“Fat” gawky Hotel and Apartment building : Questionable design even with 4 floors lopped off

What environmental considerations, Mr Page?

More than minor.

[Everyone will remember the learned Mr Page from the Betterways hotel and apartment building application for 41 Wharf St at the waterfront, not so long ago.]

Mr Bryce (independent planner): …a “key concern” for submitters…the building would block sun from reaching the Regent Theatre and surrounds from 3pm at winter solstice. “At this time of year, the proposal will effectively remove all remaining access to sunlight received over [the] southern end of the western side of the Octagon.” (ODT)

Mr Page (the developer’s ‘Brief’): The “potential shading effect” was acknowledged, but Mr Page was confident the hotel’s benefits “will far outweigh” those concerns. (ODT)

Mr Page, again : The hotel’s “tall, slender built form” minimised the impact on those living closest to the hotel project site… (ODT)

Good heavens.

Source: Application documents

At Facebook:

### ODT Online Tue, 11 July 2017
Hotel developer still confident
By Chris Morris
Dunedin’s latest five-star hotel bid will “not be viable” if the developer is forced to reduce the building’s height, it has been claimed. But the man behind the project, Tekapo businessman Anthony Tosswill, remains confident the hearings panel set to decide the project’s fate can yet be swayed by the hotel’s benefits. The comments came from Phil Page, the lawyer acting for Mr Tosswill, days after the public release of an independent planner’s report running the ruler over the hotel proposal.
The report by Nigel Bryce concluded consent be declined unless Mr Tosswill agreed to a “substantial reduction” in the building’s height, by four storeys, to bring it down from 60m to 45.5m.
Read more

****

Resource Consent Application LUC 2017-48 and SUB 2017-26, 143 – 193 Moray Place, Dunedin (Proposed Hotel)

The hearing will be held on Mon 31 Jul, Tue 1 Aug, Wed 2 Aug, Thu 3 Aug and Fri 4 Aug 2017 in the Edinburgh Room, Municipal Chambers (off the Octagon). The hearing will commence at 9.30 am each day.

Consultant Planner’s Section 42a Report (PDF, 4.3 MB)

[excerpt]

SUMMARY OF RECOMMENDATION
[5] For the reasons set out in paragraphs 72 to 334 below, I consider that the Proposal in its current form, will not promote the sustainable management of natural and physical resources in accordance with Part 2 of the Resource Management Act 1991 (RMA or the Act).
[6] The Development promotes a contemporary design, which is considered acceptable within this setting and articulates sufficient design interest and modulation through the facades and its pinwheel like form expressed in the tower component of the building. The building’s design incorporates a base building or podium, which allows the structure to have an active street frontage to Moray Place and Filleul Street, which is considered a positive design response.
[7] The Development will be ‘juxtaposed’ against a backdrop of the heritage buildings located to the east of Moray Place, including the Town Hall and St Paul’s Cathedral when viewed from the west and St Paul’s Cathedral and the Municipal Chambers when viewed from the south (including from the Octagon).
[8] The building’s overall height is considered to generate an over-dominance on properties to the north and west of the Site, and will have more than minor adverse effects on the amenity values of residential properties to the west of the Site. This is largely due to the significant change in scale introduced by the Development and the lower scale built environment that currently exists to the west and north of the development site, comprising predominantly two to three storeys in height.
[9] The Development will adversely impact upon the townscape values of the TH02 Octagon townscape precinct under the Operative Dunedin City District Plan (Operative Plan), including loss of sunlight penetration into the Octagon during the Winter Solstice and will adversely impact upon the setting and pre-eminence of existing heritage buildings such as the St Paul’s Cathedral and the Municipal Chambers building when viewed from the Octagon.
[10] The Development is considered to result in more than minor visual amenity and shading effects on Kingsgate Hotel to the south of the Site. The Kingsgate Hotel will experience prolonged and more sustained loss of light over a wider part of the property and associated buildings over the critical morning period during the Equinox and Winter Solstice periods (or collectively over ¾ of the year). This conclusion has been reached having regard to the potential for the Site to be developed up to a maximum height of 11 metres with a building erected against all boundaries (the ‘controlled activity building outline’).
[11] For the scale of the building to be mitigated to an acceptable level, and to maintain and enhance the amenity values of the City Centre and wider environs, Council’s urban design consultant, Mr [Garth] Falconer recommends reducing the proposed building height by four levels to bring the total height down to nine storeys (Level 13, +157,500 (datum level) on Drawing Section AA). This reduction would provide for a maximum height of 45.6 metres from existing ground level, or a maximum height breach of 34.4 metres (including the lift shaft). This mitigation response would not remove any of the 210 visitor accommodation rooms (hotel rooms), and would maintain supporting facilities including licensed premises, retail, conference, meeting facilities and on-site amenities, parking, and servicing areas. I note, for completeness, that the Applicant is not currently proposing to reduce the height of the Development.
[12] In its current form, it is my recommendation that the proposal should be declined.

