Tag Archives: 1980s Chase

Apartment hotel proposal has FATAL Flaws : ODT offers Flimsy Poll

Updated post.
Tue, 7 Aug 2017 at 2:58 p.m.

We (Dunedin) are confronted by a poorly detailed, plonk-down apartment building proposal that we suspect is fronted by an agent for Asian developers –it would not be unusual for such a proposal to be offered on the strength of tainted money looking for safe haven in the South Pacific.

Our gullible country.
The gullible shiny pants Grow Dunedin partnership.
Our ever so gullible city council under the leadership of cull-cat Cull.

A massively over-height apartment building with a frilly hard-to-read podium base is proposed —a building that may never see a five star hotel as the anchor tenant (never believe unquantified/unqualified pitches from used car salesmen, if all they offer is a Price plucked from the air).

Not so long ago large tracts of New Zealand land were bought and sold for glass beads and muskets.

A lot can happen between resource consent being granted and a deathly, failing, improperly costed build.

Is Dunedin City Council about to find out.

Beware the gift horse.
It turned out Dunedin disliked the hocks of the last one (41 Wharf St), ridden by a little cardigan-wearer. The local suits were paid to make the waterfront tower seem generous, rousing and necessary. Ha-haaa.

At ALL times, the Dunedin City Council MUST stay acutely awake despite its needful dependence on independent commissioners and independent professional advisors – the latter advisors, along with some council staff, appear to have greatly missed the Fact that the minimal concept plans presented for 143-193 Moray Place DO NOT provide a workable building; or a building compliant with district plan objectives, policies, rules, and anticipated environmental results ….or prevailing traffic standards.

Oh dear. ‘So much’ [$$$] for the independent advice. Yes, expensive use of expert and staff time to massage the applicant dream – to no convincing or winning effect.

Further, Dunedin City Council MUST be prepared to APPEAL the outcome of the decision-making process should it wish to AVOID being left with another expensive DEBT VEHICLE in the form of one unfinished and or leaky building …..as the collapsed companies, and dusty heels of run-away developers and construction personnel disappear back to Asian shores, far away from Lake Tekapo ….. dangerously constructed, whole or in part, as a further burden on beleaguered Ratepayers of this fair city.

“What a stupid thing to assume!” you thunder.
“How? On what grounds?”, you chide.
“Dunedin NEEDS a five star hotel!”, imperiously.

You think it’s that simple ??
You’re about to be done over, Buds.

The inference being, oh great apartment hotel supporters, that all that glistens in green-tinted glass is gold, or might be a five star hotel. Yeah right.

It never was. The gold, I mean.
The five star hotel, I mean.
A hoover-up of NZ cash to offshore parties who remain anonymous throughout planning and consenting, and construction and building operation; all supported by the errant notion of immigrant labour and (imperfect) imported materials.

You might as well ask now, How MUCH will the Dunedin economy make ($$$) on this “slap in the face” to the community owned district plan (statutory), and the (strategic) spatial and the central city plans which are publicly consulted policy directions informing the city council’s annual and long term plans.

Not much.

****

During five days of evidence and submissions, one knowledgeable submitter, Mr Russell Lund – well up on construction management, hotel building costs, the visitor accommodation market and investment patterns, and the risk and liability to local authorities in consequence – carefully outlined the quandaries which for various councils around New Zealand have become money-losing Unalterable Fact.

In the original written submission for himself and Suzanne Lund (affected property owners), Mr Lund asserted:

The “assessment of effects” is hollow and of no substance. Under the Act, the assessment of effects is required to be just that, an assessment of effects on the affected properties and tenants. Incredibly, the assessment makes no attempt to examine the effects on all the affected parties.

This, of course, is echoed in independently written and voiced submissions by many opposing the application; and curiously, it is underlined in evidence given by Mr Don Anderson (planning consultant) and Mr David Compton-Moen (urban design, visual amenity consultant), for the applicant.

My own submission to hearing states:

We can’t take what is offered [from the applicant] on trust, because it is incomplete and imprecise; therefore the assessment of effects is difficult to pin down to anything concrete and remains unhelpfully superficial – this was “the work” the applicant was to table for us, we thought, to generously persuade us that moving beyond the ‘norms’ of height in this Dunedin location has measurable benefits against other sites or, through strong honest examination of design alternatives for this site.

I am open to being persuaded. It is expensive to do that persuading. However, it has to happen in other city centres in this country. For an expensive building, isn’t it worth doing the budgeting for preparation of your case – to get the result you want, which is consent to subdivide and build. These are open questions but they lie at the heart of A for architecture as the practical art and science of building economics and professional practice. Behind and in front of the commercial facades, that must have depth of delivery. […] And so I come to the white building model here [a 3D-printed solid plastic model of the proposed building, of hand-held size, put into evidence by Christchurch architect Thom Craig], and the drawings presented by the applicant. There appears to have been too much time spent on merely diagrammatic ‘entreaties’ to architectural form and texture without hacking into 3D investigation. There is not one clear drawing of the way the podium can work for the public or the ‘retailers’ or ‘exhibitors’ – or indeed the people staying at the hotel, servicing the building functions and or using vehicles on site. We get an idea ‘about it’, a not convincing one, there is too much guesswork to do. And so the commissioners’ questions have been rather intense.

