s to all the fricking horses out there, including hypocritical colleagues and friends with blinkers like demo balls prepared to squeeze the last dollar and pass us to Hell. Anyway, back to “the business”…. cargo cult tourism. The wider effects of tourism are like those of dairying. Too many eggs in one basket and everybody (I mean, everybody) ends up doing it badly —killing Our Place for generations. Greed, like endorphins, like a running addiction, binds them up. They think they’re bright, they think they’re enablers (read risk takers/investors centred on their own gains only), they think they’re entrepreneurs, better than others (but because I for one will tell you things you don’t want to hear, you’ll say “I’ll ring you tomorrow”, that silence again) but they’re just funneled, tunneled sheepybaas – doing it wrong. Like cows, deer, Chinese gooseberries (Kiwifruit!), wines, stadiums….. or ‘getting a room’ behind the poorly remembered, heavily made-up, Disney’d facade of our city and nationhood. The worst kind didn’t, or didn’t bother to, ‘grow up’ here. They get desperate, create mess, import other yes men. Ring you like nothing happened, their exploits —not to ask deeply madly who and how you really are.

### ODT Online Sat, 20 May 2017
Trenz prompts high aspirations
By David Loughrey
Next year’s Trenz conference in Dunedin is set to cost ratepayers $200,000, but the long-term pay-off should run well into the millions.
The Dunedin City Council will next week be given an idea of the costs to the city of hosting the conference from May 7 to 10, and also the estimated benefits. The city learned last week it would host the tourism industry event next year, bringing up to 1200 international travel and tourism buyers, media and New Zealand tourism operators to Dunedin. It will be the first time the event, run by Tourism Industry Aotearoa (TIA), has come to Dunedin and the first time it has been hosted outside Auckland, Rotorua, Christchurch or Queenstown since it began in the 1960s. Trenz is an opportunity for New Zealand tourism operators to sell their product to buyers, effectively overseas travel agents who put together itineraries for overseas tourists. Attracting more than 350 buyers to experience the tourism products on offer here is considered a huge coup. On average, each buyer sends 4000 visitors a year to New Zealand, totalling 1.5 million. It comes as figures show New Zealand’s tourism market is expected to continue to grow strongly, topping $15 billion by 2023. Tourism contributes more than $690 million to Dunedin’s economy every year.
Read more

Meanwhile, although we (‘our stock’ NZ) and the UK farm gate look pretty much the same……

‘Herdwick Shepherd’ aka James Rebanks (@herdyshepherd1) farms Herdwick sheep in the English Lake District. Author of bestselling memoir, The Shepherd’s Life:

### ODT Online Saturday, 20 May 2017
OE to Britain set to get tougher
Prime Minister Bill English says the Conservative Party’s new plans to clamp down on immigration will sting New Zealanders wanting to live in the United Kingdom, including on the traditional OE, but there is little he can do until Brexit is completed. The British party’s election manifesto includes plans to drastically cut net migration from 273,000 to less than 100,000 by targeting students and those on working visas. It proposes cutting the number of skilled migrants to get visas, higher levies on employers who take on migrant workers and tripling the National Health Service immigration health surcharge from £200 to £600 ($NZ380 to $NZ1130) a year for those in the UK on visas of more than six months and 450 for international students. That surcharge increase will also affect those on the traditional OE, although there is no mention of scrapping the two-year youth mobility visa which allows young New Zealanders to get a two-year visa to work and travel in the United Kingdom. Mr English said the changes would affect those on their OE but they would have to grin and bear it until Brexit was completed. NZME.
Read more

Super City mayor Phil Goff has a plan for getting money from tourists – it bears some similarity to that of the Mongrel Mob……

### NZ Herald Thu, 18 May 2017
Winston Aldworth: Seeking the smart money
OPINION What do Phil Goff and the Mongrel Mob have in common? As hundreds of travel industry figures from all around the world gathered in Auckland for last week’s Trenz conference, one of the many topics up for discussion was the Auckland mayor’s enthusiasm for a hotel bed tax on visitors to the city. Meanwhile, up north at Ahipara on Ninety Mile Beach, three German tourists were approached by two local Mongrel Mob members who told them that they were on Maori land, and had to pay koha. They also told the tourists they’d be taking a few of their cigarettes. A tobacco tax, if you will. Perhaps their plan for putting heavy taxes on visitors was inspired by the Super City mayor. Goff’s bed tax is about as blunt an instrument as the Mob’s shakedown. “Look there’s a foreigner! Let’s get a couple of bucks off them.” The airport tax introduced by John Key a year ago is equally clumsy. It’s a travesty that these tariffs are the best we can come up with for making money out of tourism. Yes, other countries put dull levies on visitor arrivals, but that’s no reason to follow suit. We New Zealanders pride ourselves on being innovators, so let’s find innovative ways to get more money out of the tourism sector. Both Goff and Key were ministers in governments that did everything they could to remove tariffs from the dairy trade. Today, the best and brightest marketing wallahs of Goff’s inner circle are putting forward a plan no more sophisticated than one devised by two Mongrel Mob members standing on a Northland beach. I’m not against making money out of tourists — quite the opposite, in fact. I think it’s terrific that our country can be boosted by an industry that encourages us to care for our environment, celebrate the things that make our culture unique and spreads revenue quickly and efficiently to the regions. But how about instead of putting a dumb tax on the visitors, we upsell them? Take their money at the gate for sure, but give them something special in return.
Read more

Enough randomising. More rain and ice falls.

Posted by Elizabeth Kerr

This post is offered in the public interest.

24 Comments

Filed under Architecture, Baloney, Business, Carisbrook, Central Otago, COC (Otago), Concerts, Construction, Corruption, Crime, CST, Cycle network, Democracy, Design, Dunedin, Economics, Education, Electricity, Enterprise Dunedin, Events, Finance, Freedom camping, Geography, Health & Safety, Heritage, Highlanders, Hospital, Hotel, Housing, Infrastructure, Media, Music, Name, New Zealand, NZRU, OAG, Offshore drilling, ORFU, Otago Polytechnic, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Public interest, Queenstown Lakes, Resource management, SDHB, SFO, Site, South Dunedin, Sport, Stadiums, Technology, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design

Delta and the (T)r * uble with Mr . . . .

At Facebook:

### ODT Online Wed, 17 May 2017
Delta appoints new CEO
Dunedin City Council-owned company Delta has appointed a new chief executive as it splits with sister company Aurora Energy. Delta chairman Steve Thompson announced today that Mike Costelloe will take over as chief executive of the company next month. […] Mr Thompson said Mr Costelloe was appointed following a thorough and competitive executive search process, which considered candidates from throughout New Zealand and overseas. Since January 2015 Mr Costelloe had been strategic accounts general manager at Downer New Zealand and before that he was the Otago and Southland general manager at the same company. […] “His track record in the highly competitive contracting sector positions him well to drive Deltas future success, to prepare the organisation as it adapts to new energy technologies and to deliver to the exacting requirements of our customers,” Mr Thompson said. Mr Costelloe, who resides in Dunedin, said he was looking forward to taking on the new challenge when he took over the role on June 19. […] Dunedin City Holdings Limited (DCHL) is in the process of implementing director changes for its subsidiaries Delta and Aurora Energy from 3 July.
Read more

****

Most of us will remember Mr Costelloe from his short time at DCC.

