Tag Archives: SH1 one-way system

SH1 Cycleways : the real story

Received from Hilary Calvert
Wed, 22 Feb 2017 12:40 p.m.

[begins]

NZTA has produced a Q and A sheet for their project news update on our cycle lanes along the one-way streets.

An annotated version is provided for reality junkies:

Q: Why is there a need for separated cycleways on the one-way system?

NZTA: Cyclists and pedestrians are over represented in fatal and serious injury crashes. There have been 2 fatalities since 2011. Short-term safety measure were put into place in 2013. Separated cycle lanes are the long-term solution.

Reality: There have been no deaths since the cycle lanes were widened in 2013. The two deaths since 2011 were likely contributed to by the very act of creating cycle lanes in the blind spot of vehicles. Had these cyclists been on the road they would have been safer.

Q: Where else in the country are they using these?

NZTA: These lanes are becoming familiar in major cities including Christchurch. Busy urban routes such as the one-way streets in Dunedin need higher standards of cycle lanes.

Reality: No one in their right mind would direct cyclists to State Highway 1, where all the trucks go. If these two parallel roads were returned to two-way streets, you might put trucks on one and bikes on the other. But this is mad.

Q: Why put the cycleways on the right rather than the left?

NZTA: Because it increases cycle safety and separates them from bus stops.

Reality: Bingo! NZTA has finally realised delivering cyclists to the blind side of trucks is very dangerous. But it was NZTA who chose to do that last time. A simple sorry would be a start.

Q: why not on the right-hand side from Duke St to Otago Museum then?

NZTA: This has been done in response to feedback received and supported by further cycle surveys. And there is a large number of cyclists who use this route who would have to cross the road.

Reality: Really? So feedback overcomes safety? Surely this brings into question whether they really understand the safety issues with the left-hand side. WE all know that cyclists are no different from the rest of us, they will take their bikes on the shortest route they can find. Which will mean that they are spending most of their time not on the new cycle lane. Actually, most of their time will be spent walking around campus because the University won’t let cyclists inside – safety issues, apparently.

Q: What impact will this have on parking?

NZTA: Keeping the cycle lanes on the unsafe side of the road will mean we lose 20 fewer parks. Parking will be provided in high demand areas. (see revised plans).

Reality: We will lose hundreds of parks, particularly in the highest parking areas around the hospital (made worse by the DCC proposal to build on the car parking area at Frederick St). Parking is already squeezed in high demand areas. These guys are in la la land, and I don’t mean the award winning movie.

Q: Will these cycle lanes disrupt traffic flows?

NZTA: The lanes are likely to smooth traffic flows and provide more reliable travel times because there will be fewer parking movements.

Reality: Yes more reliably longer times, which are likely to double for anyone using the one-way streets. More phases for cyclists and pedestrians, more traffic trying to find parks, more time needed to get to hospital appointments. It wasn’t that broke. Why are those from out of town so determined to get in the way of traffic in Dunedin?

Q: How many cyclists are likely to use the cycle lanes?

NZTA: Current usage peaks at 500 per day, but this could easily double. We will measure the change.

Reality: Weasel words. Try looking north from Lower Stuart St along the one-way street. There will be several vehicles on the cycle lanes and likely not even 1 cyclist. The reality is that we are likely to have fewer than 1 cyclist per kilometre of cycleway in Dunedin at any one time. The maximum of 500 is not relevant to the usage in general. (And indeed 500 per day is 500 over 1440 minutes, about one every 3 minutes. At the absolute peak. For a moment in time. So it may double to 1 cyclist at the absolute maximum every 1.5 minutes.) And having measured it later, we are still stuck with the cycle lanes even if they don’t create double the usage. Meanwhile there is no proposed monitoring of the time wasted on getting to hospital appointments, or the time spent by students walking further from free car parking to lectures, or any other flow-on effects of decreased parking where it is currently available.

Q: When is work likely to start?

NZTA: May 2017, taking around 15 months and in such a way as to ensure the one-way system is able to operate effectively and any disruption is kept to a minimum.

Reality: These streets are groaning at the seams already. Our entire one-way system will become impossible to operate usefully, and it will take double the time. By this time those who came to Dunedin because the traffic wasn’t so bad will have the start of every working day diminished and their Dunedin experience effectively destroyed around the central city. We have an elderly population, and this will be the last three years of the lives of some of us.

Q: Who pays and what will it cost?

NZTA: NZTA will pay for the work directly related to the cycle lanes. $8million.

