Tag Archives: Zoning

Calder Stewart pay up #Carisbrook

What will Dave and the greenies spend this loot on ?

ODT 23.7.16 (page 6)

2016-07-23 22.18.13

Link: http://www.odt.co.nz/news/dunedin/391281/dcc-paid-31-million-carisbrook-sale

█ For more, enter the terms *carisbrook* or *orfu* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

7 Comments

Filed under Business, Carisbrook, DCC, Democracy, District Plan, Dunedin, Economics, Finance, Highlanders, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Sport, Stadiums, Town planning, Travesty, Urban design, What stadium

Dairying, Housing : More on Resource Legislation Amendment Bill 2015

Water resource management [lincoln.ac.nz] 1Irrigation [lincoln.ac.nz]

█ Interpretation of the existing RMA has led to dairy intensification destroying waterways and threatening public health and welfare, in large measure.
A bit of a tour….

### Stuff.co.nz Last updated 14:29, March 23 2016
Canterbury rumbly-gut outbreak linked to dairying
By Pat Deavoll
An outbreak of “rumbly-gut” among communities in Canterbury has Waikato veterinarian and agri-ecology consultant Alison Dewes concerned. She thinks the outbreak is the result of dairy intensification and irrigation contaminating public drinking water. Thirty per cent of the region’s shallow wells have already experienced an increase in nitrogen and pathogen levels after 10-15 years of irrigation on shallow lighter soils, she says. “We have the highest rates of ecoli diseases in the world, and the highest rate of campylobacter, cryptosporidia and giardia in communities in the Hinds region. We have the highest rates of zoonoses (disease spread from animals to humans) in the world in some of the irrigated/dairy catchments like Selwyn and Hinds and the government is promoting a further 40,000ha of irrigation in an already allocated and at risk catchment. Economics and dairy intensification are trumping public health and welfare.”
Read more

****

### NZ Herald Online 8:42 AM Wednesday Mar 9, 2016
40pc of farms fail to lodge consents
By Zaryd Wilson – Wanganui Chronicle
Forty per cent of dairy farms required to lodge a resource consent application with Horizons Regional Council have not done so. A total of 229 dairy operations were required to have lodged an application by January 1 this year under the regional council’s One Plan, which aims to limit nitrogen pollution of waterways. The One Plan – adopted by the council in 2014 – limits nitrogen leaching by intensive farm operations, namely dairy, commercial horticulture, cropping and intensive sheep and beef farming. Figures released to the Chronicle under the Official Information Act reveal that only 137 of the 229 dairy operations which came under new rules have lodged consent applications. The new rules took effect on July 1 last year, and farms had six months – up until January 1 – to apply.
Read more

****

Wetland copy-header [nzarm.org.nz] 1Wetlands [nzarm.org.nz]

26.11.15 NZH: Resource Management Act reforms to be introduced
The Government will introduce its long awaited Resource Management Act reforms to Parliament next week after securing the support of the Maori Party. The reforms to the country’s main planning document stalled two years ago when National’s support partners refused to back them because of their potential impact on the environment.

Ministry for the Environment

About the Resource Legislation Amendment Bill 2015
This page has information on the amendments proposed in 2015 to the Resource Management Act 1991.

Resource Legislation Amendment Bill [New Zealand Legislation website]
The Resource Legislation Amendment Bill (the Bill) was introduced to Parliament on 26 November 2015.

****

Leading New Zealand law firm Chapman Tripp say:
OPINION Most of the provisions in the Bill have been telegraphed in advance so there is little to surprise. If passed as drafted, it has the capacity to reduce costs and speed up planning processes – but probably only at the margins. For more radical and meaningful change we may have to await the results of the Productivity Commission’s inquiry into urban planning (see Chapman Tripp’s commentary here, dated 2.11.15).

RMA Reform Bill – busy with change but less than National wanted
Chapman Tripp 26 November 2015
OPINION The ‘phase two’ RMA reforms, initially to have been passed in 2014, have now finally been introduced to Parliament as the Resource Legislation Amendment Bill. The Bill is a busy piece of legislation running to more than 200 pages, and aims to help streamline planning and consenting processes. But National has had to abandon its proposals to remove the “hierarchy” some saw as enshrined in the existing Part 2 of the RMA, promoting environmental values ahead of economic development in sections six and seven. After the loss of the Northland seat to Winston Peters in March, it does not have the votes to get the wider and more far-reaching changes through. We look at the Bill:
Major changes
● Requiring councils to follow national planning templates (once such templates are available) with standardised provisions across the country.
● A range of measures aimed at producing faster, more flexible planning processes. These include: tighter timelines for plan production and the introduction of two new tracks – a collaborative track and a streamlined track.
● Reduced requirements for consents – allowing councils discretion not to require a resource consent for minor changes, creating a new 10 day fast-track for simple consents and eliminating the need for an RMA consent when consenting is provided for in other legislation.
● Stronger national direction – especially in relation to hot-button issues like providing for new housing or addressing dairy stock in rivers.
Read more

Blue skies review for urban planning – the take-off
Chapman Tripp 15 January 2016
OPINION The blue skies review into urban planning has now left the runway, with the release by the Productivity Commission before Christmas of an issues paper seeking feedback on possible directions for change.