More about Garth Falconer, DCC’s consulting urban designer:
LinkedIn profile: https://nz.linkedin.com/in/garth-falconer-a0699bb3
Owner and Director, Reset Urban Design Ltd: http://reseturban.co.nz/

Take a glimpse of the ‘urban form’ at Takapuna, North Shore Auckland (his home turf), to know Mr Falconer is likely missing any handle on building height for a heritage city like Dunedin.

****

Agenda and all documents including Submissions at:

http://www.dunedin.govt.nz/council-online/notified-resource-consents/notified-applications-pending/luc-2017-48-and-sub-2017-26

****

At Facebook [see comments]:

### ODT Online Sat, 8 Jul 2017
Reject hotel bid: planner
By Chris Morris
A planner has recommended rejecting Dunedin’s latest five-star hotel bid, unless the developer agrees to a “substantial reduction” in the building’s height. The recommendation to decline consent came in a report by independent consultant Nigel Bryce, made public yesterday, ahead of the public hearing beginning on July 31. In his report to the panel of independent commissioners, Mr Bryce said the hotel development would “visually dominate” its surroundings, including the town hall, St Paul’s Cathedral and the Municipal Chambers. It would be the tallest building in the central city and would cast a shadow over the Octagon, as well as the nearby Kingsgate Hotel, during winter. Together with other impacts, the development was considered to be “non-complying” under the city’s district plan rules. It would only be acceptable if the building was reduced by four storeys, lowering its overall height from 60m to 45.6m, which was still well above the existing 11m height limit for the site, his report said.
Read more

[initial coverage]
7.7.17 ODT: Decline hotel consent: report

### ODT Online Wed, 28 Jun 2017
Two from North Island on hotel hearings panel
By Chris Morris
The panel to decide the fate of Dunedin’s latest five-star hotel bid features one familiar face and two from the North Island. Tekapo businessman Anthony Tosswill’s bid to build a 17-storey hotel and apartment tower in Dunedin would be considered over five days, beginning on July 31, it was confirmed yesterday. […] The panel of three would be headed by chairman Andrew Noone, now an Otago regional councillor, acting in his role as an independent commissioner. […] Alongside him will be fellow independent commissioners Stephen Daysh, of Napier, and Gavin Lister, of Auckland.
Read more

Related Posts and Comments:
● 14.5.17 RNZ reports July hearings for proposed hotel apartment building [comments by Mr Tosswill]
● 4.5.17 Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building
● 7.4.17 Proposed hotel *height and design* —the very least of it #sellingoursouls
● 5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

Source: Application documents

6 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Enterprise Dunedin, Finance, Geography, Heritage, Hot air, Hotel, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, Otago Polytechnic, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