Reality: More weasel words. There are large costs not included in the direct costs. Agencies are keen on doing guestimates of the multiplier effect of benefits to the city for, say, acts at the stadium. What about a study of the likely costs to the city of loss of parking revenue, loss of time spent driving around, loss of time spent walking from vehicles, anxiety around hospital appointments, loss of business for those relying on easy car access for their custom etc. There are also costs for the work connecting roads and footpaths etc between the cycleways and the rest of our DCC infrastructure, and the inevitable landscaping in the vicinity. And then the costs of fixing what we had to redo because none of the agencies are working together. An expensive nightmare.

Q: What is being done to provide more integrated transport in Dunedin?

NZTA: NZTA, DCC and ORC are implementing transport related projects: this is one. These cycle lanes will connect with cycling lanes being considered in North Dunedin linking University, Hospital, Otago Polytechnic and the CBD.

Reality: These institutions are already handy to each other. As regards the University the biggest obstacle to cycling is the size of the campus which cannot be crossed by cyclists.

****

Pity NZTA doesn’t have a booth in the heart of Dunedin where they could come and sit and listen to the issues. Perhaps on the corner of Stuart St and the one-way streets?

[ends]

NZTA Dunedin Urban Cycleways Programme
Cycling in Dunedin contributes to improving transport options, providing a more efficient and integrated transport network, improving health, economic and social outcomes and city liveability. The Urban Cycleways Fund, subject to council approval, will help to accelerate the City to Harbour Bridge and the Central City and North East Valley cycle network.

NZTA Urban Cycleways Programme [general information]

Posted by Elizabeth Kerr

This post is offered in the public interest.

█ GREEN ATTACK ON YOUR BUILT ENVIRONMENT

leisure-cyclist-on-beach-road-cycleway-auckland-nzta-govt-nz-1two-way-separated-cycleway-beach-road-auckland-nzta-govt-nzTwo-way separated cycleway on Beach Road, Auckland [nzta.govt.nz]

15 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Geography, Health, Hot air, Infrastructure, Name, New Zealand, NZTA, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Sport, Tourism, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

Coastal erosion, Taieri Mouth : ‘DCC shouldn’t rush into potentially costly repair job’

Hands Off | Let’s Write Another Report | Let’s Take Another Year….

[The same appears to apply to repair and upgrade of the Aurora Energy power network (except, minus the DCC reports!) and Delta’s Yaldhurst subdivision (let’s spend UNTOLD MILLIONS with no due diligence by DCC itself!). And what was that about another subdivision hitherto unmentioned, patience Whatiffers…..]

Instead, DCC rushes to spend Public Funds by building cycleways on SH1 before external subsidies dry up.

The core infrastructure DEBACLE continues.
Thanks DCC, you’re a star.

taieri-mouth-by-alastair-smith-flickr-com-3287453742_5bd2f5cba4_oTaieri Mouth by Alastair Smith [flickr.com]

### ODT Online Sat, 28 Jan 2017
Board wants urgent action on erosion
By Chris Morris
The Saddle Hill Community Board is calling for “urgent” action to address worsening coastal erosion threatening part of Taieri Mouth Rd. A group including board chairman Scott Weatherall and Dunedin City Council staff visited the area, about 100m north of Dicksons Rd, again this week to inspect the damage. The area had been slowly slipping away for years, monitored by the council, but Mr Weatherall said  action was now needed.
It was reported last year erosion had stripped about 10m of the bank, exposing fence railings and a telecommunications cable, and Mr Weatherall said this week it was continuing to creep closer to Taieri Mouth Rd. “It’s absolutely getting worse,” he said. The problem was at its most “significant” at that location, but also a problem in other areas along the coastal route, he said.
The council, after monitoring the situation for years, had responded more recently with a traffic management plan, including cones and new fences, he said. However, the advice from council staff to the board had been that money to fix the problem was not available until the next financial year.
Read more

[click to enlarge]
google-maps-taieri-mouth-rd-and-flagged-dickson-rd-otagoGoogle Maps – Taieri Rd and (flagged) Dicksons Rd, Otago

google-earth-taieri-mouth-rd-and-flagged-dickson-rd-otagoGoogle Earth – Taieri Rd and (flagged) Dicksons Rd, Otago

dcc-webmap-taieri-mouth-rd-and-dicksons-rd-area-janfeb2013DCC Webmap – Taieri Mouth Rd and Dicksons Rd coastal area JanFeb2013

****

Comment received:

Donald
2017/02/08 at 2:03 pm
I see Cr Wilson’s at it again with her expert knowledge on road issues. First it was the cycle ways and the shambles she headed. Now she is giving her knowledgeable opinion about the erosion hazard on a section of Taieri Mouth Road. Even though the Chair of the Saddle Hill community board called for urgent action. Cr Wilson calls it concerning, but council should not rush a solution. Could the gestation period for this fix be another 20 reports and $200,000 later it is decided that ‘Oh we did have a problem, but not any more, we don’t have a road’. Clean out the swamp.