LinkedIn profile [screenshot]

****

### channel39.co.nz Wed, 23 Jan 2008
Defective Traffic Light Causing Havoc
A defective traffic light is causing havoc for pedestrians and traffic at the intersection of King Edward St and Hillside Rd. The light’s been stopping and starting periodically since Saturday, with the Dunedin City Council unable to get it working properly again. Council Transport Operations Manager, Mike Costelloe, says many attempts have been made to repair the light, but it crashes again every time. There have been several reports of near misses at the intersection, and an elderly man’s been treated for minor injuries at Dunedin Hospital, after he was knocked over by a vehicle. Costelloe says they haven’t been able to find the source of the problem, making it difficult to find a solution.
Read more + Video

█ Channel 39 ran a second news item the following evening, entitled “Defective Traffic Light Still Causing Havoc”…..

Mr. Bean Uploaded on Sep 17, 2009
Mr Bean – Red Traffic Light
OFFICIAL MR BEAN. Mr Bean nips out of his car at the traffic light and holds up a queue of traffic. When the lights change green for second time he holds them up again on purpose. From animated episode No Parking.

Mr. Bean Uploaded on Sep 4, 2009
Mr Bean – Traffic Lights — An der Ampel
OFFICIAL MR BEAN. Mr Bean gets stopped at a red light. He sees a cyclist get off and push his bike round the corner. So he gets out of his car and pushes the mini round the corner. From Mr Bean Goes to Town.

Ilyass AB3 Published on Jan 20, 2013
Mr.bean – Episode 5 FULL EPISODE “The Trouble with Mr.bean”

Posted by Elizabeth Kerr

This post is offered in the public interest.

6 Comments

Filed under Aurora Energy, Baloney, Business, Central Otago, DCC, DCHL, DCTL, Delta, Dunedin, Economics, Electricity, Finance, Fun, Health & Safety, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Public interest, Queenstown Lakes, Technology, Travesty, What stadium

Cumulative DCC rates rise; council boffins continue ruse of ‘found savings’

At Facebook:

****

The council had engaged with the public well, and arrived at a figure under the 3% limit. It was pleasing to keep faith with the community, and keep that promise. –Mayor Cull

### ODT Online Wed, 17 May 2017
2.99% Dunedin rates rise
By David Loughrey
Despite an extra $100,000 of spending approved this week, the Dunedin City Council scraped in under its self-imposed 3% target for rates rises for the next financial year. The council approved a budget that will see ratepayers asked for an extra 2.99% for 2017-18. Annual plan deliberations ended yesterday, after councillors spent a day and a-half discussing spending for the year ahead. The only major changes affecting ratepayers were an extra $100,000 approved for two projects, changes that came after staff found a further $100,000 in savings. […] Mr Cull said some people had reservations about the annual plan process, which featured feedback meetings rather than formal submissions this year, before full submissions are brought back for the long-term plan next year.
Read more

****

### ODT Online Wed, 17 May 2017
DCC approves $1m for artificial turf
By David Loughrey
Dunedin is set to get two artificial turf sports fields at Logan Park late this year or early next, after a proposal set to cost the city $1 million won unanimous approval yesterday. The move has delighted Football South, which had asked for the money to be provided urgently to attract available funding from Fifa. The Dunedin City Council annual plan deliberations meeting supported the proposal despite concerns from Cr Aaron Hawkins there had been no official public submissions this year, and others had been discouraged from suggesting new projects until next year’s long-term plan.
Read more

****

We’re not interested in (thank god) ex Cr Jinty MacTavish’s or the Green Party’s vision (what vision). DCC’s job IS to look after the environment together with infrastructure service provision. No further strategy is needed. Note the contradictions and hypocrisy contained in this item (italics by whatifdunedin):

The council moved the decision to give the strategy $200,000 to continue work towards making Dunedin a zero carbon, healthy environment.

### ODT Online Tue, 16 May 2017
Funding set for strategy
By Margot Taylor
The environment, bus governance and pool admission fees dominated discussions at the first day of Dunedin City Council annual plan hearings yesterday. The absence of public submissions was a notable difference at the hearing. The public had a chance to voice their opinions on the 2017-18 draft annual plan at public forums and drop-in sessions from March 30 to May 1, rather than at annual plan hearings as in previous years. Dunedin’s environment strategy received 26 comments during the consultation. Mayor Dave Cull said the comments provided “a pretty clear response” about funding for the initiative.
Read more

CUMULATIVE RATES INCREASES –
NO FAITH IS KEPT AT ALL EXCEPT THAT MAYOR CULL HAS TO GO

Posted by Elizabeth Kerr

This post is offered in the public interest.

51 Comments

Filed under Aurora Energy, Business, Central Otago, DCC, DCHL, DCTL, Democracy, District Plan, Dunedin, Economics, Electricity, Finance, Geography, Health & Safety, Infrastructure, LTP/AP, Media, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, South Dunedin, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

As predicted —Aurora Energy delivery stuffed on pole replacement

I T ● W A S ● N E V E R ● G O I N G ● T O ● H A P P E N

Aurora Energy board chair Steve Thompson should shuffle back under his rock.
DCHL chairman Graham Crombie, mowing lawns at Clyde, has nothing to say.
The largest risk to the Otago Community continues to be Aurora itself.

At Facebook:

### ODT Online Mon, 24 Apr 2017
Aurora sets new date to ‘remove risk’
By Vaughan Elder
Aurora Energy has abandoned a target to have all condition-zero poles replaced by the end of this month, saying it was now on track to “remove the risk” of 2910 poles by the end of this year. […] An Aurora spokesman said it had abandoned its original plan to replace all 1181 condition-zero poles, which are the worst-rated poles on its network, by the end of this month.
“Our target is to remove the risk around 2910 priority poles by the end of the year and we are on track to achieve that. That’s the target we are working towards. The April target was an initial working target before detailed programme planning had been completed.” After being given more than two weeks to respond, the spokesman did not say how many new condition-one and zero poles had been discovered during its fast-track programme, saying: “We don’t have these figures to hand today”.
Read more

The article also says: “Aurora had stepped up customer service support and communication so its customers were informed when power needed to be cut.” As far as we know this support and communication has been seriously deficient in many instances.

