Tag Archives: Protest

Apartment hotel proposal has FATAL Flaws : ODT offers Flimsy Poll

Updated post.
Tue, 7 Aug 2017 at 2:58 p.m.

We (Dunedin) are confronted by a poorly detailed, plonk-down apartment building proposal that we suspect is fronted by an agent for Asian developers –it would not be unusual for such a proposal to be offered on the strength of tainted money looking for safe haven in the South Pacific.

Our gullible country.
The gullible shiny pants Grow Dunedin partnership.
Our ever so gullible city council under the leadership of cull-cat Cull.

A massively over-height apartment building with a frilly hard-to-read podium base is proposed —a building that may never see a five star hotel as the anchor tenant (never believe unquantified/unqualified pitches from used car salesmen, if all they offer is a Price plucked from the air).

Not so long ago large tracts of New Zealand land were bought and sold for glass beads and muskets.

A lot can happen between resource consent being granted and a deathly, failing, improperly costed build.

Is Dunedin City Council about to find out.

Beware the gift horse.
It turned out Dunedin disliked the hocks of the last one (41 Wharf St), ridden by a little cardigan-wearer. The local suits were paid to make the waterfront tower seem generous, rousing and necessary. Ha-haaa.

At ALL times, the Dunedin City Council MUST stay acutely awake despite its needful dependence on independent commissioners and independent professional advisors – the latter advisors, along with some council staff, appear to have greatly missed the Fact that the minimal concept plans presented for 143-193 Moray Place DO NOT provide a workable building; or a building compliant with district plan objectives, policies, rules, and anticipated environmental results ….or prevailing traffic standards.

Oh dear. ‘So much’ [$$$] for the independent advice. Yes, expensive use of expert and staff time to massage the applicant dream – to no convincing or winning effect.

Further, Dunedin City Council MUST be prepared to APPEAL the outcome of the decision-making process should it wish to AVOID being left with another expensive DEBT VEHICLE in the form of one unfinished and or leaky building …..as the collapsed companies, and dusty heels of run-away developers and construction personnel disappear back to Asian shores, far away from Lake Tekapo ….. dangerously constructed, whole or in part, as a further burden on beleaguered Ratepayers of this fair city.

“What a stupid thing to assume!” you thunder.
“How? On what grounds?”, you chide.
“Dunedin NEEDS a five star hotel!”, imperiously.

You think it’s that simple ??
You’re about to be done over, Buds.

The inference being, oh great apartment hotel supporters, that all that glistens in green-tinted glass is gold, or might be a five star hotel. Yeah right.

It never was. The gold, I mean.
The five star hotel, I mean.
A hoover-up of NZ cash to offshore parties who remain anonymous throughout planning and consenting, and construction and building operation; all supported by the errant notion of immigrant labour and (imperfect) imported materials.

You might as well ask now, How MUCH will the Dunedin economy make ($$$) on this “slap in the face” to the community owned district plan (statutory), and the (strategic) spatial and the central city plans which are publicly consulted policy directions informing the city council’s annual and long term plans.

Not much.

****

During five days of evidence and submissions, one knowledgeable submitter, Mr Russell Lund – well up on construction management, hotel building costs, the visitor accommodation market and investment patterns, and the risk and liability to local authorities in consequence – carefully outlined the quandaries which for various councils around New Zealand have become money-losing Unalterable Fact.

In the original written submission for himself and Suzanne Lund (affected property owners), Mr Lund asserted:

The “assessment of effects” is hollow and of no substance. Under the Act, the assessment of effects is required to be just that, an assessment of effects on the affected properties and tenants. Incredibly, the assessment makes no attempt to examine the effects on all the affected parties.

This, of course, is echoed in independently written and voiced submissions by many opposing the application; and curiously, it is underlined in evidence given by Mr Don Anderson (planning consultant) and Mr David Compton-Moen (urban design, visual amenity consultant), for the applicant.

My own submission to hearing states:

We can’t take what is offered [from the applicant] on trust, because it is incomplete and imprecise; therefore the assessment of effects is difficult to pin down to anything concrete and remains unhelpfully superficial – this was “the work” the applicant was to table for us, we thought, to generously persuade us that moving beyond the ‘norms’ of height in this Dunedin location has measurable benefits against other sites or, through strong honest examination of design alternatives for this site.

I am open to being persuaded. It is expensive to do that persuading. However, it has to happen in other city centres in this country. For an expensive building, isn’t it worth doing the budgeting for preparation of your case – to get the result you want, which is consent to subdivide and build. These are open questions but they lie at the heart of A for architecture as the practical art and science of building economics and professional practice. Behind and in front of the commercial facades, that must have depth of delivery. […] And so I come to the white building model here [a 3D-printed solid plastic model of the proposed building, of hand-held size, put into evidence by Christchurch architect Thom Craig], and the drawings presented by the applicant. There appears to have been too much time spent on merely diagrammatic ‘entreaties’ to architectural form and texture without hacking into 3D investigation. There is not one clear drawing of the way the podium can work for the public or the ‘retailers’ or ‘exhibitors’ – or indeed the people staying at the hotel, servicing the building functions and or using vehicles on site. We get an idea ‘about it’, a not convincing one, there is too much guesswork to do. And so the commissioners’ questions have been rather intense.

****

Now, back to the points the Lunds are making. In their original submission on the application, Mr Lund says:

7. I have serious concerns about the expertise and amount of resource that has gone into assessing the feasibility of the project. In the last year, the Otago Daily Times advised the developer, Mr Tosswill of Horizon Hospitality, had indicated that the cost of the project, which was then 200 rooms and 52 apartments was $50-75M. The proposal now is for 210 rooms and 66 apartments, which is not substantially different. The car parking and front of house areas are similar to the original application. The application confirms the hotel has a gross floor area of 20,835 m2.
In my opinion this hotel will be not built for anything less than around $100M, and this casts serious doubts over the viability of the scheme.
Evidence of this is found for the building costs of the much simpler 200 room 4 star Novotel Hotel being built at Christchurch airport after a competitive tender process (and utilising an Asian fabricated structural steel structure). It is well known in the building industry that the tender costs received for that very regular and efficient 7 level hotel were $4,500-5,000 per m2. The Novotel is a filing cabinet design, that is, it is a completely regular rectangular structure which provides the most efficient floorplates and the best wall to floor ratio, ie the least amount of exterior wall enclosing the maximum possible amount of interior space. The Novotel has no balconies.
The applicant’s proposal is far less efficient, and therefore more costly per m2, as it is effectively three blocks grouped around a central core, but the blocks themselves are not rectangular, but have recesses, and there is a significant amount of extra cost with most rooms having screened “smokers” balconies, which entails effectively, 2 exterior systems, one for the rooms, and another enclosing the balconies.

8. The application confirms there are 16,136 m2 of above ground (habitable or hospitality space) and 4,687 m2 of below ground, back of house / car park space. At a cost of $2,200-2,500 per m2 for the below ground floors, and $5,500 per m2 for the above ground space, the proposal has a construction cost of over $100m, excluding land, furnishings, design marketing, et al. The total budget excluding GST will be around $130M. A feasibility study will typically have to include a development margin of at least 20 %, preferably 25 %, if any sort of lender is involved. This means the end value of the project will need to be at or over $160M. If the best case scenario is adopted and Mr Tosswill is able to convince Chinese or other overseas investors to pay the current market value in Queenstown for premium, new managed hotel rooms and apartments of $10,000 per m2 – for a hotel with an unproven demand in Dunedin, it is still not enough.
Selling all the apartments and hotel rooms will yield about $90M, which is a long, long way from the $160M end value needed. The parking and lower public floor spaces on a yield basis will have a value of around $10M, that might get the project to $100M. Mr Tosswill in earlier reports stated that the value was around $90M, so while there is broad agreement on the likely end value, the estimate of the cost is not close to reality. Mr Tosswill may be planning to bring in a Chinese construction company who will park a retired cruise ship at the waterfront for the duration of the project and have their workers stay there, but they will be subject to the same minimum wage laws, working conditions and health and safety requirements that local companies face, which will dramatically reduce any cost benefit from using overseas labour. (The idea of having a cruise ship accommodating Chinese workers is not fanciful – the Chinese government offered to repair the damaged sections of SH1 after last year’s Kaikoura earthquake using that same method, and did not require any New Zealand labour resources, but the Government decided that this was politically unacceptable). One hopes it would be also unacceptable to have a Council endorsed project built using essentially, forced labour.

9. There is sufficient doubt around the financial viability of the project that the applicant should provide some evidence that the entire scheme is not in fact fanciful, but makes economic sense, and provide details about the proposed ownership model, which is highly relevant to Council, in light of their liability which is discussed below.

10. Mr Tosswill may think he is able to make savings from current building costs by utilising Chinese products, but many Local Authorities around New Zealand are very wary of various untested products as there have been many failures for which Local Authorities ultimately end up bearing the cost of.
This raises another issue which is the massive liability that the building control division of the Dunedin City Council will be exposed to, in relation to its building consent approval and compliance monitoring. The experience of the QLDC in recent years is extremely relevant : A large number of hotel and apartments have been built in Queenstown and the individual hotel rooms and apartments are sold off individually. A body corporate is then responsible for repairs and maintenance. The developer has no long term or permanent stake in the completed structure, and therefore no incentive to specify materials and pay for quality standards with the long term in mind. As Warren Buffet has said, “show me the incentive and I will show you the result”, and the result for QLDC has been an ongoing series of legal actions brought by Body Corporates against Council, alleging that Council was at fault in some form, and as they are the “last man standing”, the Council have inevitably had to pay substantial figures. [I have] experience of several of these, having repaired one major complex in Queenstown at a cost of several million dollars, and provided cost evidence in regard to two others, also in Queenstown in the last year. It should be remembered that QLDC has a 7 metre height limit, but despite this, on complexes less than a quarter of the size of the proposed hotels, the cost to repair has run to millions. QLDC has advised this year in the Otago Daily Times that it has now completely drained its reserve fund for remedial building work, and any further costs will need to come directly from ratepayers. It has spent $3.6M just on legal fees for remedial building liability cases, which will rise to close to $4M by the end of this year.

11. At the Hearing, in submission, some proposals will be presented to show how the design liability and weathertightness risk to Council and ratepayers can be mitigated in the unlikely event that the proposal is given consent and such consent is upheld in the Environment Court.

Proposal 1 : A bond be posted with Council to cover sufficient funds to get the building to completed weathertight envelope and have the podium and all external works completed in the event the project is halted.