****

Now, back to the points the Lunds are making. In their original submission on the application, Mr Lund says:

7. I have serious concerns about the expertise and amount of resource that has gone into assessing the feasibility of the project. In the last year, the Otago Daily Times advised the developer, Mr Tosswill of Horizon Hospitality, had indicated that the cost of the project, which was then 200 rooms and 52 apartments was $50-75M. The proposal now is for 210 rooms and 66 apartments, which is not substantially different. The car parking and front of house areas are similar to the original application. The application confirms the hotel has a gross floor area of 20,835 m2.
In my opinion this hotel will be not built for anything less than around $100M, and this casts serious doubts over the viability of the scheme.
Evidence of this is found for the building costs of the much simpler 200 room 4 star Novotel Hotel being built at Christchurch airport after a competitive tender process (and utilising an Asian fabricated structural steel structure). It is well known in the building industry that the tender costs received for that very regular and efficient 7 level hotel were $4,500-5,000 per m2. The Novotel is a filing cabinet design, that is, it is a completely regular rectangular structure which provides the most efficient floorplates and the best wall to floor ratio, ie the least amount of exterior wall enclosing the maximum possible amount of interior space. The Novotel has no balconies.
The applicant’s proposal is far less efficient, and therefore more costly per m2, as it is effectively three blocks grouped around a central core, but the blocks themselves are not rectangular, but have recesses, and there is a significant amount of extra cost with most rooms having screened “smokers” balconies, which entails effectively, 2 exterior systems, one for the rooms, and another enclosing the balconies.

8. The application confirms there are 16,136 m2 of above ground (habitable or hospitality space) and 4,687 m2 of below ground, back of house / car park space. At a cost of $2,200-2,500 per m2 for the below ground floors, and $5,500 per m2 for the above ground space, the proposal has a construction cost of over $100m, excluding land, furnishings, design marketing, et al. The total budget excluding GST will be around $130M. A feasibility study will typically have to include a development margin of at least 20 %, preferably 25 %, if any sort of lender is involved. This means the end value of the project will need to be at or over $160M. If the best case scenario is adopted and Mr Tosswill is able to convince Chinese or other overseas investors to pay the current market value in Queenstown for premium, new managed hotel rooms and apartments of $10,000 per m2 – for a hotel with an unproven demand in Dunedin, it is still not enough.
Selling all the apartments and hotel rooms will yield about $90M, which is a long, long way from the $160M end value needed. The parking and lower public floor spaces on a yield basis will have a value of around $10M, that might get the project to $100M. Mr Tosswill in earlier reports stated that the value was around $90M, so while there is broad agreement on the likely end value, the estimate of the cost is not close to reality. Mr Tosswill may be planning to bring in a Chinese construction company who will park a retired cruise ship at the waterfront for the duration of the project and have their workers stay there, but they will be subject to the same minimum wage laws, working conditions and health and safety requirements that local companies face, which will dramatically reduce any cost benefit from using overseas labour. (The idea of having a cruise ship accommodating Chinese workers is not fanciful – the Chinese government offered to repair the damaged sections of SH1 after last year’s Kaikoura earthquake using that same method, and did not require any New Zealand labour resources, but the Government decided that this was politically unacceptable). One hopes it would be also unacceptable to have a Council endorsed project built using essentially, forced labour.

9. There is sufficient doubt around the financial viability of the project that the applicant should provide some evidence that the entire scheme is not in fact fanciful, but makes economic sense, and provide details about the proposed ownership model, which is highly relevant to Council, in light of their liability which is discussed below.

10. Mr Tosswill may think he is able to make savings from current building costs by utilising Chinese products, but many Local Authorities around New Zealand are very wary of various untested products as there have been many failures for which Local Authorities ultimately end up bearing the cost of.
This raises another issue which is the massive liability that the building control division of the Dunedin City Council will be exposed to, in relation to its building consent approval and compliance monitoring. The experience of the QLDC in recent years is extremely relevant : A large number of hotel and apartments have been built in Queenstown and the individual hotel rooms and apartments are sold off individually. A body corporate is then responsible for repairs and maintenance. The developer has no long term or permanent stake in the completed structure, and therefore no incentive to specify materials and pay for quality standards with the long term in mind. As Warren Buffet has said, “show me the incentive and I will show you the result”, and the result for QLDC has been an ongoing series of legal actions brought by Body Corporates against Council, alleging that Council was at fault in some form, and as they are the “last man standing”, the Council have inevitably had to pay substantial figures. [I have] experience of several of these, having repaired one major complex in Queenstown at a cost of several million dollars, and provided cost evidence in regard to two others, also in Queenstown in the last year. It should be remembered that QLDC has a 7 metre height limit, but despite this, on complexes less than a quarter of the size of the proposed hotels, the cost to repair has run to millions. QLDC has advised this year in the Otago Daily Times that it has now completely drained its reserve fund for remedial building work, and any further costs will need to come directly from ratepayers. It has spent $3.6M just on legal fees for remedial building liability cases, which will rise to close to $4M by the end of this year.

