Tag Archives: Cr Jinty MacTavish

Cycleways and scattered nails

bike - fixed gear track racing [humancyclist.wordpress.com] 1

### radionz.co.nz 24 June 2016 at 9:23 pm
RNZ News
Cycleway truce called as review set up
By Michael Cropp
Wellington’s beleaguered cycleway programme will not be getting the shot in the arm some were hoping for – instead it will be reviewed, refreshed and recommissioned. The outcome of that process – a ‘refreshed cycleways programme’ – would go to the Wellington City Council’s transport committee in August, the council announced today. Meanwhile, Island Bay Residents’ Association had reached a truce with cycling advocates and councillors, and was planning to start on its own consultation. A New Zealand Transport Agency report this month on the council’s ability to implement its programme stated the fallout from the Island Bay project had jeopardised the council’s other cycleway initiatives, and had eroded the public’s faith in the council. It said the council had lost the confidence of officials and ministers. Today’s announcement was intended to provide a pathway to regaining that trust.
Read more

IDEAS !!!!

nails 1 [hdwires.in]

Earlier this year, nails were scattered on the cycleway and the local residents’ association threatened a rates revolt if it wasn’t dug up.

### radionz.co.nz 1 June 2016 at 6:44 pm
RNZ News
WCC told it let spokes fall off cycleway plan
By Michael Cropp
The way Wellington City Council conducted the rollout of a controversial cycleway in Island Bay has hurt its city-wide ambitions for the bike routes, an independent review has found. The report into the city’s cycleways, which was commissioned by New Zealand Transport Agency (NZTA), concluded people felt the path in the southern suburb was a poor solution that was delivered without proper community engagement and consultation. It recommended it be reviewed and modified after further community consultation.
Read more

Read the report commissioned by NZTA (PDF, 1.3MB)

Related RNZ stories:
Legal costs mount in battle over Southland cycleway
Modified Hutt Rd cycleway plans welcomed
Capital cycleway faces strong opposition

****

Meanwhile at Dunedin…. plodding incompetence. A recent series of city council-led (earworms: Spokes Dunedin and NZTA) technical planning and cycleway construction FAILURES, at Exorbitant Expense forced on Ratepayers. All this while South Dunedin core infrastructure maintenance and upgrades received little if no DCC attention, ultimately leading to Council-fuelled multimillion-dollar flood damage. And now, the ODT Editor exhibits gut-wrenching Cheek to devoutly urge DCC to YES, Build Cycleways!

Fri, 24 Jun 2016
ODT Editorial: Learning from cycleway errors
OPINION After a long year of construction, mistakes, remedial work, wasted money and public dissatisfaction the South Dunedin Cycle Network has finally been shunted down the council’s cycleway queue. In an Otago Daily Times report this month council infrastructure networks general manager Ruth Stokes said she could not say when the South Dunedin network would be completed. The new focus, she said, was to employ the limited available resources on fixing the Portobello Rd cycleway and the central city network.

“Build them well, build them smart and build them efficiently.” (ODT)

SPOKES Dunedin speaks out for cycling in Dunedin, New Zealand and represents everyone who rides a bike or would like to ride a bike in the city. SPOKES is a local volunteer cycling advocacy group founded in 1996 as an affiliate of the New Zealand Cycling Advocates Network. SPOKES Dunedin is an incorporated society registered under the Incorporated Societies Act 1908.

bike dog jun co-passage [hbr.org]

We look forward to working with the Dunedin City Council to develop a real cycle network for Dunedin. (Spokes)

God Almighty! Read this:

█ SPOKES DUNEDIN SUBMISSION ON DRAFT 2016-2017 ANNUAL PLAN
Posted on April 6, 2016 by spokesdunedin

Summary
A change of scope is needed for Dunedin’s cycling network, but it is unclear what the DCC’s change in scope actually means, and higher standard cycleways are only part of the story. Spokes Dunedin has a vision for successfully realising the cycle network. We want everyone to be able to cycle from North Dunedin to South Dunedin, out both sides of the Harbour, and through the tunnels to Green Island and Mosgiel on a connected framework of city-spanning arterial routes that are safe, direct, and convenient to use. This will focus work where there is a clear need for improved safety rather than on streets that are already relatively safe, and will create a solid initial network that can grow and develop in response to future demand. The great thing is that there already exists some cycling infrastructure on many of the routes for this initial network. Several things can be achieved by the end of this year that will help Dunedin catch back up to where it should be.

To do in 2016
1. Support NZTA to begin construction of the SH1 separated lanes by the end of this year.
2. Fix Portobello Road – it’s already been two years. We don’t need fancy landscaping, we just need the median barrier realignment so the road looks like a road and the cycleway looks like a cycleway.
3. Complete the Wharf/Roberts intersection as agreed – it’s already been two years. This intersection presents an identified safety risk on a high demand route.
4. Continue the SH88 path through the rail corridor to the railway station, thereby providing an alternative to the cycle lanes on Anzac Ave (heavy freight route and high risk).
5. Create a separated cycle lane from the intersection of Andersons Bay/Strathallan, along The Oval, to Crawford Street in place of the existing cycle lane between two lanes of fast-moving traffic.
6. Develop plans for a separated cycle lane on North Road and safety improvements for the Opoho intersection to tie in with NZTA’s forthcoming separated cycle lanes on SH1. This route is of very high strategic priority.

Introduction
Dunedin is a pro-cycling city, where a significant proportion of the population regularly cycles for recreation, transportation, or both. Year after year, cycling is one of the most strongly supported and heavily submitted-on topics in the annual plan. One of the biggest public consultation events in Dunedin history was held in 2013 regarding the proposed SH1 separated cycle lanes. In addition to widespread media coverage, NZTA and DCC staff solicited input from the public at information booths in busy locations including the Golden Center, Toitu, and the University. With over 2000 written submissions and roughly 800 survey responses, the SH1 separated cycle lanes received one of the highest response rates of any topic ever consulted on. The result was overwhelming support for the proposed separated cycle lanes. Independently, the AA undertook a survey of their local membership, with over 70% of the nearly 1500 respondents supporting the proposed separated lanes. The overwhelming public demand and support for better cycling in Dunedin cannot be denied.
In response to this demand, the City rightly undertook to develop a Strategic Cycle Network. But the South Dunedin portion of the cycle network has not delivered on the ambitions of the cycle network plan adopted in 2011. Nothing has progressed in the last year, leaving half-finished elements scattered around, with other things ripped out without consultation.
Some might argue that we should throw up our hands in despair, abandoning the possibility of future success under the fear of past failures. But others know that setbacks are par for the course when charting new waters and trying new things. Where would we be if the likes of Cook, Columbus, or Magellan had turned around after the first storm and torn sail? Those leaders stayed the course, their sailors gained experience, and they ultimately changed the world.
Read more

“SPOKES, CYCLE-SAIL OFF THE EDGE OF THE WORLD WHY NOT”
Sail wagon [en.wikipedia.org] 1

█ For more, enter the terms *cycle* and *christmas present* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

*Images: (from top) humancyclist.wordpress.com – fixed track racing | hdwires.in – nails | hbr.org – bike dog jun co-passage | en.wikipedia.org – sail wagon

19 Comments

Filed under Business, Cycle network, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Geography, Health, Housing, Infrastructure, Media, Name, New Zealand, NZTA, OAG, Ombudsman, People, Pet projects, Politics, Project management, Proposed 2GP, Public interest, Resource management, South Dunedin, Sport, Tourism, Town planning, Transportation, University of Otago, Urban design, What stadium

Douglas Field counters DCC climate change bunkum

Received.
Mon, 8 Feb 2016 at 5:19 pm (GMT+12:00)

Douglas Field Published on Feb 7, 2016
Dr John Christy testimony US House Committee 2 Feb 2016
Comparison between local politicians’ opinions on climate and Professor John Christy’s testimony at US senate committee hearing.

The full text of Christy’s testimony to the Senate Science committee. It really reinforces the little clip above and is so clear and easy to comprehend.

[begins] I am John R. Christy, Distinguished Professor of Atmospheric Science, Alabama’s State Climatologist and Director of the Earth System Science Center at The University of Alabama in Huntsville. I have served as Lead Author, Contributing Author and Reviewer of United Nations IPCC assessments, have been awarded NASA’s Medal for Exceptional Scientific Achievement, and in 2002 was elected a Fellow of the American Meteorological Society.
It is a privilege for me to offer my analysis of the current situation regarding (1) the temperature datasets used to study climate, (2) our basic understanding of climate change and (3) the effect that regulations, such as the Paris agreement, might have on climate. I have also attached an extract from my Senate Testimony last December in which I address (1) the popular notion that extreme climate events are increasing due to humaninduced climate change (they are not), and (2) the unfortunate direction research in this area has taken.
My research area might be best described as building datasets from scratch to advance our understanding of what the climate is doing and why. Cont/

█ Download: https://science.house.gov/sites/republicans.science.house.gov/files/documents/HHRG-114-SY-WState-JChristy-20160202.pdf

Posted by Elizabeth Kerr

8 Comments

Filed under Business, Climate change, Construction, Corruption, DCC, Democracy, Design, District Plan, Dunedin, Economics, Geography, Infrastructure, Inspiration, Leading edge, Media, Name, New Zealand, People, Project management, Property, Proposed 2GP, South Dunedin, Town planning, Travesty, Urban design

Epere on driving charges, now faces drugs charges after police raid

From: Hamish McNeilly [Fairfax Dunedin Bureau Chief]
Sent: Wednesday, 16 December 2015 6:16 p.m.
To: Elizabeth Kerr
Subject: So Albert Epere on drug raid. See my earlier links

Gang member loses gardening contract with Dunedin Council after arrested for speeding
By Hamish McNeilly Last updated 17:11, December 16 2015
A gang member has lost his contract to maintain Dunedin’s public gardens after he was arrested for racing on a state highway. In October, the Dunedin City Council awarded Mauri Kohatu Incorporated, a $52,000 trial contract to maintain some city greenspaces until June 30, 2016. […] In a statement issued late Wednesday, the council said it suspended its trial social procurement contract with Mauri Kohatu after becoming aware of Epere’s alleged offending on Monday.
http://www.stuff.co.nz/national/75172101/gang-member-loses-gardening-contract-with-dunedin-council-after-arrested-for-speeding