Proposal 2 : The applicant provide a Owners Protective Professional Indemnity, and have DCC named as an insured party on the policy. This is to protect indemnify the DCC against any claims brought against them in relation the building consent process, compliance monitoring or any matter for which they are liable for.

****

The applicant tabled NEW evidence at the hearing, from Infometrics. At its website, Infometrics (NZ) says it “provides industry, regional, and general economic analysis and forecasts that assist organisations in making their planning, policy, and strategic decisions”.

In the Lunds’ submission to hearing under the subheading ‘Dunedin Hotel Economic Impacts – Ongoing GDP Effects’, Mr Lund says:

….Infometrics assume that the 64 apartments will all be in the hotel pool, but acknowledge this is unclear. This significantly increases the GDP contribution as it raises the income of the hotel by around 40%, assuming conservative tariff rates of $250 per night and $350 per night per apartment. Infometrics also assume that there will be no “crowding out” of the existing activity, ie ALL guests would otherwise have not come to Dunedin had this hotel not been there. This is an unrealistic assumption.
In my opinion this report is an example of tailoring assumptions to achieve the desired outcome.
At Section 2, the “impact” of the construction phase is estimated at $45.6M in total, but based on the “key assumption” that there is capacity in the construction sector to build the hotel without crowding out other investment”. This appears to mean that if other projects are delayed, there is in fact no benefit at all because $63M of other projects will simply be displaced by the alleged $63M cost of this project. History shows that in Dunedin, Clients such as the DCC, University and some private clients keep a close eye on the state of the market. Many Ministry of Education projects have strict cost guidelines, and will not proceed if they are over budget. There have been examples of work deferred in Dunedin when the market is busy, and the Post Office Hotel is one of them. The Owner Mr Geoff Thompson, deferred the construction of the hotel for several years when he first owned the property citing the overheated construction market, due to the construction of the $220M Milton Prison project in 2005-2007.
At the present time, there is a high level of commercial construction activity at present, witnessed by the fact that there are main contractors from outside Dunedin performing the 2 largest projects in Dunedin (The Dental School and the University Science 3 project). There is every likelihood some projects will be delayed due to the high level of activity.
The report assumes that 21.1M of the $63M, or a third of the cost, will flow into the local Dunedin economy. This would be on the basis that local companies and suppliers are employed, but this is far from clear, given the estimated cost of $63M. The only way the cost could be anywhere near this level is if virtually all of the materials were low cost imports, and quite likely a proportion of the labour cost component.
The only significant material that will be made locally is concrete, and it is only the basement levels that will be predominantly a concrete structure. If out of region companies were employed for work to do such trades as painting and carpentry, as they were at the Forsyth Barr stadium, then that figure will not be accurate.
Infometrics then ascribe $16.1M to the “second round of economic effects” but acknowledge there is some “leakage of spending outside the city”. If an outside main contractor, or even an overseas contractor completes the work, they will very likely bring with them their out of town networks of subcontractors and suppliers and there will be much less than the $16.1M as the second round of effects. Having completed many projects out of Dunedin, I have first hand knowledge of the negligible economic effect of construction on the region concerned. Generally, goods and services are sourced from habitual suppliers with whom there is an ongoing relationship, and only the small consumables are sourced from local suppliers.
Mr Tosswill should clarify what the intention is regarding the construction of the hotel, and if that is not forthcoming, then he should at least confirm what type and form of construction contract will be used as that perhaps more than anything will determine whether there is the possibility of a meaningful local business component.

On ‘Construction Cost’, Mr Lund refers the commissioners to the Lunds’ original submission, continuing with:

Further facts about construction
Examples of risk from imported products
FCC (Fletcher) budgeted to use Chinese sourced bathrooms in the Novotel Christchurch projects. Did not work. Has cost FCC $2M extra (unbudgeted) to get prefab bathrooms built locally in Canterbury. The cost is $26,000 per bathroom.
Chinese steel : there are 2 major CBD projects underway in Christchurch that are steel structures using Chinese fabricated steel. On one project the steel is 12 weeks late and on the other it is 16 weeks late. The Chinese suppliers had committed to make the steel, then out-sourced it to another firm without advising the contractor, and the delays have resulted. On one of these projects there is now legal action between the Engineer and contractor because of the nature of the steel does not conform to the specification.
There is a further major dispute litigation on another major project now completed due to extreme delays with the steelwork and external cladding. The project was around 10 months late, and the Owner lost the anchor tenant (The Government) due to the delay. That project was tendered on the basis of using a large degree of imported materials from China in association with a large state run Chinese construction company, but the project was so disastrous (financially and in terms of market perception), involving a loss of 8-15M on a $50M project, it has caused the company to withdraw from large scale commercial construction and focus on project management.
External Cladding : There are only a very small number of NZ firms with the capability to design and build the curtain walling, and they have a huge backlog and extremely onerous business terms that will not be acceptable to any funder or main contractor, so the Owner will probably need to contract with them direct, and take on this risk.

These important matters aside, the legal submissions brought to hearing by Ms Lauren Semple (for Millenium & Copthorne Hotels) and Mr John Hardie (for Misbeary Holdings Ltd) blew the application out of the water; so did the transport evidence to hearing by Mr Andy Carr (for Millenium & Copthorne Hotels) to which Commissioner Mr Stephen Daysh responded by asking if the problems (such as summit points, swept paths, access to basement parking, onsite coach travel, and truck travel as well as loading access) pointed out by Mr Carr in his assessment of the proposed building’s perimeter road were “fatal flaws”? Yes, was the direct reply. Refer article: Traffic problems at hotel (ODT 3.8.17)

The hearing is adjourned until 17 August.

All ODT can do is offer a flimsy and inconsequential readers’ poll.
Not Based On Reality. Go ODT! LOL

█ All application documents, reports, evidence and submissions for 143-193 Moray Place – Non-complying activity – LUC-2017-48 & Sub-2017-26 at this link.

Related Posts and Comments:
● 11.7.17 “Fat” gawky Hotel and Apartment building : Questionable design even with 4 floors lopped off
● 14.5.17 RNZ reports July hearings for proposed hotel apartment building [comments by Mr Tosswill]
● 4.5.17 Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building
● 7.4.17 Proposed hotel *height and design* —the very least of it #sellingoursouls
● 5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

█ The following images are taken from Appendix 6 – Consultant Urban Designer’s Report – Appendix plans (PDF, 1.5 MB).

They comprise
● 2 cross sections – originally provided as applicant evidence by Thom Craig Architects Ltd, and
● 7 photomontages of anticipated views – originally provided as applicant evidence by Paterson Pitts Group (surveying, planning, engineering)

– to which new height levels have been added in the evidence provided by independent Urban Design consultant Garth Falconer for Dunedin City Council.

[click to enlarge]








7 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Events, Finance, Heritage, Hot air, Hotel, Housing, Infrastructure, Media, Name, New Zealand, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Town planning, Transportation, Travesty, Urban design, What stadium

“Fat” gawky Hotel and Apartment building : Questionable design even with 4 floors lopped off

What environmental considerations, Mr Page?

More than minor.

[Everyone will remember the learned Mr Page from the Betterways hotel and apartment building application for 41 Wharf St at the waterfront, not so long ago.]

Mr Bryce (independent planner): …a “key concern” for submitters…the building would block sun from reaching the Regent Theatre and surrounds from 3pm at winter solstice. “At this time of year, the proposal will effectively remove all remaining access to sunlight received over [the] southern end of the western side of the Octagon.” (ODT)

Mr Page (the developer’s ‘Brief’): The “potential shading effect” was acknowledged, but Mr Page was confident the hotel’s benefits “will far outweigh” those concerns. (ODT)

Mr Page, again : The hotel’s “tall, slender built form” minimised the impact on those living closest to the hotel project site… (ODT)

Good heavens.

Source: Application documents

At Facebook:

### ODT Online Tue, 11 July 2017
Hotel developer still confident
By Chris Morris
Dunedin’s latest five-star hotel bid will “not be viable” if the developer is forced to reduce the building’s height, it has been claimed. But the man behind the project, Tekapo businessman Anthony Tosswill, remains confident the hearings panel set to decide the project’s fate can yet be swayed by the hotel’s benefits. The comments came from Phil Page, the lawyer acting for Mr Tosswill, days after the public release of an independent planner’s report running the ruler over the hotel proposal.
The report by Nigel Bryce concluded consent be declined unless Mr Tosswill agreed to a “substantial reduction” in the building’s height, by four storeys, to bring it down from 60m to 45.5m.
Read more

****

Resource Consent Application LUC 2017-48 and SUB 2017-26, 143 – 193 Moray Place, Dunedin (Proposed Hotel)

The hearing will be held on Mon 31 Jul, Tue 1 Aug, Wed 2 Aug, Thu 3 Aug and Fri 4 Aug 2017 in the Edinburgh Room, Municipal Chambers (off the Octagon). The hearing will commence at 9.30 am each day.

Consultant Planner’s Section 42a Report (PDF, 4.3 MB)

[excerpt]

SUMMARY OF RECOMMENDATION
[5] For the reasons set out in paragraphs 72 to 334 below, I consider that the Proposal in its current form, will not promote the sustainable management of natural and physical resources in accordance with Part 2 of the Resource Management Act 1991 (RMA or the Act).
[6] The Development promotes a contemporary design, which is considered acceptable within this setting and articulates sufficient design interest and modulation through the facades and its pinwheel like form expressed in the tower component of the building. The building’s design incorporates a base building or podium, which allows the structure to have an active street frontage to Moray Place and Filleul Street, which is considered a positive design response.
[7] The Development will be ‘juxtaposed’ against a backdrop of the heritage buildings located to the east of Moray Place, including the Town Hall and St Paul’s Cathedral when viewed from the west and St Paul’s Cathedral and the Municipal Chambers when viewed from the south (including from the Octagon).
[8] The building’s overall height is considered to generate an over-dominance on properties to the north and west of the Site, and will have more than minor adverse effects on the amenity values of residential properties to the west of the Site. This is largely due to the significant change in scale introduced by the Development and the lower scale built environment that currently exists to the west and north of the development site, comprising predominantly two to three storeys in height.
[9] The Development will adversely impact upon the townscape values of the TH02 Octagon townscape precinct under the Operative Dunedin City District Plan (Operative Plan), including loss of sunlight penetration into the Octagon during the Winter Solstice and will adversely impact upon the setting and pre-eminence of existing heritage buildings such as the St Paul’s Cathedral and the Municipal Chambers building when viewed from the Octagon.
[10] The Development is considered to result in more than minor visual amenity and shading effects on Kingsgate Hotel to the south of the Site. The Kingsgate Hotel will experience prolonged and more sustained loss of light over a wider part of the property and associated buildings over the critical morning period during the Equinox and Winter Solstice periods (or collectively over ¾ of the year). This conclusion has been reached having regard to the potential for the Site to be developed up to a maximum height of 11 metres with a building erected against all boundaries (the ‘controlled activity building outline’).
[11] For the scale of the building to be mitigated to an acceptable level, and to maintain and enhance the amenity values of the City Centre and wider environs, Council’s urban design consultant, Mr [Garth] Falconer recommends reducing the proposed building height by four levels to bring the total height down to nine storeys (Level 13, +157,500 (datum level) on Drawing Section AA). This reduction would provide for a maximum height of 45.6 metres from existing ground level, or a maximum height breach of 34.4 metres (including the lift shaft). This mitigation response would not remove any of the 210 visitor accommodation rooms (hotel rooms), and would maintain supporting facilities including licensed premises, retail, conference, meeting facilities and on-site amenities, parking, and servicing areas. I note, for completeness, that the Applicant is not currently proposing to reduce the height of the Development.
[12] In its current form, it is my recommendation that the proposal should be declined.