11. At the Hearing, in submission, some proposals will be presented to show how the design liability and weathertightness risk to Council and ratepayers can be mitigated in the unlikely event that the proposal is given consent and such consent is upheld in the Environment Court.

Proposal 1 : A bond be posted with Council to cover sufficient funds to get the building to completed weathertight envelope and have the podium and all external works completed in the event the project is halted.

Proposal 2 : The applicant provide a Owners Protective Professional Indemnity, and have DCC named as an insured party on the policy. This is to protect indemnify the DCC against any claims brought against them in relation the building consent process, compliance monitoring or any matter for which they are liable for.

****

The applicant tabled NEW evidence at the hearing, from Infometrics. At its website, Infometrics (NZ) says it “provides industry, regional, and general economic analysis and forecasts that assist organisations in making their planning, policy, and strategic decisions”.

In the Lunds’ submission to hearing under the subheading ‘Dunedin Hotel Economic Impacts – Ongoing GDP Effects’, Mr Lund says:

….Infometrics assume that the 64 apartments will all be in the hotel pool, but acknowledge this is unclear. This significantly increases the GDP contribution as it raises the income of the hotel by around 40%, assuming conservative tariff rates of $250 per night and $350 per night per apartment. Infometrics also assume that there will be no “crowding out” of the existing activity, ie ALL guests would otherwise have not come to Dunedin had this hotel not been there. This is an unrealistic assumption.
In my opinion this report is an example of tailoring assumptions to achieve the desired outcome.
At Section 2, the “impact” of the construction phase is estimated at $45.6M in total, but based on the “key assumption” that there is capacity in the construction sector to build the hotel without crowding out other investment”. This appears to mean that if other projects are delayed, there is in fact no benefit at all because $63M of other projects will simply be displaced by the alleged $63M cost of this project. History shows that in Dunedin, Clients such as the DCC, University and some private clients keep a close eye on the state of the market. Many Ministry of Education projects have strict cost guidelines, and will not proceed if they are over budget. There have been examples of work deferred in Dunedin when the market is busy, and the Post Office Hotel is one of them. The Owner Mr Geoff Thompson, deferred the construction of the hotel for several years when he first owned the property citing the overheated construction market, due to the construction of the $220M Milton Prison project in 2005-2007.
At the present time, there is a high level of commercial construction activity at present, witnessed by the fact that there are main contractors from outside Dunedin performing the 2 largest projects in Dunedin (The Dental School and the University Science 3 project). There is every likelihood some projects will be delayed due to the high level of activity.
The report assumes that 21.1M of the $63M, or a third of the cost, will flow into the local Dunedin economy. This would be on the basis that local companies and suppliers are employed, but this is far from clear, given the estimated cost of $63M. The only way the cost could be anywhere near this level is if virtually all of the materials were low cost imports, and quite likely a proportion of the labour cost component.
The only significant material that will be made locally is concrete, and it is only the basement levels that will be predominantly a concrete structure. If out of region companies were employed for work to do such trades as painting and carpentry, as they were at the Forsyth Barr stadium, then that figure will not be accurate.
Infometrics then ascribe $16.1M to the “second round of economic effects” but acknowledge there is some “leakage of spending outside the city”. If an outside main contractor, or even an overseas contractor completes the work, they will very likely bring with them their out of town networks of subcontractors and suppliers and there will be much less than the $16.1M as the second round of effects. Having completed many projects out of Dunedin, I have first hand knowledge of the negligible economic effect of construction on the region concerned. Generally, goods and services are sourced from habitual suppliers with whom there is an ongoing relationship, and only the small consumables are sourced from local suppliers.
Mr Tosswill should clarify what the intention is regarding the construction of the hotel, and if that is not forthcoming, then he should at least confirm what type and form of construction contract will be used as that perhaps more than anything will determine whether there is the possibility of a meaningful local business component.

