Tag Archives: Sense of Place

Apartment hotel proposal has FATAL Flaws : ODT offers Flimsy Poll

Updated post.
Tue, 7 Aug 2017 at 2:58 p.m.

We (Dunedin) are confronted by a poorly detailed, plonk-down apartment building proposal that we suspect is fronted by an agent for Asian developers –it would not be unusual for such a proposal to be offered on the strength of tainted money looking for safe haven in the South Pacific.

Our gullible country.
The gullible shiny pants Grow Dunedin partnership.
Our ever so gullible city council under the leadership of cull-cat Cull.

A massively over-height apartment building with a frilly hard-to-read podium base is proposed —a building that may never see a five star hotel as the anchor tenant (never believe unquantified/unqualified pitches from used car salesmen, if all they offer is a Price plucked from the air).

Not so long ago large tracts of New Zealand land were bought and sold for glass beads and muskets.

A lot can happen between resource consent being granted and a deathly, failing, improperly costed build.

Is Dunedin City Council about to find out.

Beware the gift horse.
It turned out Dunedin disliked the hocks of the last one (41 Wharf St), ridden by a little cardigan-wearer. The local suits were paid to make the waterfront tower seem generous, rousing and necessary. Ha-haaa.

At ALL times, the Dunedin City Council MUST stay acutely awake despite its needful dependence on independent commissioners and independent professional advisors – the latter advisors, along with some council staff, appear to have greatly missed the Fact that the minimal concept plans presented for 143-193 Moray Place DO NOT provide a workable building; or a building compliant with district plan objectives, policies, rules, and anticipated environmental results ….or prevailing traffic standards.

Oh dear. ‘So much’ [$$$] for the independent advice. Yes, expensive use of expert and staff time to massage the applicant dream – to no convincing or winning effect.

Further, Dunedin City Council MUST be prepared to APPEAL the outcome of the decision-making process should it wish to AVOID being left with another expensive DEBT VEHICLE in the form of one unfinished and or leaky building …..as the collapsed companies, and dusty heels of run-away developers and construction personnel disappear back to Asian shores, far away from Lake Tekapo ….. dangerously constructed, whole or in part, as a further burden on beleaguered Ratepayers of this fair city.

“What a stupid thing to assume!” you thunder.
“How? On what grounds?”, you chide.
“Dunedin NEEDS a five star hotel!”, imperiously.

You think it’s that simple ??
You’re about to be done over, Buds.

The inference being, oh great apartment hotel supporters, that all that glistens in green-tinted glass is gold, or might be a five star hotel. Yeah right.

It never was. The gold, I mean.
The five star hotel, I mean.
A hoover-up of NZ cash to offshore parties who remain anonymous throughout planning and consenting, and construction and building operation; all supported by the errant notion of immigrant labour and (imperfect) imported materials.

You might as well ask now, How MUCH will the Dunedin economy make ($$$) on this “slap in the face” to the community owned district plan (statutory), and the (strategic) spatial and the central city plans which are publicly consulted policy directions informing the city council’s annual and long term plans.

Not much.

****

During five days of evidence and submissions, one knowledgeable submitter, Mr Russell Lund – well up on construction management, hotel building costs, the visitor accommodation market and investment patterns, and the risk and liability to local authorities in consequence – carefully outlined the quandaries which for various councils around New Zealand have become money-losing Unalterable Fact.

In the original written submission for himself and Suzanne Lund (affected property owners), Mr Lund asserted:

The “assessment of effects” is hollow and of no substance. Under the Act, the assessment of effects is required to be just that, an assessment of effects on the affected properties and tenants. Incredibly, the assessment makes no attempt to examine the effects on all the affected parties.

This, of course, is echoed in independently written and voiced submissions by many opposing the application; and curiously, it is underlined in evidence given by Mr Don Anderson (planning consultant) and Mr David Compton-Moen (urban design, visual amenity consultant), for the applicant.

My own submission to hearing states:

We can’t take what is offered [from the applicant] on trust, because it is incomplete and imprecise; therefore the assessment of effects is difficult to pin down to anything concrete and remains unhelpfully superficial – this was “the work” the applicant was to table for us, we thought, to generously persuade us that moving beyond the ‘norms’ of height in this Dunedin location has measurable benefits against other sites or, through strong honest examination of design alternatives for this site.

I am open to being persuaded. It is expensive to do that persuading. However, it has to happen in other city centres in this country. For an expensive building, isn’t it worth doing the budgeting for preparation of your case – to get the result you want, which is consent to subdivide and build. These are open questions but they lie at the heart of A for architecture as the practical art and science of building economics and professional practice. Behind and in front of the commercial facades, that must have depth of delivery. […] And so I come to the white building model here [a 3D-printed solid plastic model of the proposed building, of hand-held size, put into evidence by Christchurch architect Thom Craig], and the drawings presented by the applicant. There appears to have been too much time spent on merely diagrammatic ‘entreaties’ to architectural form and texture without hacking into 3D investigation. There is not one clear drawing of the way the podium can work for the public or the ‘retailers’ or ‘exhibitors’ – or indeed the people staying at the hotel, servicing the building functions and or using vehicles on site. We get an idea ‘about it’, a not convincing one, there is too much guesswork to do. And so the commissioners’ questions have been rather intense.

****

Now, back to the points the Lunds are making. In their original submission on the application, Mr Lund says:

7. I have serious concerns about the expertise and amount of resource that has gone into assessing the feasibility of the project. In the last year, the Otago Daily Times advised the developer, Mr Tosswill of Horizon Hospitality, had indicated that the cost of the project, which was then 200 rooms and 52 apartments was $50-75M. The proposal now is for 210 rooms and 66 apartments, which is not substantially different. The car parking and front of house areas are similar to the original application. The application confirms the hotel has a gross floor area of 20,835 m2.
In my opinion this hotel will be not built for anything less than around $100M, and this casts serious doubts over the viability of the scheme.
Evidence of this is found for the building costs of the much simpler 200 room 4 star Novotel Hotel being built at Christchurch airport after a competitive tender process (and utilising an Asian fabricated structural steel structure). It is well known in the building industry that the tender costs received for that very regular and efficient 7 level hotel were $4,500-5,000 per m2. The Novotel is a filing cabinet design, that is, it is a completely regular rectangular structure which provides the most efficient floorplates and the best wall to floor ratio, ie the least amount of exterior wall enclosing the maximum possible amount of interior space. The Novotel has no balconies.
The applicant’s proposal is far less efficient, and therefore more costly per m2, as it is effectively three blocks grouped around a central core, but the blocks themselves are not rectangular, but have recesses, and there is a significant amount of extra cost with most rooms having screened “smokers” balconies, which entails effectively, 2 exterior systems, one for the rooms, and another enclosing the balconies.

