Tag Archives: fubar stadium

Stadiums, in particular the FB Aurora Delta Stadium at Dunedin

Olympiastadion München, opened 26 May 1972

Received from Gurglars
Thu, 8 Jun 2017 at 2:11 p.m.

Bayern Munich bought out TSV 1860 Munich, their 50% joint venture partners, for €11 million. The stadium cost €360 million and originally seated 80,000 pax.

This is despite the Stadium being used weekly for matches for Bayern and TS Munchen, and six World Cup games being played at the stadium.

█ Wikipedia: Olympiastadion (Munich)

What this tells us is that stadiums are worthless once built – are not assets, but liabilities.

If they are fully owned (no debt) and receipts go to the stadium owners then they can be profitable, but only if the owner is also the user. Thus the only hope is for the Highlanders/Otago to own the stadium.

The DCC have demonstrated that all they can rack up is more debt, more bills and more losses.

[ends]

****

Fat chance of Otago Rugby taking over the stadium while it continues to be subsidised by DVML – the true cost of which is not made public. ORFU is now making profits but declines to pay back the ratepayers for the ‘simple things’, like black tie dinners held at the stadium in recent times. God knows what we’re paying for while Mr Davies sits atop his rugby goal post roost, clucking inanely, looking down at the pretty (untouchable) grass.

The prima donna approach is a False Economy, but not for dullards and professional rugby thugs.

Rip up the grass, put in articial turf, and let the Otago stadium be used by more codes / more sports people.

****

“It is a little naive to think because it is raining outside and there is water on the facilities, you can just come inside.” –Terry Davies

### ODT Online Thu, 8 Jun 2017
Unrealistic to have club sport at stadium – Davies
By Adrian Seconi
The chances of playing club sport under the roof at Forsyth Barr Stadium without an advanced booking are virtually nil, Dunedin Venues chief executive Terry Davies says. The issue came up in mid-April when the Dunedin City Council closed all its grounds due to poor weather. The Dunedin Rugby Metropolitan Council was reluctant to cancel round five of premier rugby and had hoped to play on the sand-based surfaces at Hancock Park and Kettle Park and possibly under the roof at Forsyth Barr Stadium. However, the stadium was ruled out because of scheduled maintenance. The issue came up again last month when grotty weather forced more cancellations, although premier rugby went ahead as planned. Davies said the idea club sport could be played at Forsyth Barr Stadium because of poor weather was naive. […] “The stadium was fundamentally built to deliver a real economic impact for the city. We have a number of major contracts in place with the professional rugby bodies … and there are other major events that we need to look after. On that basis we run quite a detailed maintenance schedule right through to the year it ensure we can deliver. The last thing we want to do is have a facility that is [not looking its best].”
Read more

Posted by Elizabeth Kerr

This post is offered in the public interest.

30 Comments

Filed under Architecture, Aurora Energy, Baloney, Business, Construction, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Events, Finance, Geography, Highlanders, Hot air, Infrastructure, Media, Name, NZRU, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Site, Sport, Stadiums, Travesty

SCANDAL : Aurora Energy Ltd set to burden Otago ratepayers and residents with massive rates increases

At Facebook:

****

“Overall, the planning period will be characterised by the delivery of the largest work programme in Aurora Energy’s history.” –Steve Thompson

Read: The Otago power network is THAT DEGRADED – caused by various rugby supporting and clip-ticket gentlemen, whose names we all know so well. Described by civil words (not cuss words) that start with F and C.

The “laundry” was well and truly harsh, leaving the network in threadbare tatters…. while private pockets were filled. That’s One Billion Dollars worth of power asset the Otago ratepayers have had to pay for TWICE. Talk about ‘power’ and corruption, Bryce Edwards (?) – Dunedin in the last 30 years was built on it, solidly at source.

The “gents” might like to explain where all the money went, and how the hell they think they can make us pay for their near limitless mismanagement and fully reckless endangerment (to workers, citizens and the regional economy) over three decades …..without shoving them in deep at the NZ Court system —for processing.

█ Today an Aurora/Delta executive had the audacity (after spinning out their LGOIMA response to the 20th working day, following my request made 26 April) to want to charge me for official information at the vindictive “maximum charge” (their words) of $190.00. Shove that, boys. Other council owned companies have provided the information free of charge and very promptly and courteously.

Tuck it back in your pants Aurora/Delta, or be sliced.

At Facebook:

● Aurora will spend $347 million on asset renewal, including a total of 14,000 poles…..