More about Garth Falconer, DCC’s consulting urban designer:
LinkedIn profile: https://nz.linkedin.com/in/garth-falconer-a0699bb3
Owner and Director, Reset Urban Design Ltd: http://reseturban.co.nz/

Take a glimpse of the ‘urban form’ at Takapuna, North Shore Auckland (his home turf), to know Mr Falconer is likely missing any handle on building height for a heritage city like Dunedin.

****

Agenda and all documents including Submissions at:

http://www.dunedin.govt.nz/council-online/notified-resource-consents/notified-applications-pending/luc-2017-48-and-sub-2017-26

****

At Facebook [see comments]:

### ODT Online Sat, 8 Jul 2017
Reject hotel bid: planner
By Chris Morris
A planner has recommended rejecting Dunedin’s latest five-star hotel bid, unless the developer agrees to a “substantial reduction” in the building’s height. The recommendation to decline consent came in a report by independent consultant Nigel Bryce, made public yesterday, ahead of the public hearing beginning on July 31. In his report to the panel of independent commissioners, Mr Bryce said the hotel development would “visually dominate” its surroundings, including the town hall, St Paul’s Cathedral and the Municipal Chambers. It would be the tallest building in the central city and would cast a shadow over the Octagon, as well as the nearby Kingsgate Hotel, during winter. Together with other impacts, the development was considered to be “non-complying” under the city’s district plan rules. It would only be acceptable if the building was reduced by four storeys, lowering its overall height from 60m to 45.6m, which was still well above the existing 11m height limit for the site, his report said.
Read more

[initial coverage]
7.7.17 ODT: Decline hotel consent: report

### ODT Online Wed, 28 Jun 2017
Two from North Island on hotel hearings panel
By Chris Morris
The panel to decide the fate of Dunedin’s latest five-star hotel bid features one familiar face and two from the North Island. Tekapo businessman Anthony Tosswill’s bid to build a 17-storey hotel and apartment tower in Dunedin would be considered over five days, beginning on July 31, it was confirmed yesterday. […] The panel of three would be headed by chairman Andrew Noone, now an Otago regional councillor, acting in his role as an independent commissioner. […] Alongside him will be fellow independent commissioners Stephen Daysh, of Napier, and Gavin Lister, of Auckland.
Read more

Related Posts and Comments:
● 14.5.17 RNZ reports July hearings for proposed hotel apartment building [comments by Mr Tosswill]
● 4.5.17 Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building
● 7.4.17 Proposed hotel *height and design* —the very least of it #sellingoursouls
● 5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

Source: Application documents

15 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Enterprise Dunedin, Finance, Geography, Heritage, Hot air, Hotel, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, Otago Polytechnic, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

RNZ reports July hearings for proposed hotel apartment building

Image: Paterson Pitts Group

Image: Thom Craig Architects

### rnz.co.nz Wed, 10 May 2017 at 6:13 p.m.
RNZ News: New Zealand / Business
Hotel plans prioritise visitors over residents – objectors
By Lydia Anderson – Otago/Southland reporter
Residents above the proposed site for Dunedin’s first five-star hotel say it’s not right their view of the city will be blocked so tourists can have a better one. The 17-storey ‘Electric Thistle’ Moray Place design would sit behind the city’s heritage buildings in the Octagon. More than 200 submissions on the project have been filed – three quarters of them in opposition. The hotel’s height and modern design has some residents worried – at about 64m high it would be significantly taller than the current 11m limit imposed on the chosen site, which is currently a carpark.
….The proposed hotel would feature 210 hotel rooms plus apartments, cafe, a wine club, public hot pools and conference rooms.
….The hotel’s developer [?]* Tony Tosswill, who represented Horizon Hospitality Group, said the hotel was being built high rather than wide out of consideration for the views of people living in the city rise area. To meet international five-star standards the hotel needed views and around 200 rooms, he said.
….Public hearings on the submissions will take place in July.
Read more

● Full application: 143-193 Moray Place – LUC-2017-48 and SUB-2017-26
View all submissions

****

The applicant is NZ Horizon Hospitality Group Limited http://www.companies.govt.nz/co/5876487

The name of the building developer/financier hasn’t been announced. Asian finance is suspected as being needed but likely not obtained yet; New Zealand’s Australian-owned banks aren’t providing credit on speculative developments at this scale.

Pullman Hotels is fêted as the hotel manager.

█ Spokesman for the (unnamed) developer is Anthony Tosswill of Tekapo, NZ. Mr Tosswill is not the developer, as may have been construed from MSM news items.

****

The following comments from Mr Tosswill were received for publication by What if? Dunedin in late April. Links to the threads where they appear are provided here:

2017/04/24 at 9:37 pm
Anthony Tosswill
In reply to Elizabeth.
why do you wish to destroy employment in Dunedin, why do you want to prevent creating Jobs and more revenues for the Community and supporting Tourism and local Business?
Why do you wish to keep subsidizing Dunedin venues when they can support themselves with the Services that this Hotel can offer.
Why dont you disclose who you are so People can judge you and your motives. The Jobs that Cadburys will make redundant are you able to give them Jobs or the new Students ending there education.
When was the Last New Hotel Built in Dunedin? Dunedin None Queenstown 6, Queenstown 26,000 Dunedin 126,000.
How about supporting Development, and Jobs or are you one of those that just as you say destroy everything before its starts.
Who am I, I am a spokesman for the Developer

2017/04/24 at 9:46 pm
Anthony Tosswill
In reply to Elizabeth.
Great Video, it suggests you are supporting Terrorism. Is that amusing blowing up things. It also suggests you want to stop Jobs, supporting local Business. preventing People attending Events and Venues, dislike tourism and dont want a venue that supports Dunedin. I suggest you at least remove the Blowing up of the Developments its in very bad taste.
When reading comments on this site its easy to see why it has so little support.
I am a spokesman for the Developer, who are you?

2017/04/25 at 4:58 pm
Anthony Tosswill
In reply to Peter.
I would like to point out that Residents in Londo complained about the about the Shard in London and the London Eye yet, Yet Today we Recognize London for these 2 Buildings as they are also Top Tourists sites as is the Palace. Hindsight is marvelous
Do you recall the complaints when the stadium prior to been Built now its recognized as one of the Top 20 in the World. Dunedin be proud.
One may tell us of Identical Buildings so we can learn from your expertise.
The Design relates to minimizing views from residents behind plus maximizing views of Tourists that want to appreciate Dunedin and its Harbour we believe in our design and concept.
Retrospective opinions are great if you are trying to stop the future progress of Dunedin, if your view point is taken seriously its Dunedin’s loss.
Spokesman for the Developer.

2017/04/25 at 5:28 pm
Anthony Tosswill
In reply to Elizabeth.
Hi Elizabeth,
you made several comments. Architectural design.
a) Design and the Changes,
In Response, I respectfully point out that does not relate to commercial facts or results, hence for any 5 Star Hotel and in Particular in Dunedin our view is very different but it is for this type of Development whats been Built in All Cities around the World, we are one of the 99% (Not the 1%)
b) We have incorporated a Design that shows off Dunedin, with new Technology that is expected today by 5 Star Guests. Dunedin is the Showcase, the Development is to provide Access to the City not be the City~
You suggest and refer to your time and Resources “What are They”?
It Also appears that you think Asians are also different or at least there Money is, maybe you should complain also about the contribution made by Asians that go to Otago University is their money bad? I like Asian People, I married to one.
Love to know more about whatever Cargo Growth is? Are you a Supporter of Cadbury Factory Closure as well? Is that not a local Resource?
400 Persons Daily Spending Money in New 5 Star Hotel in Dunedin is Growth to Dunedin, please re add up the equation since you have an alleged financial background your sums should add up one cold think,
Good on you Farmer for having an independent view point congratulation is this Elizabeth’s Blog its appears to be!
Spokesman for the Developer

Related Posts and Comments:
● 4.5.17 Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building
● 7.4.17 Proposed hotel *height and design* —the very least of it #sellingoursouls
● 5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

14 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Enterprise Dunedin, Finance, Geography, Heritage, Hot air, Hotel, Infrastructure, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, Otago Polytechnic, People, Perversion, Pet projects, Politics, Pools, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

Submissions close 10 May : Proposed 17-storey, est. 62.5 metres-high Moray Place hotel/apartment building

Where to access more information about the application:

Dunedin City Council website:

█ Current notified resource consent applications
http://www.dunedin.govt.nz/council-online/notified-resource-consents

Applicant: NZ Horizon Hospitality Group Limited
[ http://www.companies.govt.nz/co/5876487 ]
Subject site: 143-193 Moray Place
Status: Non-complying activity
Submissions close: Wednesday, 10 May 2017 at 5:00 p.m.

█ Application information + submission information/online form at:
143-193 Moray Place – Non-complying activity – LUC-2017-48 and SUB-2017-26

A P P L I C A T I O N ● D E S C R I P T I O N

Land use consent is sought to construct and operate a commercial residential development involving 210 visitor accommodation rooms (hotel rooms), 64 self-contained apartments, four self-contained penthouse suites, together with licensed premises, retail, conference, meeting facilities and on-site amenities, parking, and servicing. The development proposes a new building with 17 storeys (including the lift core on the top of the building, and three levels of the building extending below ground). The overall height of the proposed building varies in relation to the existing ground level, but will be approximately 62.5m at the highest point above the existing ground level (including the lift core). The proposed building is assessed as a non-complying activity under the operative Dunedin City District Plan. The application includes an assessment of effects.

