Cycleways and scattered nails

bike - fixed gear track racing [humancyclist.wordpress.com] 1

### radionz.co.nz 24 June 2016 at 9:23 pm
RNZ News
Cycleway truce called as review set up
By Michael Cropp
Wellington’s beleaguered cycleway programme will not be getting the shot in the arm some were hoping for – instead it will be reviewed, refreshed and recommissioned. The outcome of that process – a ‘refreshed cycleways programme’ – would go to the Wellington City Council’s transport committee in August, the council announced today. Meanwhile, Island Bay Residents’ Association had reached a truce with cycling advocates and councillors, and was planning to start on its own consultation. A New Zealand Transport Agency report this month on the council’s ability to implement its programme stated the fallout from the Island Bay project had jeopardised the council’s other cycleway initiatives, and had eroded the public’s faith in the council. It said the council had lost the confidence of officials and ministers. Today’s announcement was intended to provide a pathway to regaining that trust.
Read more

IDEAS !!!!

nails 1 [hdwires.in]

Earlier this year, nails were scattered on the cycleway and the local residents’ association threatened a rates revolt if it wasn’t dug up.

### radionz.co.nz 1 June 2016 at 6:44 pm
RNZ News
WCC told it let spokes fall off cycleway plan
By Michael Cropp
The way Wellington City Council conducted the rollout of a controversial cycleway in Island Bay has hurt its city-wide ambitions for the bike routes, an independent review has found. The report into the city’s cycleways, which was commissioned by New Zealand Transport Agency (NZTA), concluded people felt the path in the southern suburb was a poor solution that was delivered without proper community engagement and consultation. It recommended it be reviewed and modified after further community consultation.
Read more

Read the report commissioned by NZTA (PDF, 1.3MB)

Related RNZ stories:
Legal costs mount in battle over Southland cycleway
Modified Hutt Rd cycleway plans welcomed
Capital cycleway faces strong opposition

****

Meanwhile at Dunedin…. plodding incompetence. A recent series of city council-led (earworms: Spokes Dunedin and NZTA) technical planning and cycleway construction FAILURES, at Exorbitant Expense forced on Ratepayers. All this while South Dunedin core infrastructure maintenance and upgrades received little if no DCC attention, ultimately leading to Council-fuelled multimillion-dollar flood damage. And now, the ODT Editor exhibits gut-wrenching Cheek to devoutly urge DCC to YES, Build Cycleways!

Fri, 24 Jun 2016
ODT Editorial: Learning from cycleway errors
OPINION After a long year of construction, mistakes, remedial work, wasted money and public dissatisfaction the South Dunedin Cycle Network has finally been shunted down the council’s cycleway queue. In an Otago Daily Times report this month council infrastructure networks general manager Ruth Stokes said she could not say when the South Dunedin network would be completed. The new focus, she said, was to employ the limited available resources on fixing the Portobello Rd cycleway and the central city network.

“Build them well, build them smart and build them efficiently.” (ODT)

SPOKES Dunedin speaks out for cycling in Dunedin, New Zealand and represents everyone who rides a bike or would like to ride a bike in the city. SPOKES is a local volunteer cycling advocacy group founded in 1996 as an affiliate of the New Zealand Cycling Advocates Network. SPOKES Dunedin is an incorporated society registered under the Incorporated Societies Act 1908.

bike dog jun co-passage [hbr.org]

We look forward to working with the Dunedin City Council to develop a real cycle network for Dunedin. (Spokes)

God Almighty! Read this:

█ SPOKES DUNEDIN SUBMISSION ON DRAFT 2016-2017 ANNUAL PLAN
Posted on April 6, 2016 by spokesdunedin

Summary
A change of scope is needed for Dunedin’s cycling network, but it is unclear what the DCC’s change in scope actually means, and higher standard cycleways are only part of the story. Spokes Dunedin has a vision for successfully realising the cycle network. We want everyone to be able to cycle from North Dunedin to South Dunedin, out both sides of the Harbour, and through the tunnels to Green Island and Mosgiel on a connected framework of city-spanning arterial routes that are safe, direct, and convenient to use. This will focus work where there is a clear need for improved safety rather than on streets that are already relatively safe, and will create a solid initial network that can grow and develop in response to future demand. The great thing is that there already exists some cycling infrastructure on many of the routes for this initial network. Several things can be achieved by the end of this year that will help Dunedin catch back up to where it should be.

To do in 2016
1. Support NZTA to begin construction of the SH1 separated lanes by the end of this year.
2. Fix Portobello Road – it’s already been two years. We don’t need fancy landscaping, we just need the median barrier realignment so the road looks like a road and the cycleway looks like a cycleway.
3. Complete the Wharf/Roberts intersection as agreed – it’s already been two years. This intersection presents an identified safety risk on a high demand route.
4. Continue the SH88 path through the rail corridor to the railway station, thereby providing an alternative to the cycle lanes on Anzac Ave (heavy freight route and high risk).
5. Create a separated cycle lane from the intersection of Andersons Bay/Strathallan, along The Oval, to Crawford Street in place of the existing cycle lane between two lanes of fast-moving traffic.
6. Develop plans for a separated cycle lane on North Road and safety improvements for the Opoho intersection to tie in with NZTA’s forthcoming separated cycle lanes on SH1. This route is of very high strategic priority.