Continue reading

7 Comments

Filed under Agriculture, Architecture, Business, Construction, Democracy, Design, District Plan, Dunedin, Economics, Geography, Heritage, Housing, Infrastructure, Media, Name, New Zealand, People, Politics, Project management, Property, Resource management, Site, Tourism, Town planning, Transportation, Travesty, Urban design

Takes the Cake | What Dairy Crisis ? #DUD #PropertySpeculation

Updated post – audio links added below
Mon, 21 Mar 2015 at 7:48 p.m.

WHERE ARE THE PERMANENT JOBS, DUNEDIN

Syd Brown Mosgiel sign 1

Real estate across the city is suddenly booming for the first time since 2007.

### radionz.co.nz 8:05 am on 18 March 2016
Is Dunedin out of the doldrums?
By Ian Telfer – Otago reporter
Dunedin has been economically stagnant so long that no-one is brave enough to declare the gloomy times over. But all the signs say it is out of the economic doldrums it has been in for 10 years.
The city is enjoying booms in real estate, tourism and niche technology industries such as video gaming. A report from economic monitoring company BERL shows 1770 new jobs have been created in the city in the past two years and Dunedin’s economy is now growing at 1.3 percent a year per capita.
[…] An example of the city’s turnaround is Highland Park in Mosgiel, Dunedin’s first major housing subdivision in many years. Today, 100 tradespeople are on site, building 25 homes.
The subdivision’s developer Syd Brown said they set themselves a decade to sell 225 sections, but the demand is so strong they are two-thirds sold and three years ahead of schedule. “It’s racing ahead for us. Sometimes you wake up in the morning and think ‘is this real?’, but that’s the market at the moment, and the demand is here,” Mr Brown said. Mr Brown said 60 percent of the people buying were from out of town, mainly from Christchurch and other South Island locations, such as Ashburton and Timaru.
Read more

### radionz.co.nz 8:49 am on 18 March 2016
RNZ National – Morning Report
Dunedin out of doldrums for the first time in a decade
8:36 AM. Dunedin’s economy is sailing out of the doldrums for the first time in 10 years.
Audio | Download: OggMP3 (4′13″)

QUESTIONS : What did Syd Brown have to do to convert rural zoned land to residential zoned land ? How did a position on council enable zone changes, new roading and infrastructure services to benefit these properties ?

[the blurb]

Highland Park is an exciting new community located in the heart of the Taieri and is set to redefine living standards in the Otago region. Seamless integration with Mosgiel’s rich Scottish tradition, Highland Park properties express qualities of modern urban living right on the doorstep of Dunedin city. With a high level of amenities and land and home packages to suit all, Highland Park offers a unique lifestyle defined by openness, green spaces, and a nurtured sense of community.

All section packages are designed to take the hassle and stress out of building a new home. Every section with Highland includes:
• Quality Timber Fences
• Professionally Installed Vehicular Crossings
• Storm Water Discharge Connections
• All Services To The Boundary … Including Fibre
Sections are priced with services as above and with flexible land and home packages available to suit all lifestyles, there has never been a better time to move out to the Taieri.

[click to enlarge]

Highland Park Subdivision Mosgiel - Sections for sale

DCC Webmap - Highland Park Subdivision, Mosgiel JanFeb2013DCC Webmap – Highland Park, Mosgiel JanFeb 2013

GROAN – #ImpoverishedSubdivisionDesign #UrbanSprawl
Shades of 1940s-style cul de sac living without neighbourhood amenity, includes migration from central Dunedin to flat sections (urban drift). It looks bad, and is. ‘Browning’ the greenfields.

Posted by Elizabeth Kerr

*Image: whatifdunedin – Syd Brown + Mosgiel sign

17 Comments

Filed under Business, Construction, District Plan, Dunedin, Economics, Geography, Hot air, Infrastructure, Media, Name, New Zealand, People, Politics, Project management, Property, Proposed 2GP, Resource management, Site, Town planning, Transportation, Travesty, Urban design, What stadium

DCC extends 2GP further submissions period

Dunedin City Council has extended the Further Submissions period for the second generation district plan (2GP) to Thursday, 3 March 2016 at 5pm.