Land use consent is also sought for earthworks because the site development will involve an estimated 8,914m3 of earthworks and a maximum cut depth of 7.35 metres from existing ground level.

Subdivision consent is sought for a unit title subdivision in relation to the proposed building. The application includes plans of the proposed subdivision.
The subject site is located in the Central Activity Zone in the operative Dunedin City District Plan and is located within the north Princes Street/Moray Place/Exchange townscape precinct TH03.

The proposed building is a non-complying activity under the operative Dunedin City District Plan (due to non-compliance with Rule 9.5.2(i) no front or side yards, Rule 9.5.2(iii) veranda requirements along Filleul Street frontage of the site, and signage under Rule 9.5.2(vi)). The building also exceeds the maximum 11 metre height limit under Rule 9.5.2(ii) which requires consent as a restricted discretionary activity under Rule 9.5.3(i). The proposal is also a controlled activity under Townscape Rule 13.7.2(i).  

The proposed earthworks are a restricted discretionary activity under Rule 17.7.3 of the operative Dunedin City District Plan.

The unit title subdivision is a non-complying activity under Rule 18.5.2. Rule 18.5.3 requires that every allotment in a subdivision must have both legal access and vehicle access to a formed road. The rules for subdivision do not expressly provide for unit title divisions where the allotments created may comprise multiple units within a building.

The subject site is zoned Central Business District in the proposed Second Generation Plan and a secondary pedestrian frontage applies.

The proposed 2GP was notified on 26 September 2015. The relevant objectives and policies of the 2GP must be considered. Rules in the 2GP can be deemed as operative if no submissions have been made in opposition. The application says that some 2GP rules may be deemed operative. If the decision maker determines that 2GP rules are deemed operative these rules will apply instead of the corresponding Dunedin City District Plan rule. {bolding by whatifdunedin}

SUB-2017-26 & LUC-2017-48 – Public Notice (PDF, 31.4 KB)

Please read the accompanying documents and reports that apply to this application, as listed here.

M A K I N G ● A ● S U B M I S S I O N

Online submission form

SUB-2016-26 & LUC-2017-48 – Submission Form (Form 13) (PDF, 38.9 KB)

IMPORTANT: If you wish to make a submission on this application you may do so by sending a written submission to the consent authority, Dunedin City Council at PO Box 5045, Moray Place, Dunedin, 9058 Attn: City Planning, no later than 5:00 pm on the closing date shown.
Email: resconsent.submission@dcc.govt.nz

The submission must be dated, signed by you, and include the following information:

• Your name and postal address and phone number/fax number;
• Details of the application in respect of which you are making the submission including location;
• Whether you support, oppose, or are neutral towards the application;
• Your submission, with reasons;
• The decision you wish the consent authority to make;
• Whether you wish to be heard in support of your submission.

Please note: If you make your submission by electronic means, a signature is not required.

An acknowledgment of your submission will be sent by post when the submission is accepted as complete. The application may be viewed at the City Planning Enquiries Desk, Customer Service Centre on the Ground Floor, Civic Centre, 50 The Octagon.

You must serve a copy of your submission on NZ Horizon Hospitality Group Limited, the applicant, whose address for service is Anderson & Co Resource Management, PO Box 5933, Dunedin 9058, as soon as reasonably practicable after serving your submission on the Dunedin City Council.

Alternatively, you can Email copy of your submission to NZ Horizon Hospitality Group Limited via Anderson & Co Resource Management (Dunedin) –
Attention: Conrad Anderson conrad_a@xtra.co.nz

V I E W S ● A N D ● L A N D S C A P E ● C O N T E X T

7. Architectural Drawings, including Arch Statement and earthworks (PDF)
8. Subdivision plans (PDF)
13a. Photomontage notes (PDF)
13b. Photomontage (PDF)
13c. Anticipated Views Assessment Notes – supplementary (PDF)
20. Urban Design (PDF)
21. Memo – Re: Glass (PDF)

NB. Note a number of the angled street views provided in the application are partial only – the full extent of the proposed building (in order to help assess accompanying effects) is not given except in wider landscape perspectives such as when seen from across the harbour or along street vistas. Most close-up perspective views of the proposed building, such as when seen from the Octagon, may appear to be ‘diminished’ or foreshortened in height – scale accuracy is difficult to determine in the presentation renders without technical knowledge of how the views were generated. It is somewhat likely that independent peer review(s) of the (landscape and townscape) presentation renders provided by the applicant and their consultants will be sought by submitters, if not the processing authority.

█ Spokesman for the (unnamed) developer is Anthony Tosswill of Tekapo, NZ.
Mr Tosswill has noted in comments to What if? Dunedin that he speaks for the developer. Mr Tosswill is not the developer, as may have been construed from news items published by the Otago Daily Times previously.

Posted by Elizabeth Kerr

This post is offered in the public interest.

Selected renders from application documents : Thom Craig Architects and Paterson Pitts Group

*Poor quality of images as received via DCC webpages.

70 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Geography, Heritage, Hotel, Infrastructure, Name, New Zealand, OAG, Ombudsman, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Urban design, What stadium

Proposed hotel *height and design* —the very least of it #sellingoursouls

At Facebook:

[screenshot]

Channel 39 via YouTube [screenshot]

Related Post and Comments:
5.6.17 Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks

Posted by Elizabeth Kerr

This post is offered in the public interest.

7 Comments

Filed under Architecture, Baloney, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Heritage, Hot air, Infrastructure, LGNZ, LTP/AP, Media, Name, New Zealand, OAG, Ombudsman, Other, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, SFO, Site, Structural engineering, Technology, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

Application lodged for FIASCO Hotel by Tosswill #DunedinWrecks

At Facebook:

****

Tekapo-based businessman Anthony Tosswill is hoping to send the signal “the city is open” with this master-disaster, or something closely akin.
JFC i

An application for resource consent was lodged with DCC today for this unlanced boil on the elegant hind quarter of our heritage city.

Details in brief according to ODT deputy editor Craig Page at Channel 39 News tonight:

● 17 storey ‘glass hotel in central city’
● 60 [read 64] metres at highest point
● 210 rooms
● 64 apartments
● 4 penthourse suites
as well as retail opportunities.

The proposal exceeds the district plan height limit (11 metres) – meaning the application is to be publicly notified.

ODT will publish concept renders and contextuals tomorrow.

Get your Smart Hats on Dunedinites, give him a fricking run for his (or other people’s) money. Beyond the Mass Unsightliness, you will lose your convenient central city parking area – be prepared to walk for blocks next time you want to attend events at the Council, Town Hall, Dunedin Public Art Gallery, Central Library or Regent Theatre.

Has the Dunedin City Council SOLD YOU OUT ???
Ratepayers own/owned the site. What DEAL has been done by council politicians and staff to prosper an OUT OF TOWN private individual above and beyond your immediate and long term LOCAL requirements in the central city.
JFC ii

DCC Webmap – Filleul St council-owned parking area (shaded)

Market Gap Report Hotels – Evidence Stephen Hamilton, Horwath HTL
December 2012 (PDF, 482 KB)

Related Posts and Comments:
● 18.12.16 DCC set to take away CBD car parks without Economic Impact research
● 15.10.16 Battle of the hotels : DCC meat in the sandwich (unedifying)
● 5.10.16 Dunedin bauble #votecatcher
● 4.10.16 The Demon Duck freak show of partial ‘Civic’ information! Before voting closes! #Dunedin
11.1.16 Un hôtel. Dunedin.
19.8.15 Hotels ? Business ? [DCC lost +++152 fleet vehicles] —Cull in charge of building chicken coops, why ?
1.4.14 HOTEL Town Hall… Another investment group, Daaave’s pals from the communist state?
25.3.14 Hotel We LIKE: Distinction Dunedin Hotel at former CPO

Posted by Elizabeth Kerr

This post is offered in the public interest.

60 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Heritage, Hotel, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Tourism, Town planning, Travesty, Urban design, What stadium

Local govt and the question of general competence #North

Received.
Mon, 9 Jan 2017 at 10:56 p.m.

Subject: Did you notice……

Message:
Whangarei District Council was reported on TV3 as supporting protesters who have put a road block across four roads and are not letting trucks pass because they are pissed off with the dust from the roads, and want them sealed. Not that we wouldn’t have sympathy with their cause, but how is it right for a Council to support illegal road closures?
These Councils may have been given by law the power of general competence but they sure don’t warrant the confidence of central government in hope that they may become generally competent……

protesters-set-up-four-separate-road-blocks-along-pipiwai-road-newshub-co-nzProtesters set up four separate road blocks along Pipiwai Road [newshub.co.nz]

### newshub.co.nz 15/12/2016
Northland residents block dusty roads in protest
By Wilhelmina Shrimpton
Frustrations have reached boiling point as locals of a small Northland town fight to have a notoriously dusty logging truck route sealed. Locals have had enough and stepped up protest action by blocking logging trucks from using the gravel roads. “Don’t piss me off, you either do it or you go,” one protester yelled at a truck driver while blocking the road. “What you gonna do bro? What you gonna do? Cause you ain’t going down here today!” Puti Tipene says the dense dust clouds thrown up by the trucks are unhealthy and dangerous. […] Locals say up to 50 trucks drive along unsealed routes every day, and believe the council isn’t doing enough to help. […] Whangarei Mayor Sheryl Mai says the council wants the roads sealed but doesn’t have the money. “We’ve had money in our budget to do it … if there was a subsidy from our partners the NZTA, that hasn’t happened. Until that happens, we don’t think it’s appropriate for the wider ratepayers to pay 100 percent of that.”
Read more + Video

****

pipiwai-valley-protest-puti1-ngapuhi-iwi-nz-2Pipiwai Valley protest [ngapuhi.iwi.nz]

### newshub.co.nz 09/01/2017
Protestors block trucks from dusty Northland road
By Newshub staff
Ten people blocked off a Northland road today in a fight to have the notoriously dusty logging truck route sealed. Protesters set up four separate road blocks around Pipiwai Valley on Monday morning, an area they say is plagued by dust kicked up both water tanks and trucks. They parked vehicles across Pipiwai Rd to deter trucks, but are letting locals through. Police were at the protest, which was kept low key. Protest organiser Alex Wright says truckers may have been tipped off and taken another route. Those truck drivers that did come their way had to reverse back down the gravel road. […] “It’s affecting our way of life… It’s horrific. We can’t handle it anymore and that’s why we’re here today. We’ve tried all avenues.” Ms Wright says they’re their new campaign won’t stop until the road is sealed.
Read more