Man arrested after police raid on Dunedin gang pad
By Hamish McNeilly Last updated 13:45, December 16 2015
Armed police took part in an early morning raid of a Dunedin gang house. Police raided a Pine Hill Rd property on Wednesday morning and arrested a 49-year-old man. The property was understood to be connected with Black Power.
http://www.stuff.co.nz/national/75154505/man-arrested-after-police-raid-on-dunedin-gang-pad

Related Posts and Comments:
14.12.15 Epere arrested
13.10.15 Stuff: DCC to pay Epere $37 an hour
12.10.15 alfred e cull
11.10.15 DCC: Numpty – Cull – Epere
6.10.15 DCC suckered by Black Power leader
9.3.15 DCC patched: How NZ Herald sells our “story” #gangs
8.7.14 DCC: Mayor Cull and council staff consort with criminal gangs

█ Embarrassing for Dave Cull, Sue Bidrose, Rebecca Williams and all the uninformed Do-gooder councillors and staff at Dunedin City Council who wanted to throw ratepayers’ money at criminal gangs.

rebecca and mad hatter cull with black power menber parts 1 and 2 [371100] Douglas Field 16.12.15 (1)Douglas Field 16 Dec 2015 [click to enlarge]

Posted by Elizabeth Kerr

39 Comments

Filed under Business, DCC, Dunedin, Media, Name, New Zealand, People, Police, Politics, Project management, Property

Message to Daaave from Santa Al

ODT 9.12.15 (page 14)

ODT 9.12.15 ODT Letter to editor Broad p14 (1)[phone shot]

Posted with unbecoming tinge of green by Elizabeth Kerr

15 Comments

Filed under Business, DCC, Democracy, Dunedin, Economics, Events, Hot air, Inspiration, Name, New Zealand, People, Politics, Tourism, Urban design

DCC report: Mosgiel Pool Future Aquatic Provision

█ Full Council Meeting Monday 30 November 2015 at 1:00 p.m.
Council Chamber, Municipal Chambers, The Octagon

Agenda – Council – 30/11/2015 (PDF, 39.6 KB)

Other Reports to be tabled.

Item 16

Report – Council – 30/11/2015 (PDF, 7.1 MB)
Mosgiel Pool Future Aquatic Provision

[Extract]

Council 30 November 2015
MOSGIEL POOL FUTURE AQUATIC PROVISION
Department: Parks, Recreation and Aquatics

EXECUTIVE SUMMARY
1. This report presents high level concept design options and associated capital and operating costs for a new aquatic facility in Mosgiel. A decision is required on which, if any option should be progressed to developed design stage to enable more detailed operating costs, capital costs and whole of life cost options to be developed.

2. Staff have conducted a robust process, assisted by aquatic facility development and operation experts, using architects and quantity surveyors with substantial aquatic experience (including Selwyn) and with the input of Sport New Zealand. Despite this, and whilst reaching agreement on a preferred site, there is a fundamental difference between the staff position and that of the Taieri Community Facilities Trust (the Trust).

3. Council staff consider they can deliver a high quality aquatic facility containing two bodies of water that provide for casual recreation (leisure), casual fitness (lap swimming) and learn to swim that will be valued by the Mosgiel community. The Trust does not agree.

4. The estimated total capital cost for this option is approximately $14.4m, based on benchmarking, which can be refined and reduced through developed design, value management and procurement processes.

5. The Trust position is that for the same amount of money, ie approximately $14.4m, a four-pool proposal, as presented in 2014, can be delivered. The staff assessment of this position is that the capital cost is more likely to be approximately $18-20m, based on feedback from Sport New Zealand and the quantity surveyor.

RECOMMENDATIONS
That the Council:
a) Decides that Site A, located adjacent to the existing Mosgiel Pool is the preferred site for the development of a new aquatic facility.

b) Directs officers to progress the option of two bodies of water, delivering leisure, lap and learn to swim activities through to developed design including further refinement of capital costs, operating costs, and the development of whole of life facility costs, and report back to Council in May 2016.

c) Notes the estimated capital cost of the current concept for two bodies of water is $10,458,000 (buildings, siteworks and infrastructure) plus $2,379,500 (fees, consents, furniture and equipment) plus $1,567,000 (project contingency and ground improvement provision); a total of $14,404,500.

d) Notes that the estimated capital cost excludes an escalation provision, currently estimated at 2.8% per annum for the three years until the Council funding is available.

e) Acknowledges the continued commitment of the Taieri Community Facilities Trust to the project, through their participation in the steering group and input into the concept design process.

Author: Jendi Paterson, Parks and Recreation Planning Manager
Authoriser(s): Richard Saunders, Group Manager, Parks, Recreation and Aquatics; Ruth Stokes, General Manager, Infrastructure and Networks

DUNEDIN CITY COUNCIL PROPOSED TAIERI AQUATIC CENTRE – MOSGIEL
19 October 2015
Feedback on Taieri Community Facilities Trust Feasibility Study (November 2014), Warren & Mahoney Architects (WAM) and Barnes Beagley Doherr (BBD) Master Plan and Cost Estimate (September 2015).

[Extracts]

1. General observations – There is universal acceptance that the existing Mosgiel Community Pool is an asset at the end of its usefulness and fit with existing and future community needs. The Taieri Community Facilities Trusts (the Trust) Feasibility correctly establishes that historical reports, information and recommendations along with DCC support this view. What is unclear or fully evidenced in the study is:
– What needs assessment and demand are evident and directly related to the size, scale and component mix for the facility required? E.g. need for a FINA certified 10 lane competition pool.
– Confirmation of the likely and sustainable catchment that the centre will serve?
– The impact of the proposed facility on the existing aquatic network?
– What is the projects full capital cost and whole of life affordability for the community?

3. Site and location – It is agreed that Memorial Park is the preferred site for the development of a new aquatic centre. The Feasibility Study promotes the use of a site that impacts significantly the existing Memorial Park Gardens. This option seems unnecessary given the other options available at the park to DCC. Of the subsequent locations within the park proposed by Warren and Mahoney Architects (20.09.15) those sites favoured are those that enable the existing pool to operate during any development period, impact adjacent residents the least, provides multiple points of entry, maximises existing car parking and allows for future expansion should be considered. In this context Site A and Site B are favoured. Site A may offer the opportunity to upgrade and integrate the Caravan Park operation into the new facility, management model and provide a positive revenue stream for the centre.

6. Funding Strategy – the expectation placed on the Trust to raise 50% ($7.5m) of the capital cost of the project is considered unrealistic and unfair. Despite the optimism of the Trust would be unachievable by the second half of 2016 as identified in the Trusts timeline for achieving the pledged funding target. Undoubtedly, this would place extreme pressure of exiting funding agencies and fundraising organisations delivering alternative community outcomes and services for some time. One needs to ask the question – is the same expectation places on communities of interest to raise 50% of funding for developments of public libraries, community halls, sport parks and other public amenities?

Conclusion, the size scale and complexity of the proposed aquatic centre seems to address the wants rather than the needs of the community. Justification of the overall component mix, the need for 10 v’s 8 lanes, competitive aquatic sport needs v’s wider community recreation, wellness and entertainment (youth and older adults) would benefit from closer consideration given the significant level of investment under consideration. The size and extent of the projected catchment population may be inflated and with minimal consideration given to the impact of the new centre on the existing aquatic network of facilities and in its current form designed to compete rather than compliment Moana Pool. The assessment of capital cost seems consistent based on similar south island projects and assessment of construction rates without due consideration to those costs currently excluded. The projected operating budget is not inclusive of all relevant costs (debt repayments and depreciation) nor does it consider the whole of life costs for the assets which will require the need for an ongoing level of operational subsidy.

[screenshots – click to enlarge]

Mosgiel Pool - Trust selected sites

Mosgiel Pool - Sites Analysed by Architects

Mosgiel Pool - Site Option A

Mosgiel Pool - Brief Matrix

Mosgiel Pool - Brief Study 2B

Mosgiel Pool - Brief Study 3B

Mosgiel Pool - Brief Study 4B

Related Posts and Comments:
16.9.15 DCC Please Explain —Mosgiel pool design to Warren & Mahoney
● 7.8.15 MOU DCC and TCFT New Aquatic Facility #MosgielPool
● 24.7.15 Hands off Mosgiel Memorial Gardens
● 23.7.15 Dunedin ratepayers —Green Island best site for city pool users…
● 22.7.15 DCC Long Term Plan 2015/16 – 2024/25
● 19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
17.5.15 Cr Vandervis on DCC project budgets
● 4.5.15 DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’
● 7.5.15 DCC Draft LTP 2015/16-2024/25 —public submissions online
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
25.3.15 DCC Long Term Plan: Green-dyed chickens home to roost
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
14.1.15 DCC Draft Long Term Plan: more inanity from Cull’s crew pending
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

34 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, Dunedin, Economics, Geography, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Politics, Pools, Project management, Property, Site, Sport, Town planning, Transportation, University of Otago, Urban design, What stadium

DCC: Meet Stupid x 2 #carbonemissionsLUNACY

█ Full Council Meeting Monday 30 November 2015 at 1:00 p.m.
Council Chamber, Municipal Chambers, The Octagon

Agenda – Council – 30/11/2015 (PDF, 39.6 KB)

Other Reports to be tabled.

Item 18

Report – Council – 30/11/2015 (PDF, 3.1 MB)

GREEN BUSINESSLESS PEOPLE like Pigs in Muck at DCC - Hawkins MacTavish

█ ANTI BUSINESS COUNCILLORS
█ CRS AARON HAWKINS & JINTY MACTAVISH
█ VOTE OUT HAWKINS & MACTAVISH OCTOBER 2016

Posted by Elizabeth Kerr

18 Comments

Filed under Business, DCC, Democracy, Dunedin, Economics, Name, New Zealand, Offshore drilling, People, Politics, Transportation

John Evans: ‘Always Follow the Money Honey’ #DunedinCyclewayCRIME

Fair Go [tvnz.co.nz]
Fair Go in FrameScrollCornerJPRfinished

Received from John Evans
Wed, 28 Oct 2015 at 7:55 p.m.

Tonight on Fair Go – https://www.tvnz.co.nz/ondemand/fair-go/28-10-2015 – we find that the Bike Barn franchise has been in breach of the Sale of Goods Act and is being investigated by the Commerce Commission.

The great shame is that the councillors on the DCC will spend $47 million of your money to advance the commercial interests of a private business group.