On ‘Construction Cost’, Mr Lund refers the commissioners to the Lunds’ original submission, continuing with:

Further facts about construction
Examples of risk from imported products
FCC (Fletcher) budgeted to use Chinese sourced bathrooms in the Novotel Christchurch projects. Did not work. Has cost FCC $2M extra (unbudgeted) to get prefab bathrooms built locally in Canterbury. The cost is $26,000 per bathroom.
Chinese steel : there are 2 major CBD projects underway in Christchurch that are steel structures using Chinese fabricated steel. On one project the steel is 12 weeks late and on the other it is 16 weeks late. The Chinese suppliers had committed to make the steel, then out-sourced it to another firm without advising the contractor, and the delays have resulted. On one of these projects there is now legal action between the Engineer and contractor because of the nature of the steel does not conform to the specification.
There is a further major dispute litigation on another major project now completed due to extreme delays with the steelwork and external cladding. The project was around 10 months late, and the Owner lost the anchor tenant (The Government) due to the delay. That project was tendered on the basis of using a large degree of imported materials from China in association with a large state run Chinese construction company, but the project was so disastrous (financially and in terms of market perception), involving a loss of 8-15M on a $50M project, it has caused the company to withdraw from large scale commercial construction and focus on project management.
External Cladding : There are only a very small number of NZ firms with the capability to design and build the curtain walling, and they have a huge backlog and extremely onerous business terms that will not be acceptable to any funder or main contractor, so the Owner will probably need to contract with them direct, and take on this risk.

These important matters aside, the legal submissions brought to hearing by Ms Lauren Semple (for Millenium & Copthorne Hotels) and Mr John Hardie (for Misbeary Holdings Ltd) blew the application out of the water; so did the transport evidence to hearing by Mr Andy Carr (for Millenium & Copthorne Hotels) to which Commissioner Mr Stephen Daysh responded by asking if the problems (such as summit points, swept paths, access to basement parking, onsite coach travel, and truck travel as well as loading access) pointed out by Mr Carr in his assessment of the proposed building’s perimeter road were “fatal flaws”? Yes, was the direct reply. Refer article: Traffic problems at hotel (ODT 3.8.17)

The hearing is adjourned until 17 August.

All ODT can do is offer a flimsy and inconsequential readers’ poll.
Not Based On Reality. Go ODT! LOL

█ All application documents, reports, evidence and submissions for 143-193 Moray Place – Non-complying activity – LUC-2017-48 & Sub-2017-26 at this link.

Related Posts and Comments:
● 11.7.17 “Fat” gawky Hotel and Apartment building : Questionable design even with 4 floors lopped off
● 14.5.17 RNZ reports July hearings for proposed hotel apartment building [comments by Mr Tosswill]
● 4.5.17 Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building
● 7.4.17 Proposed hotel *height and design* —the very least of it #sellingoursouls
● 5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

█ The following images are taken from Appendix 6 – Consultant Urban Designer’s Report – Appendix plans (PDF, 1.5 MB).

They comprise
● 2 cross sections – originally provided as applicant evidence by Thom Craig Architects Ltd, and
● 7 photomontages of anticipated views – originally provided as applicant evidence by Paterson Pitts Group (surveying, planning, engineering)

– to which new height levels have been added in the evidence provided by independent Urban Design consultant Garth Falconer for Dunedin City Council.

[click to enlarge]








7 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Events, Finance, Heritage, Hot air, Hotel, Housing, Infrastructure, Media, Name, New Zealand, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Town planning, Transportation, Travesty, Urban design, What stadium

“Fat” gawky Hotel and Apartment building : Questionable design even with 4 floors lopped off

What environmental considerations, Mr Page?

More than minor.

[Everyone will remember the learned Mr Page from the Betterways hotel and apartment building application for 41 Wharf St at the waterfront, not so long ago.]

Mr Bryce (independent planner): …a “key concern” for submitters…the building would block sun from reaching the Regent Theatre and surrounds from 3pm at winter solstice. “At this time of year, the proposal will effectively remove all remaining access to sunlight received over [the] southern end of the western side of the Octagon.” (ODT)

Mr Page (the developer’s ‘Brief’): The “potential shading effect” was acknowledged, but Mr Page was confident the hotel’s benefits “will far outweigh” those concerns. (ODT)

Mr Page, again : The hotel’s “tall, slender built form” minimised the impact on those living closest to the hotel project site… (ODT)

Good heavens.

Source: Application documents

At Facebook:

### ODT Online Tue, 11 July 2017
Hotel developer still confident
By Chris Morris
Dunedin’s latest five-star hotel bid will “not be viable” if the developer is forced to reduce the building’s height, it has been claimed. But the man behind the project, Tekapo businessman Anthony Tosswill, remains confident the hearings panel set to decide the project’s fate can yet be swayed by the hotel’s benefits. The comments came from Phil Page, the lawyer acting for Mr Tosswill, days after the public release of an independent planner’s report running the ruler over the hotel proposal.
The report by Nigel Bryce concluded consent be declined unless Mr Tosswill agreed to a “substantial reduction” in the building’s height, by four storeys, to bring it down from 60m to 45.5m.
Read more

****

Resource Consent Application LUC 2017-48 and SUB 2017-26, 143 – 193 Moray Place, Dunedin (Proposed Hotel)

The hearing will be held on Mon 31 Jul, Tue 1 Aug, Wed 2 Aug, Thu 3 Aug and Fri 4 Aug 2017 in the Edinburgh Room, Municipal Chambers (off the Octagon). The hearing will commence at 9.30 am each day.