### ODT Online Wed, 24 May 2017
Aurora plans $720m upgrade of network
By Vaughan Elder
Aurora Energy has unveiled a $720 million plan to upgrade its ageing electricity network over the next decade. The plan is a more than $300 million increase on the 10-year plan the Dunedin City Council owned company released last year. […] In a press release this afternoon, Aurora Energy said the plan would have an extensive impact on the region’s economy through job creation and spill-over benefits to other businesses. […] Other major projects included a new substation at Carisbrook, which would replace the 60-year-old Neville St substation by 2019 and a new Wanaka substation on Riverbank Rd, Wanaka. […] Aurora Energy chairman Steve Thompson said an additional $81 million would be spent on growth and security of supply projects to support the region. […] The remaining expenditure was tagged to maintenance and operating expenditure ($192 million), and capital expenditure primarily related to new consumer connections and safety and reliability ($101 million).
Read more

****

The vertiginous mountain of HEALTH AND SAFETY DANGERS due to Aurora mismanagement and neglect of the power asset across Otago.

And the WorkSafe option could be “…..an infringement notice”, possibly not PROSECUTION.

Hmm, have the good old boys been dealing in the way they usually deal ??? Is WorkSafe a soft touch. To date it certainly hasn’t been Acute. Or at all worried about the danger to electrical workers or the general public. What a damnably prolonged and sordid farce this is.

### ODT Online Wed, 24 May 2017
No decision to prosecute Aurora
By Vaughan Elder
Worksafe is yet to decide whether it will prosecute Aurora Energy over the state of its power poles. WorkSafe has been looking into Aurora and its sister company Delta since October over accusations dangerous power poles across Dunedin, Central Otago and Queenstown Lakes were putting the public at risk. The government entity gave fresh details about its audit of the two companies in response to an Official Information Act request from the Otago Daily Times. WorkSafe high hazards and energy safety general manager Wayne Vernon said it had completed an “initial” audit of a sample of the network’s assets and provided a report to Aurora. […] “WorkSafe has not to date made a decision to prosecute or not to prosecute Aurora over health and safety issues associated with the state of its poles.” Mr Vernon emphasised prosecution was one of many options available to it, which also included issuing instructions to remove or minimise the potential for danger and issuing an infringement notice.
Read more

█ For more, enter the terms *delta*, *aurora*, *epic fraud*, *poles*, *healey* or *dchl* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

14 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Health & Safety, Highlanders, Infrastructure, LTP/AP, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Site, Sport, Stadiums, Technology, Tourism, Town planning, Travesty, Urban design

DCC fails to meet LGOIMA request re ‘lost’ secure storage of CST files

The Dunedin City Council OWNS the Carisbrook Stadium Trust files, note.

Received from Bev Butler
Mon, 8 May 2017 at 1:40 p.m.

Subject: Complaint Dunedin City Council/storage of stadium documents

Message: Attached is the letter from the Ombudsman Office. I have sent a response to the Ombudsman letter.

[screenshot – click to enlarge]

● Download: 0_1-408161-3117439

Related Posts and Comments:
2.6.16 Official Information at Dunedin City : Bev Butler maintains pressure
10.7.15 Ombudsman complaint re DCC reply to LGOIMA requests #CSTfiles
9.7.15 DCC: Council-owned CST files whereabouts not declared
27.6.15 Ratepayer boxes #saga
20.6.15 DCC / CST document scramble #LGOIMA

Posted by Elizabeth Kerr

This post is offered in the public interest.

23 Comments

Filed under Baloney, Business, CST, DCC, Democracy, Dunedin, Economics, Finance, Hot air, New Zealand, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, SFO, Sport, Stadiums, Travesty

Councillor don’t tell us, we know Dunedin industry and manufacturing is Tops

But Rachel Elder did need to inform Mr Mayor, since it’s he who opines that [singularly ???] “weightless” manufacturing will one day make Dunedin great.
A while back Mr Mayor lauded expansion at Speight’s, Emerson’s and Greggs ….but recently, dreadfully, when interviewed by John Campbell on RNZ Checkpoint, Mr Mayor had trouble remembering these and other multimillion-dollar manufacturing investments in the good people, raw products and knowhow of Dunedin City. As well, he slipped past the convenient fact that the deputy mayor is a director of Scott Technology Ltd, and his old flower Mr McLauchlan, advisor and confidant, is the company’s board chairman.

Notwithstanding, Ms Elder thought it necessary to set herself a free writing project, an op-ed to ‘tell’ Mr Mayor, as well as advertise her paid work skills. Yes, yes, we’re all for free speech and pumping political mileage; however, we are the converted and connected, we know just how great Dunedin manufacturing is and can be —if not for DCC.

It must be said, though, that Mr Mayor’s speech at the Cadbury protest in the Octagon last Saturday was a large complimentary step up from the fatal Checkpoint phone interview.