When will we get some non naïve councillors – apart from Hilary and Lee.

For Jehovah’s sake Dunedin

WAKE UP.

Your representatives are naïve and being conned by outside interests and inside corruption.

[ends]

Posted by Elizabeth Kerr

Image: 4.bp.blogspot.com – ScrollCornerJPRfinished, frame added by whatifdunedin

13 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Dunedin, Economics, Geography, Hot air, Media, Name, New Zealand, NZTA, OAG, Ombudsman, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Transportation, Urban design, What stadium

DCC cycle lanes, the real reason……. foul-ups @DUD

Received from Brian Miller
Sat, 24 Oct 2015 at 5:40 p.m.

The real reason why DCC wants cyclists to have their own cycling lane.

So this is why those people in funny clothes wander all over our roads!
—I knew there was a reason why I took up biking.

THE RETIREMENT BICYCLE
Retirement BicycleImage: Supplied

My doctor says to drink lots while exercising!
And I always follow the doctor’s advice.

Related Posts and Comments:
22.10.15 Bloody DCC —superlative cost blowout #cycleways #SUCKS
6.10.15 DCC v Tauranga CC + costly stadium cycle/walkway :[
12.9.15 Cr Kate ‘Cycleways’ Wilson —(disingenuous) fails constituents
3.9.15 Dunedin support for extensive cycle lanes and Free bicycles
22.8.15 DCC cycleway$ now tied to more ‘urban de$ign’ $pend…
18.7.15 DCC Cycleways: SEEING RED, apology NOT accepted
10.4.15 DCC cycleways propaganda continues #SpendSpendSpend
20.3.15 DCC Shame …John Wilson Dr nonsense, now Portobello Rd cycleway
11.2.15 Dunedin Cycleways: Pet project staff, ‘entitlement’? #irony

█ For more on Dunedin’s inordinately expensive Strategic Cycle Network, enter the term *cycle* in the search box at right.

Posted by Elizabeth Kerr

15 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Dunedin, Economics, Enterprise Dunedin, Hot air, Inspiration, Name, New Zealand, NZTA, OAG, Ombudsman, People, Pics, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Transportation, Urban design, What stadium

DCC and the AWFUL 2GP ‘threat of THREATS’

THREATS TO YOUR PROPERTY, NEIGHBOURHOOD OR DISTRICT CONTAINED IN PROPOSED 2GP (Second Generation District Plan)

Natural hazards ● Medium density zones ● Heritage ● Rural zones ● Transition zones ● Warehouse precinct —and much much more.

Proposed 2GP graphic [ODT files - tweaked by whatifdunedin]Composite no-go image | whatifdunedin

### ODT Online Sat, 24 Oct 2015
Planning for the city’s future (Part I)
By Chris Morris
Property owners face new rules but the city’s heritage is in for a boost, as the Dunedin City Council pushes ahead with a new district plan for the city. Thousands of properties across Dunedin will be covered by new rules designed to protect against natural hazards. But, according to Dunedin Mayor Dave Cull, the city needs to face up to the threats. Doing nothing is not an option. […] The [proposed] plan has already ruffled feathers from the Taieri to the inner city, amid concerns about the impact on property prices, insurance premiums and future development plans.
Read more

█ The public has until November 24 to make submissions.

2GP banner

Proposed Second Generation District Plan (2GP)
https://2gp.dunedin.govt.nz/2gp/index.html

‘2GP’ feeds Cull’s fairytale of doom, with help from Coldplay

Coldplay Official Uploaded on May 30, 2011
Coldplay – Strawberry Swing (Google Play • iTunes)

Coldplay Official Uploaded on May 30, 2011
Coldplay – Trouble (Google Play • iTunes)

Coldplay Official Uploaded on May 27, 2011
Coldplay – In My Place (Google Play • iTunes)

Related Posts and Comments:
12.10.15 DCC Proposed 2GP (district plan) —DEFEND YOUR PROPERTY
3.10.15 DCC: Public Notice Draft 2GP + “Community Presentations”
3.10.15 DCC appointees to draft 2GP panel #greenasgrass #infatuation
2.10.15 DCC Draft 2GP hearings panel lacks FULL INDEPENDENCE
30.10.15 DCC 2GP molasses and the dreadful shooflies (You)
28.9.15 Message to DCC: The People can’t deal with your 2GP documentation…
26.9.15 DCC: Proposed 2GP to line pockets of cowboy developers #FIGHTDIRTY

Posted by Elizabeth Kerr

38 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Events, Resource management

Bloody DCC —superlative cost blowout #cycleways #SUCKS

#GreaterDunedinNOTsustainable
#DaveCullNOTsustainable
#KateWilsonNOTsustainable
#JintyMacTavishNOTsustainable
#CouncilStaffManagersNOTsustainable

Cycling [screenshot at YT].jpgNo photograph of Kate in lycra could be found. The Mayor and MacTavish were both camel shackled when our photographer called (say no more).

### ODT Online Thu, 22 Oct 2015
Dunedin cycleway cost blowout
By Craig Borley
Building Dunedin’s cycleways could cost “three to four times” more per metre than first thought. That news was delivered to the Dunedin City Council’s infrastructure services committee this morning by the council’s infrastructure and networks general manager Ruth Stokes

The committee voted to continue with the rollout of the network, ensuring the design and finish were of the more expensive, higher quality option.

Read more

█ Council Reports available at What if? via (12.10.15)https://dunedinstadium.wordpress.com/2015/08/22/dcc-cycleways-now-tied-to-more-urban-design-spend-after-rehash-numero/#comment-66330

Sandy Graham advises there is one amended page (item 6 ph 6.8) – a map was altered for clarity. The website copy will be updated with the amended page.

Posted by Elizabeth Kerr

*Image: [screenshot] youtube.com – Cycling Training Program – Crashing on a bike

57 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Geography, Media, Name, New Zealand, NZTA, OAG, Ombudsman, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Transportation, Urban design, What stadium

DCC Proposed 2GP (district plan) —DEFEND YOUR PROPERTY

2GP banner

Proposed Second Generation District Plan (2GP)
https://2gp.dunedin.govt.nz/2gp/index.html

ODT hasn’t treated the following “Opinion piece” with due deference, it’s something to miss —no link at ODT Online. Mr Pickford probably forgot to ask that his propaganda be broadcast. Ah well.

ODT 12.10.15 (page 7)

ODT 12.10.15 Opinion Pickford p7 (1)

The PROPOSED 2GP at 1600 pages is the biggest TURN OFF in Dunedin Planning History, ever.

The 2GP is the second generation district plan; and YOU, THE COMMUNITY, OWN this regulatory document once it is fully operational. Unfortunately, City Planning thinks THEY own it for your own good. Forget that. Eyeball the bastards and be prepared to defend your realms. Expect to meet with senior management of DCC, get past the desk staff. Most important —go straight to the top: group and general managers, and the chief executive. Avoid lower pond life. Cut to the chase.

Make no mistake, your property if it lies in the City Rise will be GREATLY AFFECTED. There’s very serious stuff going on if you live in a natural hazards zone. But what about your business, read very carefully. Buy a Resource Management specialist if you want to truly defend your property, its use and its value – or if you seek something different, time to stop writing invective just DEAL to the 1600 pages before the submission deadline in November. Write further submissions. Appeal the 2GP to Glory at Environment Court. Go to the High Court if you must. Etc. Etc.

Start your submission with the fact that the hearings panel is not INDEPENDENT and you protest this – councillors should not be sitting on the panel – at the moment Cull’s followers have a voting majority to push their green agendas through. STOP THE ROT. Already, you haven’t been served natural justice. Demand experienced independent commissioners from out of district that DCC hasn’t got to.

The DANGER is, if you’re a Ratepayer and you think you can deal with the 2GP through a DCC-produced summary you are BARKING MAD, you will sign your life away immediately. Wise up.

Related Posts and Comments:
3.10.15 DCC: Public Notice Draft 2GP + “Community Presentations”
3.10.15 DCC appointees to draft 2GP panel #greenasgrass #infatuation
2.10.15 DCC Draft 2GP hearings panel lacks FULL INDEPENDENCE
30.10.15 DCC 2GP molasses and the dreadful shooflies (You)
28.9.15 Message to DCC: The People can’t deal with your 2GP documentation…
26.9.15 DCC: Proposed 2GP to line pockets of cowboy developers #FIGHTDIRTY

Posted by Elizabeth Kerr

54 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Geography, Heritage, Media, Name, New Zealand, OAG, Ombudsman, Otago Polytechnic, People, Politics, Project management, Property, Resource management, Site, Tourism, Town planning, Transportation, University of Otago, Urban design, What stadium

DCC Please Explain —Mosgiel pool design to Warren & Mahoney

This is Dunedin City Council, Cr Jinty MacTavish (Chair, DCC Community and Environment Committee), Mosgiel Taieri Community Board, and the Taieri Community Facilities Trust (TCFT) keeping Dunedin ratepayers and residents THOROUGHLY INFORMED.

Read all about it at NBR, why not. [thanks Anon Anon]
Corruption, backroom deals, vested interests, Anyone?

National Business Review
Warren & Mahoney clinches three big sports contracts
Chris Hutching · Friday September 11, 2015

Today’s sports centres accommodate a diverse range of disciplines under one roof and are social hubs and health centres. “Their design should have clarity of access, and a welcoming pathway which encourages maximum participation in recreation. The scale of the recent commissions varies. At the Mosgiel Aquatic Centre, the $14 million budget is earmarked for lane swimming, as well as pools for learners, leisure and warm water.

http://www.nbr.co.nz/article/warren-mahoney-clinches-three-big-sports-contracts-ch-178407

[screenshot – click to enlarge]

NBR 11.9.15 W&M clinches three big sports contracts [screenshot tweaked]

Related Posts and Comments:
● 7.8.15 MOU DCC and TCFT New Aquatic Facility #MosgielPool
● 24.7.15 Hands off Mosgiel Memorial Gardens
● 23.7.15 Dunedin ratepayers —Green Island best site for city pool users…
● 22.7.15 DCC Long Term Plan 2015/16 – 2024/25
● 19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
17.5.15 Cr Vandervis on DCC project budgets
● 4.5.15 DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’
● 7.5.15 DCC Draft LTP 2015/16-2024/25 —public submissions online
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
25.3.15 DCC Long Term Plan: Green-dyed chickens home to roost
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
14.1.15 DCC Draft Long Term Plan: more inanity from Cull’s crew pending
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

22 Comments

Filed under Architecture, Business, Construction, CST, DCC, DCHL, DCTL, Democracy, Design, Economics, Enterprise Dunedin, Geography, Hot air, LGNZ, Media, Name, New Zealand, NZRU, OAG, OCA, Ombudsman, ORFU, People, Politics, Pools, Project management, Property, SFO, Site, Sport, Stadiums, Town planning, University of Otago, Urban design, What stadium

Cr Kate ‘Cycleways’ Wilson —(disingenuous) fails constituents

█ Cr Kate Wilson says cycleways will bring myriad benefits to Dunedin.