█ Customers should check the Aurora website on outage days for cancellations.
http://www.auroraenergy.co.nz/outages/

****

At Facebook:

Related Posts and Comments:
21.4.17 Why would DCC shaft its own company instead of investing in its change and development ?!
14.4.17 Dunedin homes face power blackout #Delta #Aurora
11.3.17 How Safe Are We/Our Businesses with the Corporate Disaster that’s Aurora, owned by DCC ? #reliability

█ For more, enter the terms *aurora*, *delta*, *grady*, *godfrey*, *poles*, *asset management plan*, *dchl*, *auditor-general*, *epicpolefail* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

15 Comments

Filed under Aurora Energy, Baloney, Business, Central Otago, Construction, DCHL, Delta, Democracy, Design, Dunedin, Economics, Education, Electricity, Finance, Geography, Health & Safety, Hot air, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Structural engineering, Technology, Tourism, Town planning, Travesty, Urban design, What stadium

DCC 2017/18 Annual Plan —Call for Submissions by Mon 1 May at 5 pm

Updated post
Fri, 21 Apr 2017 at 3:37pm

The site owner has corrected the post below for Cr Hawkins’ name and apologises to the councillor for the error in judgement and any offence or distress the now deleted form of addresss may have caused. A full apology will be emailed to the councillor later today.

+++++++++++++++

If you’ve stacked all your furniture up and carefully placed your mattress on top where it’s dry, here’s a DCC Sudoku to while away the hours before the FLOOD WATERS (what flood waters) recede from your property. Yarp, study the numbers and statements, the patterns, in the (draft) Annual Plan 2017/18, and go Bonkers.

The rain has become fractionally heavier for a moment due to AUTUMN WEATHER, that’s no reason not to try the DCC Sudoku. Do critique where YOUR MONEY is disappearing to, and slap Daaave’s wrist if you Disagree with the prescribed budget lines. Treat this as a warm-up for the Long Term (Community) Plan. Is your money ACTUALLY being spent on core infrastructure services, or more of the soft-goo and popcorn programmed by Cr Hawkins on behalf of the Labour/Greens vote in September.

The DCC summary of the current (draft) Annual Plan says:
“We’re on track. We listened carefully to you when we developed the Council’s Long Term Plan (LTP) in 2015 and the Annual Plan for 2016/17. We’ve responded to calls to reduce our debt and rates increases and to provide services to high standards.”

Ah well. Rates increases at Dunedin are still far ahead of the national rate of inflation and…. are about to escalate strongly.*

[screenshot – click to enlarge]

*The council-owned Aurora/Delta fiasco is Not Mentioned by your elected mayor and councillors – that’s ONE BILLION DOLLARS WORTH of burnt asset (the totality of Otago’s electricity network) that Dunedin Ratepayers will have to (paying twice!) finance in replacement.

[screenshot – click to enlarge]

Active links:

Click here for the Annual Plan summary.

Submissions: Use this online feedback form.

Facebook: www.facebook.com/DunedinCityCouncil
Twitter feed (@DnCity Council): http://twitter.com/DnCityCouncil

Posted by Elizabeth Kerr

This post is offered in the public interest.

5 Comments

Filed under Aurora Energy, Baloney, Business, Central Otago, Construction, Cycle network, DCC, Delta, Dunedin, Economics, Education, Electricity, Finance, Geography, Health & Safety, Hot air, Infrastructure, LTP/AP, Media, OAG, Ombudsman, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Queenstown Lakes, Resource management, Site, Travesty, University of Otago, Urban design, What stadium

Famous Fat Bros’ Aurora/Delta news trickles in…. but can the sisters divorce

### channel39.co.nz Wed, 29 Mar 2017
Delta and Aurora Energy to separate
About 95 Delta employees are expected to transfer to Aurora Energy by mid-year as the two companies separate. The business divorce is one of the recommendations from an independent review by Dunedin City Holdings Limited. Delta and Aurora Energy Chair Steve Thompson says they expect no redundancies from either business. Delta will employ just over 500 staff following the transition. Aurora Energy will be a network company with network renewal as its priority, while Delta will provide electricity distribution, green-space and solid waste services.
Ch39 Link

Review of Aurora Energy Limited / Delta Utility Services Limited – Network Safety Concerns (December 2016). Deloitte.

****

### radionz.co.nz 9:22 pm on 29 March 2017
Dunedin’s Aurora Energy to take on Delta workers
Almost 100 employees from Dunedin power lines company Delta will transfer to its sister company Aurora Energy as the two firms separate.
The split of the council-owned companies was sparked by the discovery that thousands of power poles in Otago were rotting.
A whistleblower last year revealed thousands of power poles managed by Delta and Aurora were failing.
The Dunedin City Council released a report in December that recommended splitting the council-owned companies into separate entities, after three official inquiries.
A report by Deloitte recommended separate board management structures.
In a statement today, Delta said 95 employees would transfer to Aurora by mid-year, and there were no expected redundancies.
RNZ Link

****

DCHL/DCC farming of the conjoined twins deserves a break….

█ The devilish ongoing loss of one billion dollars of Otago line user and ratepayer funds. And Steve Thompson can’t be contacted. Oh brother.

Yes we really believe the two council-owned companies have great governance and superb management!? We also totally believe DCHL is a solid grounded entity!? Pity about the number of executive and staff resignations from Delta to date, and the resulting inability to fill job vacancies. Would you touch these blighted babies. Oink.

At Facebook:

****

### ODT Online Thu, 30 Mar 2017
Restructure proceeds
By Vaughan Elder
Dunedin City Council-owned companies Delta and Aurora are a step closer to becoming separate entities. Aurora and Delta announced in a joint press release yesterday about 95 Delta staff were expected to transfer to Aurora Energy by mid-year as part of the companies’ transition to standalone entities. The transition comes after a Deloitte report into accusations Aurora dangerously mismanaged its power network and failed to replace compromised poles recommended the two companies be split. According to Aurora’s annual report, it employs no staff and the management of the company is carried out by Delta, which is also contracted to carry out network maintenance. The Deloitte report said the closely linked arrangement was “fraught” with challenges, but acknowledged Aurora had been working on a restructuring programme which would have split the two companies in any case. Delta and Aurora chairman Steve Thompson, who was not available to answer questions about the press release, said significant progress had been made in the reorganisation of both businesses.
Read more

Related Posts and Comments:
11.3.17 How Safe Are We/Our Businesses with the Corporate Disaster that’s Aurora, owned by DCC ? #reliability
16.12.16 Tim Hunter, NBR —Aurora/Delta, DCC and ComCom
12.11.16 Delta/Aurora : Current strategy to “fix on failure” [extreme neglect]
22.10.16 DCC struggles with Governance…. Delta/Aurora/DCHL in slipslidy mode
● 9.6.16 Aurora Energy Ltd warned by regulator

█ For more, enter the terms *aurora*, *delta*, *grady*, *poles*, *asset management plan*, *dchl*, *auditor-general*, *epicpolefail* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: monsters international via blogspot.com – Siamese Twin Pigs by Alicia B Lim, ink on watercolour paper (US), tweaked by whatifdunedin

24 Comments

Filed under Aurora Energy, Baloney, Business, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, Economics, Electricity, Finance, Geography, Health & Safety, Hot air, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, Other, People, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Sport, Technology, Tourism, Travesty, What stadium

***Pssst #Delta CEO Grady replaced

An INTERNAL appointment has been made for the position of Chief Executive Officer at Delta Utility Services Ltd.

Which likely means few external executives with relevant experience wanted to apply for lead position in the ‘degraded’ council-owned company —but then, not many executives were left internally. What does that say…….

Related Post and Comments:
5.3.17 Seeking the New Grady #Delta

Posted by Elizabeth Kerr

This post is offered in the public interest.