Introduction
Dunedin is a pro-cycling city, where a significant proportion of the population regularly cycles for recreation, transportation, or both. Year after year, cycling is one of the most strongly supported and heavily submitted-on topics in the annual plan. One of the biggest public consultation events in Dunedin history was held in 2013 regarding the proposed SH1 separated cycle lanes. In addition to widespread media coverage, NZTA and DCC staff solicited input from the public at information booths in busy locations including the Golden Center, Toitu, and the University. With over 2000 written submissions and roughly 800 survey responses, the SH1 separated cycle lanes received one of the highest response rates of any topic ever consulted on. The result was overwhelming support for the proposed separated cycle lanes. Independently, the AA undertook a survey of their local membership, with over 70% of the nearly 1500 respondents supporting the proposed separated lanes. The overwhelming public demand and support for better cycling in Dunedin cannot be denied.
In response to this demand, the City rightly undertook to develop a Strategic Cycle Network. But the South Dunedin portion of the cycle network has not delivered on the ambitions of the cycle network plan adopted in 2011. Nothing has progressed in the last year, leaving half-finished elements scattered around, with other things ripped out without consultation.
Some might argue that we should throw up our hands in despair, abandoning the possibility of future success under the fear of past failures. But others know that setbacks are par for the course when charting new waters and trying new things. Where would we be if the likes of Cook, Columbus, or Magellan had turned around after the first storm and torn sail? Those leaders stayed the course, their sailors gained experience, and they ultimately changed the world.
Read more

“SPOKES, CYCLE-SAIL OFF THE EDGE OF THE WORLD WHY NOT”
Sail wagon [en.wikipedia.org] 1

█ For more, enter the terms *cycle* and *christmas present* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

*Images: (from top) humancyclist.wordpress.com – fixed track racing | hdwires.in – nails | hbr.org – bike dog jun co-passage | en.wikipedia.org – sail wagon

19 Comments

Filed under Business, Cycle network, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Geography, Health, Housing, Infrastructure, Media, Name, New Zealand, NZTA, OAG, Ombudsman, People, Pet projects, Politics, Project management, Proposed 2GP, Public interest, Resource management, South Dunedin, Sport, Tourism, Town planning, Transportation, University of Otago, Urban design, What stadium

Bloody DCC —superlative cost blowout #cycleways #SUCKS

#GreaterDunedinNOTsustainable
#DaveCullNOTsustainable
#KateWilsonNOTsustainable
#JintyMacTavishNOTsustainable
#CouncilStaffManagersNOTsustainable

Cycling [screenshot at YT].jpgNo photograph of Kate in lycra could be found. The Mayor and MacTavish were both camel shackled when our photographer called (say no more).

### ODT Online Thu, 22 Oct 2015
Dunedin cycleway cost blowout
By Craig Borley
Building Dunedin’s cycleways could cost “three to four times” more per metre than first thought. That news was delivered to the Dunedin City Council’s infrastructure services committee this morning by the council’s infrastructure and networks general manager Ruth Stokes

The committee voted to continue with the rollout of the network, ensuring the design and finish were of the more expensive, higher quality option.

Read more

█ Council Reports available at What if? via (12.10.15)https://dunedinstadium.wordpress.com/2015/08/22/dcc-cycleways-now-tied-to-more-urban-design-spend-after-rehash-numero/#comment-66330

Sandy Graham advises there is one amended page (item 6 ph 6.8) – a map was altered for clarity. The website copy will be updated with the amended page.

Posted by Elizabeth Kerr

*Image: [screenshot] youtube.com – Cycling Training Program – Crashing on a bike

57 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Geography, Media, Name, New Zealand, NZTA, OAG, Ombudsman, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Transportation, Urban design, What stadium

Dunedin: The Final Solution *dearjohn

Link received.

Chris Burland Published on May 15, 2015
cycling and john wayne
Music: “The Good, the Bad and the Ugly (From “The Good, the Bad and the Ugly”) (Titles)” by Ennio Morricone (Google Play • eMusic • iTunes)

█ For more, enter *cycle* in the search box at right.

Posted by Elizabeth Kerr

1 Comment

Filed under Business, Cycle network, DCC, Democracy, Economics, Hot air, People, Politics, Project management, Sport, Town planning, Transportation, University of Otago, Urban design, What stadium

Cr Kate ‘Cycleways’ Wilson —(disingenuous) fails constituents

█ Cr Kate Wilson says cycleways will bring myriad benefits to Dunedin.

ODT Online Sat, 25 Jul 2015
Why Dunedin is investing in cycling
By Craig Borley
Dunedin appears divided over the cycle network. Some see it as unnecessary. Others see it as vital. ODT reporter Craig Borley spoke to Dunedin city councillor Kate Wilson, chairwoman of the infrastructure services committee, about why the city is investing in cycle infrastructure.
Read more

█ The Dunedin City Council is sleep-walking to yet another poorly thought out cycleway project. (ODT)

### ODT Online Thu, 20 Aug 2015
Time to put brakes on cycleway
By Hilary Calvert
OPINION Somehow, the Dunedin City Council has been so beguiled by the gift-horse that is the New Zealand Transport Agency (NZTA) that it seems to have completely forgotten to carry out its proper role of looking after the interests of the citizens of Dunedin in respect of the State Highway 1 cycleway plans.
Read more

ODT 26.8.15 (page 8)
– shot in a half-lit Dunedin café off the beaten cycle paths

ODT 26.8.15 Letter to editor Wilson Diehl Hopkins p12

█ Proposed: Separated cycle lanes to run along north and south one way routes, between Botanic Garden and Queens Gardens.