All members of the public are eligible to make submissions on the Summary of Decisions Requested to the proposed 2GP.

[screenshot – click to enlarge]

DCC 2GP Update 17.2.16 - Further submissions period extended to 3 March 2016

██ DCC 2GP Index Page at https://2gp.dunedin.govt.nz/2gp/index.html

██ Have Your Say at https://2gp.dunedin.govt.nz/2gp/submissions.html

██ Search for Summaries of Decisions Requested and Submissions at https://2gp.dunedin.govt.nz/submit/PublicSubmissionSearch.aspx

Related Posts and Comments:
● 16.2.16 DCC: 2GP further submissions [consultation software with bug?]
8.2.16 DCC 2GP further submissions [update]
4.2.16 2GP commissioner appears to tell Council outcome before hearings…
3.2.16 DCC 2GP Hearings Panel
22.12.15 DCC consultation warped | inaccessible Proposed 2GP ‘eplan’
9.12.15 Otago Regional Council hammers DCC’s proposed 2GP
19.11.15 DCC Conditions: Extensions for public submissions (2GP)
19.11.15 DCC Proposed 2GP ridiculousness: formatting + plan content
16.11.15 DCC operating deficit $1M worse than budget
11.11.15 Letter to DCC chief executive re extension for public submissions…
9.11.15 Letter to DCC chief executive re Proposed 2GP hearings panel
24.10.15 DCC and the AWFUL 2GP ‘threat of THREATS’
12.10.15 DCC Proposed 2GP (district plan) —DEFEND YOUR PROPERTY
3.10.15 DCC: Public Notice Draft 2GP + “Community Presentations”
3.10.15 DCC appointees to draft 2GP panel #greenasgrass #infatuation
2.10.15 DCC Draft 2GP hearings panel lacks FULL INDEPENDENCE
30.10.15 DCC 2GP molasses and the dreadful shooflies (You)
28.9.15 Message to DCC: The People can’t deal with your 2GP documentation…
26.9.15 DCC: Proposed 2GP to line pockets of cowboy developers #FIGHTDIRTY

Posted by Elizabeth Kerr

13 Comments

Filed under Business, Climate change, DCC, Democracy, District Plan, Dunedin, Economics, Geography, Infrastructure, New Zealand, People, Politics, Project management, Proposed 2GP, Resource management, Town planning, Travesty, Urban design

DCC: 2GP further submissions [consultation software with bug?]

Copy of DCC internal correspondence received.
Tue, 16 Feb 2016 at 7:01 a.m.

On 12/02/16 4:53 pm, “Simon Pickford” wrote:

Good afternoon,

A quick update on the 2GP: we have found a technical issue with the reports that were produced in response to the submissions on the 2GP. As a result the reports need to be reissued and this means that we are outside the 10 day minimum statutory period of the current consultation and will have to re-notify.

We are assessing whether there will be an impact on the timing of the 2GP hearings and the remaining consultation process, but it will require us to re-advertise our consultation period. We are updating the website and making sure the necessary adverts are in place.

Regards

Simon

Simon Pickford
General Manager Services and Development
Dunedin City Council

****

I forwarded this yesterday without knowledge of Mr Pickford’s email:

From: Elizabeth Kerr
Sent: Monday, 15 February 2016 10:51 p.m.
To: Simon Pickford; Sandy Graham; Sue Bidrose
Subject: FW: Public Notice for the Summary of Decisions Requested

Dear All

I received the below DCC email on 5 February, and was prepared to make a further submission before the closing date of 26 February 2016.

Today, confusion at the DCC website with regards to further submissions – given two updates provided.

The first said, in effect, that the closing date for further submissions would be put back [because of an internal stuff up] and the new closing date was going to be publicly notified. [I didn’t make a screenshot of the message]

This was followed by another, replacing the first, which said:

Error in Summary of Decisions Requested reports
12/02/2016
The Summary of Decisions Requested reports have been temporarily withdrawn from the website due to a technical error in exporting data. In the interim please use the search function on the Search the Submissions page to view the correct Summary of Decisions Requested. Updated Summary of Decisions Requested reports will be distributed online and to libraries as soon as practically possible.

This last made no reference to public notification of an extended closing date for further submissions.

Given the date of issue was 12/02/2016 this suggests that by now all submitters should have been emailed individually about something having gone wrong with the process and to await further information from DCC.

I hope the technical error which affects all those making further submissions is properly recognised and a public notice will be issued that extends the closing date for submissions.