8. The application confirms there are 16,136 m2 of above ground (habitable or hospitality space) and 4,687 m2 of below ground, back of house / car park space. At a cost of $2,200-2,500 per m2 for the below ground floors, and $5,500 per m2 for the above ground space, the proposal has a construction cost of over $100m, excluding land, furnishings, design marketing, et al. The total budget excluding GST will be around $130M. A feasibility study will typically have to include a development margin of at least 20 %, preferably 25 %, if any sort of lender is involved. This means the end value of the project will need to be at or over $160M. If the best case scenario is adopted and Mr Tosswill is able to convince Chinese or other overseas investors to pay the current market value in Queenstown for premium, new managed hotel rooms and apartments of $10,000 per m2 – for a hotel with an unproven demand in Dunedin, it is still not enough.
Selling all the apartments and hotel rooms will yield about $90M, which is a long, long way from the $160M end value needed. The parking and lower public floor spaces on a yield basis will have a value of around $10M, that might get the project to $100M. Mr Tosswill in earlier reports stated that the value was around $90M, so while there is broad agreement on the likely end value, the estimate of the cost is not close to reality. Mr Tosswill may be planning to bring in a Chinese construction company who will park a retired cruise ship at the waterfront for the duration of the project and have their workers stay there, but they will be subject to the same minimum wage laws, working conditions and health and safety requirements that local companies face, which will dramatically reduce any cost benefit from using overseas labour. (The idea of having a cruise ship accommodating Chinese workers is not fanciful – the Chinese government offered to repair the damaged sections of SH1 after last year’s Kaikoura earthquake using that same method, and did not require any New Zealand labour resources, but the Government decided that this was politically unacceptable). One hopes it would be also unacceptable to have a Council endorsed project built using essentially, forced labour.

9. There is sufficient doubt around the financial viability of the project that the applicant should provide some evidence that the entire scheme is not in fact fanciful, but makes economic sense, and provide details about the proposed ownership model, which is highly relevant to Council, in light of their liability which is discussed below.

10. Mr Tosswill may think he is able to make savings from current building costs by utilising Chinese products, but many Local Authorities around New Zealand are very wary of various untested products as there have been many failures for which Local Authorities ultimately end up bearing the cost of.
This raises another issue which is the massive liability that the building control division of the Dunedin City Council will be exposed to, in relation to its building consent approval and compliance monitoring. The experience of the QLDC in recent years is extremely relevant : A large number of hotel and apartments have been built in Queenstown and the individual hotel rooms and apartments are sold off individually. A body corporate is then responsible for repairs and maintenance. The developer has no long term or permanent stake in the completed structure, and therefore no incentive to specify materials and pay for quality standards with the long term in mind. As Warren Buffet has said, “show me the incentive and I will show you the result”, and the result for QLDC has been an ongoing series of legal actions brought by Body Corporates against Council, alleging that Council was at fault in some form, and as they are the “last man standing”, the Council have inevitably had to pay substantial figures. [I have] experience of several of these, having repaired one major complex in Queenstown at a cost of several million dollars, and provided cost evidence in regard to two others, also in Queenstown in the last year. It should be remembered that QLDC has a 7 metre height limit, but despite this, on complexes less than a quarter of the size of the proposed hotels, the cost to repair has run to millions. QLDC has advised this year in the Otago Daily Times that it has now completely drained its reserve fund for remedial building work, and any further costs will need to come directly from ratepayers. It has spent $3.6M just on legal fees for remedial building liability cases, which will rise to close to $4M by the end of this year.

11. At the Hearing, in submission, some proposals will be presented to show how the design liability and weathertightness risk to Council and ratepayers can be mitigated in the unlikely event that the proposal is given consent and such consent is upheld in the Environment Court.

Proposal 1 : A bond be posted with Council to cover sufficient funds to get the building to completed weathertight envelope and have the podium and all external works completed in the event the project is halted.

Proposal 2 : The applicant provide a Owners Protective Professional Indemnity, and have DCC named as an insured party on the policy. This is to protect indemnify the DCC against any claims brought against them in relation the building consent process, compliance monitoring or any matter for which they are liable for.

****

The applicant tabled NEW evidence at the hearing, from Infometrics. At its website, Infometrics (NZ) says it “provides industry, regional, and general economic analysis and forecasts that assist organisations in making their planning, policy, and strategic decisions”.

In the Lunds’ submission to hearing under the subheading ‘Dunedin Hotel Economic Impacts – Ongoing GDP Effects’, Mr Lund says:

….Infometrics assume that the 64 apartments will all be in the hotel pool, but acknowledge this is unclear. This significantly increases the GDP contribution as it raises the income of the hotel by around 40%, assuming conservative tariff rates of $250 per night and $350 per night per apartment. Infometrics also assume that there will be no “crowding out” of the existing activity, ie ALL guests would otherwise have not come to Dunedin had this hotel not been there. This is an unrealistic assumption.
In my opinion this report is an example of tailoring assumptions to achieve the desired outcome.
At Section 2, the “impact” of the construction phase is estimated at $45.6M in total, but based on the “key assumption” that there is capacity in the construction sector to build the hotel without crowding out other investment”. This appears to mean that if other projects are delayed, there is in fact no benefit at all because $63M of other projects will simply be displaced by the alleged $63M cost of this project. History shows that in Dunedin, Clients such as the DCC, University and some private clients keep a close eye on the state of the market. Many Ministry of Education projects have strict cost guidelines, and will not proceed if they are over budget. There have been examples of work deferred in Dunedin when the market is busy, and the Post Office Hotel is one of them. The Owner Mr Geoff Thompson, deferred the construction of the hotel for several years when he first owned the property citing the overheated construction market, due to the construction of the $220M Milton Prison project in 2005-2007.
At the present time, there is a high level of commercial construction activity at present, witnessed by the fact that there are main contractors from outside Dunedin performing the 2 largest projects in Dunedin (The Dental School and the University Science 3 project). There is every likelihood some projects will be delayed due to the high level of activity.
The report assumes that 21.1M of the $63M, or a third of the cost, will flow into the local Dunedin economy. This would be on the basis that local companies and suppliers are employed, but this is far from clear, given the estimated cost of $63M. The only way the cost could be anywhere near this level is if virtually all of the materials were low cost imports, and quite likely a proportion of the labour cost component.
The only significant material that will be made locally is concrete, and it is only the basement levels that will be predominantly a concrete structure. If out of region companies were employed for work to do such trades as painting and carpentry, as they were at the Forsyth Barr stadium, then that figure will not be accurate.
Infometrics then ascribe $16.1M to the “second round of economic effects” but acknowledge there is some “leakage of spending outside the city”. If an outside main contractor, or even an overseas contractor completes the work, they will very likely bring with them their out of town networks of subcontractors and suppliers and there will be much less than the $16.1M as the second round of effects. Having completed many projects out of Dunedin, I have first hand knowledge of the negligible economic effect of construction on the region concerned. Generally, goods and services are sourced from habitual suppliers with whom there is an ongoing relationship, and only the small consumables are sourced from local suppliers.
Mr Tosswill should clarify what the intention is regarding the construction of the hotel, and if that is not forthcoming, then he should at least confirm what type and form of construction contract will be used as that perhaps more than anything will determine whether there is the possibility of a meaningful local business component.

On ‘Construction Cost’, Mr Lund refers the commissioners to the Lunds’ original submission, continuing with:

Further facts about construction
Examples of risk from imported products
FCC (Fletcher) budgeted to use Chinese sourced bathrooms in the Novotel Christchurch projects. Did not work. Has cost FCC $2M extra (unbudgeted) to get prefab bathrooms built locally in Canterbury. The cost is $26,000 per bathroom.
Chinese steel : there are 2 major CBD projects underway in Christchurch that are steel structures using Chinese fabricated steel. On one project the steel is 12 weeks late and on the other it is 16 weeks late. The Chinese suppliers had committed to make the steel, then out-sourced it to another firm without advising the contractor, and the delays have resulted. On one of these projects there is now legal action between the Engineer and contractor because of the nature of the steel does not conform to the specification.
There is a further major dispute litigation on another major project now completed due to extreme delays with the steelwork and external cladding. The project was around 10 months late, and the Owner lost the anchor tenant (The Government) due to the delay. That project was tendered on the basis of using a large degree of imported materials from China in association with a large state run Chinese construction company, but the project was so disastrous (financially and in terms of market perception), involving a loss of 8-15M on a $50M project, it has caused the company to withdraw from large scale commercial construction and focus on project management.
External Cladding : There are only a very small number of NZ firms with the capability to design and build the curtain walling, and they have a huge backlog and extremely onerous business terms that will not be acceptable to any funder or main contractor, so the Owner will probably need to contract with them direct, and take on this risk.

These important matters aside, the legal submissions brought to hearing by Ms Lauren Semple (for Millenium & Copthorne Hotels) and Mr John Hardie (for Misbeary Holdings Ltd) blew the application out of the water; so did the transport evidence to hearing by Mr Andy Carr (for Millenium & Copthorne Hotels) to which Commissioner Mr Stephen Daysh responded by asking if the problems (such as summit points, swept paths, access to basement parking, onsite coach travel, and truck travel as well as loading access) pointed out by Mr Carr in his assessment of the proposed building’s perimeter road were “fatal flaws”? Yes, was the direct reply. Refer article: Traffic problems at hotel (ODT 3.8.17)

The hearing is adjourned until 17 August.

All ODT can do is offer a flimsy and inconsequential readers’ poll.
Not Based On Reality. Go ODT! LOL

█ All application documents, reports, evidence and submissions for 143-193 Moray Place – Non-complying activity – LUC-2017-48 & Sub-2017-26 at this link.

Related Posts and Comments:
● 11.7.17 “Fat” gawky Hotel and Apartment building : Questionable design even with 4 floors lopped off
● 14.5.17 RNZ reports July hearings for proposed hotel apartment building [comments by Mr Tosswill]
● 4.5.17 Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building
● 7.4.17 Proposed hotel *height and design* —the very least of it #sellingoursouls
● 5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

█ The following images are taken from Appendix 6 – Consultant Urban Designer’s Report – Appendix plans (PDF, 1.5 MB).

They comprise
● 2 cross sections – originally provided as applicant evidence by Thom Craig Architects Ltd, and
● 7 photomontages of anticipated views – originally provided as applicant evidence by Paterson Pitts Group (surveying, planning, engineering)

– to which new height levels have been added in the evidence provided by independent Urban Design consultant Garth Falconer for Dunedin City Council.

[click to enlarge]








Advertisements

7 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Events, Finance, Heritage, Hot air, Hotel, Housing, Infrastructure, Media, Name, New Zealand, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Town planning, Transportation, Travesty, Urban design, What stadium

“Fat” gawky Hotel and Apartment building : Questionable design even with 4 floors lopped off

What environmental considerations, Mr Page?

More than minor.

[Everyone will remember the learned Mr Page from the Betterways hotel and apartment building application for 41 Wharf St at the waterfront, not so long ago.]