### ODT Online Thu, 10 Sep 2015
Dedicated cycle lanes get closer
By Craig Borley
Nationally-funded separated cycle lanes along Dunedin’s one way system are now two steps closer as the project moves swiftly through the New Zealand Transport Agency machine.
Read more

NZTA said it had resolved to:
• Incorporate high turnover short term parking for businesses, particularly those reliant on short stay kerbside parking and deliveries
• Incorporate medium term parking close to the hospital and museum.
Updated plans were now being prepared to show where the parking would be included. The plans will be available for public comment at the end of the month.

ODT 11.9.15 (page 16)

ODT 11.9.15 Letters to editor Hopkins Pillans Oaten (1) p16

Related Posts and Comments:
● 3.9.15 Dunedin support for extensive cycle lanes and Free bicycles
● 22.8.15 DCC cycleway$ now tied to more ‘urban de$ign’ $pend….
● 18.7.15 DCC Cycleways: SEEING RED, apology NOT accepted
● 10.4.15 DCC cycleways propaganda continues #SpendSpendSpend
20.3.15 DCC Shame: First, John Wilson Dr … now Portobello Rd cycleway
11.2.15 Dunedin Cycleways: Pet project staff, ‘entitlement’? #irony
3.12.14 Cycling at Dunedin —boring debate, network spending continues #DUD
22.5.14 DCC Transportation Planning —ANOTHER consultation disaster
6.5.14 Roading network screwed by council staff
● 14.2.14 DCC: Broadband AND bicycles #fraudband speed
14.1.14 DCC: Hospital area parking changes #cyclelanes
5.1.14 Norman Foster: SkyCycling utopia above London railways #ThinkBig
24.12.13 Daaave’s $47 million Christmas present to Jinty. We’re paying.
4.12.13 Dunedin cycleways: Calvin Oaten greeted by DCC silence
17.11.13 Dunedin cycleways: Calvin Oaten’s alternative route
17.11.13 Cull and MacTavish… “Have you fixed the debt crisis?”
14.11.13 Cycle lane explosions and puncture kits (SPOKES grenades launch)
8.11.13 Dunedin Separated Cycle Lane Proposal [how to make a submission]
29.10.13 DCC (EDU) invents new job! [GigatownDunedin]
19.10.13 Cycle lobby games and media tilts
24.9.13 Mediocrity and lack of critical awareness at DCC [council reports]
8.7.13 Bloody $tupid cycleways and Cull’s electioneering… [route maps]
28.3.13 DCC DAP 2013/14: Portobello Harington Point Road Improvements
26.2.13 DCC binge spending alert: Proposed South Dunedin cycle network
22.2.13 DCC: Council meeting agenda and reports for 25 February 2013
31.1.13 Who? 2010 electioneering
21.11.12 Safe cycling -Cr Fliss Butcher
5.11.12 DCC, NZTA: Cycle lanes controversy

Posted by Elizabeth Kerr

15 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Enterprise Dunedin, Geography, Hot air, Media, Name, New Zealand, NZTA, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Transportation, University of Otago, Urban design, What stadium

Dunedin support for extensive cycle lanes and Free bicycles

### ODT Online Thu, 3 Sep 2015
Refugee crisis: ‘We’re not ruling out doing more’ – PM
The Government was considering fast-tracking a review of how many refugees it takes, Prime Minister John Key said today, as the humanitarian crisis escalates with millions fleeing war-torn Syria. A review of New Zealand’s refugee quota is scheduled for next year. NZME
Read more

Received from John Evans
Thu, 3 Sep 2015 at 7:21 p.m.

█ Subject: A Question

Why have Spokes, Jinty and all the other BHL (bleeding heart cycle proponents) not supported extensive cycle lanes and Free bicycles for placement at the Hungarian rail station.

The advantages:

● A gross saving of 250 Euros per capita (approximately $200 million just for German refugees) Rail Fares
● A solution to the problem of fitness amongst Syrian refugees
● More mosques for Germany and less for Hungary (and New Zealand)
(just in case this seems insensitive to you, there are 8 mosques in Auburn alone, a small suburb of Sydney)
● And finally, it would put the cycleways fairly where people want to go, not on foot or in a car from Hungary Station to Deutschland; not from South Dunedin where they are unwanted, to Dunedin where they are unused! 2.6% of commuters travel to WORK by bicycle in Dunedin? We know that is bull**it. It is possible that lazy Dunedin students living in North Dunedin ride a bike to university rather than walk and they cannot afford cars or parking fees, but give them a free car and car park and see how many cycle!

As to lecturers, from my experience the major contributor again to this queer behaviour is a desire to reduce cost of travel and parking, rather than some higher ideal.

[ends]

Santa [cycle-lane-2-copy1]Daaave’s $47 million Christmas present to Jinty. We’re paying.

Posted by Elizabeth Kerr

2 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Enterprise Dunedin, Geography, Media, Name, New Zealand, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Transportation, University of Otago, Urban design, What stadium

DCC cycleways propaganda continues #SpendSpendSpend

GREATER DUNEDIN ELECTIONEERING ALERT

cycle hero [www.odopod.com]

Dunedin City Council – Media Release
Another Busy Year Ahead With Cycleways

This item was published on 10 Apr 2015

Dunedin residents will be able to make the most of safer cycle routes in coming months as the city’s cycleway network continues to expand. Dunedin City Council Infrastructure Services Committee Chair Cr Kate Wilson says cycleways make the streets safer for all road users and hopefully encourage more people to get on bikes.