Posted by Elizabeth Kerr

This post is offered in the public interest.

Leave a comment

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, District Plan, Dunedin, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, NZTA, OAG, Ombudsman, ORFU, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Queenstown Lakes, Resource management, SFO, Tourism, Town planning, Transportation, Travesty, What stadium

SH1 Cycleway : Carnage for Dunedin road users and city parking

The cycleway construction MANGLE is a MASSIVE over reaction to the loss of just two lives – TWO academics(!), who individually decided to risk their lives on the State Highway rather than take available quiet streets.

NZTA corralled by the DCC upstarts such as Mayor Cull, Cr Wilson and the dreadful DCC transportation planners…. is about to cripple the State Highway one-way system that caters for motorists, our trucking companies and large freight movers – as well as savage the public resource of city car parks.
258 parks to be lost.

Expect more cycle deaths and maiming as a result of the new segregated cycleways.

New Zealand road deaths are rising. An indictment but not due to the use of pedal cycles in urban centres so much as motor vehicles and motorbikes on the open road —no one, it appears, likes to wear seat belts, keep their speed down, stay free of distraction, or drive on the correct side of the road, any more. The Road Rules represent real inconvenience for petrolhead homies and overseas nationals.

The Liability Cull council likes to believe cyclists are important in a hilly aging town – or that the absolutely Vast minority of toasted ones were important (just the 2). But cycling, like skiing and boarding, has the excitement of the odd bruise, graze, break or concussion. Mincemeat too, is an option. Not sure it isn’t ‘natural’ to dice.

So we all must pay. And pay again on the one-ways.

This is yet another disreputable DCC detour from putting public funds (ours!) to core infrastructure. We know what core is.

OF COURSE
Latest cost estimates for the SH1 segregated cycleways, noted as $8M in the DCC propaganda published by Pravda, are set to spiral wildly out of control – a certainty!

All that DCC touches in its project work FAILS, immeasurably so, since council staff time and labour costs are kept fully hidden to keep the populace from casting pitchforks at the suited ones (men and women with desks at the City) who pillow out on stipends and salaries.

Give us a break. People die every day.
Why should that disfigure our heavy transports of delight….
The evil DCC staccato of red lights through town is bad enough.

More information on UGLY….

New Zealand Transport Agency (NZTA)
Dunedin one-way system separated cycle lanes

Dunedin City Council
Cycle lanes in the city | Proposed Cycle Network

****

### ODT Online Thu, 26 Jan 2017
SH1 cycleway work to start
By David Loughrey
Work will start soon on an $8 million separated cycleway on Dunedin’s one-way system. The project is intended to provide safe cycling on a roading system overrepresented in fatal and serious crashes, with [merely!] two fatalities since 2011. The first stretch to be built will run between the Botanic Garden and Albany St. Work is expected to start in May.
Read more

“The loss of parking [258 parks] is justified in terms of safety, and supporting cycling can reduce parking pressure in the long term.” –University

Posted by Elizabeth Kerr

This post is offered in the public interest.

12 Comments

Filed under Baloney, Business, Construction, Corruption, Cycle network, DCC, Design, Dunedin, Economics, Finance, Geography, Infrastructure, Media, Museums, NZTA, OAG, Ombudsman, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Town planning, Transportation, Travesty, University of Otago, What stadium

Cycleways and scattered nails

bike - fixed gear track racing [humancyclist.wordpress.com] 1

### radionz.co.nz 24 June 2016 at 9:23 pm
RNZ News
Cycleway truce called as review set up
By Michael Cropp
Wellington’s beleaguered cycleway programme will not be getting the shot in the arm some were hoping for – instead it will be reviewed, refreshed and recommissioned. The outcome of that process – a ‘refreshed cycleways programme’ – would go to the Wellington City Council’s transport committee in August, the council announced today. Meanwhile, Island Bay Residents’ Association had reached a truce with cycling advocates and councillors, and was planning to start on its own consultation. A New Zealand Transport Agency report this month on the council’s ability to implement its programme stated the fallout from the Island Bay project had jeopardised the council’s other cycleway initiatives, and had eroded the public’s faith in the council. It said the council had lost the confidence of officials and ministers. Today’s announcement was intended to provide a pathway to regaining that trust.
Read more

IDEAS !!!!

nails 1 [hdwires.in]

Earlier this year, nails were scattered on the cycleway and the local residents’ association threatened a rates revolt if it wasn’t dug up.

