![Emperors new clothes [catherinewhite.files.wordpress.com] re-imaged 1](https://dunedinstadium.files.wordpress.com/2013/09/emperors-new-clothes-catherinewhite-files-wordpress-com-re-imaged-1.jpg?w=500&h=503)
### ODT Online Fri, 18 Oct 2013
Final tally increases mayor’s vote margin
By Chris Morris
Dunedin Mayor Dave Cull extended his victory margin slightly when the Dunedin City Council’s final election results were released yesterday.
The figures, which added about 340 special votes not previously included, saw Mr Cull’s tally in the mayoral race rise by 158 votes, from 18,446 to 18,604. That meant his winning margin was extended by 113 votes, from 12,017 to 12,130, over nearest rivals Hilary Calvert (now with 6474 votes) and Cr Lee Vandervis (5872).
The final results saw small increases in the votes cast for all nine mayoral candidates, as well as the city’s 14 elected councillors.
Read more
Related Posts and Comments:
13.10.13 Pressuring Cull and his GD Party . . .
3.10.13 Exercise your right to VOTE
29.9.13 Alert: Dunedin voters —Mayors gain more powers
—
Council roading maintenance engineer Peter Standring said the first rock placement was included in the already documented $500,000 cost of immediately fixing [the] problem. The rocks placed this week cost about $60,000. Consultants hired by the council to look into the problem plan to report to the council next week, and may be required to do more work.
### ODT Online Fri, 18 Oct 2013
Start on Esplanade boat ramp close
By Debbie Porteous
The Dunedin City Council will begin building a temporary rescue boat launching ramp at the north end of the St Clair Beach sea wall next week, after this week dumping another 1000 tonnes of rock along the wall. The ramp is to run from the north end of the Esplanade down to the beach, and will be used by the St Clair Surf Lifesaving Club to get its inflatable rescue boats to the water. The club lost its original concrete ramp after the sea wall near the ramp was undermined and the fill behind the wall sucked out to sea earlier this year.
A consent application was lodged, but the ramp would be built at the same time as the application progressed, as it needed to be in place for the start of beach patrols at the end of this month.
Read more
Related Posts and Comments:
26.5.13 [bad news] St Clair seawall #FAIL
25.6.13 DCC Annual Plan 2013/14
![Campbell Live 17.6.13 [screenshot 1a]](https://dunedinstadium.files.wordpress.com/2013/06/campbell-live-17-6-13-screenshot-1a.jpg?w=500&h=266)
![Campbell Live 17.6.13 [screenshot 2a]](https://dunedinstadium.files.wordpress.com/2013/06/campbell-live-17-6-13-screenshot-2a1.jpg?w=500&h=261)
St Clair sea wall, Campbell Live (TV3) 17.6.13 [screenshots]
—
Posted by Elizabeth Kerr
*Image (top) – Emperors new clothes [catherinewhite.files.wordpress.com] re-imaged by whatifdunedin
Like this:
Like Loading...
Filed under Construction, DCC, Design, Economics, Geography, Name, People, Politics, Project management, Property, Site, Town planning, Urban design, What stadium
Tagged as Candidates, Compromised, Council debt CRISIS, DCC, Democracy, Dunedin, Dunedin City Council, FAILED, Local body elections 2013, Mayoralty, Politics, Ratepayers and Residents, Sea wall, Special votes, St Clair, Stadium debt, Technology, The Esplanade, Under-engineered, Undermined