Tag Archives: Art museum

DPAG April #exhibition arrivals

[click to enlarge]
DPAG April 2016

LIGHT SWITCH AND CONDUIT
The Jim Barr and Mary Barr Collection
9 Apr 2016 – 14 Aug 2016
This exhibition explores the relationship between artworks and the domestic context by delving into the personal collection of Jim Barr and Mary Barr. Light switch and conduit focuses on their recent period of collecting and brings together works by key figures in the rising generation of contemporary New Zealand artists, alongside more established New Zealand artists and several international artists as well. This exhibition includes work by Dan Arps, Fiona Connor, Simon Denny, Oscar Enberg, Glen Hayward, Kate Newby, Campbell Patterson and Luke Willis Thompson. Link

Posted by Elizabeth Kerr

*Michael Parekowhai Canis Minor 2016 (detail), Axminister carpet, brass, bronze, c-type photograph | Photo: Max Bellamy

9 Comments

Filed under Business, Coolness, DCC, Democracy, Design, DPAG, Dunedin, Economics, Events, Fun, Heritage, Innovation, Inspiration, Leading edge, New Zealand, People, Pet projects, Politics, Project management, Property, Site

Perforated orange metal cube, Sweden

### dezeen.com April 8th, 2010 at 12:56 am
Moderna Museet Malmö by Tham & Videgård Arkitekter
By Rose Etherington
Stockholm studio Tham & Videgård Arkitekter have completed a museum in Malmö, Sweden, adding an extention clad in perforated orange metal. Called Moderna Museet Malmö, the project involved renovating the existing building and adding a new entrance hall, cafe and upper gallery.

The following information is from the architects:

A starting point was that a new art museum, a public and cultural building, represents a rare opportunity to create a new node within the city, the urban balance is changed and the neighborhood develops.

In Malmö, in the south of Sweden, there was also the possibility to, starting from the industrial architecture of the former Electricity plant dating from the year 1900, create a new art museum with an informal and experimental character that would complement the main museum in Stockholm.

The greatest challenge posed by the project, (in addition to the demanding eighteen-month time limit from sketch-design to inauguration), was the need to adapt the existing industrial brick building to current climatic and security requirements to comply with the highest international standards for art exhibition spaces.
Read more + Images

Related Posts:
2.7.09 Town Hall: Glazed cube and square for Moray Place
1.7.09 Town Hall Dunedin Centre architecture for a What if? second

Post by Elizabeth Kerr

1 Comment

Filed under Architecture, Construction, Design, Geography, Inspiration, Project management, Site, Urban design