RNZ reports July hearings for proposed hotel apartment building

Image: Paterson Pitts Group

Image: Thom Craig Architects

### rnz.co.nz Wed, 10 May 2017 at 6:13 p.m.
RNZ News: New Zealand / Business
Hotel plans prioritise visitors over residents – objectors
By Lydia Anderson – Otago/Southland reporter
Residents above the proposed site for Dunedin’s first five-star hotel say it’s not right their view of the city will be blocked so tourists can have a better one. The 17-storey ‘Electric Thistle’ Moray Place design would sit behind the city’s heritage buildings in the Octagon. More than 200 submissions on the project have been filed – three quarters of them in opposition. The hotel’s height and modern design has some residents worried – at about 64m high it would be significantly taller than the current 11m limit imposed on the chosen site, which is currently a carpark.
….The proposed hotel would feature 210 hotel rooms plus apartments, cafe, a wine club, public hot pools and conference rooms.
….The hotel’s developer [?]* Tony Tosswill, who represented Horizon Hospitality Group, said the hotel was being built high rather than wide out of consideration for the views of people living in the city rise area. To meet international five-star standards the hotel needed views and around 200 rooms, he said.
….Public hearings on the submissions will take place in July.
Read more

● Full application: 143-193 Moray Place – LUC-2017-48 and SUB-2017-26
View all submissions

****

The applicant is NZ Horizon Hospitality Group Limited http://www.companies.govt.nz/co/5876487

The name of the building developer/financier hasn’t been announced. Asian finance is suspected as being needed but likely not obtained yet; New Zealand’s Australian-owned banks aren’t providing credit on speculative developments at this scale.

Pullman Hotels is fêted as the hotel manager.

█ Spokesman for the (unnamed) developer is Anthony Tosswill of Tekapo, NZ. Mr Tosswill is not the developer, as may have been construed from MSM news items.

****

The following comments from Mr Tosswill were received for publication by What if? Dunedin in late April. Links to the threads where they appear are provided here:

2017/04/24 at 9:37 pm
Anthony Tosswill
In reply to Elizabeth.
why do you wish to destroy employment in Dunedin, why do you want to prevent creating Jobs and more revenues for the Community and supporting Tourism and local Business?
Why do you wish to keep subsidizing Dunedin venues when they can support themselves with the Services that this Hotel can offer.
Why dont you disclose who you are so People can judge you and your motives. The Jobs that Cadburys will make redundant are you able to give them Jobs or the new Students ending there education.
When was the Last New Hotel Built in Dunedin? Dunedin None Queenstown 6, Queenstown 26,000 Dunedin 126,000.
How about supporting Development, and Jobs or are you one of those that just as you say destroy everything before its starts.
Who am I, I am a spokesman for the Developer

2017/04/24 at 9:46 pm
Anthony Tosswill
In reply to Elizabeth.
Great Video, it suggests you are supporting Terrorism. Is that amusing blowing up things. It also suggests you want to stop Jobs, supporting local Business. preventing People attending Events and Venues, dislike tourism and dont want a venue that supports Dunedin. I suggest you at least remove the Blowing up of the Developments its in very bad taste.
When reading comments on this site its easy to see why it has so little support.
I am a spokesman for the Developer, who are you?

2017/04/25 at 4:58 pm
Anthony Tosswill
In reply to Peter.
I would like to point out that Residents in Londo complained about the about the Shard in London and the London Eye yet, Yet Today we Recognize London for these 2 Buildings as they are also Top Tourists sites as is the Palace. Hindsight is marvelous
Do you recall the complaints when the stadium prior to been Built now its recognized as one of the Top 20 in the World. Dunedin be proud.
One may tell us of Identical Buildings so we can learn from your expertise.
The Design relates to minimizing views from residents behind plus maximizing views of Tourists that want to appreciate Dunedin and its Harbour we believe in our design and concept.
Retrospective opinions are great if you are trying to stop the future progress of Dunedin, if your view point is taken seriously its Dunedin’s loss.
Spokesman for the Developer.