Otherwise I imagine the Council will leave itself open to challenge.

Please could someone clarify how the process is to presume, and accurately.

Kind regards

Elizabeth Kerr

From: Teresa Gutteridge
Sent: Friday, 5 February 2016 3:28 p.m.
To: Elizabeth Kerr
Subject: Public Notice for the Summary of Decisions Requested

Dear Elizabeth Kerr
Dear Submitter,
Please see the public notice for the Summary of Decisions Requested for the Proposed Second Generation Dunedin City District Plan below.
It would be appreciated if you contacted the 2GP Team at the times and through the options laid out in the public notice rather than by responding to this email.
Yours Sincerely

Anna Johnson
City Development Manager

DCC Summary of Decisions Requested 5.2.16 Public Notice

[ends]

██ DCC 2GP Index Page at https://2gp.dunedin.govt.nz/2gp/index.html

Related Posts and Comments:
8.2.16 DCC 2GP further submissions [update]
4.2.16 2GP commissioner appears to tell Council outcome before hearings…
3.2.16 DCC 2GP Hearings Panel
22.12.15 DCC consultation warped | inaccessible Proposed 2GP ‘eplan’
9.12.15 Otago Regional Council hammers DCC’s proposed 2GP
19.11.15 DCC Conditions: Extensions for public submissions (2GP)
19.11.15 DCC Proposed 2GP ridiculousness: formatting + plan content
16.11.15 DCC operating deficit $1M worse than budget
11.11.15 Letter to DCC chief executive re extension for public submissions…
9.11.15 Letter to DCC chief executive re Proposed 2GP hearings panel
24.10.15 DCC and the AWFUL 2GP ‘threat of THREATS’
12.10.15 DCC Proposed 2GP (district plan) —DEFEND YOUR PROPERTY
3.10.15 DCC: Public Notice Draft 2GP + “Community Presentations”
3.10.15 DCC appointees to draft 2GP panel #greenasgrass #infatuation
2.10.15 DCC Draft 2GP hearings panel lacks FULL INDEPENDENCE
30.10.15 DCC 2GP molasses and the dreadful shooflies (You)
28.9.15 Message to DCC: The People can’t deal with your 2GP documentation…
26.9.15 DCC: Proposed 2GP to line pockets of cowboy developers #FIGHTDIRTY

Posted by Elizabeth Kerr

7 Comments

Filed under Business, DCC, Democracy, District Plan, Dunedin, Economics, Name, New Zealand, People, Politics, Project management, Proposed 2GP, Resource management, Town planning, Travesty, Urban design

DCC 2GP further submissions [update]

Updated post
Mon, 15 Feb 2016 at 5:36 p.m. Last updated 10:59 p.m.

Two updates were issued today by DCC on the 2GP further submission process.

In the first, DCC said it had withdrawn the 2GP Summary of Decisions, and the closing date for further submissions would be put back and publicly notified.

The second update made no reference to the closing date or public notification:

DCC says: Error in Summary of Decisions Requested reports
12/02/2016
The Summary of Decisions Requested reports have been temporarily withdrawn from the website due to a technical error in exporting data. In the interim please use the search function on the Search the Submissions page to view the correct Summary of Decisions Requested. Updated Summary of Decisions Requested reports will be distributed online and to libraries as soon as practically possible.

Awaiting clarification and advice from DCC.

2GP logo 2Have your say
IGNORE THIS DATE – The Further submission period is open from Wednesday, 10 February to Friday, 26 February.

What can a further submission cover?
A further submission can only be made in support or opposition to a point raised in an original submission on the 2GP.

Who can make a further submission?
The RMA limits who can make further submissions to:
● any person representing a relevant aspect of the public interest
● any person that has an interest in the proposed plan greater than the interest that the general public has
● the local authority (the Dunedin City Council).

It provides an opportunity for people who may be affected by an original submission to have their views considered. You do not have to have made an original submission to participate. If you have made an original submission you do not need to repeat submission points made in that submission as they will already be considered.

Summary of decisions requested
The Summaries of Decisions Requested are a concise summary of the decisions requested in the submissions on the 2GP which closed on 24 November 2015. It is not the full or exact content of submissions. It is prepared to enable the further submission process which is set out in Schedule 1 of the RMA.

█ The Summary of Decisions Requested and copies of all submissions will be available from midday Tuesday, 9 February.

Hard copies of the Summary of Decisions Requested reports will also be available for inspection at:
● 2GP drop-in centre, 11 George Street, Dunedin, 10am to 3pm, Monday to Friday
● public libraries and/or service centres at Dunedin, Middlemarch, Mosgiel, Port Chalmers, Blueskin Bay (Waitati) and Waikouaiti.