Mr Bryce (independent planner): …a “key concern” for submitters…the building would block sun from reaching the Regent Theatre and surrounds from 3pm at winter solstice. “At this time of year, the proposal will effectively remove all remaining access to sunlight received over [the] southern end of the western side of the Octagon.” (ODT)

Mr Page (the developer’s ‘Brief’): The “potential shading effect” was acknowledged, but Mr Page was confident the hotel’s benefits “will far outweigh” those concerns. (ODT)

Mr Page, again : The hotel’s “tall, slender built form” minimised the impact on those living closest to the hotel project site… (ODT)

Good heavens.

Source: Application documents

At Facebook:

### ODT Online Tue, 11 July 2017
Hotel developer still confident
By Chris Morris
Dunedin’s latest five-star hotel bid will “not be viable” if the developer is forced to reduce the building’s height, it has been claimed. But the man behind the project, Tekapo businessman Anthony Tosswill, remains confident the hearings panel set to decide the project’s fate can yet be swayed by the hotel’s benefits. The comments came from Phil Page, the lawyer acting for Mr Tosswill, days after the public release of an independent planner’s report running the ruler over the hotel proposal.
The report by Nigel Bryce concluded consent be declined unless Mr Tosswill agreed to a “substantial reduction” in the building’s height, by four storeys, to bring it down from 60m to 45.5m.
Read more

****

Resource Consent Application LUC 2017-48 and SUB 2017-26, 143 – 193 Moray Place, Dunedin (Proposed Hotel)

The hearing will be held on Mon 31 Jul, Tue 1 Aug, Wed 2 Aug, Thu 3 Aug and Fri 4 Aug 2017 in the Edinburgh Room, Municipal Chambers (off the Octagon). The hearing will commence at 9.30 am each day.

Consultant Planner’s Section 42a Report (PDF, 4.3 MB)

[excerpt]

SUMMARY OF RECOMMENDATION
[5] For the reasons set out in paragraphs 72 to 334 below, I consider that the Proposal in its current form, will not promote the sustainable management of natural and physical resources in accordance with Part 2 of the Resource Management Act 1991 (RMA or the Act).
[6] The Development promotes a contemporary design, which is considered acceptable within this setting and articulates sufficient design interest and modulation through the facades and its pinwheel like form expressed in the tower component of the building. The building’s design incorporates a base building or podium, which allows the structure to have an active street frontage to Moray Place and Filleul Street, which is considered a positive design response.
[7] The Development will be ‘juxtaposed’ against a backdrop of the heritage buildings located to the east of Moray Place, including the Town Hall and St Paul’s Cathedral when viewed from the west and St Paul’s Cathedral and the Municipal Chambers when viewed from the south (including from the Octagon).
[8] The building’s overall height is considered to generate an over-dominance on properties to the north and west of the Site, and will have more than minor adverse effects on the amenity values of residential properties to the west of the Site. This is largely due to the significant change in scale introduced by the Development and the lower scale built environment that currently exists to the west and north of the development site, comprising predominantly two to three storeys in height.
[9] The Development will adversely impact upon the townscape values of the TH02 Octagon townscape precinct under the Operative Dunedin City District Plan (Operative Plan), including loss of sunlight penetration into the Octagon during the Winter Solstice and will adversely impact upon the setting and pre-eminence of existing heritage buildings such as the St Paul’s Cathedral and the Municipal Chambers building when viewed from the Octagon.
[10] The Development is considered to result in more than minor visual amenity and shading effects on Kingsgate Hotel to the south of the Site. The Kingsgate Hotel will experience prolonged and more sustained loss of light over a wider part of the property and associated buildings over the critical morning period during the Equinox and Winter Solstice periods (or collectively over ¾ of the year). This conclusion has been reached having regard to the potential for the Site to be developed up to a maximum height of 11 metres with a building erected against all boundaries (the ‘controlled activity building outline’).
[11] For the scale of the building to be mitigated to an acceptable level, and to maintain and enhance the amenity values of the City Centre and wider environs, Council’s urban design consultant, Mr [Garth] Falconer recommends reducing the proposed building height by four levels to bring the total height down to nine storeys (Level 13, +157,500 (datum level) on Drawing Section AA). This reduction would provide for a maximum height of 45.6 metres from existing ground level, or a maximum height breach of 34.4 metres (including the lift shaft). This mitigation response would not remove any of the 210 visitor accommodation rooms (hotel rooms), and would maintain supporting facilities including licensed premises, retail, conference, meeting facilities and on-site amenities, parking, and servicing areas. I note, for completeness, that the Applicant is not currently proposing to reduce the height of the Development.
[12] In its current form, it is my recommendation that the proposal should be declined.

More about Garth Falconer, DCC’s consulting urban designer:
LinkedIn profile: https://nz.linkedin.com/in/garth-falconer-a0699bb3
Owner and Director, Reset Urban Design Ltd: http://reseturban.co.nz/

Take a glimpse of the ‘urban form’ at Takapuna, North Shore Auckland (his home turf), to know Mr Falconer is likely missing any handle on building height for a heritage city like Dunedin.

****

Agenda and all documents including Submissions at:

http://www.dunedin.govt.nz/council-online/notified-resource-consents/notified-applications-pending/luc-2017-48-and-sub-2017-26

****

At Facebook [see comments]:

### ODT Online Sat, 8 Jul 2017
Reject hotel bid: planner
By Chris Morris
A planner has recommended rejecting Dunedin’s latest five-star hotel bid, unless the developer agrees to a “substantial reduction” in the building’s height. The recommendation to decline consent came in a report by independent consultant Nigel Bryce, made public yesterday, ahead of the public hearing beginning on July 31. In his report to the panel of independent commissioners, Mr Bryce said the hotel development would “visually dominate” its surroundings, including the town hall, St Paul’s Cathedral and the Municipal Chambers. It would be the tallest building in the central city and would cast a shadow over the Octagon, as well as the nearby Kingsgate Hotel, during winter. Together with other impacts, the development was considered to be “non-complying” under the city’s district plan rules. It would only be acceptable if the building was reduced by four storeys, lowering its overall height from 60m to 45.6m, which was still well above the existing 11m height limit for the site, his report said.
Read more