2017/04/25 at 5:28 pm
Anthony Tosswill
In reply to Elizabeth.
Hi Elizabeth,
you made several comments. Architectural design.
a) Design and the Changes,
In Response, I respectfully point out that does not relate to commercial facts or results, hence for any 5 Star Hotel and in Particular in Dunedin our view is very different but it is for this type of Development whats been Built in All Cities around the World, we are one of the 99% (Not the 1%)
b) We have incorporated a Design that shows off Dunedin, with new Technology that is expected today by 5 Star Guests. Dunedin is the Showcase, the Development is to provide Access to the City not be the City~
You suggest and refer to your time and Resources “What are They”?
It Also appears that you think Asians are also different or at least there Money is, maybe you should complain also about the contribution made by Asians that go to Otago University is their money bad? I like Asian People, I married to one.
Love to know more about whatever Cargo Growth is? Are you a Supporter of Cadbury Factory Closure as well? Is that not a local Resource?
400 Persons Daily Spending Money in New 5 Star Hotel in Dunedin is Growth to Dunedin, please re add up the equation since you have an alleged financial background your sums should add up one cold think,
Good on you Farmer for having an independent view point congratulation is this Elizabeth’s Blog its appears to be!
Spokesman for the Developer

Related Posts and Comments:
● 4.5.17 Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building
● 7.4.17 Proposed hotel *height and design* —the very least of it #sellingoursouls
● 5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

14 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Enterprise Dunedin, Finance, Geography, Heritage, Hot air, Hotel, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, Otago Polytechnic, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building

Where to access more information about the application:

Dunedin City Council website:

█ Current notified resource consent applications
http://www.dunedin.govt.nz/council-online/notified-resource-consents

Applicant: NZ Horizon Hospitality Group Limited
[ http://www.companies.govt.nz/co/5876487 ]
Subject site: 143-193 Moray Place
Status: Non-complying activity
Submissions close: Wednesday, 10 May 2017 at 5:00 p.m.

█ Application information + submission information/online form at:
143-193 Moray Place – Non-complying activity – LUC-2017-48 and SUB-2017-26

A P P L I C A T I O N ● D E S C R I P T I O N

Land use consent is sought to construct and operate a commercial residential development involving 210 visitor accommodation rooms (hotel rooms), 64 self-contained apartments, four self-contained penthouse suites, together with licensed premises, retail, conference, meeting facilities and on-site amenities, parking, and servicing. The development proposes a new building with 17 storeys (including the lift core on the top of the building, and three levels of the building extending below ground). The overall height of the proposed building varies in relation to the existing ground level, but will be approximately 62.5m at the highest point above the existing ground level (including the lift core). The proposed building is assessed as a non-complying activity under the operative Dunedin City District Plan. The application includes an assessment of effects.

Land use consent is also sought for earthworks because the site development will involve an estimated 8,914m3 of earthworks and a maximum cut depth of 7.35 metres from existing ground level.

Subdivision consent is sought for a unit title subdivision in relation to the proposed building. The application includes plans of the proposed subdivision.
The subject site is located in the Central Activity Zone in the operative Dunedin City District Plan and is located within the north Princes Street/Moray Place/Exchange townscape precinct TH03.

The proposed building is a non-complying activity under the operative Dunedin City District Plan (due to non-compliance with Rule 9.5.2(i) no front or side yards, Rule 9.5.2(iii) veranda requirements along Filleul Street frontage of the site, and signage under Rule 9.5.2(vi)). The building also exceeds the maximum 11 metre height limit under Rule 9.5.2(ii) which requires consent as a restricted discretionary activity under Rule 9.5.3(i). The proposal is also a controlled activity under Townscape Rule 13.7.2(i).  

The proposed earthworks are a restricted discretionary activity under Rule 17.7.3 of the operative Dunedin City District Plan.

The unit title subdivision is a non-complying activity under Rule 18.5.2. Rule 18.5.3 requires that every allotment in a subdivision must have both legal access and vehicle access to a formed road. The rules for subdivision do not expressly provide for unit title divisions where the allotments created may comprise multiple units within a building.