“For years people have been asking the Council for enhanced cycleways in Dunedin. We have a responsibility to provide networks that give people travel choices, whether that be cycling, walking or taking a bus or car. The more of the network that is completed, the more we can provide for people who want to use cycleways, whether it’s a child cycling to school, an adult cycling recreationally, or anything in between.”

It is also a central government priority to rapidly expand and enhance networks of cycleways around the country, recognising the benefits to health, the economy and the environment. The DCC has received $570,000 from the Government’s Urban Cycleway Fund and the Council has decided the funding will be used to enhance and expand the South Dunedin Cycle Network. The DCC also receives funding from the NZ Transport Agency to build the network.

“Taking advantage of Government funding now is important as we have a limited window of opportunity to capitalise on our position as one of only a few cities with the requisite Strategic Cycle Network Plan. We are a financially constrained Council and the more funding we get from outside sources the less we need from ratepayers.”

In August 2011, the Council adopted the Strategic Cycle Network for Dunedin, which gave the South Dunedin network of routes the highest priority for design and construction. Cr Wilson says 40% of people living in South Dunedin do not have access to a car, which is a key reason for South Dunedin cycle routes being prioritised.

“We understand introducing cycleways to our streets has been a big change for some people, but we’ve got a great opportunity here to improve our city in a very positive way for current and future generations.”

Here’s an outline of what’s happening with South Dunedin cycleways over the next month.
● Portobello Road (between Timaru Street and Portsmouth Drive) – wider consultation on a revised concept plan for this stretch of road.
● Hillside Road/McBride Street – staff are reviewing the proposed cycleway design after meeting with local businesses.
● Neville/Wilkie Streets – a final decision on the type of cycleway for these streets will be made in April. Construction is scheduled to begin in May.
● Harbourside/Roberts Street – the Harbourside Working Group will meet again in mid April.
● Richardson/Coughtrey, Fingall/Tedder, Bellona/New Streets – Construction of these ‘quiet streets’ and dedicated cycleway should be finished in the next couple of weeks.

Residents, businesses and property owners in areas where cycleways are planned will be contacted directly.

█ General information is also available at http://www.dunedin.govt.nz/sdcn and more details will be added as projects are rolled out.

Contact Cr Kate Wilson, Infrastructure Services Committee Chair on 027 443 8134. DCC Link

cycling getty [blogs.independent.co.uk]

Related Posts and Comments:
20.3.15 DCC Shame: First, John Wilson Dr … now Portobello Rd cycleway
11.2.15 Dunedin Cycleways: Pet project staff, ‘entitlement’? #irony
3.12.14 Cycling at Dunedin —boring debate, network spending continues #DUD
22.5.14 DCC Transportation Planning —ANOTHER consultation disaster
6.5.14 Roading network screwed by council staff
14.2.14 DCC: Broadband AND bicycles #fraudband speed
14.1.14 DCC: Hospital area parking changes #cyclelanes
5.1.14 Norman Foster: SkyCycling utopia above London railways #ThinkBig
24.12.13 Daaave’s $47 million Christmas present to Jinty. We’re paying.
4.12.13 Dunedin cycleways: Calvin Oaten greeted by DCC silence
17.11.13 Dunedin cycleways: Calvin Oaten’s alternative route
17.11.13 Cull and MacTavish… “Have you fixed the debt crisis?”
14.11.13 Cycle lane explosions and puncture kits (SPOKES grenades launch)
8.11.13 Dunedin Separated Cycle Lane Proposal [how to make a submission]
29.10.13 DCC (EDU) invents new job! [GigatownDunedin]
19.10.13 Cycle lobby games and media tilts
24.9.13 Mediocrity and lack of critical awareness at DCC [council reports]
8.7.13 Bloody $tupid cycleways and Cull’s electioneering . . . [route maps]
28.3.13 DCC DAP 2013/14: Portobello Harington Point Road Improvements
26.2.13 DCC binge spending alert: Proposed South Dunedin cycle network
22.2.13 DCC: Council meeting agenda and reports for 25 February 2013
31.1.13 Who? 2010 electioneering
21.11.12 Safe cycling -Cr Fliss Butcher
5.11.12 DCC, NZTA: Cycle lanes controversy

Posted by Elizabeth Kerr

*Image: (from top) odopod.com – cycle hero; blogs.independent.co.uk – cycling getty [Getty images]

41 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Geography, Hot air, Name, New Zealand, NZTA, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Urban design, What stadium

DCC Shame: First, John Wilson Dr nonsense, now Portobello Rd cycleway

The agreement meant Portobello Rd, between Andersons Bay Rd and Portsmouth Dr, would remain a two-lane road, after the council last year reduced it from four lanes to accommodate a new cycleway.

### ODT Online Wed, 18 Mar 2015
Cycleway compromise earns praise
By Chris Morris
The Dunedin City Council has earned praise from a group of businesses after compromising to resolve a cycleway dispute in Portobello Rd. But the council has also been urged to learn lessons after initial changes introduced on the road prompted an outcry in the area. The deal was confirmed yesterday after a closed-door meeting between councillors, council staff, business representatives and cycling advocates, chaired by the Automobile Association Otago district councillor Norman Oakley.
Read more

****

Comment at ODT Online:

Money wasting madness from DCC
Submitted by photonz on Thu, 19/03/2015 – 1:09pm.