ODT Online Sat, 25 Jul 2015
Why Dunedin is investing in cycling
By Craig Borley
Dunedin appears divided over the cycle network. Some see it as unnecessary. Others see it as vital. ODT reporter Craig Borley spoke to Dunedin city councillor Kate Wilson, chairwoman of the infrastructure services committee, about why the city is investing in cycle infrastructure.
Read more

█ The Dunedin City Council is sleep-walking to yet another poorly thought out cycleway project. (ODT)

### ODT Online Thu, 20 Aug 2015
Time to put brakes on cycleway
By Hilary Calvert
OPINION Somehow, the Dunedin City Council has been so beguiled by the gift-horse that is the New Zealand Transport Agency (NZTA) that it seems to have completely forgotten to carry out its proper role of looking after the interests of the citizens of Dunedin in respect of the State Highway 1 cycleway plans.
Read more

ODT 26.8.15 (page 8)
– shot in a half-lit Dunedin café off the beaten cycle paths

ODT 26.8.15 Letter to editor Wilson Diehl Hopkins p12

█ Proposed: Separated cycle lanes to run along north and south one way routes, between Botanic Garden and Queens Gardens.

### ODT Online Thu, 10 Sep 2015
Dedicated cycle lanes get closer
By Craig Borley
Nationally-funded separated cycle lanes along Dunedin’s one way system are now two steps closer as the project moves swiftly through the New Zealand Transport Agency machine.
Read more

NZTA said it had resolved to:
• Incorporate high turnover short term parking for businesses, particularly those reliant on short stay kerbside parking and deliveries
• Incorporate medium term parking close to the hospital and museum.
Updated plans were now being prepared to show where the parking would be included. The plans will be available for public comment at the end of the month.

ODT 11.9.15 (page 16)

ODT 11.9.15 Letters to editor Hopkins Pillans Oaten (1) p16

Related Posts and Comments:
● 3.9.15 Dunedin support for extensive cycle lanes and Free bicycles
● 22.8.15 DCC cycleway$ now tied to more ‘urban de$ign’ $pend….
● 18.7.15 DCC Cycleways: SEEING RED, apology NOT accepted
● 10.4.15 DCC cycleways propaganda continues #SpendSpendSpend
20.3.15 DCC Shame: First, John Wilson Dr … now Portobello Rd cycleway
11.2.15 Dunedin Cycleways: Pet project staff, ‘entitlement’? #irony
3.12.14 Cycling at Dunedin —boring debate, network spending continues #DUD
22.5.14 DCC Transportation Planning —ANOTHER consultation disaster
6.5.14 Roading network screwed by council staff
● 14.2.14 DCC: Broadband AND bicycles #fraudband speed
14.1.14 DCC: Hospital area parking changes #cyclelanes
5.1.14 Norman Foster: SkyCycling utopia above London railways #ThinkBig
24.12.13 Daaave’s $47 million Christmas present to Jinty. We’re paying.
4.12.13 Dunedin cycleways: Calvin Oaten greeted by DCC silence
17.11.13 Dunedin cycleways: Calvin Oaten’s alternative route
17.11.13 Cull and MacTavish… “Have you fixed the debt crisis?”
14.11.13 Cycle lane explosions and puncture kits (SPOKES grenades launch)
8.11.13 Dunedin Separated Cycle Lane Proposal [how to make a submission]
29.10.13 DCC (EDU) invents new job! [GigatownDunedin]
19.10.13 Cycle lobby games and media tilts
24.9.13 Mediocrity and lack of critical awareness at DCC [council reports]
8.7.13 Bloody $tupid cycleways and Cull’s electioneering… [route maps]
28.3.13 DCC DAP 2013/14: Portobello Harington Point Road Improvements
26.2.13 DCC binge spending alert: Proposed South Dunedin cycle network
22.2.13 DCC: Council meeting agenda and reports for 25 February 2013
31.1.13 Who? 2010 electioneering
21.11.12 Safe cycling -Cr Fliss Butcher
5.11.12 DCC, NZTA: Cycle lanes controversy

Posted by Elizabeth Kerr

15 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Enterprise Dunedin, Geography, Hot air, Media, Name, New Zealand, NZTA, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Transportation, University of Otago, Urban design, What stadium

Tale of two pools & very different community boards #Mosgiel #Wanaka

ODT 8.9.15 (page 8)

ODT 8.9.15 Letter to editor Miller p8[click to enlarge]

The Mosgiel Taieri Community Board is heading for disestablishment. (tick)

Related Posts and Comments:
● 7.8.15 MOU DCC and TCFT New Aquatic Facility #MosgielPool
● 24.7.15 Hands off Mosgiel Memorial Gardens
● 23.7.15 Dunedin ratepayers —Green Island best site for city pool users…
● 22.7.15 DCC Long Term Plan 2015/16 – 2024/25
● 19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
17.5.15 Cr Vandervis on DCC project budgets
● 4.5.15 DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’
● 7.5.15 DCC Draft LTP 2015/16-2024/25 —public submissions online
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
25.3.15 DCC Long Term Plan: Green-dyed chickens home to roost
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
14.1.15 DCC Draft Long Term Plan: more inanity from Cull’s crew pending
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

6 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, Economics, Geography, Media, Name, New Zealand, NZRU, ORFU, People, Politics, Pools, Project management, Property, Site, Sport, Town planning, Urban design, What stadium

Dunedin support for extensive cycle lanes and Free bicycles

### ODT Online Thu, 3 Sep 2015
Refugee crisis: ‘We’re not ruling out doing more’ – PM
The Government was considering fast-tracking a review of how many refugees it takes, Prime Minister John Key said today, as the humanitarian crisis escalates with millions fleeing war-torn Syria. A review of New Zealand’s refugee quota is scheduled for next year. NZME
Read more

Received from John Evans
Thu, 3 Sep 2015 at 7:21 p.m.

█ Subject: A Question

Why have Spokes, Jinty and all the other BHL (bleeding heart cycle proponents) not supported extensive cycle lanes and Free bicycles for placement at the Hungarian rail station.

The advantages:

● A gross saving of 250 Euros per capita (approximately $200 million just for German refugees) Rail Fares
● A solution to the problem of fitness amongst Syrian refugees
● More mosques for Germany and less for Hungary (and New Zealand)
(just in case this seems insensitive to you, there are 8 mosques in Auburn alone, a small suburb of Sydney)
● And finally, it would put the cycleways fairly where people want to go, not on foot or in a car from Hungary Station to Deutschland; not from South Dunedin where they are unwanted, to Dunedin where they are unused! 2.6% of commuters travel to WORK by bicycle in Dunedin? We know that is bull**it. It is possible that lazy Dunedin students living in North Dunedin ride a bike to university rather than walk and they cannot afford cars or parking fees, but give them a free car and car park and see how many cycle!

As to lecturers, from my experience the major contributor again to this queer behaviour is a desire to reduce cost of travel and parking, rather than some higher ideal.

[ends]

Santa [cycle-lane-2-copy1]Daaave’s $47 million Christmas present to Jinty. We’re paying.

Posted by Elizabeth Kerr

2 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Enterprise Dunedin, Geography, Media, Name, New Zealand, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Transportation, University of Otago, Urban design, What stadium

Cr Whiley on offensive at Build Dunedin #fb

Updated post

It’s naïve and self-promoting —Cr Andrew Whiley is after the new chairship Mayor Dave Cull might establish to meet a particular contingency (as sourced from council staff a few weeks back).

Facebook.com | BuildTheHotel <<< …
Sat, 8 Aug 2015 at 3:30 p.m. [screenshot]

Build Dunedin facebook - It's Vandervis versus the Council yet again - 3.30 pm 8.8.15

█ For more, enter the terms *citifleet*, *vandervis*, *conduct*, *long term plan* or *mosgiel* in the search box at right.

Ode to Whiley…. Pick me Pick me

LennyKravitzVEVO Uploaded on May 6, 2011
Lenny Kravitz – Are You Gonna Go My Way
Official video of Lenny Kravitz performing Are You Gonna Go My Way from the album Are You Gonna Go My Way. Directed by Mark Romanek.
Music: “Are You Gonna Go My Way” by Lenny Kravitz (Google Play • iTunes)

Posted by Elizabeth Kerr

7 Comments

Filed under Business, Carisbrook, Citifleet, Construction, CST, Cycle network, DCC, DCHL, DCTL, Delta, Democracy, DVL, DVML, Economics, Enterprise Dunedin, Hot air, Hotel, LGNZ, Media, Name, New Zealand, NZRU, NZTA, OCA, Offshore drilling, ORFU, People, Pics, Police, Politics, Pools, Project management, Property, Site, Sport, Stadiums, Tourism, Town planning, Transportation, Urban design

MOU DCC and TCFT New Aquatic Facility #MosgielPool

In previous weeks, with receipt of the DCC Long Term Plan 2015/16 – 2024/25, contributors to What if? Dunedin seized upon the fact (page 166) that the Council has somehow (if by political vote-catching, deception and or undemocratic business method?) — facilitated by the Mayor of Dunedin — taken on the whole cost of the proposed ‘Taieri Aquatic Centre’ for Mosgiel, to be loaded onto UNSUSPECTING Dunedin ratepayers.

This is contrary to what was discussed, and understood, at the time of the draft LTP hearings.

[click to enlarge]
DCC LTP 2015-16 to 2024-25 p166DCC LTP Section 3 – Forecast Financial Statements (PDF, 877.9 KB)
Forecast Financial Statements (financial statements, gross debt chart, accounting policies, 10 year capital expenditure programme, prospective information, significant forecasting assumptions, inflation adjusters, reserve funds, long term plan disclosure statement)

In reference to page 166, Bev Butler (23 July) emailed all Councillors about the figures for Aquatic Services new Capital Expenditure: Mosgiel Pool $410,000 in 2016/17 and $14.478 million in 2018/19.