****

truck-generated-dust-at-pipiwai-issue-for-more-than-10-years-graham-wright-via-nzherald-co-nzTruck-generated dust at Pipiwai, an ongoing issue for more than 10 years.
Photo: Graham Wright [nzherald.co.nz]

### NZ Herald Online 10:47 AM Mon, Sep 14, 2015
Logging and trucking industries asked to pay $132k
By Alexandra Newlove – Northern Advocate
Logging and trucking industries will be asked to cough up cash to help solve a dusty road problem that has had residents up in arms for more than a decade. Whangarei District Council had allocated $400,000 over the next two years to seal ten 100m strips along the notoriously dusty Wright, McCardle and Pipiwai roads west of Whangarei, though the work was expected to cost $532,000, said WDC roading manager Jeff Devine. “We will be asking the industry if they can make up the [$132,00] shortfall,” he said. The New Zealand Transport Agency declined a $4.5 million funding request from council early this year for a full 9km seal of Wrights Rd and McCardle Rd. Pipiwai Titoki Advocacy for Community Health and Safety Group spokeswoman Alex Wright said she was unconvinced that the strip sealing would make a huge amount of difference. “It’s our 11th year now. We’re heading in the right direction but need to do it properly and completely.” Mr Devine said he agreed that the dust was a health and safety issue. “The big issue is that when they shifted the port from Whangarei to Marsden Point the traffic direction changed. It was never planned when the forests were planted that this would be the [trucking] route.” Council would continue approaching central Government for money to seal the remainder of roads, Mr Devine said.
Read more

Posted by Elizabeth Kerr

This post is offered in the public interest.

1 Comment

Filed under Business, Construction, Democracy, Design, Economics, Finance, Geography, Health, Infrastructure, LGNZ, Media, Name, New Zealand, NZTA, OAG, Ombudsman, People, Politics, Project management, Public interest, Resource management, Transportation, Travesty

spilt milk, tears, Unnecessary

Received from Anonymous
Sun, 10 April 2016 at 9:56 a.m.

Following receipt of the newspaper clipping, I dredged family files. My great-great-grandfather [unnamed for privacy reasons], then in business at Maclaggan Street, was one of the signatories. He went on to prominently support, with other Dunedin businessmen, the provincial and national development aims, and political aspirations of the indefatigable Julius Vogel.

The Otago Daily Times was founded by W.H. Cutten and Julius (later Sir Julius) Vogel during the boom following the discovery of gold at the Tuapeka, the first of the Otago goldrushes. “Vogel had an elevated idea of the role of the press, believing it had the power to create public opinion. He took a strong, positive line on all the current major issues and used the Times to promote his own views and political career. He appointed a number of reporters, such as Edward Gillon, William Harrison and Ebenezer Fox, who later had notable careers in journalism, politics and the civil service.”

Lessons from history ODT Issue 650, 18 Jan 1864 p4 (resized)[paperspast.natlib.govt.nz]

Another weekend find. Modern image, un-Vogel-like.

abuse scandal lets-not-sweep-the-dirt-under-the-carpet-for-a-change [nation.com.pk][nation.com.pk]

Life after politics Vogel has a reputation as the first New Zealander to write a science-fiction novel: Anno Domini 2000, or, Woman’s Destiny, published in 1889. It anticipated a utopian world where women held many positions of authority. New Zealand went on to become the first country to give women the vote, and, from 1997-2008, continuously had a female Prime Minister, while for a short period (2005–2006) women simultaneously held all five highest government positions (Monarch, Governor-General, Prime Minister, Speaker of the House and Chief Justice). In honour of this book, the Sir Julius Vogel Awards for New Zealand speculative fiction take their name from him.

SPEAK ● OUT ● ORGANISE

Posted by Elizabeth Kerr

6 Comments

Filed under Business, Democracy, Dunedin, Economics, Heritage, Inspiration, Media, Name, People, Politics

Significant tree: 28 Argyle Street Mosgiel – LUC-2015-296

As a community board member and a businessman-resident, Martin Dillon, it seems, has set a precedent for removal of (District Plan listed) Significant Trees from the streets of Mosgiel township. Not only this, his community board supports the destruction of many community-established trees at Mosgiel’s Memorial Gardens – to make way for a new swimming pool complex. Earlier this year the community board was ultimately responsible for destruction of the community’s beautification scheme at Gladstone Road (railway corridor).
That’s one hell of a lot of greenery you’ve seen wiped off the planet, Mr Dillon.
SHAME ON YOU

ANOTHER APPLICATION FOR REMOVAL – A COPPER BEECH THIS TIME
The tree is prettier than the freaking house beside it.

28 Argyle Street Mosgiel - LUC-2015-296 (significant tree) 3aSignificant tree – 28 Argyle Street Mosgiel – LUC-2015-296
Closes: 28/08/2015

Notification of Application for a Resource Consent – Under Section 93(2) of the Resource Management Act 1991.
The Dunedin City Council has received the following application for Resource Consent:

Application description
To remove a tree that is listed in the Dunedin City District Plan under Schedule 25.3 as T151 (Copper Beech).

Application documents
LUC-2015-296 – Public notice (PDF, 34.6 KB)
This document is the Public Notice for Resource Consent application LUC-2015-296

LUC-2015-296 – Submission 13 form (PDF, 78.2 KB)
This document can be used to make a submission regarding Resource Consent application LUC-2015-296

LUC-2015-296 – Application (PDF, 530.0 KB)
This document is a scanned copy of the application for resource consent LUC-2015-296

Notified resource consent details
Closing date: 28/08/2015
Consent number: Significant tree – 28 Argyle Street Mosgiel – LUC-2015-296

Name of applicant: M J Sproule & J A Maxwell

Location of site: 28 Argyle Street, Mosgiel, being that land legally described as Lot 3 Deposited Plan, 470637 held in Computer Freehold Register 636380

Address for service: M J Sproule & J A Maxwell, 34A Ayr Street, Mosgiel 9024

Online submissions: Online submission form

http://www.dunedin.govt.nz/council-online/notified-resource-consents/current-consultation/significant-tree-28-argyle-street-Mosgiel

LUC-2015-296 [excerpts from application]

28 Argyle Street Mosgiel - LUC-2015-296 (significant tree)

28 Argyle Street Mosgiel - LUC-2015-296 (significant tree) 1

DCC on Significant Trees
Dunedin City District Plan — Schedule 25.3 Significant Trees (PDF, 275.6 KB)

Related Posts and Comments:
24.7.15 Hands off Mosgiel Memorial Gardens
20.3.15 DESTROYED, beautification project —Railway corridor, Gladstone Road
14.12.14 Significant Tree: 23 Church St, Mosgiel [Applicant: M L & M C Dillon]
15.5.14 Significant Tree: 28A Heriot Row
22.2.13 DCC: Significant Trees

Posted by Elizabeth Kerr

3 Comments

Filed under Business, Construction, DCC, Democracy, Design, Economics, Heritage, Name, New Zealand, People, Politics, Project management, Property, Site, Town planning, Urban design

Hands off Mosgiel Memorial Gardens

Received from Brian Miller
‎Fri‎, ‎24‎ ‎July ‎2015 at ‎1‎:‎43‎ ‎p.m.

Hands off Mosgiel Memorial Garden 3

█ Trees and green space at Mosgiel Memorial Gardens poised for destruction if DCC develops a community pool on site. Photographs by Brian Miller.

Memorial Park, Mosgiel 1.jpgMemorial Park, Mosgiel 2aMemorial Park, Mosgiel 3.jpgMemorial Park, Mosgiel 4.jpgMemorial Park, Mosgiel 5.jpgMemorial Park, Mosgiel 6.jpgMemorial Park, Mosgiel 7.jpgMemorial Park, Mosgiel 8.jpgMemorial Park, Mosgiel 9.jpgMemorial Park, Mosgiel 10.jpgMemorial Park, Mosgiel 11.jpgMemorial Park, Mosgiel 12Memorial Park, Mosgiel 13Memorial Park, Mosgiel 14

Related Posts and Comments:
23.7.15 Dunedin ratepayers —Green Island best site for city pool users….
22.7.15 DCC Long Term Plan 2015/16 – 2024/2025
19.5.15 Mosgiel pool trust conflicts of interest #bigfishsmallpond
18.5.15 NEWSFLASH —Mosgiel pool, tracking [PONT] . . . .
20.3.15 DESTROYED, beautification project —Railway corridor, Gladstone Road

█ For more, enter “pool*, *taieri*, *mosgiel*, *secret* or *community board* in the search box at right.

Posted by Elizabeth Kerr

23 Comments

Filed under Business, Construction, DCC, Democracy, Design, Economics, Heritage, Inspiration, Name, New Zealand, People, Politics, Pools, Project management, Property, Site, Town planning, Urban design

Cr Lee Vandervis: Why I continue to vote. #email

Received.

From: Lee Vandervis
Sent: ‎Monday‎, ‎4‎ ‎May‎ ‎2015 ‎3‎:‎59‎ ‎p.m.
To: Chris Morris, Elizabeth Kerr, Andrew Noone, Andrew Whiley, Chris Staynes, Doug Hall, Hilary Calvert, John Bezett, Jinty MacTavish, Kate Wilson, Lee Vandervis, Mayor Cull, Mike Lord, Neville Peat, Richard Thomson, David Benson-Pope, Aaron Hawkins, Sue Bidrose, Sandy Graham, News [Ch39]
Subject: Why I continue to vote.

Dear Mr Morris,

Mayor Cull’s ambushed change to the Council Code of Conduct resolution item claims that my apology on which my responsibility for being able to vote apparently hangs “is to be judged by the CEO or her delegate.”

Standing Orders J4.2 clearly says that Council may take Code of Conduct action against a member by means of a three-fourths majority of those present, and the action taken was to demand a genuine apology which I have provided.
I can only genuinely apologise as far as the evidence I am allowed to see permits.
Standing Orders does not empower a CEO’s delegate to rule on the appropriateness of my apology which ruling has the effect of denying my responsibility to vote on behalf of the thousands of Dunedin people that voted for me. That is for Councillors to decide and they have not been given that opportunity.
My legal advice is that there is no legal basis for the Code of Conduct censure being delegated to the DCC chief accountant.
Councillors must vote for such a Code of Conduct action and I believe that Mayor Cull knows he does not have the Councillor numbers to vote for such an action.