Consultant Planner’s Section 42a Report (PDF, 4.3 MB)

[excerpt]

SUMMARY OF RECOMMENDATION
[5] For the reasons set out in paragraphs 72 to 334 below, I consider that the Proposal in its current form, will not promote the sustainable management of natural and physical resources in accordance with Part 2 of the Resource Management Act 1991 (RMA or the Act).
[6] The Development promotes a contemporary design, which is considered acceptable within this setting and articulates sufficient design interest and modulation through the facades and its pinwheel like form expressed in the tower component of the building. The building’s design incorporates a base building or podium, which allows the structure to have an active street frontage to Moray Place and Filleul Street, which is considered a positive design response.
[7] The Development will be ‘juxtaposed’ against a backdrop of the heritage buildings located to the east of Moray Place, including the Town Hall and St Paul’s Cathedral when viewed from the west and St Paul’s Cathedral and the Municipal Chambers when viewed from the south (including from the Octagon).
[8] The building’s overall height is considered to generate an over-dominance on properties to the north and west of the Site, and will have more than minor adverse effects on the amenity values of residential properties to the west of the Site. This is largely due to the significant change in scale introduced by the Development and the lower scale built environment that currently exists to the west and north of the development site, comprising predominantly two to three storeys in height.
[9] The Development will adversely impact upon the townscape values of the TH02 Octagon townscape precinct under the Operative Dunedin City District Plan (Operative Plan), including loss of sunlight penetration into the Octagon during the Winter Solstice and will adversely impact upon the setting and pre-eminence of existing heritage buildings such as the St Paul’s Cathedral and the Municipal Chambers building when viewed from the Octagon.
[10] The Development is considered to result in more than minor visual amenity and shading effects on Kingsgate Hotel to the south of the Site. The Kingsgate Hotel will experience prolonged and more sustained loss of light over a wider part of the property and associated buildings over the critical morning period during the Equinox and Winter Solstice periods (or collectively over ¾ of the year). This conclusion has been reached having regard to the potential for the Site to be developed up to a maximum height of 11 metres with a building erected against all boundaries (the ‘controlled activity building outline’).
[11] For the scale of the building to be mitigated to an acceptable level, and to maintain and enhance the amenity values of the City Centre and wider environs, Council’s urban design consultant, Mr [Garth] Falconer recommends reducing the proposed building height by four levels to bring the total height down to nine storeys (Level 13, +157,500 (datum level) on Drawing Section AA). This reduction would provide for a maximum height of 45.6 metres from existing ground level, or a maximum height breach of 34.4 metres (including the lift shaft). This mitigation response would not remove any of the 210 visitor accommodation rooms (hotel rooms), and would maintain supporting facilities including licensed premises, retail, conference, meeting facilities and on-site amenities, parking, and servicing areas. I note, for completeness, that the Applicant is not currently proposing to reduce the height of the Development.
[12] In its current form, it is my recommendation that the proposal should be declined.

More about Garth Falconer, DCC’s consulting urban designer:
LinkedIn profile: https://nz.linkedin.com/in/garth-falconer-a0699bb3
Owner and Director, Reset Urban Design Ltd: http://reseturban.co.nz/

Take a glimpse of the ‘urban form’ at Takapuna, North Shore Auckland (his home turf), to know Mr Falconer is likely missing any handle on building height for a heritage city like Dunedin.

****

Agenda and all documents including Submissions at:

http://www.dunedin.govt.nz/council-online/notified-resource-consents/notified-applications-pending/luc-2017-48-and-sub-2017-26

****

At Facebook [see comments]:

### ODT Online Sat, 8 Jul 2017
Reject hotel bid: planner
By Chris Morris
A planner has recommended rejecting Dunedin’s latest five-star hotel bid, unless the developer agrees to a “substantial reduction” in the building’s height. The recommendation to decline consent came in a report by independent consultant Nigel Bryce, made public yesterday, ahead of the public hearing beginning on July 31. In his report to the panel of independent commissioners, Mr Bryce said the hotel development would “visually dominate” its surroundings, including the town hall, St Paul’s Cathedral and the Municipal Chambers. It would be the tallest building in the central city and would cast a shadow over the Octagon, as well as the nearby Kingsgate Hotel, during winter. Together with other impacts, the development was considered to be “non-complying” under the city’s district plan rules. It would only be acceptable if the building was reduced by four storeys, lowering its overall height from 60m to 45.6m, which was still well above the existing 11m height limit for the site, his report said.
Read more