[initial coverage]
7.7.17 ODT: Decline hotel consent: report

### ODT Online Wed, 28 Jun 2017
Two from North Island on hotel hearings panel
By Chris Morris
The panel to decide the fate of Dunedin’s latest five-star hotel bid features one familiar face and two from the North Island. Tekapo businessman Anthony Tosswill’s bid to build a 17-storey hotel and apartment tower in Dunedin would be considered over five days, beginning on July 31, it was confirmed yesterday. […] The panel of three would be headed by chairman Andrew Noone, now an Otago regional councillor, acting in his role as an independent commissioner. […] Alongside him will be fellow independent commissioners Stephen Daysh, of Napier, and Gavin Lister, of Auckland.
Read more

Related Posts and Comments:
● 14.5.17 RNZ reports July hearings for proposed hotel apartment building [comments by Mr Tosswill]
● 4.5.17 Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building
● 7.4.17 Proposed hotel *height and design* —the very least of it #sellingoursouls
● 5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

Source: Application documents

15 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Enterprise Dunedin, Finance, Geography, Heritage, Hot air, Hotel, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, Otago Polytechnic, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

rough sheds, sydney london

Tinshed by Raffaello Rosselli
Amy Frearson | 21 June 2013 ● Dezeen
Australian architect Raffaello Rosselli has repurposed a corroding tin shed in Sydney to create a small office and studio apartment. Rather than replace the crumbling structure, Raffaello Rosselli chose to retain the rusty corrugated cladding of the two-storey building so that from the outside it looks mostly unchanged. The project embraces that it will continue to change with time through rust, decay and repair.

“The humble tin shed is an iconic Australian structure,” he explains. “As the only remaining shed in the area it is a unique reminder of the suburb’s industrial past.”

The architect began by taking the building apart and replacing its old skeleton with a modern timber frame. He then reattached the cladding over three facades, allowing room for three new windows. The frames of the windows are made from sheets of Corten steel that display the same orange tones as the retained facade.

“The materials have been left raw and honest, in the spirit of its industrial economy,” adds Rosselli. In contrast with the exterior, the inside of the building has a clean finish with white walls and plywood floors in both the ground-floor living space and the first-floor office.
Read more + Images

*Photography by Mark Syke, apart from where otherwise indicated.

****

Collage House, London

Dezeen Published on Feb 13, 2017
Movie explores Jonathan Tuckey’s home in a 19th-century workshop 14 years on
Filmmaker Tapio Snellman has documented the ageing process of architect Jonathan Tuckey’s home, 14 years after he overhauled a 19th-century London workshop to create it. The architect, who is the founder of London-based firm Jonathan Tuckey Design, renovated and extended the steel fabricator’s workshop in 2002 to create a unique home for his family and their dog. He left the bare brick walls tarnished with black marks and chose “simple and everyday” materials to rejuvenate the character of the building, but also because they would weather well. Snellman, who shot Collage House in 2016, captures the ageing of these materials – including nicks and scratches on a series metal fixture and doors by splitting the screen into four – a trick he repeats throughout his film. “The split-screen sequences talk about the occupants and about the way architecture is integrated seamlessly with family life and personal expression,” Snellman told Dezeen. “The four simultaneous views create one strong spatial impression without any single image dominating the effect,” he told Dezeen. Both moving and fixed larch plywood panels clad the exterior, while beach plywood sheeting used as a floor lining inside the house, along with a concrete covering. Douglas fir stud work was planed and left exposed to partition spaces. This enables zones of activity to be defined, while also maintaining openness throughout.

Movie explores Jonathan Tuckey’s home in a former London steel workshop
Eleanor Gibson | 13 February 2017 ● Dezeen
This photography taken by James Brittain when the project completed in the early 2000s shows how Tuckey overhauled the industrial building by partially demolishing walls to create a central courtyard. “Plywood has weathered beautifully on both the interior and exterior and the scuff marks of 15 years use now tell the personal story of the family,” Tuckey told Dezeen. “The concrete floors have patinated and subsequently become more beautiful,” he continued. “The exposed brick was already there but continued to age gracefully as it was used to hang pictures and the kids used it to draw on it.” A space that forms a central part of Snellman’s film is the open-plan kitchen-cum-dining room, which occupies the former workshop. Here, he captures diagonal patterns of light that floods in through the long skylight between the original wooden bowstring beams restored by Tuckey. Snellman contrasts colour footage with black and white in the film, as well as tracking members of the family through the house. “The very controlled track shots try to eliminate the viewers awareness of the presence of the camera, as if the space would be seen at its most intimate, when no-one is present,” the filmmaker told Dezeen.

Ground floor plan [click to enlarge]

First floor plan

When renovating the building, Tuckey’s aim was to maintain as many of the building’s existing features as possible, while also creating plenty of playful spaces that catered to his then-young children. He divided the long and narrow building, which widens at the southern end, into three parts. He also demolished one of the existing buildings to create a courtyard and a small pond. The entrance hall and living area occupy the northern end with a mezzanine above, while the kitchen-cum-dining room occupies the central space. A walkway links these spaces to the two-storey structure added to the southern side, which houses the bedrooms and a bathroom. Since the original renovation, Tuckey has reconfigured the arrangement of the bedrooms, as his now teenage daughters needed more space. The children’s bedrooms have moved upstairs from the downstairs, while the single room used by the parents was divided into two interconnected rooms. A pair of hatches in the bedrooms open to the rooftop terrance, which was also only recently completed by the designer.
Read more

Posted by Elizabeth Kerr

This post is offered in the public interest.

7 Comments

Filed under Architecture, Construction, Design, Economics, Education, Fun, Heritage, Housing, Innovation, Inspiration, Media, Name, People, Pet projects, Property, Public interest, Resource management, Site, Structural engineering, Town planning, Urban design

Christchurch Cathedral : Marcus Brandt and the People’s Steeple Project

christchurch-cathedral-steeple-by-country-farm-garden-photos-cfgphoto-com-render1-1

While Bishop Victoria and the Anglican church property trust (CPT) continue to sit on their hands perhaps awaiting devine intervention, who knew, it turns out that a group of stalwart people in New Zealand – with an incredible level of international assistance – are busy planning a very special Cathedral project.