Consequently I will continue to vote as before, and it is up to staff whether my votes are properly recorded.
All of this is on the back of a constantly corrupted Code of Conduct process where I have not been allowed to see the evidential statements made against me from Councillors or from CEO Bidrose, and have therefore been unable to defend myself against those evidential statements.
I have obtained consistent legal advice from two different sources in addition to ex-lawyer Cr. Calvert’s opinion printed in the ODT, and these sources do not want the DCC to know who they are as they believe that may prejudice their opportunities for other work in Dunedin. I do not intend to sue Mayor Cull or Council at this stage as I am still hopeful of getting the Deloitte’s information that would be pivotal in any Citifleet fraud cases brought.
I am still not permitted to see the Deloitte Citifleet fraud investigation evidence which would allow me to establish whether Police have in fact, recently investigated appropriately or not.
Time will tell who has been misleading who regarding the Citifleet frauds issue of substance.

Regards,
Cr. Vandervis

█ For more, enter the terms *vandervis*, *cull*, *bidrose*, *citifleet* or *deloitte* in the search box at right.

Posted by Elizabeth Kerr

32 Comments

Filed under Business, Citifleet, DCC, Democracy, Economics, Events, Media, Name, New Zealand, OAG, People, Police, Politics, Project management, Property, SFO, What stadium

Hmmmmmm #DCC

Received from TQoFE
Mon, 4 May 2015 at 2:49 p.m.

█ Message: Sorry Dr Bidrose, but that Big Question still remains to be answered…

Smoke-screen by TQoFE 4.5.15

Posted by Elizabeth Kerr

1 Comment

Filed under Business, Citifleet, DCC, Democracy, Economics, Name, New Zealand, OAG, People, Police, Politics, Project management, Property, SFO, What stadium

Cr Vandervis unlikely to quit several missions #coverup #naturaljustice

From ‘City’ colleague with an eye for the law, Wikipedia definition
Fri, 1 May 2015 at 11:00 a.m.

Cover up - Wikipedia (grey paper)

### ODT Online Fri, 1 May 2015
Apology lacking; voting rights go
By Chris Morris
Dunedin city councillor Lee Vandervis has been stripped of his voting rights after failing to apologise before a 24-hour deadline. […] In a statement last night, council group chief financial officer Grant McKenzie said Cr Vandervis was suspended from all council committees from today until July 1.
Read more

****

[Cr Hilary Calvert] questioned the council’s right to delegate to council staff any final judgement on whether Cr Vandervis’ apology was appropriate, arguing that was a call for councillors to make.

“The process was open and fair, and, as far as I’m concerned, completely in accordance with proper meeting procedure. I question the motivation in quibbling about it now.” –Mayor Dave Cull

### ODT Online Fri, 1 May 2015
Mayor dismisses legality questions
By Chris Morris
Mayor Dave Cull has a one-word response to questions about the legality of stripping Cr Lee Vandervis of voting rights: “Whatever.” Mr Cull’s abrupt response came in an email to Cr Hilary Calvert yesterday, as she questioned whether the council had followed proper process when considering its punishment of Cr Vandervis.
Read more

█ For more, enter the terms *vandervis*, *cull*, *bidrose*, *citifleet* or *deloitte* in the search box at right.

Posted by Elizabeth Kerr

*Image: Cover-up image by whatifdunedin with acknowledgement to Wikipedia

38 Comments

Filed under Business, Citifleet, DCC, Democracy, Economics, Media, Name, New Zealand, OAG, People, Police, Politics, SFO, What stadium

Burn Robbie Burn!

Received from TQoFE
Thu, 30 Apr 2015 at 12.40 p.m.

Burn-Rabbie-Burn

Calvin Oaten
Submitted on 2015/04/30 at 9:38 am

That guy sitting on his pedestal in the upper Octagon (you know, him wearing all that seagull crap) must be quietly wondering what is going on in this Edinburgh of the south.

Posted by Elizabeth Kerr

13 Comments

Filed under Business, Citifleet, DCC, Democracy, Design, Economics, Name, New Zealand, OAG, People, Pics, Police, Politics, Project management, Property, SFO, Site, Tourism, What stadium

The ol’ BP Gag treatment revisited….

Received from TQoFE
Wed, 29 Apr 2015 at 1:24 p.m.

The-ol'-BP-Gag-Trick 29.4.15 by TQoFE

Posted by Elizabeth Kerr

5 Comments

Filed under Business, Citifleet, DCC, Democracy, Design, Economics, Hot air, New Zealand, People, Politics, Sport

Hype O’Thermia’s whole Guy story

Received Sat, 8 Nov 2014 at 10:18 a.m.

Lake Okareka Volunteer Rural Fire Force 20.9.14 [okarekarural.fire.com] 1Sparklers - CrispNZ Trips [cris.lovell-smith.com] 2.1

Please to remember
new
Submitted by Hype.O.Thermia on Sat, 08/11/2014 – 1:07am.

“We’re not “celebrating” Mr Fawkes as a hero. We’re celebrating the fact that he failed to destroy parliament, failed to institute an absolutist monarch.”
Back in the distant days of my childhood the connection with Mr Fawkes and the night of fireworks was clear. We had bonfires, we gathered wood for it and built it up, kids being told by adults, and you don’t just chuck sticks in the direction of the pile, there’s a right way to do these things. And we had a guy, trousers and shirt and a round head-shaped bundle with a hat on top if someone’s Dad could be persuaded to part with an old one. So the story of Guy Fawkes was told, short and medium and long versions, and we knew from kids’ stories that English kids trundled their guy around the neighbourhood and people gave them money in response to their call, “Penny for the guy?”

Safety has ruled out all but the most rigidly organised public Guy Fawkes nights. We can’t have our own bonfires among friends, so there’s nowhere to burn a guy, so they don’t get made and the story has died or, as is seen in comments, misunderstood as celebrating Guy Fawkes, hero. Many popular types of fireworks have been outlawed for reasons of safety, only for the law of unintended consequences to kick in. Manufacturers added ear-shattering noise to replace the banned excitements.

In country areas the bonfire could be 2 or 3 neighbours’ shared festivity, or in a nearby town the Lions or some other group might organise a big bonfire for all comers, and Plunket sold hot dogs and cuppas to raise funds. Everyone would bring along their own fireworks, little kids waved sparklers, older kids lit strings of crackers and threw them at each other and laughed when the target leapt in shock at the bangs at his feet.

Next day we kids scoured the scuffed area around the charcoal and ashes looking for fireworks whose fuse had gone out, and the greatest prize: an untouched one that someone might have dropped in the dark. This was before daylight saving, we stayed up way past our usual bedtimes, but after all this was a special occasion, only once a year.

The ratio of injury to activity was pretty good, from memory. Especially with the private family bonfires, there was a great deal of scouring for dry branches and dragging them to the bonfire site, everyone had to physically do something. In the process we tended to get our ears bent about bonfires and matches and dry grass and how easily fire could spread, and the importance of having water buckets and a hose if it would reach, and sacks to wet if there had been no rain for a while and there could be sparks into dry vegetation.

Perhaps fireworks do need to be removed permanently from sale to the public, because so many of the public are no longer in touch with real practical elements of life such as safe outdoor fires, urban digital competence is a whole different knowledge set from what we grew up surrounded by when I was thrilled by November 5th, some double happies and being allowed to light one of the rockets, reminded of the checking procedure, where is it pointing, and is the bottle it’s sitting in well-seated so it won’t tilt?

[abridged at ODT Online]

Images:
● Lake Okareka Volunteer Rural Fire Force 2014 [okarekarural.fire.com]
● Sparklers, CrispNZ Trips [cris.lovell-smith.com]

__________________________________

NZHerald 31.10.14 Auckland's new Guy Fawkes restrictions kick in (article)NZ Herald 31.10.14

The Economist 6.11.14 Guy Fawkes face post modern protest [economist.com]The Economist 4.11.14

Posted by Elizabeth Kerr

1 Comment

Filed under Democracy, Events, Fun, Geography, Heritage, Inspiration, Media, Name, New Zealand, People, Politics, Property, Site, Urban design

Taking to water like a duck on oil

A report on ethical investment opportunities, commissioned by Dunedin City Council, will be discussed by councillors later this month.

“This is an opportunity for us as a community to have a conversation about what we collectively feel comfortable making money from. It is important to have this conversation.” –Cr MacTavish (via ODT)

The councillor has written:
“I think drilling for hydrocarbons is unethical because of climate change. At the Council, we’re already having to factor climate change planning into decision-making, and it’s pretty obvious that it’s not the cheap option.”

Read Jinty MacTavish’s recent comments at ODT Online:
On ethics and hypocrisy… (9.1.14) and Climate change policy, cycle investments (12.1.14).

****

Link supplied.
Monday, 13 January 2014 4:06 a.m.

Ethical Sat Nav [newsbiscuit.com] 1Cr MacTavish need never get lost again

### newsbiscuit.com Jan 7th, 2014
Politicians to replace faulty moral compass with new Ethical Sat Nav
By Ludicity
MPs are preparing for the arrival of a new piece of wearable technology that will help them navigate difficult terrain and always guide them towards the high moral ground.
The EPS, or Ethical Positioning System, operates by triangulating a person’s political standpoint via a number of morally aware ‘smart satellites’. If a politician starts to veer off course, perhaps about to break a manifesto pledge, the Sat Nav will interrupt with the message: ‘You are no longer on the agreed route, please perform a U-turn now.’
The new system replaces the old and unreliable moral compass. ‘In theory the moral compass should have worked,’ explained philosopher AC Grayling, ‘but many politicians found it confusing and were clearly unable to tell which way it was pointing. All too often they either they left it at home or held it upside down and headed off in entirely the wrong direction.’
Read more

****

Those speaking at the inaugural Oil Free Future Summit included Gareth Hughes (Green Party), Jinty MacTavish, Prof Bob Lloyd, and photo journalist John Wathen.

offs-poster (detail) 4a### ODT Online Mon, 13 Jan 2014
Flotilla to hinder drilling
By John Lewis
Oil Free Otago has established a ”rapid response” team of up to 260 people to take to the waters around Otago to hinder Anadarko Petroleum Corporation’s deep-sea drilling operations. Oil Free Otago spokeswoman Niamh O’Flynn said the team was established during the Oil Free Future Summit in Dunedin at the weekend, and hinted it may be used to block the shipping lane in Otago Harbour to stop Anadarko vessels from using Dunedin as a servicing port.
Read more