$320,000 spent already for 700m of cycleway, that was already sealed, is madness. And now it has to be redone.
Just like the cycle crossing on Victoria Road that was rebuilt three or four times at a cost of tens of thousands of dollars, yet despite passing over it multiple times a day, including rush hour, I’ve seen it used by bicycles just once in nearly a year.
Similar money wastage is now happening with total redesigns of intersection kerbing around St Kilda, at the cost of many thousands of dollars, including intersections which are some of quietest and least used in all of Dunedin.
Yet not a dollar for the very busy intersection at Allendale/Forbury/Bay View Roads, where opposing right turning traffic on Forbury Road, is channelled into a head-on collision.
Heads should roll at the DCC – this is madness. It’s a waste of our money to spend hundreds of thousands on barely used or needed pet projects, often redoing them several times, while not spending a cent on dangerous intersections.

****

The letter from Cr Vandervis was delayed for publication supposedly due to slow reply: [Psalms 118.1….]

ODT 19.3.15 (page 16)
ODT 19.3.15 Letter to editor Vandervis reply Bidrose p16 (2)

****

### dunedintv.co.nz March 18, 2015 – 5:54pm
Opposing parties reach agreement over Portobello Road development
Parties at loggerheads over plans to develop the southern part of Portobello Road have reached an agreement. The Dunedin City Council and Automobile Association has met with cycling advocacy group Spokes and business owners about changes to the road. Representatives have come up with a mutually agreeable plan to widen the section of road between Timaru Street and Portsmouth Drive. It will provide room for large trucks to safely enter and exit industrial sites along the road. And there will be a 3m cycleway separated from traffic, allowing cyclists to travel in both directions along the road. Construction is expected to be completed by the end of the year.
Ch39 Link [no video available]

Dunedin City Council – Media Release
Positive Meeting on Portobello Road Plans

This item was published on 17 Mar 2015

A revised concept plan for the southernmost section of Portobello Road has been welcomed by key parties.
A meeting was held this morning between some Dunedin City Councillors, DCC staff and representatives from the Automobile Association (AA), cycling advocacy group Spokes Dunedin, local businesses and leaseholders. Those at the meeting, which was chaired by AA Otago District Councillor Norman Oakley, strongly supported the revised concept plan for the section of Portobello Road between Timaru Street and Portsmouth Drive. The proposed plan addresses concerns with the existing layout, by providing room for large trucks to safely enter and exit industrial sites along the road.
The revised concept plan increases the total road width to 10.1m, made up of a northbound and a southbound lane, with a 2.5m painted median strip between the lanes (such as in Hillside Road). A 3m wide, two way cycleway, separated from traffic, is still part of the plan. This concept means removing the current concrete median to make more room for the new lanes and the median strip. The intersections at either end of the road remain the same.
DCC Infrastructure Services Committee Chair Cr Kate Wilson says, “I congratulate all the groups involved for working collaboratively to reach such a positive result. Once the revised plans have been finalised, we will be asking other interested parties and the wider community for feedback.” Cr Wilson noted the revised concept plan did not propose major changes for residents on that stretch of road, who can still access their properties as they do now.
AA Otago District Councillor Hudson Biggs says the revised plan is a workable solution for all parties. “There has been a lot of work in the background to get to this point and what has been presented recognises the fact there needs to be cycle access from South Dunedin along Portobello Road, while still meeting the needs of other road users.” Spokes Dunedin Chair Robert Thompson also supported the revised layout. “It strikes the right balance between all road users, providing a high standard cycleway and improved vehicle access within a more intuitive road layout.”

CSL Containers Director Philip Chapman says the new plan addresses his concerns very well. “I couldn’t ask for anything better.”

DCC Group Manager Transportation Gene Ollerenshaw says the proposed design will now be finalised and released within the next two to three weeks for wider feedback from the community. Further consultation will include a mail drop to nearby residents, discussions with other parties such as Bayfield High School and signs to alert motorists who use that route. Following that feedback, the design will be finalised and construction completed as soon as possible before the end of the year.

Portobello Rd cross section information[click to enlarge]

█ Download: Portobello Rd cross section information (PDF, 96 KB)

Contact Infrastructure Services Committee Chair on 03 477 4000.
DCC Link

****

Dunedin City Council – Media Release
Further consultation on Portobello Road Changes

This item was published on 28 Nov 2014

The Dunedin City Council will work further with key parties to finalise a design for the southernmost section of Portobello Road.
DCC Infrastructure Services Committee Chair Cr Kate Wilson says the decision was made following a constructive meeting on Wednesday attended by Councillors, DCC staff and representatives from the Automobile Association (AA), cycling advocacy group Spokes, local businesses and leaseholders.
The meeting, which was chaired by the AA, discussed the recent changes to the section of Portobello Road between Andersons Bay Road and Portsmouth Drive. Discussions began with some context setting. The use of that part of Portobello Road has changed greatly, as has the land ownership in the area. Rather than being a high volume commuter route, it is now a relatively low volume road used by heavy transport, with industrial land on one side and residential on the other.
The road has been altered to accommodate one of the key cycleways in the new South Dunedin Cycle Network. The first stage of work was completed in May. The concept was not fully implemented then because of funding constraints, but the intention was to do further work if it was required as funds became available.
Cr Wilson says a preliminary layout for the second stage was developed in consultation with AA, Spokes and residents and businesses in the area. “However, further feedback from businesses, leaseholders and the public, conclusions we have drawn ourselves, issues around the look and feel of the road, access to the industrial properties and safety concerns at the Timaru Street end mean some further consideration of options is needed.” “We take seriously the concerns raised and following this week’s meeting we will seek further inputs from the affected businesses and leaseholders so we incorporate their concerns and needs into the options.”
DCC Group Manager Transportation Gene Ollerenshaw says in the meantime some interim improvements would be investigated with urgency, such as signage and road marking, particularly at the Timaru Street end. The DCC is still aiming to complete the project in the 2014/15 year.