From: Mark Belton
Sent: Sunday, February 26, 2017 11:11 PM
To: [Elizabeth Kerr + RCC Mailing List]
Subject: Introducing The People’s Steeple

Dear Cathedral Restoration supporters

Below is a link to a video clip of the People’s Steeple proposal being demonstrated by its creator Marcus Brandt. Marcus has been in CHCH this last week promoting the People’s Steeple Project.

The People’s Steeple is a mind blowing proposal…audacious, visionary, inspiring. Lifting telescoping timber sections of the spire 60 metres into the sky…powered by about 500 trained people working 16 capstan winches placed around Cathedral Square, watched by up to 50,000 people in the Square.

The US based Timber Framers Guild (TFG), a professional organisation of engineers and timber framers has offered to be the lead contractor to build, assemble, and erect the People’s Steeple. The lead NZ engineers would be renowned CHCH timber engineer – Prof Andy Buchanan whose report on the project is attached.

Skilled TFG members from the US and around the world would gift their time, working in the Square preparing and assembling the timbers, and then helping lead the steeple’s erection. Up to 300 TFG members along with locals could be involved working in the Square over a period of about 6 months.

The TFG have successfully undertaken 75 community building projects over the last 25 years in the US and around the world. They are super keen to offer their services to CHCH. The TFG emphasise their projects are about ‘building communities’.

Marcus says would take only 2-3 hrs to lift and secure the telescoping sections. Flooring and bells would be assembled the same day and in the evening the bells would ring out…proclaiming to the world – ‘Christchurch is back’….and a Hangi feast would be opened…for a crowd of 50,000! International media would broadcast the event around the world…the whole enterprise being about engaging our community in the most positive way…and it would ignite fund raising for the restoration of the cathedral. It is envisaged the construction of the People’s Steeple would lead restoration of the cathedral and the Square.

It is noted huge pro bono contributions from the Guild’s members are being offered, and Blakely Pacific NZ Ltd, a US based forestry company has offered to provide the timbers at no cost from giant 125-year-old Port Orford Cedar from its Pioneer Forest in South Canterbury.

The Restore Christchurch Cathedral Group is strongly supportive of the People’s Steeple.

We hope this inspiring project will help engage and enthuse Christchurch people with recovery of the cathedral, and help get the cathedral restoration programme underway.

Warm regards

Mark Belton
Co-Chair, Restore Christchurch Cathedral

Mark Belton
Managing Director
Permanent Forests NZ Limited
PO Box 34, Lyttelton 8841, New Zealand

See attached reports by Marcus Brandt, Andy Buchanan, and the TFG.
TFG People’s Steeple Project approach notes-10-2-16
Steeple 16-8-12
M Belton report on Timber Framers Guild conf and People’s Steeple 23-9-16
Engineering the People’s Steeple v9

The People’s Steeple | Whare Films Published on Feb 23, 2017

christchurch-cathedral-tonyhphotography-co-nz-bw-render1-1

The People’s Steeple
Rebuilding the Bell Tower at Christchurch Cathedral

Marcus Brandt: An Introduction

For the last thirty years or so, I’ve been restoring historic stone and timber buildings, mostly in Southeastern Pennsylvania. I’m a working master carpenter and stone mason. Most of the historic buildings I am called to work on are 150 to 300 years old. Solid and well crafted, these old buildings tend to age well, but neglect and damage can take a toll. Much of my effort is spent in repairing and strengthening the timber frames of barns, bridges, houses, gristmills and churches. I’ve had several commissions to build new structures in the old style. I have organized and led many barn raisings, in which hundreds of volunteers gather to raise a barn’s frame in a day. A good crew will have the sides and roof on too.
Straightening, plumbing and repairing damaged stone walls is often called for. It is not uncommon to straighten a wall 10 meters high that is out of plumb by 400 or 500 mm. Having studied and worked with several Scots masons, I’m a strong believer in lime based mortars and good masonry practice. The interface between stone and timber is of particular interest to me.
Since 1989, I’ve been a professional member of the Timber Framers Guild (TFG) and a member of the Traditional Timberframe Research and Advisory Group (TTRAG). That part of the Guild focuses on understanding the past practice of the craft with a view that the past might help inform future practice. I have advised many historical and preservation societies and sat on many review boards.
As a result of my participation in Guild efforts and projects, I was invited to go to both Scotland and China to investigate “lost” technologies for the Public Broadcast Service series NOVA. We built working siege weapons in Scotland and in China we built a bridge design that hadn’t been built since the Mongol invasion.
I teach Traditional building skills at Lehigh University, Bethlehem, PA. I’m particularly interested in ways that the pre-industrial past practice can inform building in the greener, sustainable post-industrial world of the future.
I serve as a sailor, boson and ship’s carpenter aboard the tall ship Gazela (www.Gazela.org). That experience has taught me much about rigging and raising heavy loads in confined spaces. It’s taught me about erecting tall, secure, flexible, stable structures that get tossed about and shaken mercilessly. A sea captain in her own right, my wife serves as First Mate aboard Gazela. She out-ranks me, and helps keep me humble.
Since 22 February, I have been working as much as possible to develop a method to rebuild the Bell tower at Christchurch. With the help of friends and students, and the forbearance of my wife, I developed a plan that is beautiful, solid, strong, flexible, earthquake resistant, buildable, durable, and familiar. But more than anything, I want to use the rebuilding of the steeple as a vehicle for rebuilding and strengthening the community. And, once built, serve as an outward witness to the inward love we have for each other as fellow humans.
I look forward to doing this project with the able help of my best friends in the world…many of whom I haven’t yet met.