10 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, CST, DCC, DCHL, DCTL, Delta, Democracy, Dunedin, DVL, DVML, Economics, Electricity, Finance, Geography, Health & Safety, Housing, Infrastructure, New Zealand, OAG, Ombudsman, People, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Stadiums, Travesty, What stadium

Councillor don’t tell us, we know Dunedin industry and manufacturing is Tops

But Rachel Elder did need to inform Mr Mayor, since it’s he who opines that [singularly ???] “weightless” manufacturing will one day make Dunedin great.
A while back Mr Mayor lauded expansion at Speight’s, Emerson’s and Greggs ….but recently, dreadfully, when interviewed by John Campbell on RNZ Checkpoint, Mr Mayor had trouble remembering these and other multimillion-dollar manufacturing investments in the good people, raw products and knowhow of Dunedin City. As well, he slipped past the convenient fact that the deputy mayor is a director of Scott Technology Ltd, and his old flower Mr McLauchlan, advisor and confidant, is the company’s board chairman.

Notwithstanding, Ms Elder thought it necessary to set herself a free writing project, an op-ed to ‘tell’ Mr Mayor, as well as advertise her paid work skills. Yes, yes, we’re all for free speech and pumping political mileage; however, we are the converted and connected, we know just how great Dunedin manufacturing is and can be —if not for DCC.

It must be said, though, that Mr Mayor’s speech at the Cadbury protest in the Octagon last Saturday was a large complimentary step up from the fatal Checkpoint phone interview.

“Messaging that it is too expensive to export from Dunedin and that we are too far away from markets and that manufacturing is best not done here does not support the many families and individuals who work in this sector.”
–Rachel (take that Dave Cull) Elder

### ODT Online Wed, 15 Mar 2017
We have skilled workers and can make it all here
By Rachel Elder
OPINION As an employment consultant and someone who advocates for a wide range of jobs in Dunedin, I am keen for Dunedin to be advertised nationwide as a place that is great for manufacturing and production as this will supply jobs to our skilled workers. The fact is Cadbury is owned by a multinational that has caused its demise. Manufacturing can be done here well and efficiently.
Read more

Comment published at ODT Online:

ej kerr Wed, 15/03/2017 – 7:59pm #
As a city councillor Ms Elder should be overtly aware that the Dunedin City Council-owned power distribution company Aurora Energy Ltd does not and cannot offer a safe and secure electricity supply network for businesses, manufacturers and other large power users (this aside from the now obvious inability to offer safe supply to residential users). The mayor and councillors are not listening and not communicating clearly on the state of Aurora’s burnt asset. Thankfully, the Otago Daily Times has filled that void with strong news reporting. At a cost of one billion dollars to repair and upgrade the existing lines and facilities – not counting the cost of new development work required in Central Otago and Lakes District to meet growth and increasing infrastructural demand – there will shortly be a very heavy impost landing on all local businesses via rates increases. Such an unpopular debating topic at the head-in-the-sand Dunedin City Council.

****

Truly fine examples of the sort of thing your grandmother and mother will tell you about Dunedin that Mr Mayor can’t:
. . . .

McMeeking Manufacturing, 123 Maclaggan St

Jaytee Baking Cups have been a household name since the 1930s, when the company was founded by a printing engineer James Thomas Williamson, hence the name Jaytee. Since acquiring the company in 1979, McMeeking Manufacturing has been the largest supplier of Baking Cups in New Zealand with exports to Australia and the Pacific Islands. Due to the dramatic increase in bakeries, cafes etc, the range of products – all manufactured in the Dunedin factory – has grown to fulfil customers requirements and follow the latest trends. Read more at https://www.jaytee.co.nz/

. . . .

### ODT Online Wed, 15 Mar 2017
Machine tool smart, versatile
By Simon Hartley
Farra Engineering’s latest $1.3 million machining kit not only has the capacity to work 24/7, but can text its progress to operators day and night. The DMG Mori “multi-pallet (work bench) horizontal machining centre”, supplied by a German-Japanese merged company, has been running for about a fortnight, at Farra Engineering, Dunedin, chief executive John Whitaker said. The DMG Mori could work on castings weighing just a few grams, on pieces weighing up to three tonnes, and castings up to 1.4cu m in size. “Being so productive, we’re going to the marketplace to fill the spare capacity,” Mr Whitaker said.
Read more

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: jaytee.co.nz – jaytee baking cups

29 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, Economics, Education, Electricity, Finance, Geography, Health, Hot air, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Structural engineering, Technology, Tourism, Town planning, Travesty, What stadium

Maggie Lawton, RIP

Received from Russell Garbutt
Tue, 14 Mar 2017 at 12:47 p.m.

Extremely sad to learn this morning that Maggie Lawton died yesterday at Wanaka following a diagnosis of cancer a short time ago.
Maggie was the top polling candidate in the Dunstan Ward for the Otago Regional Council in the last Local Body Elections and she brought to the role a huge passion for the quality of our region’s waterways and lakes. Extraordinarily well qualified and a vast experience in all things water, her death will mean a huge loss in the Central Otago/Lakes area as well as a strong voice for the wider region. Just a few days ago we were emailing each other and she had said that she was amazed how cancer is both so random and so rampant.
Sincere condolences to her family, friends and colleagues.

****

****

Otago Regional Council
ORC mourns Cr Lawton’s untimely passing
Tuesday, 14 March 2017
Otago Regional Council chairman Stephen Woodhead today noted with sorrow the passing of Dunstan constituency representative Maggie Lawton on Sunday after a brief but determined battle with cancer.
Mr Woodhead said Cr Lawton, who was elected to the council as the constituency’s top-polling candidate at last year’s local government elections, was passionate about environmental issues and the region she served, and particularly water quality.
As chairwoman of the council’s technical committee, her contribution, while brief, was an indication of the time and effort she intended to put into her role as an elected member during the remainder of the 2016-2019 triennium, he said.
“All of us at ORC mourn Maggie’s untimely passing, and extend our heartfelt condolences to her family and friends.”
ORC Link

At Facebook:

Tue, 14 Mar 2017
ODT: ORC pays tribute to late councillorThe Otago Regional Council is mourning and paying tribute to one of its own, following the death of Dunstan constituency representative Maggie Lawton. The Wanaka-based councillor was diagnosed with cancer about two months ago, after it was discovered during an operation, and died yesterday. She was 67 …. Cr Lawton told the Otago Daily Times last week she was determined to make sure the concerns of her constituents were still heard at the council and was receiving treatment at home, but still taking part in council business.

Posted by Elizabeth Kerr

This post is offered in the public interest.

6 Comments

Filed under Central Otago, Democracy, Dunedin, Geography, Name, New Zealand, ORC, People, Politics, Public interest, Queenstown Lakes

How Safe Are We/Our Businesses with the Corporate Disaster that’s Aurora, owned by DCC ? #reliability

Latest Aurora ‘safety’ ads at ODT Online this week [screenshots]

A N O T H E R ● L E A K —Aurora confirms it has breached standards over the average amount of time power has been cut per customer after its data was leaked to the Otago Daily Times.