In email reply, Cr Richard Thomson, chair of the Finance Committee, noted an asterisk:
‘you will see that the figure is asterixed and that this references back to notes that these are projects which have “full or partial external funding”. In this case the pool is subject to the community fundraising their share but that is included in the capital spend. you will see a similar situation with the cricket lights at Logan park where $2.2m is being spent but Council has approved up to $1m of its money only…’

This is what ODT reported on 22 May:

ODT: Mosgiel pool wins support
Dunedin City councillors have thrown their support behind a Mosgiel aquatic facility, despite a staff warning about council missing its debt targets. Councillors at yesterday’s long-term plan hearings voted in favour of building a facility “in principle”, subject to a number of conditions.
● Taieri Community Facilities Trust to raise $7.5 million towards project.
● Council has allocated a placeholder budget of $6 million for the facility in the 2018-19 financial year.
● Budget of up to $300,000 approved for council staff to investigate project costs, design options and site location
● Staff to report back to council by April next year, at which point councillors would decide whether to proceed with the project and how.
● Councillors voted that council staff and the trust develop a new memorandum of understanding.

Without building a Mosgiel pool, debt was forecast to be at $223 million in 2021, $7 million below the council’s self-imposed $230 million target. (ODT)

Now read the following chain of correspondence.

Received from Lee Vandervis
Fri, 7 Aug 2015 at 8:22 a.m.

█ Message: I believe it is in the pubic interest for the points below to be made public. Kind regards, Lee

—— Forwarded Message
From: Lee Vandervis
Date: Fri, 07 Aug 2015 08:18:32 +1200
To: Dave Cull, Jinty MacTavish
Cc: Chris Staynes, Kate Wilson, Richard Thomson, Aaron Hawkins, Neville Peat, Mike Lord, David Benson-Pope, Andrew Whiley, Andrew Noone, John Bezett, Hilary Calvert, Doug Hall, Richard Saunders [DCC], Jendi Paterson [DCC], Sue Bidrose [DCC], Sandy Graham [DCC]
Conversation: MOU DCC and TCFT New Aquatic Facility
Subject: Re: MOU DCC and TCFT New Aquatic Facility

Dear Mayor Cull,

Thank you for your helpful suggestion which I intend to take up especially when DCC file evidence is available which can confirm many allegations made to me by members of the public.

I do wonder that you seem to think so little of an MOU statement of intent that apparently commits Council to “the development of a new Aquatic Facility Complex“ when Council has not yet made any final Pool Complex decision and in any case has not got the financial resources or even a sufficiently large place holder budget to achieve building the proposed Pool Complex. At the risk of boring our public as you suggest, I will do what I can to let them know.

The claim by Cr. McTavish below “that the phrase “new aquatic facility complex” covers everything from a refurbishment of the existing (which is the base level of service required for the aging, arguably beyond useful life, asset)…” is not credible in commonly understood usage of the words used, but I hope that wide publication of this particular interpretation will reduce the misrepresentation that I believe the Mosgiel Aquatic MOU currently represents.

Regards,
Cr. Lee Vandervis

———————————

On 7/08/15 6:29 AM, “Dave Cull” wrote:

Lee
Rather than boring an even wider audience with your laughable brew of ignorance and malice, how about developing some testicular fortitude and going public, as you have been requested to, with the evidence behind the other far more serious accusations and insinuations you have made?
Dave

———————————

From: Lee Vandervis
Sent: Thursday, August 06, 2015 10:49 PM
To: Jinty MacTavish
Cc: Dave Cull; Chris Staynes; Kate Wilson; Richard Thomson; Aaron Hawkins; Neville Peat; Mike Lord; David Benson-Pope; Andrew Whiley; Andrew Noone; John Bezett; Hilary Calvert; Doug Hall; Richard Saunders; Jendi Paterson; Sue Bidrose; Sandy Graham
Subject: Re: MOU DCC and TCFT New Aquatic Facility

Dear Jinty,

Your response below is not acceptable to me as an elected representative.
Your being ‘comfortable’ is no reason to assume Council decision-making status.
Who is this executive that you speak of who are apparently authorised to trump Council decisions as you would have them?
If you insist on acting beyond Council resolutions, I will have little alternative but to go public.

Regards,
Cr. Lee Vandervis

———————————

On 6/08/15 10:43 AM, “Jinty MacTavish” wrote:

Kia ora Lee,

Many thanks for your feedback. You raise two concerns:

A. Specific wording of paragraph.

Council’s resolution at LTP time included the following:

“That the Council agree to:
1 support in principle the development of a new aquatic facility complex for Dunedin in Mosgiel.”

The executive’s view is that the that the phrase “new aquatic facility complex” covers everything from a refurbishment of the existing (which is the base level of service required for the aging, arguably beyond useful life, asset), with “efficient” recognising the whole of life cost associated with any option. In the context of there having been a lengthy discussions between staff and the Trust to get to the point where both parties are comfortable with the wording, and given our executive’s interpretation, I am comfortable that the paragraph allows for a wide range of outcomes. A range of options will be brought back to Council in October for consideration and a decision on which to progress to detailed design with.

B. Sign off process

The sign-off on this document was delegated to chair C&E by a resolution of the Committee.
Jinty MacTavish

{Phone number deleted. -Eds}

———————————

On 6/08/2015, at 9:31 am, Lee Vandervis wrote:

Re: MOU DCC and TCFT New Aquatic Facility
Dear Jinty,

The Intent paragraph of the proposed MOU is unacceptable to me in its present form.

“The intent of the parties is to give effect to a Community/Council partnership for the development of a new Aquatic Facility Complex for Dunedin in Mosgiel in accordance with the LTP resolutions referred to in paragraph 3.4 and with the object of Council delivering an efficient modern complex that caters for all sectors of the community.”

These are weasel words which can easily be understood to mean that Council has resolved to deliver an efficient modern Aquatic Facility Complex in Mosgiel when I do not believe Council has made such a resolution. My understanding is that despite the absurdly arrived at $6 million ‘placeholder budget’, Council has asked that the Aquatic complex in Mosgiel be thoroughly mutually investigated, and that Council has not decided to give effect to the development, as stated above.

I strongly object to any such MOU INTENT being signed off by you or anybody else, and I am deeply concerned by process irregularities and the unprecedented fast-tracking of this project past many others that have been long awaited, the South Dunedin Library/Community Complex in particular.

The INTENT as I understand it, is for the parties to give effect to a Community/Council partnership to further EXPLORE the development detail of a new Aquatic Facility Complex for Dunedin in Mosgiel in accordance with the LTP resolutions referred to in paragraph 3.4 and with the object of Council then being able to decide whether it can or wishes to deliver an efficient modern complex that caters for all sectors of the community.”

Regards,
Cr. Lee Vandervis

———————————

On 5/08/15 10:20 AM, “Jinty MacTavish” wrote:

Kia ora koutou,
Please find attached a copy of a draft MOU between the DCC and the Taieri Community Facilities Trust. As it stands, both staff and the Trust are supportive of the document. As per the Council resolution, I’ve been asked to sign it off as C&E chair but would value any feedback from you before close of business tomorrow should you have concerns.
Thanks very much,
Jinty

—— End of Forwarded Message

[ends]

Related Posts and Comments:
24.7.15 Hands off Mosgiel Memorial Gardens
● 23.7.15 Dunedin ratepayers —Green Island best site for city pool users…
● 22.7.15 DCC Long Term Plan 2015/16 – 2024/25
● 19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
17.5.15 Cr Vandervis on DCC project budgets
● 4.5.15 DCC: Draft LTP matter —‘Unfunded Mosgiel Aquatic Facilities’
● 7.5.15 DCC Draft LTP 2015/16-2024/25 —public submissions online
● 12.4.15 Mosgiel pool trust calls on Dunedin ratepayers to fund distant complex
1.4.15 ‘Pooling Together’ (TCFT) loses chairman, resigns [see Wanaka pool]
28.3.15 DCC Draft LTP 2015/16 to 2024/25 —CONSULTATION OPEN
25.3.15 DCC Long Term Plan: Green-dyed chickens home to roost
11.3.15 Mosgiel pool trust PLAINLY hasn’t got ‘$7.5M community support’
● 6.3.15 Propaganda from trust for Taieri pool project #Mosgiel
● 2.3.15 DCC: Mosgiel Pool private workshop Tuesday (tomorrow) [renders]
● 20.2.15 Taieri Aquatic Centre: 2nd try for SECRET meeting —hosted by Mayor
● 13.2.15 ‘Taieri Aquatic Centre’, email from M. Stedman via B. Feather
● 10.2.15 Dunedin City Councillors invited to Secret Meeting #Mosgiel
14.1.15 DCC Draft Long Term Plan: more inanity from Cull’s crew pending
11.10.14 New Mosgiel Pool trust declared —(ready to r**t)
23.7.14 Mosgiel Pool: Taieri Times, ODT…. mmm #mates
16.7.14 Stadium: Exploiting CST model for new Mosgiel Pool #GOBs
● 4.2.14 DCC: Mosgiel Pool, closed-door parallels with stadium project…
30.1.14 DCC broke → More PPPs to line private pockets and stuff ratepayers
20.1.14 DCC Draft Annual Plan 2014/15 [see this comment & ff]
16.11.13 Community board (Mosgiel-Taieri) clandestine meetings
25.1.12 Waipori Fund – inane thinkings from a councillor
19.5.10 DScene – Public libraries, Hillside Workshops, stadium, pools
12.4.10 High-performance training pool at stadium?

Posted by Elizabeth Kerr

36 Comments

Filed under Architecture, Business, COC (Otago), Construction, DCC, DCHL, DCTL, Democracy, Design, Economics, Hot air, Name, New Zealand, OAG, ORFU, People, Politics, Pools, Project management, Property, Site, Sport, Stadiums, Town planning, Urban design, What stadium

Code of Conduct show trial

Updated post
Fri, 27 Nov 2015 at 11:17 p.m.