Contact Group Manager Transportation on 03 477 4000.
DCC Link

Posted by Elizabeth Kerr

Leave a comment

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Hot air, Media, Name, New Zealand, People, Politics, Project management, Property, Site, Town planning, Urban design, What stadium

Octagon: What?! DCC pointy heads actually care about small businesses?

So they should.

The following report will be tabled at the Council meeting to be held on Monday 3 November 2014 at 2:00pm (Council Chamber, Municipal Chambers).

Report – Council – 03/11/2014 (PDF, 1023.1 KB)
Options to Trial Pedestrianisation in Lower Octagon and Lower Stuart Street

Octagon tweaked 1.1 [via etourism.coOctagon to Steamer Basin, cherry stains by whatifdunedin

Octagon Webcam

█ [Agenda and Other Reports, including Financial for Monday]

The “do minimum” option – one of five options councillors will consider – has the support of lower Octagon and lower Stuart St business owners and retailers, who have banded together to oppose any road closures.

### ODT Online Fri, 31 Oct 2014
Council cools on Octagon trial
By Debbie Porteous
The Dunedin City Council may back away from trialling any ban or restriction on vehicles in the lower Octagon and lower Stuart St. Council staff are concerned rushing any “pedestrianisation” trial in the area could be costly and potentially have negative effects if it goes ahead without proper investigation.
Read more

Related Posts and Comments:
19.10.14 Dunedin: Randoms from inside warehouse precinct 18.10.14
● 3.10.14 DCC: Octagon entrée to more spending
● 28.9.14 “DCC entitlement” about to ramrod change at CBD #manipulation
24.9.14 Dunedin old boys, councillors & staff collude on 5-star accommodation
● 5.8.14 DCC staff-led CBD projects that impact ratepayers…
4.8.14 Cr Wilson’s integrity ‘in tatters’
23.6.14 DCC Annual Plan 2014/15 + Rugby and Rates
● 22.6.14 Vogel Street Heritage Precinct (TH13)
22.5.14 DCC Transportation Planning —ANOTHER consultation disaster
7.5.14 DCC Draft Annual Plan 2014/15 hearings
6.5.14 Roading network screwed by council staff
● 30.4.14 Octagon mud
21.4.14 Dunedin economic development strategy — low flying Year 1
1.4.14 HOTEL Town Hall… Daaave’s pals from… [April Fool’s?]
14.1.14 DCC: Hospital area parking changes #cyclelanes
24.12.13 Daaave’s $47 million Christmas present to Jinty. We’re paying.
4.12.13 Dunedin cycleways: Calvin Oaten greeted by DCC silence
17.11.13 Dunedin cycleways: Calvin Oaten’s alternative route
11.11.13 DCC: Councillors delegated street furniture decisions to staff
8.11.13 Dunedin Separated Cycle Lane Proposal
5.11.13 DCC, NZTA: Cycle lanes controversy
● 21.10.13 Harbourside: Access to a revamped Steamer Basin…
24.9.13 Mediocrity and lack of critical awareness at DCC
4.9.13 Draft Dunedin City Transport Strategy
8.3.13 Stupid bid for two-way highway ditched for now #DCC
31.10.12 Cull’s council takes business away from retailers
● 26.10.11 Dunedin Harbourside: DCC “caved”

Posted by Elizabeth Kerr

*Images: etourism.co.nz – Octagon aerial; pxm-tut.com – cherry

34 Comments

Filed under Architecture, Business, Concerts, Construction, Cycle network, DCC, Democracy, Design, DVML, Economics, Enterprise Dunedin, Events, Fun, Geography, Heritage, Hot air, Media, New Zealand, NZTA, Otago Polytechnic, People, Politics, Project management, Property, Site, Tourism, Town planning, University of Otago, Urban design, What stadium

DCC: Octagon entrée to more spending

Octagon Webcam BW 1.1

From the DCC website:

The Octagon Upgrade

The Octagon is Dunedin’s key central public space. Its form defines the central city and the area has great historic, social, cultural and economic significance. As a consequence, the Octagon has a special place in the heart of Dunedin residents.

Looking to the future, there are a number of challenges and opportunities for managing, protecting and enhancing the Octagon. These include providing enough public space, improving the safety of pedestrians and cyclists and investigating traffic use.

We also need to look at how to provide a safe environment both day and night, and how to reduce conflicts between different user groups and ensure commercial and non-commercial groups can both benefit from the area. Also to be considered is monitoring the health and future of the plane trees and appropriately recognising the historic and cultural significance of the area and its important heritage buildings. Other issues include improving urban amenity and the role of public art.

An initial concept put forward by consultants proposes a staged approach to the Octagon:
● Stage one would focus on improving pedestrian and public space in the lower Octagon within the road reserve outside existing bars, cafes and nightclubs on the northern side of the Octagon
● Stage two would focus on improving pedestrian and public space in the lower Octagon within the road reserve outside the Regent Theatre and neighbouring cafes, bars, and businesses
● Stage three would focus on the upper Octagon and the reserve area in the lower Octagon. The idea is to better link the two sections of the Octagon, maximise the area of usable public open space and views of significant heritage buildings, and look at traffic flows.

However, at this early stage no design has been chosen for any upgrade to the Octagon. The Council is keen to hear how people see the future of the Octagon and what they would like to see in the area, before launching a formal consultation process to discuss future options.