### radionz.co.nz 1 June 2016 at 6:44 pm
RNZ News
WCC told it let spokes fall off cycleway plan
By Michael Cropp
The way Wellington City Council conducted the rollout of a controversial cycleway in Island Bay has hurt its city-wide ambitions for the bike routes, an independent review has found. The report into the city’s cycleways, which was commissioned by New Zealand Transport Agency (NZTA), concluded people felt the path in the southern suburb was a poor solution that was delivered without proper community engagement and consultation. It recommended it be reviewed and modified after further community consultation.
Read more

Read the report commissioned by NZTA (PDF, 1.3MB)

Related RNZ stories:
Legal costs mount in battle over Southland cycleway
Modified Hutt Rd cycleway plans welcomed
Capital cycleway faces strong opposition

****

Meanwhile at Dunedin…. plodding incompetence. A recent series of city council-led (earworms: Spokes Dunedin and NZTA) technical planning and cycleway construction FAILURES, at Exorbitant Expense forced on Ratepayers. All this while South Dunedin core infrastructure maintenance and upgrades received little if no DCC attention, ultimately leading to Council-fuelled multimillion-dollar flood damage. And now, the ODT Editor exhibits gut-wrenching Cheek to devoutly urge DCC to YES, Build Cycleways!

Fri, 24 Jun 2016
ODT Editorial: Learning from cycleway errors
OPINION After a long year of construction, mistakes, remedial work, wasted money and public dissatisfaction the South Dunedin Cycle Network has finally been shunted down the council’s cycleway queue. In an Otago Daily Times report this month council infrastructure networks general manager Ruth Stokes said she could not say when the South Dunedin network would be completed. The new focus, she said, was to employ the limited available resources on fixing the Portobello Rd cycleway and the central city network.

“Build them well, build them smart and build them efficiently.” (ODT)

SPOKES Dunedin speaks out for cycling in Dunedin, New Zealand and represents everyone who rides a bike or would like to ride a bike in the city. SPOKES is a local volunteer cycling advocacy group founded in 1996 as an affiliate of the New Zealand Cycling Advocates Network. SPOKES Dunedin is an incorporated society registered under the Incorporated Societies Act 1908.

bike dog jun co-passage [hbr.org]

We look forward to working with the Dunedin City Council to develop a real cycle network for Dunedin. (Spokes)

God Almighty! Read this:

█ SPOKES DUNEDIN SUBMISSION ON DRAFT 2016-2017 ANNUAL PLAN
Posted on April 6, 2016 by spokesdunedin

Summary
A change of scope is needed for Dunedin’s cycling network, but it is unclear what the DCC’s change in scope actually means, and higher standard cycleways are only part of the story. Spokes Dunedin has a vision for successfully realising the cycle network. We want everyone to be able to cycle from North Dunedin to South Dunedin, out both sides of the Harbour, and through the tunnels to Green Island and Mosgiel on a connected framework of city-spanning arterial routes that are safe, direct, and convenient to use. This will focus work where there is a clear need for improved safety rather than on streets that are already relatively safe, and will create a solid initial network that can grow and develop in response to future demand. The great thing is that there already exists some cycling infrastructure on many of the routes for this initial network. Several things can be achieved by the end of this year that will help Dunedin catch back up to where it should be.

To do in 2016
1. Support NZTA to begin construction of the SH1 separated lanes by the end of this year.
2. Fix Portobello Road – it’s already been two years. We don’t need fancy landscaping, we just need the median barrier realignment so the road looks like a road and the cycleway looks like a cycleway.
3. Complete the Wharf/Roberts intersection as agreed – it’s already been two years. This intersection presents an identified safety risk on a high demand route.
4. Continue the SH88 path through the rail corridor to the railway station, thereby providing an alternative to the cycle lanes on Anzac Ave (heavy freight route and high risk).
5. Create a separated cycle lane from the intersection of Andersons Bay/Strathallan, along The Oval, to Crawford Street in place of the existing cycle lane between two lanes of fast-moving traffic.
6. Develop plans for a separated cycle lane on North Road and safety improvements for the Opoho intersection to tie in with NZTA’s forthcoming separated cycle lanes on SH1. This route is of very high strategic priority.