### ODT Online Sat, 11 Mar 2017
Aurora fails reliability for third year
By Vaughan Elder
Aurora Energy could be fined or face court action after breaching a limit on power interruptions for the third year running. The Dunedin City Council-owned company said it took the breaches “seriously” and would probably ask the Commerce Commission to relax its reliability standards. If the Commerce Commission agreed, Aurora would be only the second lines company to operate under relaxed standards under a system called a customised price-quality path. The only other company to operate under such a system was Orion, after its infrastructure was damaged in the Christchurch earthquakes. Meeting the standards is important because the Commerce Commission takes into account liability when setting limits on how much lines companies can earn. …[Aurora] would not be drawn over whether a lack of investment had contributed to the breaches. […] A Commerce Commission spokesman said it was not aware of the reported breach as Aurora was not required to provide the information until June. However, if Aurora had breached standards its response could range from warning letters to administrative settlements and court proceedings. It could also penalise Aurora by cutting up to 1% of its revenue.
Read more

We hear poor Steve Thompson is not coping with all these leaks….

Related Posts and Comments:
16.12.16 Tim Hunter, NBR —Aurora/Delta, DCC and ComCom
12.11.16 Delta/Aurora : Current strategy to “fix on failure” [extreme neglect]
22.10.16 DCC struggles with Governance…. Delta/Aurora/DCHL in slipslidy mode
● 9.6.16 Aurora Energy Ltd warned by regulator

█ For more, enter the terms *aurora*, *delta*, *grady*, *poles*, *asset management plan*, *dchl*, *auditor-general*, *epicpolefail* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

19 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Structural engineering, Technology, Travesty, What stadium

D’oh [Mayor Cull can’t name all the successful manufacturers at #Dunedin]

Rather, Daaave promotes the SHONKY programmed spend on non-essential CBD tart-ups. Not reprioritising council budgets then, Daaave….. to solve the Superduper-Mystery of council-owned Aurora/Delta LOST OR MISPLACED FUNDS, WHERE DID THEY GO ? WHERE WERE THEY SPENT ? Hundreds of millions of dollars lost from Otago ratepayers and electricity users, Daaave…..
You are going to make them pay again.

ODT 25.2.17 (page 34) tweaked

odt-25-2-17-letter-to-the-editor-crick-p34-tr[click to enlarge]

Otago Manufacturers need a Safe and Secure supply of Electricity.
The Mayor of Dunedin is making sure this won’t happen.

Posted by Elizabeth Kerr

This post is offered in the public interest.

24 Comments

Filed under Aurora Energy, Business, Central Otago, Corruption, Crime, DCC, DCHL, DCTL, Delta, Democracy, Dunedin, Economics, Electricity, Finance, Geography, Health, Hot air, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Town planning, Travesty, Urban design, What stadium

No news : Appointment of Group CFO

dcc-private-briefing

****

Consternation of Various Sorts

We note the Dunedin City Council’s very poor financial position generally, in face of the ‘explosive’ DCC-owned Aurora/Delta collapse of the Otago power network – notable for continuing poor governance and management, with contingent lack of transparency and accountability – affecting ratepayers and residents in three distinct council areas (DCC, CODC, QLDC); the city council’s snail-like attendance to infrastructure maintenance and upgrades including implementation of three waters strategy; the city council’s ongoing out-of-control stadium fiasco; and ALL The Council Debt / debt servicing costs etc etc – for the very low, ever passive and aging ratepayer base.
FANTASTIC TIMES.

How interesting then that DCC has – as yet – failed to appoint a new Group Chief Financial Officer following the resignation of Grant McKenzie last year (see announcement 11 June 2016 via ODT).

****

Fri, 12 Aug 2016
ODT: Departure reshuffle
The departure of the Dunedin City Council’s group chief financial officer, Grant McKenzie, has triggered a minor reshuffle within the organisation. The rejig includes a temporary structure while Mr McKenzie’s replacement is recruited, but the council has also taken the opportunity to realign job titles and responsibilities for two of the council’s senior managers. […] Council financial controller Gavin Logie has also been named acting chief financial officer until Mr McKenzie’s replacement is named.

Sat, 11 Jun 2016
ODT: Sir Julian stands down, McKenzie appointed CEO
Sir Julian Smith, chairman and managing director of Allied Press, publisher of the Otago Daily Times, is stepping down from the day-to-day running of the company after nearly 40 years. Sir Julian (72), who will remain as chairman, told staff yesterday he has appointed Dunedin City Council group chief financial officer Grant McKenzie as the new Allied Press chief executive officer.

****

Dunedin City Council – Media Release
DCC Appoints Treasury Manager
This item was published on 10 Sep 2014
Richard Davey has been appointed to the new position of Dunedin City Council Treasury Manager. Mr Davey, who is originally from Dunedin, has had more than 21 years of banking experience in New Zealand and Australia. His experience centres on dealing with corporate treasuries and solving their risk management and funding issues. As Treasury Manager, Mr Davey will oversee Dunedin City Treasury Ltd – a DCC-owned company provides funding and financial services to other companies in the Dunedin City Holdings Ltd group. Mr Davey will report to Group Chief Financial Officer Grant McKenzie. Read more

Dunedin City Council – Media Release
Group Chief Financial Officer Appointed
This item was published on 14 Oct 2013
The University of Otago’s Director of Financial Services, Grant McKenzie, has been appointed as the Dunedin City Council’s Group Chief Financial Officer (GCFO). Announcing the appointment of Mr McKenzie to this newly-created role, DCC Chief Executive Paul Orders says, “Grant will bring a wealth of knowledge and experience to the role and will be instrumental in ensuring the effective and efficient management of DCC group finances.” […] The new position of Group Chief Financial Officer replaces the DCC’s Chief Financial Officer (currently a vacant post), with the role expanded to include the provision of financial advice and support to the Board of Dunedin City Holdings Limited (DCHL). The role will also create more cohesive financial management between the DCC and Dunedin City Holdings Limited. Twenty eight applications were received for the position, from New Zealand and overseas.
Read more

****

It seems DCC has slumped and trailed until 27 February (20 working days) to respond formally to my request for official information – with no phone call received (see postscript).

Tomorrow Monday is D-Day. No notice of extension has been received.

HOW HARD IS IT REALLY TO ANSWER BASIC QUESTIONS—
20 working days ? Get real DCC.

OFFICIAL INFORMATION REQUEST

From: [DCC Governance Support]
Sent: Friday, 3 February 2017 11:31 a.m.
To: Elizabeth Kerr
Subject: Acknowledgement of LGOIMA request

03-Feb-2017

Dear Ms Kerr,

Official information request for: APPOINTMENT OF GROUP CHIEF FINANCIAL OFFICER

Reference Number: 289707

I am writing to acknowledge receipt of your official information request dated 27-January-2017 for information regarding the APPOINTMENT OF GROUP CHIEF FINANCIAL OFFICER as follows:

1. When will the DCC appoint a Group Chief Financial Officer (GCFO) to replace Grant McKenzie ? 2. For what reason(s) has this appointment been delayed ? 3. Have applicants for the position been short-listed ? 4. Is there anything thing else DCC wants to say about the appointment process ?