Aims
● To provide an attractive public open space in the central city
● To improve safety in and around the Octagon
● To increase room for pedestrians and make the area more vibrant and people-friendly
● To enhance opportunities for businesses around the Octagon
● To provide opportunities for a range of users, both day and night
● To provide a setting for key city events
● To respect and enhance the historical importance of the Octagon

Proposed improvements may include
● Pavement improvements
● Adjustments to road layouts
● New bins and seating
● Interactive play equipment and/or public art
● Enhanced lighting
● Street trees and planting improvements
● Cycle racks

Status
● Project planning underway
● Consultation to be programmed

Associated initiatives
● Princes Street upgrade
● George Street upgrade
● Pocket parks
● Improvements to Queens Gardens and improved links to neighbouring tourist precinct
● Upgrade of Exchange Square

DCC Link

2011 concept for redevelopment of The Octagon up for debate again at last night’s Dunedin City Council CBD planning workshop:

DCC Octagon upgrade proposal

The plan was not a proposal, and would need to be reconsidered by the council and implemented over time, but “may be able to happen”. –Kobus Mentz, Urbanismplus (Auckland)

### ODT Online Fri, 3 Oct 2014
Reimagined CBD proposals heard
By Chris Morris
Visions of a redeveloped Octagon, a more pedestrian-friendly George St and a buzzing network of free buses took centre stage at a Dunedin City Council workshop last night. The ideas flowed as about 45 people gathered at the Dunedin Public Art Gallery for a second night to share their views on the future of the city’s central business district.
Read more

Related Posts and Comments:
● 28.9.14 “DCC entitlement” about to ramrod change at CBD #manipulation
24.9.14 Dunedin old boys, councillors & staff collude on 5-star accommodation
● 5.8.14 DCC staff-led CBD projects that impact ratepayers…
4.8.14 Cr Wilson’s integrity ‘in tatters’
23.6.14 DCC Annual Plan 2014/15 + Rugby and Rates
● 22.6.14 Vogel Street Heritage Precinct (TH13)
22.5.14 DCC Transportation Planning —ANOTHER consultation disaster
7.5.14 DCC Draft Annual Plan 2014/15 hearings
6.5.14 Roading network screwed by council staff
● 30.4.14 Octagon mud
21.4.14 Dunedin economic development strategy — low flying Year 1
1.4.14 HOTEL Town Hall… Daaave’s pals from… [April Fool’s?]
14.1.14 DCC: Hospital area parking changes #cyclelanes
24.12.13 Daaave’s $47 million Christmas present to Jinty. We’re paying.
4.12.13 Dunedin cycleways: Calvin Oaten greeted by DCC silence
17.11.13 Dunedin cycleways: Calvin Oaten’s alternative route
11.11.13 DCC: Councillors delegated street furniture decisions to staff
8.11.13 Dunedin Separated Cycle Lane Proposal
5.11.13 DCC, NZTA: Cycle lanes controversy
24.9.13 Mediocrity and lack of critical awareness at DCC
4.9.13 Draft Dunedin City Transport Strategy
8.3.13 Stupid bid for two-way highway ditched for now #DCC
31.10.12 Cull’s council takes business away from retailers

Posted by Elizabeth Kerr

*Images: Octagon Webcam; DCC Graphic – Artist impression (2011)

24 Comments

Filed under Business, Construction, Cycle network, DCC, Design, Economics, Enterprise Dunedin, Geography, Heritage, Hot air, Media, New Zealand, NZTA, ORC, People, Pics, Politics, Project management, Property, Site, Stadiums, Tourism, Town planning, Urban design, What stadium

“DCC entitlement” about to ramrod change at CBD #manipulation

For the groupies…..

DCC Webmap - Dunedin (DCC pet projects)

Dunedin City council – Media Release
Help Shape the Future of Dunedin’s CBD

This item was published on 26 Sep 2014

Do you have a vision for the future of Dunedin’s central business district?

Whether you’re a retailer, resident or property owner, you are welcome to attend a free public workshop next week focusing on the future look and feel of the CBD. This discussion will build on feedback from earlier workshops on the Central City Plan (2011), the Warehouse Precinct Revitalisation Plan (2012) and Princes Street (2014).

The goal of the workshops is to hear people’s ideas and aspirations for the rest of the CBD, from the Octagon to the tertiary precinct, including George Street, lower Stuart Street and the surrounding streets.

These workshops and other comments received will feed into [WTH] transportation and amenity improvement projects in this area over the next decade.

[Oh no, not Mr Mentz AGAIN] Next week’s interactive workshop, which will be led by Kobus Mentz of Urbanism +, will be held on Thursday 2 October, 6pm to 8pm, at the Dunedin Public Art Gallery.

The DCC will also be working with the Otago Regional Council to look at the future location of a central city public transport hub. Feedback from the workshop will also link in with consultation on the central city cycle network.

[Love the extent of warning, all about bulldozing pre-envisioned DCC plans through via “Insider-Stakeholders”] Stakeholders in the area have been invited to a workshop on 1 October.

█ People [for rubber stamp duty] wishing to attend the public workshop on 2 October need to RSVP to centralcityplan @ dcc.govt.nz by Tuesday.