The subject site is zoned Central Business District in the proposed Second Generation Plan and a secondary pedestrian frontage applies.

The proposed 2GP was notified on 26 September 2015. The relevant objectives and policies of the 2GP must be considered. Rules in the 2GP can be deemed as operative if no submissions have been made in opposition. The application says that some 2GP rules may be deemed operative. If the decision maker determines that 2GP rules are deemed operative these rules will apply instead of the corresponding Dunedin City District Plan rule. {bolding by whatifdunedin}

SUB-2017-26 & LUC-2017-48 – Public Notice (PDF, 31.4 KB)

Please read the accompanying documents and reports that apply to this application, as listed here.

M A K I N G ● A ● S U B M I S S I O N

Online submission form

SUB-2016-26 & LUC-2017-48 – Submission Form (Form 13) (PDF, 38.9 KB)

IMPORTANT: If you wish to make a submission on this application you may do so by sending a written submission to the consent authority, Dunedin City Council at PO Box 5045, Moray Place, Dunedin, 9058 Attn: City Planning, no later than 5:00 pm on the closing date shown.
Email: resconsent.submission@dcc.govt.nz

The submission must be dated, signed by you, and include the following information:

• Your name and postal address and phone number/fax number;
• Details of the application in respect of which you are making the submission including location;
• Whether you support, oppose, or are neutral towards the application;
• Your submission, with reasons;
• The decision you wish the consent authority to make;
• Whether you wish to be heard in support of your submission.

Please note: If you make your submission by electronic means, a signature is not required.

An acknowledgment of your submission will be sent by post when the submission is accepted as complete. The application may be viewed at the City Planning Enquiries Desk, Customer Service Centre on the Ground Floor, Civic Centre, 50 The Octagon.

You must serve a copy of your submission on NZ Horizon Hospitality Group Limited, the applicant, whose address for service is Anderson & Co Resource Management, PO Box 5933, Dunedin 9058, as soon as reasonably practicable after serving your submission on the Dunedin City Council.

Alternatively, you can Email copy of your submission to NZ Horizon Hospitality Group Limited via Anderson & Co Resource Management (Dunedin) –
Attention: Conrad Anderson conrad_a@xtra.co.nz

V I E W S ● A N D ● L A N D S C A P E ● C O N T E X T

7. Architectural Drawings, including Arch Statement and earthworks (PDF)
8. Subdivision plans (PDF)
13a. Photomontage notes (PDF)
13b. Photomontage (PDF)
13c. Anticipated Views Assessment Notes – supplementary (PDF)
20. Urban Design (PDF)
21. Memo – Re: Glass (PDF)

NB. Note a number of the angled street views provided in the application are partial only – the full extent of the proposed building (in order to help assess accompanying effects) is not given except in wider landscape perspectives such as when seen from across the harbour or along street vistas. Most close-up perspective views of the proposed building, such as when seen from the Octagon, may appear to be ‘diminished’ or foreshortened in height – scale accuracy is difficult to determine in the presentation renders without technical knowledge of how the views were generated. It is somewhat likely that independent peer review(s) of the (landscape and townscape) presentation renders provided by the applicant and their consultants will be sought by submitters, if not the processing authority.

█ Spokesman for the (unnamed) developer is Anthony Tosswill of Tekapo, NZ.
Mr Tosswill has noted in comments to What if? Dunedin that he speaks for the developer. Mr Tosswill is not the developer, as may have been construed from news items published by the Otago Daily Times previously.

Posted by Elizabeth Kerr

This post is offered in the public interest.

Selected renders from application documents : Thom Craig Architects and Paterson Pitts Group

*Poor quality of images as received via DCC webpages.

70 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Geography, Heritage, Hotel, Infrastructure, Name, New Zealand, OAG, Ombudsman, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Urban design, What stadium