Recently, Daaave Cull – he who cannot keep a true and proper Council minute record (as the Ch39 videos demonstrate) – ran an evil-illegal ultra vires punitive Code of Conduct campaign against Cr Lee Vandervis.

code of conduct cartoon (30-6-15)Mad Hatter 30.6.15 [click to enlarge]

Douglas Field Republished Aug 17, 2016
Mad Hatter’s ‘Show Trial’ of Lee Vandervis revised 10 7 15

Posted by Elizabeth Kerr

4 Comments

Filed under Business, Citifleet, DCC, Democracy, Design, Economics, Events, Name, New Zealand, OAG, People, Pics, Police, Politics, Project management, Property, SFO

Cr Vandervis replies to local newspaper

Updated post Sun, 26 Apr 2015 at 2:44 p.m.

Meeting of the Dunedin City Council on Tuesday, 28 April 2015 at 1:00 PM, Council Chamber, Municipal Chambers

Agenda – Council – 28/04/2015 (PDF, 96.6 KB)

Report – Council – 28/04/2015 (PDF, 172.7 KB)
Conduct Committee Report to Council

Updated post Sat, 25 Apr 2015 at 3:00 a.m.

From: Lee Vandervis
Sent: ‎Friday‎, ‎24‎ ‎April‎ ‎2015 ‎9‎:‎02‎ ‎p.m.
To: Chris Morris [ODT], Nicholas George S Smith [ODT]
Cc: Elizabeth Kerr
Subject: Follow-up questions

Dear Mr Morris,

There are serious DCC issues underpinning the Code of Conduct process.

DCC Bureaucracy has run many months of self-investigations costing quarter of a million dollars, which this Councillor has not been allowed to see the results of.

Unbelievable claims that the acknowledged $1.6++ million worth of fraud was all perpetrated by one man only, now dead.

Months of Police investigation leading nowhere, with no prosecutions because they only looked at missing vehicles and anticipated that all receivers had to say was they thought the dead man had authority to sell in the way he did. And they all did. This despite many assurances from CEO Bidrose to me from the beginning that there would be a full and wide investigation.

My requests to the Serious Fraud Office [including discussion of 3 year plus investigation of Landfill frauds by local Police] to do the job local Police are seem not to be up to. CEO Bidrose claims SFO had been asked to investigate but SFO have no knowledge of this when I ask them to investigate.

Police investigation only claimed to be widened by Police management after my exposing of their very narrow investigation. Still no prosecutions, or Police interest to date in my offered evidence of Citifleet maintenance contract fraud, credit card fraud etc.

Mayor Cull and CEO Bidrose saying that no public comment allowed while investigations ongoing, but commenting themselves that it was all down to just one man and that the public can have confidence in the living remainder of the DCC organisation.

Mayor Cull accepting non-confirming [devoid of any evidence] Conduct complaints against me.
Crs. Thomson and Staynes add tampered evidence to one of their complaints but not the other – both immediately accepted again by Mayor Cull.

Mayor Cull falsely claims it is within his authority to choose the membership of the Code of Conduct committee against me. Is defeated.
Mayor Cull chooses again, this time with majority Councillor rubber stamp.

CEO Bidrose fails to ensure proper meeting and Code of Conduct processes over many weeks, fails to read my related email, finally culminating in hallway loudness. My full apology should have been printed and still should.

Audit and Risk committee fails to address major DCC problem of contract fraud, identifying 17 types of fraud but not including contract or tender fraud which I have been complaining of repeatedly.
Audit and Risk chair refuses ultra vires to allow any discussion or debate on 40 page pivotal financial report confirmed agenda item which I had previously indicated in the meeting I wanted to speak to.
Cr. Calvert also wished to speak to it but the Chair abused her authority and shut it down. This along with a history of other A&R suppression was the cause of this loudness and my final exit from this committee.

These are all real issues with stories you should be interested in Mr Morris, but instead you bypass the reasons “Whatever the reasons for your frustration…” miss the important issues and ask 5 inane questions about my behaviour.
These are the actions of a gossip columnist, not a reporter.

Cr. Vandervis

{Draft text deleted at Cr Vandervis’s request. -Eds}

On 24/04/15 4:11 PM, “Chris Morris” wrote:

Lee,

I’m following up on this morning’s story. I tried to include as much as I could of your comments, where they addressed the issues being raised in the conduct committee’s report, but I’d still far rather talk through it all point by point, in detail.

Failing that, can you respond to these specific questions about where to from here:

1. Whatever the reasons for your frustration, do you now accept that your behaviour (as reported by witnesses in the report) was bullying, aggressive and intimidating and included swearing (which you initially denied)?

2. If you do, what changes (if any) will you make to modify your behaviour, other than the previously mentioned plan to raise concerns with council staff only by email?

3. What is your reaction to the comments by Richard Thomson, who said your approach was counter-productive and your talents wasted?

4. What is your reaction to the comments by Cr Thomson and others suggesting a genuine apology might be the best way forward? Will you consider this, or do you plan to offer one at Tuesday’s meeting or at any other time, or do you maintain that you have already offered one?

5. Do you think your behaviour (as described in 1) is in any way appropriate for an elected public representative? If not, and given the limited sanctions available to the council, will you be considering your position, including whether or not you should resign?

Chris.

SICK QUOTES
—care of whatifdunedin

Richard Thomson Facebook - ODT 24.4.15 Cr Thomson on Cr Vandervis 1Mayor Cull on Cr Vandervis - ODT 24.4.15

ODT articles:
Penalty urged for Vandervis
Voting rights loss ‘punishing wrong people’

█ For more, enter the terms *vandervis*, *cull*, *bidrose*, *citifleet* or *deloitte* in the search box at right.

Posted by Elizabeth Kerr

33 Comments

Filed under Business, Citifleet, DCC, Democracy, Economics, Media, Name, New Zealand, OAG, People, Police, Politics, Project management, Property, SFO

DCC re Dr Bidrose’s time as most senior Citifleet Manager

From: Sandy Graham
Sent: ‎Friday‎, ‎24‎ ‎April‎ ‎2015 ‎4‎:‎16‎ ‎p.m.
To: Lee Vandervis
Cc: Sue Bidrose, Elizabeth Kerr
Subject: RE: Overestimation of Dr. Bidrose’s time as most senior Citifleet Manager

Dear Lee

Please find attached the information you have requested about the responsibilities of Dr Bidrose.
It took a few days to collate as I wanted to ensure accuracy.

The information will also be forwarded to all Councillors for their information.

Regards
Sandy

[click to enlarge]

Sue Bidrose - timeline of managerial responsibilities 2010 - 2013 [screenshot]

█ Download: SUE BIDROSE RESPONSIBILITIES (PDF, 16 KB)

————

From: Sandy Graham
Sent: Friday, 17 April 2015 8:45 p.m.
To: Lee Vandervis
Cc: Sandy Graham; Sue Bidrose; Elizabeth Kerr
Subject: Re: Overestimation of Dr. Bidrose’s time as most senior Citifleet Manager

Dear Lee

I will get this information on my return to work on Monday.

Regards
Sandy

Group Manager Corporate Services
Dunedin City Council

————

On 17/04/2015, at 4:12 pm, Lee Vandervis wrote:

Dear Sandy and Sue,

Thank you for correcting my overestimation of the time Sue was senior manager of Citifleet prior to becoming DCC CEO.
I sincerely apologise for my inaccuracy.
To avoid future inaccuracy on my part, can you please clarify which departments Sue was in a managerial position over and for what periods in the years Sue was at the DCC prior to be coming our CEO.

Kind regards,
Lee

The overestimation was made in Cr Vandervis’s open letter found at the highlighted link below (15.4.15). -Eds

█ For more, enter the terms *vandervis*, *cull*, *bidrose*, *citifleet* or *deloitte* in the search box at right.

Posted by Elizabeth Kerr

Leave a comment

Filed under Business, Citifleet, DCC, Democracy, Economics, Name, New Zealand, OAG, People, Police, Politics, Project management, Property, SFO

DCC severely FAILS councillor #naturaljustice #contempt

Updated post Sun, 26 Apr 2015 at 2:45 p.m.

Meeting of the Dunedin City Council on Tuesday, 28 April 2015 at 1:00 PM, Council Chamber, Municipal Chambers

Agenda – Council – 28/04/2015 (PDF, 96.6 KB)

Report – Council – 28/04/2015 (PDF, 172.7 KB)
Conduct Committee Report to Council

Received from Lee Vandervis
Thu, 23 Apr 2015 at 6:22 p.m.

█ Message: Your readers may be interested in this email exchange below.

—— Forwarded Message
From: Lee Vandervis
Date: Thu, 23 Apr 2015 15:58:40 +1300
To: Sandy Graham
Cc: Stuart Anderson [University of Otago], Andrew Noone, Andrew Whiley, Chris Staynes, Doug Hall, Hilary Calvert, John Bezett, Jinty MacTavish, Kate Wilson, Mayor Cull, Mike Lord, Neville Peat, Richard Thomson, David Benson-Pope, Aaron Hawkins, Sue Bidrose
Conversation: Code of Conduct public announcement
Subject: Re: Code of Conduct public announcement

This does not answer my governance question Ms Graham, as to why I was not advised that this was coming out.
There has been nothing standard about any of this Code of Conduct process.
Cr. Lee Vandervis

————

On 23/04/15 11:48 AM, “Sandy Graham” wrote:

Dear Councillor

The report formed part of the public agenda that was delivered to all Councillors last night in advance of Tuesday’s meeting.

The media receive a copy of the agenda at the same time as per our standard process.

Regards
Sandy

————

On 23/04/2015, at 10:34 am, Lee Vandervis wrote:

Code of Conduct public announcement
Dear [as in expensive] all,

I have been rung by media this morning wanting my comment on the outcome of the Code of Conduct claims against me.

Nobody has had the decency to inform me of what these outcomes might have been, despite the exceptionally long time the production of these outcomes has taken.

Can anyone advise me why the media seem to have this information well in advance of me, or is it just standard process for a show ‘trial’, in which I have not even been allowed to see 2/3 of the ‘evidence’.

Cr. Lee Vandervis

—— End of Forwarded Message

Received from Lee Vandervis
Thu‎, ‎23‎ ‎Apr‎ ‎2015 at ‎7:12‎ ‎p.m.

Re: Code of Conduct decision

I have sent my response to today’s Code of Conduct decision just sprung on me to you since I can not rely on ODT reporter Chris Morris to accurately present it.
Fortunately most interested parties read your blog anyway.