We received your request on 27-January-2017. We will endeavour to respond to your request as soon as possible and in any event no later than 27-February-2017, being 20 working days after the day your request was received. If we are unable to respond to your request by then, we will notify you of an extension of that timeframe.

Your request is being handled by [Governance Support]. If you have any queries, please feel free to contact [Governance Support] on 03 477 4000. If any additional factors come to light which are relevant to your request, please do not hesitate to contact us so that these can be taken into account.

Yours sincerely

[Governance Support]

P.S. I have also sent your questions to our chief executive Sue Bidrose, as she may wish to provide an answer to you directly by phone or email.

Governance Support Officer
Dunedin City Council

Related Post and Comments:
10.6.16 g’bye & ’ello

Posted by Elizabeth Kerr

This post is offered in the public interest.

13 Comments

Filed under Aurora Energy, Business, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Dunedin, DVL, DVML, Economics, Electricity, Finance, Geography, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, People, Politics, Public interest, Queenstown Lakes, What stadium

Aurora Energy at ODT 24.2.17 follows #LGOIMA

Broad spectrum (?!) LGOIMA request from earlier this week and interim acknowledgement:

From: Elizabeth Kerr
Sent: Monday, 20 February 2017 7:24 PM
To: Grady Cameron
Cc: Elizabeth Kerr
Subject: Aurora Energy Ltd – Official Information Request (LGOIMA)

Attention Grady Cameron
Chief Executive, Aurora Energy Ltd

Dear Grady

How is Aurora Energy Ltd funding the $30million pole replacement programme you speak about – from capex (capital expenditure), opex (operational expenditure), a combination of the two? or by other means? (please state)

Will Aurora Energy Ltd attempt to raise line charges for Otago power consumers, to achieve the number of (dangerous) pole replacements required in the next 3-5 years – how soon will line charges increase and by how much given regulatory scrutiny by the Commerce Commission?*

Is Aurora Energy Ltd solvent at this time? Explain.

Please provide any financial detail(s) salient to these matters.

Sincerely

Elizabeth Kerr
Dunedin

*emphasis added 24.2.17

—————————————-

From: Grady Cameron
Sent: Wednesday, 22 February 2017 1:02 p.m.
To: Elizabeth Kerr
Subject: Aurora Energy Ltd – Official Information Request (LGOIMA)

Dear Elizabeth

Thank you for your enquiry. We acknowledge receipt of your official information request received by us on 21 February regarding Aurora Energy (our reference 0945).

We will endeavour to respond to your request as soon as possible and in any event no later than 21 March, being 20 working days after the day your request was received. If we are unable to respond to your request by then, we will notify you of an extension of that timeframe.

Kind regards,
Glenda

****

Received.
Fri, 24 Feb 2017 at 1:58 a.m.

[click to enlarge]

ODT 24.2.17 (page 4)

odt-24-2-17-aurora-planned-power-outages-p4

ODT 24.2.17 (page 5)

odt-24-2-17-aurora-energy-notification-of-electricity-delivery-prices-p5

Posted by Elizabeth Kerr

This post is offered in the public interest.

2 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Technology, Tourism, Town planning, Travesty, Urban design, What stadium

Delta #EpicPowerFail 10 : Grady Cameron : The Counterfeit Comet

Received from Christchurch Driver [CD]
Thu, 16 Feb 2017 at 12:15 a.m.

Dear Readers

Local cyberspace has run hot tonight with the news that Grady Cameron has finally taken Richard Healey’s advice and fallen on one of his many splintered power poles, tendering his resignation. But just like a funhouse hall of mirrors, nothing at Aurora/Delta is as it seems. Mr Cameron is leaving later not sooner. It should be sooner, much sooner, like now.

As pointed out several times by Jarrod Stewart and Richard Healey, Grady is entirely the wrong individual to “oversee the transition process, along with the accelerated pole programme now under way”, which was the vague treacle proffered by Gary Gyroscope Johnson and Mr Thompson as an excuse for Mr Cameron to cling on for another year.

What the somewhat dim Mr Thompson does not know is that most of Delta already know what provision for early termination is in Grady’s package, and it is….12 months’ salary. (Hard to keep anything secret at Delta these days, Mr Thompson!) Go on, refute that “unfounded speculation”, Mr Gyroscope!

Therefore Mr Thompson had the two terminally unattractive options of 1) Paying Grady $600,000 to do nothing or 2) Paying Grady $600,000 to hang around and pretend that his help is “appreciated”. Chairman Thompson knew he would be sacked if he agreed to pay Grady $600,000 to do nothing, because What if? Dunedin and many others would find out in short order, and it would be curtains for Mr Thompson – sooner rather than later. However, Mr Thompson has made an elementary error. When you sack someone, get them gone. This is not Personnel Management 101, it’s 001. Despite $600,000 being a lot of cash, it was still the right thing to do because Grady’s other great failure as CEO was to preside over the accelerated decline of the staff at Delta.

odt-16-2-17-cameron-not-seeking-new-role-p3-underlined

It is past the tipping point and on its way to collapse, and if Grady stays another year collapse it will. At this stage in your correspondent’s post, the Greek chorus begins, accompanied by the rattling cups of Choysa : Evidence, evidence, give us the factual evidence!

Very well readers, have the Gaviscon ready, here are some stomach turning informational nuggets to show the appalling state of the Delta engineering department, the essential core of the organisation. Desk executive types like Grady and Matt Ballard can come and go, but the engineers make the place run.

While Mr Gyroscope and Mr Thompson trumpeted the two new external appointments today, they failed to mention that there are 45 vacancies – yes 45, that is 4 lots of 10 plus 5, Steve, at Delta.

Your correspondent understands these are in the main technical positions that any reputable company will have trouble filling, let alone a basket case like Delta.

Very recently, a capable senior design engineer was asked by either Matt Ballard or Grady “What would it take to get you to stay?”, as they had been alerted that the engineer was about to vote with his feet. “Nothing could convince me to stay” was the response and the engineer who was in the prime of his career and had worked for Delta for 6-7 years, departed to the North Island.

Next fact: There are now fewer than 10 design engineers left at Delta. There will be one less tomorrow because another resigned today but hadn’t advised The Management.

Alarming fact : Your correspondent is advised that of those left, at least three already have plans in place to leave that are not negotiable.

Strange but true : A design engineer recently resigned. Mule-like, Mr Cameron and his cohorts “refused to acknowledge his resignation”. This would appear to be code for “we will pay you absolutely anything you want because we know we will get no applicants for your position”, much like the example above. We can conclude from the example with Derek Todd quoted in #EpicPowerFail 9 that the practical limit is a tripling in salary.

There’s more : After deducting out those engineers, there are others actively looking to leave also. We can know this with confidence as a Wellington power company advertised a position for a design engineer recently. The recruiter called a contact at Delta and asked “What the heck is going on down there – we have had 4 applications and 3 of them are from Delta !!”