█ If you cannot attend the workshop, you can email your ideas and priorities for the future of the CBD to centralcityplan @ dcc.govt.nz [because DCC’s good at stealing your complementary ideas to push staff advancement and salaries, not to mention extending Mayor Daaave’s political agenda]

Contact DCC on 477 4000

DCC Link

Related Posts and Comments:
24.9.14 Dunedin old boys, councillors & staff collude on 5-star accommodation
● 5.8.14 DCC staff-led CBD projects that impact ratepayers…
4.8.14 Cr Wilson’s integrity ‘in tatters’
23.6.14 DCC Annual Plan 2014/15 + Rugby and Rates
● 22.6.14 Vogel Street Heritage Precinct (TH13)
22.5.14 DCC Transportation Planning —ANOTHER consultation disaster
7.5.14 DCC Draft Annual Plan 2014/15 hearings
6.5.14 Roading network screwed by council staff
● 30.4.14 Octagon mud
21.4.14 Dunedin economic development strategy — low flying Year 1
1.4.14 HOTEL Town Hall… Daaave’s pals from… [April Fool’s?]
14.1.14 DCC: Hospital area parking changes #cyclelanes
24.12.13 Daaave’s $47 million Christmas present to Jinty. We’re paying.
4.12.13 Dunedin cycleways: Calvin Oaten greeted by DCC silence
17.11.13 Dunedin cycleways: Calvin Oaten’s alternative route
11.11.13 DCC: Councillors delegated street furniture decisions to staff
8.11.13 Dunedin Separated Cycle Lane Proposal
5.11.13 DCC, NZTA: Cycle lanes controversy
24.9.13 Mediocrity and lack of critical awareness at DCC
4.9.13 Draft Dunedin City Transport Strategy
8.3.13 Stupid bid for two-way highway ditched for now #DCC
31.10.12 Cull’s council takes business away from retailers

Posted by Elizabeth Kerr

*Image: DCC Webmap – Inner city Dunedin

24 Comments

Filed under Architecture, Business, Construction, Cycle network, DCC, Design, Economics, Enterprise Dunedin, Events, Geography, Heritage, Hot air, NZTA, ORC, People, Politics, Project management, Property, Site, Tourism, Town planning, Urban design, What stadium

DCC Draft Annual Plan 2014/15 Submissions due by 15 April

### ODT Online Fri, 11 Apr 2014
Draft budget feedback pretty good: council
By Chris Morris
The Dunedin City Council says feedback on its draft budget has been “pretty good” despite some disappointing turnouts at public meetings in recent weeks. The council concluded a series of eight public meetings and drop-in sessions with a discussion of cycleway and road-widening work on Otago Peninsula at the Edgar Centre on Tuesday night.
Public submissions on the council’s 2014-15 draft annual plan were “flooding in now” and had reached 427 by late yesterday, council corporate planner Jane Nevill said. That was well above the 262 submissions received by the council on its 2013-14 draft budget.
Read more

****

DRAFT DCC ANNUAL PLAN 2014/2015
The draft annual plan sets out the Council’s proposed annual budgets and performance measures for 2014/15 and updates the information for the 2014/15 year that in contained in the Council’s ten year plan or Long Term Plan (LTP) which was put in place last year.
Please tell DCC whether you agree or disagree with spending priorities for 2014/15 outlined in the draft plan by making a submission.
The consultation period is your opportunity to “Have Your Say” about what you want to see included in the Council’s plans.

Submissions close at 5pm, Tuesday 15 April 2014.
Timeframes and Meeting times

█ Read more (with downloads):
http://www.dunedin.govt.nz/your-council/draft-annual-plan-2014-2015

Related Posts and Comments:
30.3.14 Paul Pope on local body annual plans
20.1.14 DCC Draft Annual Plan 2014/15

Posted by Elizabeth Kerr

40 Comments

Filed under Business, DCC, Democracy, DVL, DVML, Economics, Media, Name, ORFU, People, Politics, Project management, Property, Site, Sport, Stadiums, Tourism, Town planning, University of Otago, Urban design, What stadium

DCC: Broadband AND bicycles #fraudband speed

Contentious McPravda | ‘Cull, Vandervis censured over feud’ —read Rob Hamlin on the front page headline and story appearing at ODT today. Link

Video link received Friday, 14 February 2014 at 2:33 a.m.

Subject: Broadband AND bicycles
Comment: Yes, it’s possible to have the best of all worlds, almost.

ClarkeAndDawe Published 11 Apr 2013

A Very Smooth Presentation
“Malcolm Turnbull and Tony Abbott release the Opposition Broadband policy” Originally aired on ABC TV: 11/04/2013

Discussing the cheaper alternative to Fibre to the Premises (FttP), known as BttP or Bicycle to the Premises.

ABCTV: For 25 years John Clarke and Bryan Dawe have broadcast a weekly interview in which prominent figures speak about matters of public importance. John pretends to be someone he isn’t pretending to be and Bryan behaves with grace under pressure. The interviews are broadcast on ABCTV on Thursday nights and are available online here, on mrjohnclarke.com and on YouTube. They are also available by prescription at selected retail outlets.

http://www.twitter.com/mrjohnclarke
http://www.facebook.com/ClarkeAndDawe

More Clarke and Dawe at What if? Dunedin:
29.12.13 Clarke and Dawe —November/December 2013
17.11.13 Cull, MacTavish: (to borrow a phrase) “Have you fixed the debt crisis?”
9.11.13 Quiz on politics

Related Posts and Comments:
9.10.14 DCC’s Daaave at university bollard, in his twilight
14.1.14 DCC: Hospital area parking changes #cyclelanes
24.12.13 Daaave’s $47 million Christmas present to Jinty. We’re paying.
29.10.13 DCC (EDU) invents new job! [GigatownDunedin]

For more on cycle lanes, enter *cycle* in the search box at right.