[initial coverage]
7.7.17 ODT: Decline hotel consent: report

### ODT Online Wed, 28 Jun 2017
Two from North Island on hotel hearings panel
By Chris Morris
The panel to decide the fate of Dunedin’s latest five-star hotel bid features one familiar face and two from the North Island. Tekapo businessman Anthony Tosswill’s bid to build a 17-storey hotel and apartment tower in Dunedin would be considered over five days, beginning on July 31, it was confirmed yesterday. […] The panel of three would be headed by chairman Andrew Noone, now an Otago regional councillor, acting in his role as an independent commissioner. […] Alongside him will be fellow independent commissioners Stephen Daysh, of Napier, and Gavin Lister, of Auckland.
Read more

Related Posts and Comments:
● 14.5.17 RNZ reports July hearings for proposed hotel apartment building [comments by Mr Tosswill]
● 4.5.17 Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building
● 7.4.17 Proposed hotel *height and design* —the very least of it #sellingoursouls
● 5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

Source: Application documents

15 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Enterprise Dunedin, Finance, Geography, Heritage, Hot air, Hotel, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, Otago Polytechnic, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

RNZ reports July hearings for proposed hotel apartment building

Image: Paterson Pitts Group

Image: Thom Craig Architects

### rnz.co.nz Wed, 10 May 2017 at 6:13 p.m.
RNZ News: New Zealand / Business
Hotel plans prioritise visitors over residents – objectors
By Lydia Anderson – Otago/Southland reporter
Residents above the proposed site for Dunedin’s first five-star hotel say it’s not right their view of the city will be blocked so tourists can have a better one. The 17-storey ‘Electric Thistle’ Moray Place design would sit behind the city’s heritage buildings in the Octagon. More than 200 submissions on the project have been filed – three quarters of them in opposition. The hotel’s height and modern design has some residents worried – at about 64m high it would be significantly taller than the current 11m limit imposed on the chosen site, which is currently a carpark.
….The proposed hotel would feature 210 hotel rooms plus apartments, cafe, a wine club, public hot pools and conference rooms.
….The hotel’s developer [?]* Tony Tosswill, who represented Horizon Hospitality Group, said the hotel was being built high rather than wide out of consideration for the views of people living in the city rise area. To meet international five-star standards the hotel needed views and around 200 rooms, he said.
….Public hearings on the submissions will take place in July.
Read more

● Full application: 143-193 Moray Place – LUC-2017-48 and SUB-2017-26
View all submissions

****

The applicant is NZ Horizon Hospitality Group Limited http://www.companies.govt.nz/co/5876487

The name of the building developer/financier hasn’t been announced. Asian finance is suspected as being needed but likely not obtained yet; New Zealand’s Australian-owned banks aren’t providing credit on speculative developments at this scale.

Pullman Hotels is fêted as the hotel manager.

█ Spokesman for the (unnamed) developer is Anthony Tosswill of Tekapo, NZ. Mr Tosswill is not the developer, as may have been construed from MSM news items.

****

The following comments from Mr Tosswill were received for publication by What if? Dunedin in late April. Links to the threads where they appear are provided here:

2017/04/24 at 9:37 pm
Anthony Tosswill
In reply to Elizabeth.
why do you wish to destroy employment in Dunedin, why do you want to prevent creating Jobs and more revenues for the Community and supporting Tourism and local Business?
Why do you wish to keep subsidizing Dunedin venues when they can support themselves with the Services that this Hotel can offer.
Why dont you disclose who you are so People can judge you and your motives. The Jobs that Cadburys will make redundant are you able to give them Jobs or the new Students ending there education.
When was the Last New Hotel Built in Dunedin? Dunedin None Queenstown 6, Queenstown 26,000 Dunedin 126,000.
How about supporting Development, and Jobs or are you one of those that just as you say destroy everything before its starts.
Who am I, I am a spokesman for the Developer

2017/04/24 at 9:46 pm
Anthony Tosswill
In reply to Elizabeth.
Great Video, it suggests you are supporting Terrorism. Is that amusing blowing up things. It also suggests you want to stop Jobs, supporting local Business. preventing People attending Events and Venues, dislike tourism and dont want a venue that supports Dunedin. I suggest you at least remove the Blowing up of the Developments its in very bad taste.
When reading comments on this site its easy to see why it has so little support.
I am a spokesman for the Developer, who are you?

2017/04/25 at 4:58 pm
Anthony Tosswill
In reply to Peter.
I would like to point out that Residents in Londo complained about the about the Shard in London and the London Eye yet, Yet Today we Recognize London for these 2 Buildings as they are also Top Tourists sites as is the Palace. Hindsight is marvelous
Do you recall the complaints when the stadium prior to been Built now its recognized as one of the Top 20 in the World. Dunedin be proud.
One may tell us of Identical Buildings so we can learn from your expertise.
The Design relates to minimizing views from residents behind plus maximizing views of Tourists that want to appreciate Dunedin and its Harbour we believe in our design and concept.
Retrospective opinions are great if you are trying to stop the future progress of Dunedin, if your view point is taken seriously its Dunedin’s loss.
Spokesman for the Developer.