Grady’s response to this is to hire engineers from around the world, and try and fill engineering positions with “Project Managers” (Godfrey Brosnan is just the latest example). This is not to denigrate those with overseas qualifications or from a different culture but as Richard Healey notes, this is a dangerous high risk industry and ‘culture’ is important. Experienced local engineers with institutional knowledge and memory are priceless – and absolutely essential. The legacy of Grady and successive incompetent boards is that Delta and Aurora, are very likely to be left with somewhere between very few and almost none.

Your correspondent is given to understand that there is a funereal level of staff morale. Many staff around all departments have the view that (Delta)Aurora is only a few more key resignations away from being unable to function as a lines company. Richard Healey may be able to comment further on this.

The common theme from departed staff is that they would not work any longer under the management regime.

Normally your correspondent likes to finish with what he fondly imagines to be a witty riposte, but after surveying the decayed remnants of Aurora, humour is not appropriate. 

Since 2009, Grady Cameron has blazed across our power line landscape like a counterfeit comet. Grady’s disastrous tenure has created a giant financial crater for the city that will have to be made good by ratepayers for around twenty years – most of a generation.  

While not solely responsible, he encouraged a culture of cynical disinterest in the long-term health of the company he was charged with protecting, to flourish.

There is no wit to be had here, but justifiable anger. 

[ends]

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: ODT 16.2.17 Cameron will not seek new role page 3 detail tweaks by whatifdunedin

16 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, Delta, Democracy, Design, Dunedin, Economics, Electricity, Geography, Health, Infrastructure, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Structural engineering, Technology, Travesty, What stadium

Grader Cameron to step down as chief executive ● still on payroll

Frankly, until we see Grady Cameron up on charges in court as well . . . .
this is half-pie luke warm (PR managed) news mongering without ANY public accountability for the deliberate corporate degradation of Otago’s power network by Dunedin City Council, Dunedin City Holdings Ltd and the two council-owned companies Aurora Energy and Delta Utility Services.

As What if? noted about the dateline in previous posts care of DCC leaks:

OVERPAID Grady Cameron, chief executive of Aurora and Delta, announced today that he will step down from his position before 30 June this year.

However, we haven’t got rid of the award-winning burnt asset arsehole just yet.

● December’s Deloitte report recommended that Aurora (‘lines company and asset owner’) and Delta (‘civil engineering company and contractor’) be separated and governed by separate independent boards.

● Grady Cameron says he is not considering a new position with either company.

● Instead, Mr Cameron will take up an interim position to the end of this year, overseeing next developments for the entities.

****

grady-cameron-delta-ceo-story-19-10-16-newshub-co-nzNewshub broke the story when whistleblower Richard Healey first went public on dangerous poles 19.10.16 [newshub.co.nz]

Deloitte review report – Aurora Energy and Delta Utilities (PDF, 1740 KB)
12 Dec 2016: Review of Aurora Energy Limited/Delta Utility Services Limited – Network Safety Concerns

****

Media Release
Aurora Energy begins implementing recommendations of independent review

15 Feb 2017
Aurora Energy has begun the implementation of the organisational changes recommended by the independent review by its shareholder, Dunedin City Holdings Limited.
The first step is to transition to two standalone companies from the middle of the year.
Delta Utility Services and Aurora Energy Chair, Steve Thompson, says there have always been two organisations – Aurora Energy that owns the electricity network, and Delta that provides contracting services to Aurora Energy and other energy and environmental customers and employs the people who maintain the network.

“We about to begin the process of recruiting a new chief executive for Delta and aim to have that person in place by the middle of the year. As the Delta leadership team takes shape, we will provide further updates. We expect to appoint a permanent Aurora Energy chief executive in the latter part of the year.”

“The current chief executive, Grady Cameron, has advised me that he will not take up either of the new roles. He will remain in his existing role until 30 June 2017, after which he will be interim Aurora Energy chief executive until the end of the year.”

“The Board and I are particularly grateful that Grady has agreed to oversee the transition process along with the accelerated pole programme which is now underway,” says Mr Thompson.

A report by consulting firm Deloitte last year prepared for Dunedin City Holdings, made a number of recommendations, including separate board and management structures for Aurora Energy and Delta.

“Grady and his team have already started work on this process, and a number of senior management appointments have been made or are currently being finalised,” says Mr Thompson. The recent appointments establish the new management team and structure for Aurora Energy (see below for executive biographies).
Mr Cameron says the new structure will significantly change the leadership of the two businesses. “My focus now is on assisting the Board and the two organisations with the transition and delivering the pole programme before taking on another role.”

For media enquiries, please contact Gary Johnson on 021 224 2333.
Delta is the infrastructure specialist in energy and environmental services. www.thinkdelta.co.nz

Aurora Energy executive leadership team appointments

Warren Batchelor, General Manager Network Performance
(external appointment, starting 20 February)
Responsible for asset management strategy, planning and implementation; manages asset management, network engineering and design and programme delivery teams. Warren brings wide experience in the electricity distribution and manufacturing sectors with a strong focus on asset management, engineering and network operations. He was most recently managing the networks transformation programme for Vector, based in Auckland. Prior to that he has held senior management roles and carried out major change programmes with Aurora Energy (the state electricity provider in Tasmania) and Unison Networks, among others. He holds a Masters in Electrical Engineering from the University of Canterbury.

Mark Corbitt, Chief Technology Officer
(external appointment, starting 20 February)
Responsible for information technology strategy and operations, network technology development for Aurora Energy, including the future implementation of its new asset management system. Mark brings deep experience in information and communications technology leadership to the organisation. He was most recently Chief Information Officer for Contact Energy based in Wellington. Prior to that he has held senior information and communications technology roles and undertaken significant projects with the Ministry of Justice, Housing New Zealand and Telecom NZ, among others.

John Campbell, General Manager Operations and Risk
(internal appointment)
Responsible for network operations and customer services, operation of network control centres, strategic risk management and network safety. John has been Operations Manager for the Aurora Energy network since 2015. Prior to that, John had more than 30 years’ experience in the electricity industry including engineering, operations and project management roles at national grid operator Transpower and network engineering and operations for Central Power (Manawatu).

Alec Findlater, General Manager Network Commercial
(internal appointment)
Responsible for network pricing, connection management, commercial development, customer solutions, regulatory affairs and resource management. Alec was most recently Commercial Manager for the Aurora Energy network. He has in excess of 30 years’ experience in electricity transmission and distribution, with senior roles encompassing design and engineering, contracting and commercial management.

[ends]

Aurora Energy Link

****

█ For more, enter the terms *delta*, *aurora*, *grady*, *steve thompson*, *crombie*, *richard healey*, *dchl*, *epicpowerfail* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

10 Comments

Filed under Aurora Energy, Central Otago, Delta, Dunedin, Economics, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Stadiums, Technology, Travesty

Richard Healey on Aurora’s asset value —heralds “massive increase in rates”

Just some little things our beloved leader Mayor Cull isn’t talking about urgently with his Councillors and Dunedin ratepayers at large.