█ More information about the People’s Steeple Project and participants at http://thepeoplessteeple.org/

christchurch-cathedral-detail-mygola-com-tweaked

Related Posts and Comments:
23.12.15 Christ Church Cathedral: practical news from govt mediator…
14.7.12 Rival newspaper on historic heritage #cathedral
2.3.12 Christ Church, Cathedral Square

Posted by Elizabeth Kerr

This post is offered in the public interest.

christchurch-cathedral-detail-with-chalice-sisson-photography-photoshelter-com

christchurch-cathedral-mudbirdceramics-blogspot-co-nz

christchurch-cathedral-5-aug-2003-by-cindy-staticflickr-com-tweaked

*Images: Christchurch Cathedral – (from top) colour render by whatifdunedin [photo source: Country Farm Garden Photos at cfgphoto.com]; black white render by whatifdunedin [photo source: Tony H Photography at tonyhphotography.co.nz]; colour photo of steeple detail [mygola.com]; cathedral with chalice by Sisson Photography [via photoshelter.com]; black white photo by Mudbird Ceramics [mudbirdceramics.blogspot.co.nz]; colour photo by Cindy taken on 5 Aug 2003 [via staticflickr.com]

33 Comments

Filed under #eqnz, Architecture, Business, Construction, Democracy, Design, Economics, Education, Events, Finance, Fun, Geography, Heritage, Heritage NZ, Innovation, Inspiration, Leading edge, Name, New Zealand, People, Project management, Property, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Urban design

Green Island town centre : Say No to Council Red Tape

Green Island is a revitalising service centre peppered with new tenancies and *excellent* eateries. All in all a worthwhile destination. Just make sure, Green Island people, that DCC does not overtake your ideas with theirs (see King Edward St, South Dunedin, where council blight has occurred)…. so to kill your lovely Upbeat shopping centre. YOUR Plan, not theirs. Don’t let councils over-design your main street (avoid road engineering aesthetics) —keep everything simple and spontaneous, a People-friendly Place to entice repeat visitors.

green-island-shops-google-street-view-tweaked-by-whatifdunedin-1

A plan to improve traffic flow, intersections, parking, pedestrian safety and bus stops is being developed in Green Island, with community input.

### ODT Online Sun, 27 Nov 2016
Traffic plan for perusal soon
By Joshua Riddiford – The Star
A traffic plan for Green Island is expected to be presented to officials before Christmas Day. The plan is intended to improve traffic flow, intersections, parking, pedestrian safety and bus stops. The Greater Green Island Community Network developed the plan in response to that organisation’s household survey in May, which found 30% of residents were concerned about vehicles dominating public spaces and streets, 21% were concerned about the amount of traffic and 21% were concerned about pedestrian safety.
Read more

****

### ODT Online Sun, 13 Nov 2016
Green Island traffic plan picks up pace
By Brenda Harwood – The Star
….Greater Green Island believes the time has come for a comprehensive plan, with the recent development of the new Moyles Fresh Choice supermarket, the Z petrol station, the Sunnyvale Sports Centre, a growing population and the rise in traffic volumes. Greater Green Island community workers Amanda Reid and Leanne Stenhouse have been meeting  Dunedin City Council and Otago Regional Council representatives to discuss the issues and are now working on a comprehensive draft design for improvements …. [DCC transportation safety team leader Hjarne Poulsen] said the approach of the community network, to gather feedback and create a concept, was “very helpful” …. [ORC support services manager] Gerard Collings welcomed the community feedback and thanked the network for its “collaborative approach”.
Read more

[click to enlarge]
google-street-map-green-island-2016Google Street Map – Green Island 2016

dcc-webmap-green-island-town-centre-janfeb2013DCC Webmap – Green Island JanFeb 2013

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: Green Island street perspective via Google Street View, tweaked by whatifdunedin

9 Comments

Filed under Architecture, Business, Coolness, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Geography, Health, Heritage, Housing, Infrastructure, Inspiration, Media, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Tourism, Town planning, Transportation, Urban design, What stadium

DCC acuity: ‘Let’s shift Octagon taxi ranks, Again —near dire drinking holes #whatswrongwiththispicture

[click to enlarge]
Octagon taxi rank.xlsxOctagon taxi rank [dunedin.govt.nz] – orange overlay by whatifdunedin (drinking holes / hospitality)

Dunedin City Council – Media Release
New trial site for evening taxi rank

This item was published on 22 Aug 2016

A new location for the evening taxi rank in the Octagon will be trialled for three months. From tomorrow, the evening taxi rank will move from outside the Municipal Chambers and Civic Centre to the central lane of the Octagon, where tour bus parking has been provided. The rank will operate from 7pm to 7am, Monday to Sunday. During the day time, the taxi rank will operate from the current location outside the Municipal Chambers and Civic Centre. Dunedin City Council Acting Group Manager Transport Richard Saunders says the covered walkway will provide shelter for people waiting for taxis. There will also be a sign to show where the taxi stand is and the area is monitored by CCTV.

“This proposal has been discussed with taxi companies, local businesses and the Police, and there is a lot of support for the trial. The trial site has several advantages over the current site and we expect it to be popular with the public too.” –Saunders

DCC staff have talked with the mobile traders who use that space during the day and the trial will not affect their use of the area. Mr Saunders says at the end of the trial, staff will discuss the results with taxi companies, the Police and local businesses before deciding whether to make it a permanent move.

Contact Richard Saunders, Acting Group Manager Transport on 03 477 4000.

DCC Link

█ 22.8.16 ODT: Taxi rank trial in Octagon

****

Previously published comment (2.5.16):

C E N T R A L ● C I T Y ● V I O L E N C E

Mon, 2 May 2016
ODT: Stabbing: ‘What is this place coming to?’
The stabbing of a 21-year-old man in central Dunedin early yesterday has left the man who rushed to his aid questioning the state of his city. Detective Sergeant Chris Henderson said the victim was taken to Dunedin Hospital after being stabbed in the neck and back outside the The Bottle-O store on the corner of Princes St and Moray Pl about 3.30am.