Submissions Map
The submissions map indicates the spatial location of submissions seeking a change to the proposed zoning (management zones only not overlay zones), new heritage precincts, or changes to scheduled items. It reflects the information in the submission point address field of the Summary of Decisions Requested reports. Through pop-ups, the map provides links to relevant submissions.

DISCLAIMER: This map has been prepared as an aid for people wanting to understand the scope of submissions related to an area. The accuracy and completeness of this information is not guaranteed and people should read original submissions. In some cases, the information contained in submissions was not detailed enough to accurately map the scope of the submission. In these cases, the mapping has been either omitted or approximated where possible.

How do I make a further submission?

Online submissions
The RMA requires further submissions to be in a prescribed form (Form 6). An easy way to make a submission is using the 2GP on-line submission system, which ensures submissions are in the prescribed form and allows you to link to specific submission points

Other ways to make a submission
Hard copies of the submission form and submission guidelines can be downloaded below or paper copies can be picked up at the 2GP drop-in centre or from the DCC Customer Services Agency located on the ground floor of the Civic Centre at 50 The Octagon, Dunedin.

For written submissions
Post to: Further submission on Proposed Second Generation Dunedin City District Plan, Dunedin City Council, PO Box 5045, Dunedin 9058

Deliver to: Customer Services Agency, Dunedin City Council, Ground Floor, 50 The Octagon, Dunedin

Email to: districtplan @ dcc.govt.nz

Serving a copy of further submissions on submitters
IMPORTANT: Any person making a further submission must serve a copy of that further submission on the person who made the original submission no later than five working days after lodging the further submission with the DCC. A copy of the addresses for service for all submitters is provided in the Submitter Details Report.

DCC 2GP Have Your Say Page
DCC 2GP Index Page

Posted by Elizabeth Kerr

█ For more at What if? Dunedin, enter the term *2gp* in the search box at right.

10 Comments

Filed under Architecture, Business, Climate change, Construction, Cycle network, DCC, Democracy, Design, District Plan, Dunedin, Economics, Geography, Heritage, Infrastructure, New Zealand, NZTA, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Resource management, Site, South Dunedin, Tourism, Town planning, Transportation, Urban design

Zoning issues: Vogel Street activities

76 Vogel Street. Question to Dunedin City Council:
How did this activity happen without a publicly notified plan change?

The ‘warehouse precinct’ referred to in the restaurant’s marketing isn’t recognised by the current Dunedin City District Plan. The building is located within the LSR – Large Scale Retail Zone (see comparative district plan maps below), and the Vogel Street Heritage Precinct (TH13).

Vogel Street “remained zoned for large-scale retail uses, although it was proposed to become a mixed-use zone [the warehouse precinct] – allowing a wider variety of uses” – under the 2GP.

### ODT Online Sat, 23 Jan 2016
Objector to cafe’s licence slammed
By Chris Morris
A Dunedin businessman and his city councillor wife have been labelled “dinosaurs” amid claims they are deliberately standing in the way of the warehouse precinct’s regeneration. The criticism came after it was confirmed yesterday Alistair Broad, a commercial property owner and businessman, had filed an objection opposing the Vogel St Kitchen’s bid to renew its liquor licence.
Read more

Vogel St Kitchen webpage banner [screenshot]

In a former life, the popular Vogel St Kitchen (VSK) was the McIndoe printery. The old brick building has been strengthened and given a new lease of life as a two-level coffee house and licensed eatery. Restaurant proprietor Riah McLean and property owner Lawrie Forbes commissioned a mural by London-based street artist Phlegm for the south exterior wall, visible from the street.

“Dunedin’s coolest destination cafe situated in the heart of the Warehouse Precinct. If you like your coffee and dining to have character and spirit come and check us out.” (publicity)

█ Website: www.vogelstkitchen.co.nz
76 Vogel Street, Dunedin 9016

Posted by Elizabeth Kerr

Vogel St Kitchen exterior detail

District Plan Maps (2GP) – Compare existing and Second Generation District Plan maps:
District Plan Maps (2GP) - Compare existing and Second Generation District Plan maps

DCC Webmap - 76 Vogel Street, Dunedin [VSK]DCC Rates Information

31 Comments

Filed under Architecture, Business, Construction, Coolness, DCC, Democracy, Design, District Plan, Dunedin, Economics, Heritage, Inspiration, Name, New Zealand, Pet projects, Politics, Project management, Property, Proposed 2GP, Resource management, Site, Structural engineering, Tourism, Town planning, Urban design