M U S T ● R E A D

Excerpts from Richard Healey’s Facebook 14.2.17:

[click to enlarge]
richard-healey-facebook-14-2-17-comment-excerpts

Related Posts and Comments:
14.2.17 DCC not Delta #EpicFail : Wall Street falsehoods and a world class debt
11.2.17 Shudder : Aurora Energy programme leader likely delusional…
6.2.17 Delta #EpicPowerFail 9 —The Curious Case of Godfrey Brosnan and…
19.1.17 Jarrod Stewart is EXACTLY RIGHT [what would Steve Thompson know]

█ For more, enter the terms *delta*, *aurora*, *grady*, *steve thompson*, *richard healey*, *dchl*, *epicpowerfail* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

10 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, LTP/AP, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Stadiums, Structural engineering, Technology, Town planning, Travesty, Urban design

DCC not Delta #EpicFail : Wall Street falsehoods and a world class debt

Received from Christchurch Driver [CD]
Tue, 14 Feb 2017 at 9:16 a.m.

Readers 

We are at an interesting time in our local history. Your correspondent like hundreds of others was busy cleaning up yesterday, after what NIWA described as a fairly standard thunderstorm where just 13.6mm of rain fell. 

Also like hundreds of others no doubt, the question in the mind of your correspondent as he dutifully mopped, was : What is the next public asset to be exposed as poorly run, badly maintained and starved of funds ? 

Never before have the executive few lied so comprehensively about the true state of so much degraded public asset. Never before has so much public asset been destroyed by the actions of those few, as Winston might have said. 

Economists your correspondent is familiar with would call this the “tragedy of the commons”. We await the “macro-prudential” responses from Central Government. With the stupefying level of underfunding for DCC drainage and other underground services identified by the Auditor-General, coupled with Aurora Energy’s $1B deferred maintenance and capital work, plus the existing DCC debt, there is around $3B that will need to be extracted from ratepayers and power consumers over the next 30 years (see the Dunedin City Council Infrastructure Strategy). Dunedin has achieved its dream as a world leading small city – of debt per ratepayer. Dunedin will be broke beyond comprehension with the policy of 3% annual rises. The 3% limit is a mirage. Rate rises will be much, much more. Not this year, but quite possibly before the next election; if this council does not address the looming crisis there is the increasing possibility of the removal of the council and appointment of a commissioner. 

It seems that every week brings some fresh disaster or new development that the DCC attempts to cover up. 

Yesterday was a small but telling episode. David Loughrey of the Otago Daily Times kindly confirmed what your correspondent mentioned some months ago, that the DCC had terminated the services of Logic FM because the company would not look the other way while the DCC wilfully failed to fix hundreds of obvious fire rating defects at two of their major assets. 

Mr Kevin Taylor wrote that the council [fired] Logic because the company had been “interpreting code compliance…..beyond that required by the law”. Logic publicly scoffed at this saying – correctly – that the code is “relatively black and white”. 

What actually happened is that as well as the uncompleted fire penetrations, there is a case of simple DCC incompetence, which was only hinted at by infrastructure networks general manager Ruth Stokes in the ODT article. Here are the facts : The Wall Street mall required daily inspections of certain of its building safety systems. The DCC did not want to pay outside consultants to do this work. Fair enough, said Logic, we will train your staff to inspect the systems and they will then sign off a daily inspection sheet, which Logic as the IQP (Independent Qualified Person) need to sight every month. 

wall-street-mall-interior-teamarchitects-co-nz[teamarchitects.co.nz]wall-street-mall-logo-1wall-street-mall-exterior-wallstreetmall-nz-1

Month after month, the monthly reports could not be signed off because no one had completed the daily sign-off sheets. There were offers of more training to the apparently mule-like staff responsible but City Property could not be bothered to do it properly —and thought they could get away with not doing these daily inspections by appointing another more compliant IQP in-house and seeking cover with a further fire report by Beca. 

It is very relevant that after sacking Logic FM, and commissioning the report from Beca, DCC refused to provide a copy of the Beca report to Logic. Logic had asked repeatedly for the report to see what the alleged areas of “over compliance” were. 

It is ‘madeira cake to margarine sandwiches’ that there were no areas of over compliance, and but for Elizabeth Kerr’s LGOIMA request and latterly, the ODT, City Property may well have gotten away with inaccuracies! 

As it is, your correspondent sees only static for Mr Taylor in the DCC crystal ball. He is merely the latest in a line of unlamented DCC property managers, including Robert “Hydraulic” Clark, and Dave McKenzie.

Ruth Stokes also needs to very careful about stepping into this mess – and dissembling to protect Mr Taylor. Stating that “things could have gone a bit better, but they’ve all been addressed” does not fool anyone. Mr Taylor may have have fantasised to Ms Stokes that “all” the fire rating faults were fixed but remember your correspondent advised there were hundreds of faults, not just a few faults in one single wall as has been pretended. There is no way all the faults have been fixed. 

This is what Richard Healey would describe as the Delta dishonest reduction defence…. no, not a 1000 dangerous poles without red tags, but perhaps there are just a few…. and now we learn on that fiasco, that the ‘new’ Delta plan, unannounced to the region’s mayors, is that they can be magically restored to full strength by yet another re-classification.

Chief executive Sue Bidrose started her tenure with a promise of greater transparency and openness (read “honesty”) that was sorely needed. There was some early progress, but the transparency project appears a priority no more.

With the financial storm clouds assembling over the DCC that the chief executive cannot fail to be aware of, some honesty about the actual costs the DCC faces over the next decade is needed. It ranges from the small – just how much will it take to fix Wall Street mall to the $1B existential Aurora problem. The CEO and her staff have been invisible on this critical issue, instead producing reports of risible fantasy such as last year’s effort that valued Delta at over $50M, and Aurora at over $200M. Facing up to an austere decade is the only way that Dr Bidrose and Councillors will avoid having their careers and reputations destroyed by the appointment of a commissioner. 

[ends]

Council Documents:
DCC Infrastructure Strategy
DCC Long Term Plan 2015/16 – 2024/25
Audit Opinion – Independent auditor’s report on Dunedin City Council’s 2015-25 Long‑Term Plan. Author: Ian Lothian, Audit New Zealand on behalf of the Auditor‑General, Dunedin NZ.

ODT Stories:
14.2.17 Councils, Aurora poles apart on ‘removing risk’ definition
13.2.17 Without warrants for years
11.2.17 Aurora affected by pole, staff shortages
8.2.17 Action by Delta decried
29.12.16 Director for $30m pole project
2.12.16 Resignation blow to pole work

Related Posts and Comments:
22.1.17 DCC LGOIMA Response : Wall Street Mall and Town Hall Complex
30.11.16 Delta #EpicPowerFail 7 : Kyle Cameron —The Money or the Bag?

█ For more, enter the terms *delta*, *aurora*, *grady*, *wall street mall*, *richard healey*, *steve thompson*, *dchl*, *epicfail*, *epicpowerfail* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Images by Parker Warburton Team Architects

17 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, Delta, Democracy, Design, Dunedin, Economics, Education, Electricity, Events, Finance, Geography, Health, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Site, Structural engineering, Travesty, What stadium