Related Posts and Comments:
9.4.13 Dunedin: Future service town to Shell? #realitycheck
24.9.12 Stadium Councillors back coastal oil exploration
13.4.10 Dunedin – an oil base?
18.3.10 Dunedin harbourside for oil base?
26.2.10 Latest on Dunedin’s offshore oil and gas prospects

Posted by Elizabeth Kerr

*Images: newsbiscuit.com – Ethical Positioning System (EPS); oilfreeotago.com – OFFS poster (detail)

91 Comments

Filed under Business, DCC, Democracy, Economics, Events, Hot air, Media, Name, New Zealand, People, Politics, Site, What stadium

GCSB: National Party websites hacked

Anon NZ | Published on 28 Jul 2013

Websites down:
johnkey.co.nz | billenglish.co.nz | gerrybrownlee.com | michaelwoodhouse.co.nz | bluegreens.co.nz | judithcollins.co.nz | bluelibs.org.nz | nikkikaye.co.nz | bluegreens.org.nz | simonbridges.co.nz | maggiebarry.co.nz | national.org.nz | davidcarter.co.nz | nickywagner.co.nz
and many more

****

### stuff.co.nz Last updated 10:31 30/07/2013:
Dotcom tells hackers of National sites to stop
“It has come to our attention that the thousands that have marched against this bill has still not been enough to send John Key and Peter Dunne a message.” –Anon NZ

****

### ODT Online Tue, 30 Jul 2013 APNZ
Doctom tells National Party hackers to back off
Hackers claimed to have taken down more than a dozen National Party websites overnight – but their actions have drawn the ire of internet entrepreneur Kim Dotcom. The group calling itself Anonymous New Zealand said in a video it had taken “direct action” against the GCSB spy bill.
The video said the websites would remain down until their servers were patched or the bill was withdrawn and Prime Minister John Key has apologised to all New Zealanders and internet entrepreneur Kim Dotcom.
The video was posted to YouTube on Sunday, the same day thousands of protesters marched against the GCSB bill. Among the sites that remained down this morning were Mr Key’s site, johnkey.co.nz, and Deputy Prime Minister Bill English’s site, billenglish.co.nz as well as a handful of sites belonging to other Cabinet ministers. However, the National Party website, which the group claims to have taken down, was live this morning at national.org.nz. APNZ
Read more

Anonymous 1

The global Anonymous group is best known for takedowns of US government and corporation websites, with its members recognised for wearing Guy Fawkes masks.

### nzherald.co.nz 09:09 Tue Jul 30 2013
National trying to restore websites
IT experts are trying to restore National Party websites after an attack by activist group Anonymous over the controversial Government Communications Security Bureau Bill.
In a video message posted online, Anonymous NZ calls the legislation – which will make it legal for the GCSB to spy on New Zealanders on behalf of other agencies – “despicable”.
The group has taken more than a dozen National websites offline, including those of Prime Minister John Key and Speaker David Carter, and a number of other MPs, but the main National Party website “survived” the attack.
Anonymous says the sites will stay offline until National patches its servers, or apologises to internet piracy accused Kim Dotcom – who was illegally spied on by the GCSB – and all New Zealanders. AAP
Read more

Related Post and Comments:
7.6.13 Peter Dunne, undone

Posted by Elizabeth Kerr

Leave a comment

Filed under Business, Democracy, Media, Name, New Zealand, People, Pics, Politics

Reykjavik, Iceland: The strongest mirror [speculative apartments]

I missed it – the Otago Polytechnic press release of Thursday 21 March.

Icelandic Activist To Speak At Dunedin School Of Art
Iceland democracy activist and artist Hordur Torfason will be speaking at Otago Polytechnic’s Dunedin School of Art on Wednesday the 27th of March, as part of a series of nationwide talks on modern democracy. cont.

By chance, at morning coffee a friend mentioned the speaking event and offered a ride there. Well. Not one speaker, but two —good fortune doubled. All Dunedin residents should have downed tools, pots and pans to attend.

The two men from Iceland, Hordur Torfason and life partner Massimo Santanicchia, each delivered a session, with Santanicchia up first. They shared intriguing, calm, sensible statements about their lives and work, about the quality and countenance of human social interaction, within a gripping exposé of the capitalist drain and the peaceful revolution that occurred in their financially devastated homeland — with thoughts to urbanism, greed, discrimination, corruption, property speculation, sick governance, economic collapse, human rights, the lobby power of silence, noise and internet, and the Icelandic people’s hard-won solidarity for change.

A compelling two-hour glimpse at a nation losing and finding itself.

Iceland’s capital city, Reykjavik, is the strongest of mirrors held to Dunedin’s glaring errors of recent and pending ‘big’ construction, economic blunders, and forces of business and political corruption – in turn, Dunedin reflects our nation’s wider political and economic struggles.

[Dunedin, we’re not crippled yet… but New Zealand? Blind rhetoric.]

ODT 21-12-12 screenshotProposed hotel and apartment building, Dunedin (ODT Online, 21 Dec 2012)

Derelict Reykjavik Highrises (Donncha O Caoimh 9-3-12 inphotos.org)Derelict Reykjavik highrises

While on our photowalk today we passed these buildings on the sea front. I thought they were just another apartment building until I noticed that the balconies were fenced in by planks of wood held together loosely!
Donncha O Caoimh (9 March 2012)

Originally from Perugia, Italy, Massimo Santannichia graduated from the School of Architecture in Venice in 2000 and holds an MA from the Architectural Association, School of Architecture in London, and an MSc in Urban Studies from the London School of Economics. He has been working as an architect and urban designer in Italy, the UK and Iceland. Over the last decade he has come to know Reykjavik intimately. Essentially an outsider in the tightly knit Icelandic society he has survived the downturn by moving from the firm Arkitektur to a plethora of internationally connected activity – delivering courses at the Iceland Academy of Arts since 2004 and coordinating projects and workshops with organisations such as the International Peace and Cooperation Centre and the Architectural Association.

Santanicchia’s research interests include relations between the ecological, physical, social and economical aspects of cities. He has lectured extensively on the subject of sustainable cities and small scale urbanism in Zurich, Athens, Oslo, London, Venice, Riga and Reykjavik.

Massimo Santanicchia (AA Summer School promo for July 2013)Santanicchia, second from right (AA Summer School promo for July 2013)

The Production of Space: The lesson from Reykjavik

According to Santanicchia, small cities (less than 500,000 inhabitants) host fifty-two per cent of the world’s urban population, yet they are profoundly neglected in the urban studies field. His presentation at the School of Art focused on the small city of Reykjavik (118,326 inhabitants), investigating how the planning system is trying to build a new urban strategy away from the world city model which was adopted until the banking collapse of 2008.

Reykjavik, Iceland - houses (trekearth.com) 2Reykjavik, Iceland – vernacular housing (trekearth.com)

Commodifying the view…
In particular, Santanicchia noted Reykjavik’s receipt of its first ‘tall buildings’, a crop of extraordinarily bleak apartment developments set against the vernacular lowrise, 3-4 storeyed townscape, blocking existing residential views of the coastline – through to (now dead) speculative drive-to malls and commercial buildings [‘build it and they will come’] further problematised by the profound lack of public transport and infrastructural support to the (then) ‘new phase’ of development.

Throughout the commentary, the physical and moral contradictions were purposefully illustrated by well-selected slides, quotations, and use of statistics. Santanicchia’s creative and socio-political approach to what ails, and demonstrations of how to foster community investment in sustainable environment, is the busy-work of a contemporary intellectual with a warm humanity, grounded in the discipline of practical economics working for the public good.

He and students have won grants to set ‘in place’ temporal urban interventions that sample ways forward for the local community, utilising vacant and degraded public places; demonstrating creative re-design / re-forming of the opportunities lost to the blanket of capitalist-grey asphalt – making places that create “trust” between institutions and among people.

Massimo Santanicchia, Reykjavik (project work)Reykjavik’s dislocated waterfront (‘reconnection’ project work)
[This work is very similar to that of Gapfiller in post-quake Christchurch.]

Copy of Santanicchia’s presentation slides and readings will be made available through Professor Leonie Schmidt (Head, Dunedin School of Art).

A few points he made along the way, from my notes:

● When “priority is given to economic development” …. the city becomes all about ‘building envelope’, ‘the city as a series of volumes’ (bulk and location) | “Management of the economy is not a city, is not urban planning.”

● In 2008, Iceland’s economy shrank 90%. The economy devalued by more than 100% in one week. 1000 people emigrated which kept unemployment low.

● “Big-fix” solutions don’t work in a small city.

● The DANGER of “one idea” …. “it is NOT a plurality”.

● “The WORST is what was built.” Flats and parking lots. No public transport. No sharing. 7000 apartments at Reykjavik are redundant. 2200 properties have been acquired by the banks.

● “The WORST neighbourhoods were created in the richest years.”

● The government didn’t protect the weakest. “The architecture failed because it placed itself at the service of political and economic interests with very little regard for social interests.”

● (Jane Jacobs, 1984): “The economic model doesn’t provide niches for people’s differing skills, interests and imaginations, it is not efficient.”

● (Aldo Rossi): “Building a city is a collective effort.” [empower the people]

● Post-crash, Iceland’s birthrate has increased and children are happier.

● “Trust is about participation.” Better institutions, social justice, equity and public/private relationships.

Zurich: They used 4 hot air balloons to indicate the height and bulk of a proposed tower development, prior to public submissions being received on the proposal.

[In evidence, at Dunedin, applicant Betterways Advisory said it couldn’t afford to provide a height indicator at 41 Wharf St – all the cranes were in Christchurch (wrong), and where do you get balloons from anyway, it asked…. Mr Rodgers (Betterways), we know, took his mother-in-law ballooning in Germany recently. Perhaps he could’ve made a stopover in the Mackenzie Country on his way home.]

### architecturenow.co.nz 25 Mar 2013
Massimo Santanicchia visits New Zealand
By Stephen Olsen
Auckland’s Wynyard Quarter has won high praise from Reykjavik-based architect Massimo Santanicchia for the “observable scaffolding” it is providing for an area in transition.
Santannichia knows a thing or two about making waterfront spaces more accessible from sparking a design revival at the harbour’s edge of the world’s northernmost capital last year, within the context of an award-winning programme known as the Meanwhile projects.
Santanicchia has also been drawing audiences to hear his views on the ways in which Iceland’s largest city is embracing a more human scale of urbanism in the wake of the financial crash.
Read more

Hordur Torfason followed with a punchy impassioned delivery, spoken with a run of crowd scenes and peaceful protest images repeating behind him. Describing post-crash Reykjavik as a scene of ferment and healing, Torfason took us through specific mechanisms for the peaceful revolution that has worldwide and local application – hear that, Dunedin.

