Received from Rob Hamlin.
Monday, 27 May 2013 1:03 p.m.

Carisbrook on Sunday (26.5.13)

Carisbrook 26.5.13. Rob Hamlin 1
A picture of doomed dereliction – Innit? I tried to take photos of this last week, but the weather wasn’t good enough. I seem to recall that the comb lines in the manicured grass were going in a different direction then, indicating that further ratepayer-funded pampering has occurred this last week. What earthly reason can there be for the DCC to be spending money doing this on a structure that they claim they have a) sold and b) issued a demo permit for? Some seats are missing (but could be inside). The lights are gone, but Delta bought the last set anyway so why not ‘play it again Sam’?

Otago Regional Council – Leith Flood Protection Scheme

Water of Leith 001 (1)001 ‘Sad Sacking’
The results of the equally seawall-like doomed attempts by the ORC and their representatives to establish a million dollar[?] lawn in the middle of winter in the bottom of a drainage channel occupied by a major flood prone waterway (the Leith). An act of simply heroic lunacy. This is the aftermath of the minor flood last week. The proto-lawn is covered in sacking further up the river, except for the bit next to the water – that’s now wrapped around the post in the foreground. Luckily it did not end up in the harbour – although many tons of silt presumably did. No doubt the ORC will be able to issue itself with a retrospective resource consent for this uncontrolled discharge into the environment.

Water of Leith 002 (1)Water of Leith 004 (1)002, 004 ‘Washed away’
For weeks now and presumably at great expense to the ORC, the contractors (Lund if the site signs are to be believed) have been laying down what looks like micropore mat, hexagon reinforcement, and what looks like a very expensive chicken wire plastic mesh combo – stitched together. They then planted grass on it. This can be seen growing feebly on the slope in 002. Alas, the minor flood that dislodged the sacking also gently sluiced out the soil and grass from the expensively-laid reinforcements on the level parts of the lawn laid (lunacy) right up to the edge of the river.

Water of Leith. Robert Hamlin (1)000 gives a higher angle shot showing the artistry of this now exposed and empty (of soil) soil stabilisation system, along with the feeble grass above it. I am not sure how they will reposition the soil into this stuff short of ripping it up and starting again. Presumably if all this expensive stuff was intended to stop soil coming out, it will be equally good at resisting attempts to put it back in again by mechanical means. Oh dear!

Water of Leith 003 (1)003 ‘Mighty defences’
Here we have what is actually supposed to keep the Leith in the straight and narrow from now on. This is the concrete shuttering for an incomplete part of the bank (this shuttering is now filled with shyte from the flood). The wall when poured (one hopes after clearing out said shyte) will be a worthy successor to the St Clair seawall – it is about 12 inches tall and 8 inches thick. It is plastered onto the top of (rather than onto the front of as with the seawall) the remains of its more substantial predecessor. The lawn (in the areas where it used to be there) starts directly behind it…

Water of Leith 005 (1)005 ‘Classy concrete placing’
The mighty foot-high defences take an interesting course in the photograph taken looking up the left-hand bank from the Forth Street Bridge. I do not know if this feature-bulge in the mighty wall is the outcome of a molar-like architectural design feature to increase the organic appearance of the site or if it’s simply a concrete shuttering quality control issue. It’s your rates money – you decide.