2017/04/25 at 5:28 pm
Anthony Tosswill
In reply to Elizabeth.
Hi Elizabeth,
you made several comments. Architectural design.
a) Design and the Changes,
In Response, I respectfully point out that does not relate to commercial facts or results, hence for any 5 Star Hotel and in Particular in Dunedin our view is very different but it is for this type of Development whats been Built in All Cities around the World, we are one of the 99% (Not the 1%)
b) We have incorporated a Design that shows off Dunedin, with new Technology that is expected today by 5 Star Guests. Dunedin is the Showcase, the Development is to provide Access to the City not be the City~
You suggest and refer to your time and Resources “What are They”?
It Also appears that you think Asians are also different or at least there Money is, maybe you should complain also about the contribution made by Asians that go to Otago University is their money bad? I like Asian People, I married to one.
Love to know more about whatever Cargo Growth is? Are you a Supporter of Cadbury Factory Closure as well? Is that not a local Resource?
400 Persons Daily Spending Money in New 5 Star Hotel in Dunedin is Growth to Dunedin, please re add up the equation since you have an alleged financial background your sums should add up one cold think,
Good on you Farmer for having an independent view point congratulation is this Elizabeth’s Blog its appears to be!
Spokesman for the Developer

Related Posts and Comments:
● 4.5.17 Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building
● 7.4.17 Proposed hotel *height and design* —the very least of it #sellingoursouls
● 5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

14 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Enterprise Dunedin, Finance, Geography, Heritage, Hot air, Hotel, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, Otago Polytechnic, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building

Where to access more information about the application:

Dunedin City Council website:

█ Current notified resource consent applications
http://www.dunedin.govt.nz/council-online/notified-resource-consents

Applicant: NZ Horizon Hospitality Group Limited
[ http://www.companies.govt.nz/co/5876487 ]
Subject site: 143-193 Moray Place
Status: Non-complying activity
Submissions close: Wednesday, 10 May 2017 at 5:00 p.m.

█ Application information + submission information/online form at:
143-193 Moray Place – Non-complying activity – LUC-2017-48 and SUB-2017-26

A P P L I C A T I O N ● D E S C R I P T I O N

Land use consent is sought to construct and operate a commercial residential development involving 210 visitor accommodation rooms (hotel rooms), 64 self-contained apartments, four self-contained penthouse suites, together with licensed premises, retail, conference, meeting facilities and on-site amenities, parking, and servicing. The development proposes a new building with 17 storeys (including the lift core on the top of the building, and three levels of the building extending below ground). The overall height of the proposed building varies in relation to the existing ground level, but will be approximately 62.5m at the highest point above the existing ground level (including the lift core). The proposed building is assessed as a non-complying activity under the operative Dunedin City District Plan. The application includes an assessment of effects.

Land use consent is also sought for earthworks because the site development will involve an estimated 8,914m3 of earthworks and a maximum cut depth of 7.35 metres from existing ground level.

Subdivision consent is sought for a unit title subdivision in relation to the proposed building. The application includes plans of the proposed subdivision.
The subject site is located in the Central Activity Zone in the operative Dunedin City District Plan and is located within the north Princes Street/Moray Place/Exchange townscape precinct TH03.

The proposed building is a non-complying activity under the operative Dunedin City District Plan (due to non-compliance with Rule 9.5.2(i) no front or side yards, Rule 9.5.2(iii) veranda requirements along Filleul Street frontage of the site, and signage under Rule 9.5.2(vi)). The building also exceeds the maximum 11 metre height limit under Rule 9.5.2(ii) which requires consent as a restricted discretionary activity under Rule 9.5.3(i). The proposal is also a controlled activity under Townscape Rule 13.7.2(i).  

The proposed earthworks are a restricted discretionary activity under Rule 17.7.3 of the operative Dunedin City District Plan.

The unit title subdivision is a non-complying activity under Rule 18.5.2. Rule 18.5.3 requires that every allotment in a subdivision must have both legal access and vehicle access to a formed road. The rules for subdivision do not expressly provide for unit title divisions where the allotments created may comprise multiple units within a building.

The subject site is zoned Central Business District in the proposed Second Generation Plan and a secondary pedestrian frontage applies.

The proposed 2GP was notified on 26 September 2015. The relevant objectives and policies of the 2GP must be considered. Rules in the 2GP can be deemed as operative if no submissions have been made in opposition. The application says that some 2GP rules may be deemed operative. If the decision maker determines that 2GP rules are deemed operative these rules will apply instead of the corresponding Dunedin City District Plan rule. {bolding by whatifdunedin}

SUB-2017-26 & LUC-2017-48 – Public Notice (PDF, 31.4 KB)

Please read the accompanying documents and reports that apply to this application, as listed here.