Shortly, Torfason will head to workshops in Cypress. The following interview (2011) covers the gist of his lecture.

A multi-talented individual, he told his story from the age of 21 (1966), of how he grew the personal confidence and expertise (“proving talent”) to lead the people of a city and a nation to overturn the Icelandic Government and jail the bankers. He said Parliament has almost lost ‘all respect amongst all Icelanders’. Nevertheless, there’s a bill in passage to make Iceland a Safe Haven for journalists, whistleblowers, international media – protected by law.

● He maintains the role of the artist is to criticise, that criticism is a form of love: “We have to use reason, cultural roots, feelings and the precious gifts of life – our creativity”, to ensure human rights aren’t undermined by economic growth and politics.

“It’s about learning every week, every day, new sides of corruption,” he said. “Inequality is a tool for extortion, a way to maintain The System.”

● Inequality won’t be removed by conventional systems: “If you want to move a graveyard, don’t expect the inhabitants to help you.”

● “The internet has to be protected to dislodge the monster.”

● “One big party owns one big newspaper for Iceland.” According to that paper there was no crash.

The key word is AWARENESS. The silence of government was upsetting to the people; it meant the people used silence as a mirror to the government and politicians, to protest their rights. The cohesiveness and cleverness of the protest, the silent revolution, achieved 100% success. “They the media won’t tell you [the rest of the world] about it.”

● “Stick together and use the internet.” Make Plan A, B, C, D, E. Protest by peaceful revolution v Arrogance.

● Just 25 people from around the world are responsible for the crash, and one of them was the leader of Iceland’s national bank.

Hordur Torfason - blogs.publico.es (juan carlos monedero June 2011)Hordur Torfason by Juan Carlos Monedero (June 2011)

### grapevine.is August 4, 2011
You Cannot Put Rules On Love
An Interview With Hordur Torfason by Paul Fontaine

“I tell people, ‘I’m not demonstrating. I’m fighting for a better life.’ I think aloud, ask questions, seek answers. I knew there was corruption in this country. But I never thought in my wildest dreams that the banks would crash. We have been told lie after lie after lie, and people just accept them. They say ‘þetta reddast’ [‘it’ll all work out’], until it affects them personally, and then they come screaming.”

The 2008 economic collapse of Iceland would send Hordur’s life path in a whole new direction—one that would take him beyond the bounds of even his own country.
Read more

Posted by Elizabeth Kerr

4 Comments

Filed under Architecture, Business, Construction, DCC, Design, Economics, Events, Geography, Heritage, Innovation, Inspiration, Media, Name, People, Pics, Politics, Project management, Property, Site, Town planning, Urban design, What stadium

RESIGN: Placard Monday’s city council meeting

Call goes out – from the Citizens

Dunedin City Council meeting
Monday, 14 May 2012, 1.00 PM
Council Chamber, Municipal Chambers

[Agenda and Reports]

A lot of media will be at Monday’s 1pm Council meeting.

This is an opportunity to put pressure on pro-stadium councillors to RESIGN.

As many people as possible are invited to attend this meeting with signs demanding pro-stadium councillors RESIGN.

A simple sign with resign on would do: RESIGN

Leave a comment

Filed under Business, Construction, CST, DCC, DVL, DVML, Economics, Media, ORC, ORFU, People, Politics, Project management, Property, Site, Sport, Stadiums

DCC has PR problem

The Octagon Occupy (a peaceful legitimate protest) and the weekend’s North Dunedin fires (arson, threat to property, drunkenness and street fighting, threat to health and safety) are exerting pressure on the Dunedin City Council to enter meaningful – open and transparent – communication with residents and ratepayers; evidently, this should extend to the university and the police.

The protesters have won a significant victory and it will be even more difficult to move them now.

### ODT Online Wed, 9 Nov 2011
Editorial: Communication breakdown
Have the Dunedin City Council and senior police officers stopped talking to each other? After last Tuesday night’s public relations disaster when the council failed in its attempt to have trespassed protesters removed from the Octagon, the residents of Dunedin could well be forgiven for thinking sensible communication has ceased. The “Occupy Dunedin” protesters – some call them noble and brave and others bludgers and beneficiaries – pitched more than 30 tents in the upper Octagon on October 15, joining a global movement protesting corporate greed and social inequality and calling for greater protection of the environment.
Read more

Related Posts:
19.10.11 Octagon protest occupies minds!
21.10.11 INSANE, Dave! Occupy Dunedin STAYS in the Octagon.
24.10.11 #Occupy #OWS Good guy! US Marine Sgt Shamar Thomas

Posted by Elizabeth Kerr

13 Comments

Filed under DCC, Economics, Events, Media, People, Politics, Site

#Occupy #OWS Good guy! US Marine Sgt Shamar Thomas

1 Marine vs. 30 Cops at Occupy Times Square

This is an amazing confrontation caught on camera at the Occupy Times Square protest recently in New York.

Angry at having seen his unarmed fellow citizens being abused by the police, US Marine Sgt Shamar Thomas gives the NYPD an ear full.

Sometimes the right person with the right words and motivation can make a difference. Watch this video and if you can appreciate the message and the passion with which it is conveyed, make sure his words are spread far and wide.

Please share Brasscheck TV e-mails and videos with friends and colleagues. That’s how we grow. Thanks.

Brasscheck TV
2380 California St
San Francisco, CA 94115
www.brasschecktv.com



Sgt Shamar Thomas
from Roosevelt (NY) is an activist in the Occupy Wall Street movement. Thomas is a 24-year-old Marine Veteran (two tours in Iraq), he currently plays amateur football and is in college. He comes from a long line of people who sacrifice for their country: Mother, Army Veteran (Iraq), Step father, Army, active duty (Afghanistan), Grand father, Air Force veteran (Vietnam), Great Grand Father Navy veteran (World War II).

Posted by Elizabeth Kerr

Leave a comment

Filed under Economics, Events, Geography, Inspiration, Media, People, Politics

Dunedin: “It’s All Right Here”

Facebook: Michelle Helliwell’s photos
Michelle Helliwell: Since this photo was taken, the DCC have broken and stolen our balls! (via Steve Mowat builder who contracts to them. Anyone who knows them, please advise them to return asap, as an official damage and theft complaint is underway. As members of the freeman society, our schedule of fees for damage of and removal of our property is quite expensive. Thanks.)
19 hours ago

Related Post:
21.9.11 Can it be true? Nahhh

Posted by Elizabeth Kerr

3 Comments

Filed under Architecture, Construction, DCC, Design, Economics, Events, Fun, Geography, Hot air, Inspiration, People, Politics, Site, Urban design

Stadium Opening – Friday 5 August

The public are invited to the official opening of the Stadium at University Plaza on Friday 5 August. Those attending must be seated by 6.50am for the hour long celebrations which will begin at 7.00am.

Further details regarding entrances and parking will be available over the next two weeks.

****

This notice appeared in ODT today, page 4 – Dunedin City Council Noticeboard.
Also see:
http://www.dunedin.govt.nz/__data/assets/pdf_file/0008/198440/DCC-Noticeboard-Sat-23-July-11.pdf

What if? Dunedin… has removed any reference to the stadium’s name sponsor from the notice since it’s our understanding that to date the sponsor has made no financial contribution to the stadium project.

We’re prepared to stand corrected if this information is in some way wrong or inaccurate.

Posted by Elizabeth Kerr

72 Comments

Filed under Construction, Economics, Events, Media, Politics, Project management, Stadiums

StS Town Hall meeting SMART POINTED BRILLIANT

Telling it as it is – Stop the Stadium has done an incredible job.

CONGRATULATIONS.

Dunedin people from all walks of life filled the Town Hall to capacity.

It was the speakers who did all the work tonight – Alistair Broad, Dave Cull, Gerry Eckhoff, Robert Hamlin, Michael Stedman and Sukhi Turner, along with Dougal Stevenson in the critical role of MC. Together they were honest, truthful, pointed, on task, funny, believable and more transparent than anything the Dunedin City Council, the Otago Regional Council or the Carisbrook Stadium Trust has had to offer on the stadium proposal to date as to business feasibility – and potential effects on ratepayers and residents (citizens all), the council ledgers and the Dunedin economy for the extremely long haul ahead IF the “silly” “stupid” “appalling” project goes ahead.

The media has material enough for the largest field day, tomorrow. Since when does an ex-Mayor of Dunedin invite a civic uprising, can I say “ours does”. I say it with utmost pleasure.

The meeting was scandalously GOOD.

And hey, tomorrow, Dunedin City councillors pushing the stadium project – being ever hopeful they can get it over insurmountable odds – will once again see stadium business into non public. HOW LONG can they keep this façade up. Really. Will Crs Cull and Staynes succeed with their Notice of Motion?

Two resolutions were passed at the public meeting. In essence: 1. Hello Mr Rodney Hide, come open the books at DCC and ORC. 2. Oh, procedure: Hello Local Government Act and DCC’s LTCCP, what is due process. [Wording of the unanimous resolutions will likely be cited by the press.]

But here’s what everyone can do, safely, yes actually! {Best consult ODT 31/3/09 for clarification; I did say it was “interesting” in the next sentence; seemed too good to be true, if you’re into rates revolts that is. Elizabeth.}This is the flyer distributed at meeting end, which has interesting confirmation from Dean of Law Prof Mark Henaghan:

stop-the-stadium-notice

****

Finally, thank you DUNEDIN BUSINESS PEOPLE FOR VOICING YOUR VIEWS and for being there on stage and throughout the audience. We waited for this. It has happened. Let’s turn this monstrous DCC/ORC/CST process on its ear.

****

ANOTHER THING: EVERYONE who doesn’t want the stadium and or is not prepared to pay for it please write submissions saying so – in your very own words, with your very own feelings or facts – on the DRAFT Dunedin City Council LTCCP and the Draft ORC Annual Plan. INDICATE in your submissions that you DO WISH TO BE HEARD on your submissions. This is not a frightening process.

Check out the council documents online or contact the councils for more information about how you can participate in the process.

If the councils don’t hear from US, they will continue to falsely assume (the great CHARADE) that we want the stadium and everything that follows… as it sinks the city.

The councillors who oppose the stadium project NEED YOUR HELP. Now.

3 Comments

Filed under Architecture, Concerts, Design, Economics, Geography, Hot air, Inspiration, Media, Name, Politics, Site, Stadiums, STS, Town planning