****

DUNEDIN IS UP THERE (2015 statistics)

### newshub.co.nz Mon, 2 May 2016 at 4:45 p.m.
NZ’s most violent city spots revealed
By Lisa Owen
A Newshub investigation has revealed Auckland neighbourhoods dominate a leaderboard of the most violent city hot spots in the country. Statistics New Zealand has mapped 2015 police crime data, released to Newshub under the Official Information Act, to show the areas with the highest number of assaults, sexual assaults and robberies in public places. The crimes include anything from rape to being beaten up or being robbed of your cellphone at knife-point. Three of the five most violent city areas (precincts where there are more than 3000 residents) are in Auckland’s CBD. […] *By overlaying population data in the zones where crime has occurred, Statistics NZ has been able to work out the national average for incidents of public place violence. *Article uses 2015 statistics of victimisations by assault, sexual assault and robbery in public places.
Read more + VIDEO

█ Dunedin = No. 7 on New Zealand’s top ten most violent city hot spots
The only South Island hotspot, the area running north from the Octagon.
Dunedin_violence_low_02_05_7 [newshub.co.nz]Newshub

█ For more, enter the term *octagon* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

3 Comments

Filed under Business, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Events, Finance, Geography, Health, Heritage, Infrastructure, Media, New Zealand, People, Police, Politics, Project management, Property, Proposed 2GP, Public interest, Site, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

Dezeen: W57 —West 57th Residential Building by BIG

Durst Fetner Residential commissioned Copenhagen based BIG in the spring of 2010 to introduce a new residential typology to Manhattan.

sltube7 Uploaded on Feb 10, 2011
Jacob Slevin Bjarke Ingels Is BIG in New York City with W57
(by Designer Pages)

GlessnerGroup Uploaded on Feb 15, 2011
W57 – West 57th Residential Building [no audio]
W57 is a hybrid between the European perimeter block and a traditional Manhattan high-rise, West 57th has a unique shape which combines the advantages of both: the compactness and efficiency of a courtyard building providing density, a sense of intimacy and security, with the airiness and the expansive views of a skyscraper.
©Glessner Group, Bjarke Ingels Group (BIG)

Construction is due for completion in 2016.

█ Architect: Bjarke Ingels Group

### dezeen.com Tue, 8 Feb 2011 at 12:41 pm
West 57th by BIG
By Catherine Warmann
Durst Fetner Residential (DFR) today announced the design of West 57, a 600-unit 80/20 residential building on West 57th Street between 11th and 12th Avenues. The building is designed by renowned Danish Architect firm BIG-Bjarke Ingels Group and is their inaugural North American project. The building’s program consists of over 600 residential units of different scales situated on a podium with a cultural and commercial program. The building will strive for LEED Gold Certification.

“It’s extraordinarily exciting to build a building whose architecture will attract visitors from around the globe,” said Hal Fetner, CEO of Durst Fetner Residential. “BIG’s design is innovative, evocative and unique and the building’s beauty is matched only by its efficient and functional design that preserves existing view corridors while maximizing the new building’s access to natural light and views of the Hudson River. West 57th will establish a new standard for architectural excellence and its creative design, sustainable-construction and operations, breathtaking views and distinctive amenities will make it New York’s most sought after residential address.”

dzn_West-57th-by-BIG-22dzn_West-57th-by-BIG-23

“New York is rapidly becoming an increasingly green and livable city. The transformation of the Hudson River waterfront and the Highline into green parks, the ongoing effort to plant a million trees, the pedestrianisation of Broadway and the creation of more miles of bicycle lanes than the entire city of my native Copenhagen are all evidence of urban oases appearing all over the city. With West 57th we attempt to continue this transformation into the heart of the city fabric – into the centre of a city block,” Bjarke Ingels, Founder, BIG.

“The building is conceived as a cross breed between the Copenhagen courtyard and the New York skyscraper. The communal intimacy of the central urban oasis meets the efficiency, density and panoramic views of the tall tower in a new hybrid typology. The courtyard is to architecture what Central Park is to urbanism: a giant green garden surrounded by a dense wall of spaces for living.”
Read more + Images

[view full screen]

BIG from DRKHRSE (posted 4 months ago)
An aerial view of Bjarke Ingel’s newest building in NYC, at W57

█ Drone Photography: Darkhorse

### dezeen.com Wed, 16 Sept 2015 at 11:10 am
Drone video shows progress on New York “courtscraper” by BIG
By Jenna McKnight
Communications firm Darkhorse has used a camera mounted to a drone to capture footage of Via 57 West, the residential building by Bjarke Ingels Group that is now rising in New York. Construction is underway on the tetrahedron-shaped building, which is located on West 57th Street in Midtown Manhattan. The design is pulled up at one corner, to create a 467-foot-tall (142-metre) structure. It topped out several months ago, with the addition of the final structural beam, and work is now continuing on the building’s facades. The unofficial movie by Darkhorse shows images of Via’s sloped exterior, which is punctuated with south-facing terraces that look toward the Hudson River.

dzn_West-57th-by-BIG-36BIG-West-57-project-New-York-City_dezeen_sq

Encompassing 861,00 square feet (80,000 square metres), the building will contain 709 residential units and a large central courtyard. The project also calls for retail space totalling 45,000 square feet (4,180 square metres).

“We call it a courtscraper,” Ingels told Dezeen in an interview last year. “It’s a combination of a skyscraper and a courtyard building. One side is the height of a handrail and the other side is the height of a high-rise.”

The project is being constructed in an area with a mix of building types. W57 is sandwiched between a power plant, a sanitation garage and a highway. The building’s amenities will include a pool, fitness centre, basketball court, golf simulator, library and screening room. Residents will also be able to reserve “living rooms” for entertaining that feature fireplaces, chef’s kitchens, dining rooms and large terraces.
Read more + Images

dzn_West-57th-by-BIG-401dzn_West-57th-by-BIG-38

█ Other residential projects now underway in New York include 152 Elizabeth Street by Tadao Ando in the Nolita neighbourhood, 520 West 28th Street by Zaha Hadid near the High Line, and a luxury condo building by Alvaro Siza that is slated to rise near BIG’s Via 57 West.

Posted by Elizabeth Kerr

2 Comments

Filed under Architecture, Business, Construction, Coolness, Democracy, Design, Economics, Geography, Innovation, Inspiration, Leading edge, Media, Name, Project management, Property, Resource management, Site, Structural engineering, Town planning, Urban design