I am innocent of the Code of Conduct claim that I have misled the non-pubic Audit and Risk committee regarding the Citifleet fraud investigations.
The guilt lies with those DCC staff and some elected representatives who for years failed to act on my Citifleet fraud and other whistle-blowing allegations despite the DCC records evidence available to them. Some of this evidence has recently emerged in the Deloitte reports which I continue to seek.
If my allegations and evidence had been appropriately acted on, many matters of grave concern would have been dealt with when the record shows I raised them as early as 2011.
DCC staff refusal even now to let me see the full main unredacted Deloitte Citifleet Fraud report, or the Deloitte staff report, or the digitised relevant DCC records evidence, further increases my suspicion of a cover-up.
Questions regarding the role of new DCC CEO Bidrose as senior manager of Citifleet prior to becoming CEO, and of what she knew of my allegations in the years prior are some of the many questions yet to be answered.

What has been shown is that the Police investigation was certainly very narrowed up until my complaint of this narrowing to CEO Bidrose and the Police investigating officer, some six months after the Citifleet manager’s sudden death. Subsequent claims by Area Commander Jason Guthrie that the investigation has been widened have not been supported by Police following up on the evidence I tried to interest them in: the Citifleet maintenance contract fraud, DCC credit card use fraud, etc. or by any convictions, or other widened investigation action that has been visible to me.

The two loudness claims, evidence of which I have not been allowed to see and therefore defend, both come back to the shutting down of the wider DCC contract fraud debate, and the resulting multiple abuses of Code of Conduct process to try and shut me down.

The four prescribed penalties suggested in the Code of Conduct report are:

1 -Censure
– the Mayor has already done this on pubic and non-public occasions.

2 -Request Apology
– I already apologised for loudness at the time

3 -Suspension of voting right only in Committees, not Council
– abuse of my representative function, but a wet bus ticket given my continuing right to debate

4 -Dismissal from positions of Deputy Mayor, Chairperson or deputy chairperson of a committee
– Mayor Cull already did this at the beginning of the triennium.

The Mayor’s recommended members of the Code of Conduct Committee have run an expensive Kangaroo Court with only my loss of two months committee voting rights to be recommended. It will be interesting to see if enough Councillors will vote for that.
It will also be interesting to see what the voting public think – do they want wide investigation and full disclosure or do they just prefer good news stories from the DCC.

Kind regards,
Cr. Vandervis

Received from Lee Vandervis
Thu, 23 Apr 2015 at 7:17 p.m.

—— Forwarded Message
From: Lee Vandervis
Date: Thu, 23 Apr 2015 19:15:55 +1300
To: Chris Morris [ODT], Nicholas George S Smith [ODT]
Conversation: Code of conduct report
Subject: Re: Code of conduct report

Chris,

I have sent my response to the What If site, as I can not rely on you to accurately present it.

I was out last night, and the first I heard of the Code of Conduct decision today was radio media wanting comment.

Cheers,
Lee

————

On 23/04/15 3:34 PM, “Chris Morris” [ODT] wrote:

Lee,

I’ve sent you a text with a very basic outline of the key findings. Happy to hear from you at any time today or tonight for a detailed response once you’ve read the report in full. I understand it was hand-delivered to your house last night.

Cheers,

Chris.

—— End of Forwarded Message

Related Posts and Comments:
15.4.15 Cr Lee Vandervis: Open Letter to the DCC Code of Conduct Committee
18.3.15 Lee Vandervis releases emails #Citifleet investigation
17.3.15 DCC whistleblowing —what is open government ?
13.3.15 Cr Lee Vandervis: LGOIMA…. Citifleet Investigation – Deloitte Report
26.2.15 DCC and the day(s) of Madness
23.2.15 Lee Vandervis on DCC Code of Conduct process #emails #naturaljustice
15.2.15 DCC…. ‘CEO Bidrose confirms no Vandervis complaint with a hug’
6.2.15 Cr Lee Vandervis apology
5.1.15 DCC: Chairman denies true and correct Council record
19.12.14 Vandervis: Deloitte and Police Citifleet investigations
19.12.14 DCC Citifleet by email . . . . woops! (another timeline proof)
18.12.14 DCC: Deloitte report released on Citifleet #whitewash
24.10.14 DCC Citifleet, more revelations….
21.10.14 DCC Citifleet, undetectable….
1.9.14 DCC Fraud: Further official information in reply to Cr Vandervis
30.8.14 DCC Fraud: Cr Vandervis states urgent need for facts….

█ For more, enter the terms *vandervis*, *cull*, *bidrose*, *citifleet* or *deloitte* in the search box at right.

Posted by Elizabeth Kerr

35 Comments

Filed under Business, Citifleet, DCC, Democracy, Economics, Name, New Zealand, OAG, People, Police, Politics, Project management, Property, SFO

Cr Lee Vandervis: Open Letter to the DCC Code of Conduct Committee

Updated post Fri, 17 Apr 2015 at 6:45 p.m.
Correspondence from Lee Vandervis in reply to Sandy Graham and Sue Bidrose; and forwarded note to Code of Conduct Committee – entered below last update to post.

Updated post Fri, 17 Apr 2015 at 1:46 p.m.
Correction received by email from Sandy Graham, DCC General Manager Corporate Services entered below Open Letter.

Received Wed, 15 Apr 2015 at 11:24 a.m.

█ Message: I have forwarded this Open Letter to the DCC Code of Conduct Committee in an attempt to debunk the many misleading claims around the DCC Citifleet fraud investigations.
I am happy to provide supporting email evidence for anything stated below that your readers may find questionable.
Cr. Vandervis

—— Forwarded Message
From: Lee Vandervis
Date: Sun, 12 Apr 2015 22:48:00 +1300
To: John Bezett, David Benson-Pope, Stuart Anderson
Conversation: OPEN LETTER TO THE DCC CODE OF CONDUCT COMMITTEE
Subject: OPEN LETTER TO THE DCC CODE OF CONDUCT COMMITTEE

OPEN LETTER TO THE DCC CODE OF CONDUCT COMMITTEE

Dear Sirs,

Three separate Code of Conduct issues have been raised against me this year following my Code of Conduct complaint against Mayor Cull which Deputy Mayor Staynes decided, without giving his reasons to me, not to refer to you.
There has been an uncomfortable mix of assertions and facts in the limited evidence that has been presented regarding the claim that I misled over Citifleet investigations, which I would like you to consider.

Provable facts include my long mostly non-public attempts to clean out dysfunctional management at the DCC since I was first elected in 2004. Partial success keeps me going.
I never expected whistle blowing to be popular, but neither did I expect such personal attacks for my trouble on behalf of our ratepayers.

Regarding the Citifleet frauds, my records show my many 2011 complaints to senior DCC management of: inappropriate DCC vehicle disposal, Citifleet manager selling vehicles to himself, credit card fraud, vehicle maintenance tender fraud, and tyre fraud are all well documented.
What is equally clear is that nothing was done to seriously investigate these complaints which all turned out to have substance until almost 3 years later when the Citifleet manager’s ‘sudden death’ resulted in new CEO Sue Bidrose ordering the DCC accountants Deloittes to investigate.
Dr. Sue Bidrose had been the most senior manager in charge of Citifleet and many other DCC departments prior to becoming CEO. It is my view that whatever evidence she might have given is not only inadmissible in terms of process because I had not been advised in advance of her evidence or her intention to give evidence, but that Dr. Bidrose is compromised because of her years as the senior manager of Citifleet prior to the Citifleet manager’s sudden death.

In the month following the Citifleet manager’s sudden death I repeatedly urged CEO Bidrose and head of Governance Sandy Graham to resist the temptation to minimize the frauds’ fallout by narrowing the investigation or by blaming it all on the dead manager. Although later admitting that the initial request for investigation related mainly to missing vehicles, CEO Bidrose gave me assurances from the beginning that Deloittes and then later Police would conduct a wide investigation. This provably did not happen with the Police, and I have no evidence other than yet another management assurance that it has or will really happen.

CEO Bidrose also gave me assurances from the beginning of the investigations that if I could provide hard evidence of DCC staff stealing even one dollar she would ensure prosecutions followed. Unfortunately the DCC records evidence which I have sought to complete hard evidence cases against both DCC staff and those involved outside the DCC has been denied me by CEO Bidrose, despite my making LGOIMA requests for it last year, namely: both the full unredacted Deloittes report, the Deloittes staff report, and the digitised evidential files which Deloittes collated for their investigation.
In that month following the Citifleet manager’s death I became very concerned when CEO Bidrose did not achieve a proper Police investigation apparently ‘because Police lacked the resources’, and that only the accounting investigation by Deloittes was to take place. I was relieved that Deloittes’ investigator Kyle Cameron seemed to have a good grasp of the many Citifleet complaints that had been made to me during his detailed interview of me, and that subsequent to the Deloitte reports Police were to investigate fully after all.
My concerns about Police having a belated investigation three months later are recorded, as are my concerns that Police requested that no public statements be made about Citifleet while their belated investigation was in progress. This despite Mayoral and CEO public statements that the Citifleet frauds were all the work of one now dead man.

I have highlighted with evidence to the SFO and CEO Bidrose the extreme slowness of a previous Dunedin Police investigation into DCC Landfill frauds that took more than three years before one individual was finally prosecuted, and I have written to the Serious Fraud Office unsuccessfully urging them to have an outsider’s independent investigation into the Citifleet frauds because local Police seem unable to do the job. CEO Bidrose claimed that the SFO had been contacted re the Citifleet frauds, but curiously the SFO’s Sara Morris said to me that no request from the DCC to investigate had been received by the SFO prior to my request for them to investigate.

My worst fears for the hoped for DCC investigation were realised when the Police investigating officer Detective Mathew Preece interviewed me at my home six months after the Citifleet manager’s tragic death, in what he described as the last week of his investigation. Detective Preece said that the scope of his investigation was only the missing vehicles and that he had already interviewed all other people he intended to interview. He said that all those he interviewed regarding missing vehicles offered the defence that they thought the deceased Citifleet manager was authorised to dispose of the vehicles in the way that he did, and that subsequently there would be no prosecutions of anybody.
I told Detective Preece that I had received many Citifleet complaints for years regarding not only vehicle disposal but fraudulent Citifleet credit card use, tyre supply, fuel supply, and fraudulent Citifleet maintenance contracts and that I had a motor trade business owner and others prepared to give evidence on these issues.
That night I wrote the following email to CEO Bidrose, Head of Governance Sandy Graham and to Detective Preece voicing my concern at the very limited scope of the investigation, and the investigating officer’s understanding that he could not investigate anything else because he did not have any wider complaint from the DCC to act on.