“Messaging that it is too expensive to export from Dunedin and that we are too far away from markets and that manufacturing is best not done here does not support the many families and individuals who work in this sector.”
–Rachel (take that Dave Cull) Elder

### ODT Online Wed, 15 Mar 2017
We have skilled workers and can make it all here
By Rachel Elder
OPINION As an employment consultant and someone who advocates for a wide range of jobs in Dunedin, I am keen for Dunedin to be advertised nationwide as a place that is great for manufacturing and production as this will supply jobs to our skilled workers. The fact is Cadbury is owned by a multinational that has caused its demise. Manufacturing can be done here well and efficiently.
Read more

Comment published at ODT Online:

ej kerr Wed, 15/03/2017 – 7:59pm #
As a city councillor Ms Elder should be overtly aware that the Dunedin City Council-owned power distribution company Aurora Energy Ltd does not and cannot offer a safe and secure electricity supply network for businesses, manufacturers and other large power users (this aside from the now obvious inability to offer safe supply to residential users). The mayor and councillors are not listening and not communicating clearly on the state of Aurora’s burnt asset. Thankfully, the Otago Daily Times has filled that void with strong news reporting. At a cost of one billion dollars to repair and upgrade the existing lines and facilities – not counting the cost of new development work required in Central Otago and Lakes District to meet growth and increasing infrastructural demand – there will shortly be a very heavy impost landing on all local businesses via rates increases. Such an unpopular debating topic at the head-in-the-sand Dunedin City Council.

****

Truly fine examples of the sort of thing your grandmother and mother will tell you about Dunedin that Mr Mayor can’t:
. . . .

McMeeking Manufacturing, 123 Maclaggan St

Jaytee Baking Cups have been a household name since the 1930s, when the company was founded by a printing engineer James Thomas Williamson, hence the name Jaytee. Since acquiring the company in 1979, McMeeking Manufacturing has been the largest supplier of Baking Cups in New Zealand with exports to Australia and the Pacific Islands. Due to the dramatic increase in bakeries, cafes etc, the range of products – all manufactured in the Dunedin factory – has grown to fulfil customers requirements and follow the latest trends. Read more at https://www.jaytee.co.nz/

. . . .

### ODT Online Wed, 15 Mar 2017
Machine tool smart, versatile
By Simon Hartley
Farra Engineering’s latest $1.3 million machining kit not only has the capacity to work 24/7, but can text its progress to operators day and night. The DMG Mori “multi-pallet (work bench) horizontal machining centre”, supplied by a German-Japanese merged company, has been running for about a fortnight, at Farra Engineering, Dunedin, chief executive John Whitaker said. The DMG Mori could work on castings weighing just a few grams, on pieces weighing up to three tonnes, and castings up to 1.4cu m in size. “Being so productive, we’re going to the marketplace to fill the spare capacity,” Mr Whitaker said.
Read more

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: jaytee.co.nz – jaytee baking cups

29 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, Economics, Education, Electricity, Finance, Geography, Health, Hot air, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Structural engineering, Technology, Tourism, Town planning, Travesty, What stadium

Aurora with yet another headache

At Facebook:

****

****

Note this particular meat from Richard Healey’s Facebook post:
[my emphasis]

“If you have a property where the lines were built before 2001, then Aurora owns everything up to the house. The only exceptions are where the lines have been brought up to standard and a letter has been sent to the property owner transferring ownership of the lines or a prior agreement is in place. That has almost never happened in Dunedin. If you think that you have been billed, and shouldn’t have been, write to Aurora. If you don’t get redress file a claim.
If you would like to read the appropriate legislation, look up the electricity act 1992 and search for the definition of “point of supply”.
What does that mean? It means that it’s probable that thousands of Dunedin residents have been charged for maintenance to lines and poles that they do not own.”

Electricity Act 1992
Reprint as at 18 October 2016
http://www.legislation.co.nz/act/public/1992/0122/latest/DLM281858.html

Posted by Elizabeth Kerr

This post is offered in the public interest.

2 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Housing, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Stadiums, Tourism, Town planning, Travesty

How to drop Crombie and the mafia from City boards

Or read, how the new city council will continue to undermine the Ratepayers and Residents of Dunedin, as well as the power consumers and district councils of Otago, just like before…. by allowing ill-considered (shoulder tap) appointments of a ‘class of morons’ to the boards of the City companies.

Troughers Unite.

ODT 11.1.17 (page 4)

odt-11-1-16-in-brief-p4-1

Posted by Elizabeth Kerr

This post is offered in the public interest.

8 Comments

Filed under Aurora Energy, Carisbrook, Central Otago, Construction, Corruption, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Events, Finance, Geography, Health, Highlanders, Housing, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Site, Sport, Stadiums, Tourism, Town planning, Travesty

Letter of opinion draws wide support, view not shared by deathly DCHL

ODT 9.1.16 (page 6)

odt-9-1-16-letters-to-editor-pillans-p6-1

Posted by Elizabeth Kerr

This post is offered in the public interest.

11 Comments

Filed under Aurora Energy, Business, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Sport, Stadiums, Tourism, Town planning, Travesty