M A K I N G ● A ● S U B M I S S I O N

Online submission form

SUB-2016-26 & LUC-2017-48 – Submission Form (Form 13) (PDF, 38.9 KB)

IMPORTANT: If you wish to make a submission on this application you may do so by sending a written submission to the consent authority, Dunedin City Council at PO Box 5045, Moray Place, Dunedin, 9058 Attn: City Planning, no later than 5:00 pm on the closing date shown.
Email: resconsent.submission@dcc.govt.nz

The submission must be dated, signed by you, and include the following information:

• Your name and postal address and phone number/fax number;
• Details of the application in respect of which you are making the submission including location;
• Whether you support, oppose, or are neutral towards the application;
• Your submission, with reasons;
• The decision you wish the consent authority to make;
• Whether you wish to be heard in support of your submission.

Please note: If you make your submission by electronic means, a signature is not required.

An acknowledgment of your submission will be sent by post when the submission is accepted as complete. The application may be viewed at the City Planning Enquiries Desk, Customer Service Centre on the Ground Floor, Civic Centre, 50 The Octagon.

You must serve a copy of your submission on NZ Horizon Hospitality Group Limited, the applicant, whose address for service is Anderson & Co Resource Management, PO Box 5933, Dunedin 9058, as soon as reasonably practicable after serving your submission on the Dunedin City Council.

Alternatively, you can Email copy of your submission to NZ Horizon Hospitality Group Limited via Anderson & Co Resource Management (Dunedin) –
Attention: Conrad Anderson conrad_a@xtra.co.nz

V I E W S ● A N D ● L A N D S C A P E ● C O N T E X T

7. Architectural Drawings, including Arch Statement and earthworks (PDF)
8. Subdivision plans (PDF)
13a. Photomontage notes (PDF)
13b. Photomontage (PDF)
13c. Anticipated Views Assessment Notes – supplementary (PDF)
20. Urban Design (PDF)
21. Memo – Re: Glass (PDF)

NB. Note a number of the angled street views provided in the application are partial only – the full extent of the proposed building (in order to help assess accompanying effects) is not given except in wider landscape perspectives such as when seen from across the harbour or along street vistas. Most close-up perspective views of the proposed building, such as when seen from the Octagon, may appear to be ‘diminished’ or foreshortened in height – scale accuracy is difficult to determine in the presentation renders without technical knowledge of how the views were generated. It is somewhat likely that independent peer review(s) of the (landscape and townscape) presentation renders provided by the applicant and their consultants will be sought by submitters, if not the processing authority.

█ Spokesman for the (unnamed) developer is Anthony Tosswill of Tekapo, NZ.
Mr Tosswill has noted in comments to What if? Dunedin that he speaks for the developer. Mr Tosswill is not the developer, as may have been construed from news items published by the Otago Daily Times previously.

Posted by Elizabeth Kerr

This post is offered in the public interest.

Selected renders from application documents : Thom Craig Architects and Paterson Pitts Group

*Poor quality of images as received via DCC webpages.

70 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Geography, Heritage, Hotel, Infrastructure, Name, New Zealand, OAG, Ombudsman, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Urban design, What stadium

Proposed hotel *height and design* —the very least of it #sellingoursouls

At Facebook:

[screenshot]

Channel 39 via YouTube [screenshot]

Related Post and Comments:
5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks

Posted by Elizabeth Kerr

This post is offered in the public interest.

7 Comments

Filed under Architecture, Baloney, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Heritage, Hot air, Infrastructure, LGNZ, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, Other, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, SFO, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks

At Facebook:

****

Tekapo-based businessman Anthony Tosswill is hoping to send the signal “the city is open” with this master-disaster, or something closely akin.
JFC i

An application for resource consent was lodged with DCC today for this unlanced boil on the elegant hind quarter of our heritage city.

Details in brief according to ODT deputy editor Craig Page at Channel 39 News tonight:

● 17 storey ‘glass hotel in central city’
● 60 [read 64] metres at highest point
● 210 rooms
● 64 apartments
● 4 penthourse suites
as well as retail opportunities.

The proposal exceeds the district plan height limit (11 metres) – meaning the application is to be publicly notified.

ODT will publish concept renders and contextuals tomorrow.

Get your Smart Hats on Dunedinites, give him a fricking run for his (or other people’s) money. Beyond the Mass Unsightliness, you will lose your convenient central city parking area – be prepared to walk for blocks next time you want to attend events at the Council, Town Hall, Dunedin Public Art Gallery, Central Library or Regent Theatre.

Has the Dunedin City Council SOLD YOU OUT ???
Ratepayers own/owned the site. What DEAL has been done by council politicians and staff to prosper an OUT OF TOWN private individual above and beyond your immediate and long term LOCAL requirements in the central city.
JFC ii

DCC Webmap – Filleul St council-owned parking area (shaded)

Market Gap Report Hotels – Evidence Stephen Hamilton, Horwath HTL
December 2012 (PDF, 482 KB)

Related Posts and Comments:
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

60 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Heritage, Hotel, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Tourism, Town planning, Travesty, Urban design, What stadium