From: Lee Vandervis
Date: Tue, 11 Nov 2014 22:57:31 +1300
To: Sue Bidrose, Sandy Graham, “PREECE, Matthew”
Conversation: Police Citifleet Investigation
Subject: Police Citifleet Investigation

Dear Sue,

An hour and a half spent with Detective Matthew Preece and another Policeman called Regan has left me with deep concerns regarding the Police Citifleet investigation.
Mr Preece has informed me that the scope of his investigation has been limited by the complaint the DCC has made to the Police, and that this complaint only concerns missing or inappropriately sold DCC vehicles.

Mr Preece says that because Police have not had a complaint from you or the DCC regarding;
– fraudulent Citifleet tender processes,
– fraudulent Citifleet tyre supply contracts,
– fraudulent Citifleet maintenance contracts
– fraudulent use of DCC Citifleet vehicle fuel
– fraudulent DCC accounting of Citifleet credit cards and other payment methods used and Citifleet managerial oversight
– and fraudulent use and conversion of DCC Citifleet vehicles [eg the conversion of a DCC-owned vehicle by Mrs Bachop]

and that consequently none of these fraud areas is being investigated!

Mr Preece did say that if you as CEO were to request that he broaden his investigation to include these other areas and not just the missing cars, that he would broaden his enquiry to include them. He insisted that he would have to have a broadened complaint from you as CEO for this to happen, and implied that a complaint from me as a City Councillor would not be enough to act on.

I have highlighted to Preece and Regan the urgent need to use the Citifleet manager’s tragic death to investigate and prosecute all Citifleet fraud areas, as a failure to do so will result in the loss of an unprecedented opportunity to clean out the culture of entitlement at Citifleet and in other DCC departments.

Can you please with urgency broaden the DCC complaint to include the 6 areas of potential Citifleet fraud listed above, so that Mr Reece can broaden his enquiry to include them.

Can you please also now with urgency, forward to me all instructions to Deloitte regarding the Citifleet investigation as previously requested in my email of 26/10/14 as below.

Is it possible to meet with you at any time tomorrow at your convenience to learn whether you have broadened the DCC Police complaint or not?

Kind regards,
Cr. Lee Vandervis

From: Lee Vandervis
Date: Sun, 26 Oct 2014 18:23:41 +1300
To: Sue Bidrose, Sandy Graham
Conversation: LGOIMA requests
Subject: LGOIMA requests

Hi Sue,

Further to my verbal requests of a week or two ago please forward copies of all original correspondence and or other direction given to Deloittes in regard to their investigation of Citifleet.
I wish to have the original brief stating the terms of reference, the subsequent brief where the investigation needed to be extended, and any other direction written or otherwise given to Deloittes regarding the Citifleet investigation.

I am deeply disturbed by what I have seen in parts of the investigation conclusions appearing without covering page or any details identifying them as parts of the Deloitte findings in non-public parts of the Audit and Risk subcommittee meetings.

I note a severe slowing on responses to my recent LGOIMA requests, and hope this has been a temporary frustration.

Kind regards,
Cr. Lee Vandervis

Subsequent email from Police Area Commander Guthrie claimed as follows:

From: GUTHRIE, Jason [mailto:Jason.Guthrie@police.govt.nz]
Sent: Saturday, 15 November 2014 10:48 a.m.
To: Sue Bidrose
Cc: COSTER, Andrew; INGLIS, Malcolm
Subject: RE: Investigation Update

Hi Sue.

I can confirm that DCC staff did not (and have not) in any way attempted to restrict, curtail, or limit the scope of the Police investigation stemming from the Deloitte report either at the 1 September meeting or at any other time.

At no stage has any undue influence been exerted by DCC staff on Police as to what should be investigated and what should not be investigated.

At the 1 September meeting it was agreed that the focus of the enquiry would be limited to activity around the 152 vehicles as this was considered to be the most likely aspect to potentially lead to a criminal prosecution.

To avoid any confusion, from the outset the Dunedin City Council has been clear in it’s desire that Police investigate matters arising from the Deloitte report independently, fully, and thoroughly as Police sees fit. The DCC has also been very clear in it’s desire that if any individual(s) are identified as being involved in criminal activity linked to the matters within the Deloitte report that those people be held accountable for that criminal activity.

I hope this clarifies the situation.

If you have any further questions please do not hesitate to contact me directly.

regards Jason.

Inspector Jason Guthrie
Area Commander | Dunedin Clutha Waitaki | New Zealand Police

Dunedin Central Police Station, 25 Great King St, Private Bag 1924, Dunedin, www. police.govt.nz
Safer Communities Together

Area Commander Guthrie’s response above says that “DCC staff did not (and have not) in any way attempted to restrict…the Police investigation”, but then goes on to say that …”it was agreed that the focus of the enquiry would be limited to activity around the 152 vehicles…”!

Commander Guthrie’s subsequent claim that the Police investigation would be widened has thus far failed to result in my being contacted to provide the further evidence I have already tried to give Detective Preece regarding credit card fraud, vehicle maintenance contract fraud etc. The lack of any prosecutions after so much time adds to my concern.
This seems to me to be another example of management claiming one thing but investigating officers doing another.

I am yet to be convinced either by Police taking an interest in my offered evidence or by any Citifleet related Police prosecutions that a serious Police investigation has really been effectively widened despite stated intention to widen, even at this now very late stage. I do not dispute Police management intentions, but see them as quite different to actual Police investigating actions, which seem to me to be more interested in sidelining me as a critic of their investigation than getting to the bottom of Citifleet fraud.

Regarding the two other loudness Code of Conduct claimed complaints, I do not recognise them and I remain far from content that CEO Bidrose and Cr McTavish at least have made ‘loudness’ statements to your Code of Conduct Committee [Cr. McTavish read hers] but not provided these statements to me in advance so that I could defend them. I see these loudness complaints as politically motivated attempts to ambush me outside of proper Code of Conduct process, and I do not accept that they can have any force.
The two staff that might have had reason to complain of my loudness, namely CEO Bidrose and Sandy Graham, have made no complaint and both have independently assured me that they did not make any complaint, CEO Bidrose with a hug, and Sandy Graham with an eye-roll.

I particularly resent the swearing allegation that no Councillor has admitted to claiming, despite Mayor Cull’s publicly repeatedly saying in the ODT that my swearing had been claimed by a Councillor. I note the irony that when Code of Conduct complaining Cr. Thomson left an earlier Audit and Risk meeting in a huff using the ‘F word’, that no complaint was forthcoming from anybody.

I take this opportunity to register my complaints regarding the running of this Conduct hearing.
1 – That the loudness complaints should never have been recognised as complying by the Committee for want of evidence.
2 – That I was not permitted to record the public part of the hearing in which I spoke, but that Media were allowed to take short-hand and thus given the opportunity to misquote me with impunity.
3 – That no reason was given when asked for, for not being able to record the pubic hearing.
4 – That parts of the hearing evidence were in public, but that apparently some evidence parts were non-public.
5 – that I have been given an extract only from your draft report, on grey paper marked confidential, ensuring that I can not as a result comment on it. The claim that “This is to ensure that the principles of natural justice and due process are observed.” is absurd, given that natural justice and due process have been absent throughout.

Looking forward to having this wasteful exercise in enmity drawn to a conclusion.
Cr. Lee Vandervis

—— End of Forwarded Message

[ends]

*Email addresses, phone numbers and web links removed. The company referred to above is “Deloitte”. The councillor surname is “MacTavish”. -Eds

CORRECTION

From: Sandy Graham [DCC]
Sent: ‎Friday‎, ‎17‎ ‎April‎ ‎2015 ‎1‎:‎31‎ ‎p.m.
To: Elizabeth Kerr [What if? Dunedin]
Subject: Correction

Dear Elizabeth

As discussed, I wish to correct a statement made by Cr Vandervis in his “Open letter to the Conduct Committee” which is published on your website.

The statement that the CEO Sue Bidrose had “years as the senior manager of Citifleet prior to the Citifleet manager’s sudden death” is incorrect. Sue had Regulatory Services (which included Citifleet, Building Control, Environmental Health, Parking Services) added to her General Manager portfolio for less than five months in 2013, immediately prior to being appointed CEO. This is clearly not “years” and needs correcting. Cr Vandervis’ assertions that Sue’s evidence to the Conduct Committee was therefore compromised is not supported by the facts.

Regards

Sandy

Sandy Graham
Group Manager Corporate Services
Dunedin City Council

—— Forwarded Message
From: Lee Vandervis
Sent: ‎Friday‎, ‎17‎ ‎April‎ ‎2015 ‎5‎:‎01‎ ‎p.m.
To: John Bezett, David Benson-Pope, Stuart Anderson
Subject: FW: Overestimation of Dr. Bidrose’s time as most senior Citifleet

Dear Code of Conduct Committee,

Please accept my apology for ignorantly overstating the length of time Dr Bidrose was most senior manager of Citifleet prior to becoming our CEO.
‘Years’ should read ‘5 months as the senior manager of Citifleet and then 6 months as CEO’ prior to the Citifleet manager’s sudden death.

Kind regards,
Cr Lee Vandervis

—— Forwarded Message
From: Lee Vandervis
Date: Fri, 17 Apr 2015 16:12:33 +1300
To: Sandy Graham, Sue Bidrose
Cc: Elizabeth Kerr [What if? Dunedin]
Conversation: Overestimation of Dr. Bidrose’s time as most senior Citifleet Manager
Subject: Overestimation of Dr. Bidrose’s time as most senior Citifleet Manager

Dear Sandy and Sue,

Thank you for correcting my overestimation of the time Sue was senior manager of Citifleet prior to becoming DCC CEO.
I sincerely apologise for my inaccuracy.
To avoid future inaccuracy on my part, can you please clarify which departments Sue was in a managerial position over and for what periods in the years Sue was at the DCC prior to be coming our CEO.

Kind regards,
Lee

—— End of Forwarded Message
—— End of Forwarded Message

█ For more, enter the terms *vandervis*, *cull*, *bidrose*, *citifleet* or *deloitte* in the search box at right.

Posted by Elizabeth Kerr

68 Comments

Filed under Citifleet, DCC, Democracy, Name, New Zealand, People, Police, Politics