Introduction
Dunedin is a pro-cycling city, where a significant proportion of the population regularly cycles for recreation, transportation, or both. Year after year, cycling is one of the most strongly supported and heavily submitted-on topics in the annual plan. One of the biggest public consultation events in Dunedin history was held in 2013 regarding the proposed SH1 separated cycle lanes. In addition to widespread media coverage, NZTA and DCC staff solicited input from the public at information booths in busy locations including the Golden Center, Toitu, and the University. With over 2000 written submissions and roughly 800 survey responses, the SH1 separated cycle lanes received one of the highest response rates of any topic ever consulted on. The result was overwhelming support for the proposed separated cycle lanes. Independently, the AA undertook a survey of their local membership, with over 70% of the nearly 1500 respondents supporting the proposed separated lanes. The overwhelming public demand and support for better cycling in Dunedin cannot be denied.
In response to this demand, the City rightly undertook to develop a Strategic Cycle Network. But the South Dunedin portion of the cycle network has not delivered on the ambitions of the cycle network plan adopted in 2011. Nothing has progressed in the last year, leaving half-finished elements scattered around, with other things ripped out without consultation.
Some might argue that we should throw up our hands in despair, abandoning the possibility of future success under the fear of past failures. But others know that setbacks are par for the course when charting new waters and trying new things. Where would we be if the likes of Cook, Columbus, or Magellan had turned around after the first storm and torn sail? Those leaders stayed the course, their sailors gained experience, and they ultimately changed the world.
Read more

“SPOKES, CYCLE-SAIL OFF THE EDGE OF THE WORLD WHY NOT”
Sail wagon [en.wikipedia.org] 1

█ For more, enter the terms *cycle* and *christmas present* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

*Images: (from top) humancyclist.wordpress.com – fixed track racing | hdwires.in – nails | hbr.org – bike dog jun co-passage | en.wikipedia.org – sail wagon

19 Comments

Filed under Business, Cycle network, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Geography, Health, Housing, Infrastructure, Media, Name, New Zealand, NZTA, OAG, Ombudsman, People, Pet projects, Politics, Project management, Proposed 2GP, Public interest, Resource management, South Dunedin, Sport, Tourism, Town planning, Transportation, University of Otago, Urban design, What stadium

Bloody DCC —superlative cost blowout #cycleways #SUCKS

#GreaterDunedinNOTsustainable
#DaveCullNOTsustainable
#KateWilsonNOTsustainable
#JintyMacTavishNOTsustainable
#CouncilStaffManagersNOTsustainable

Cycling [screenshot at YT].jpgNo photograph of Kate in lycra could be found. The Mayor and MacTavish were both camel shackled when our photographer called (say no more).

### ODT Online Thu, 22 Oct 2015
Dunedin cycleway cost blowout
By Craig Borley
Building Dunedin’s cycleways could cost “three to four times” more per metre than first thought. That news was delivered to the Dunedin City Council’s infrastructure services committee this morning by the council’s infrastructure and networks general manager Ruth Stokes

The committee voted to continue with the rollout of the network, ensuring the design and finish were of the more expensive, higher quality option.

Read more

█ Council Reports available at What if? via (12.10.15)https://dunedinstadium.wordpress.com/2015/08/22/dcc-cycleways-now-tied-to-more-urban-design-spend-after-rehash-numero/#comment-66330

Sandy Graham advises there is one amended page (item 6 ph 6.8) – a map was altered for clarity. The website copy will be updated with the amended page.

Posted by Elizabeth Kerr

*Image: [screenshot] youtube.com – Cycling Training Program – Crashing on a bike

57 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Geography, Media, Name, New Zealand, NZTA, OAG, Ombudsman, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Transportation, Urban design, What stadium

Cr Kate ‘Cycleways’ Wilson —(disingenuous) fails constituents

█ Cr Kate Wilson says cycleways will bring myriad benefits to Dunedin.

ODT Online Sat, 25 Jul 2015
Why Dunedin is investing in cycling
By Craig Borley
Dunedin appears divided over the cycle network. Some see it as unnecessary. Others see it as vital. ODT reporter Craig Borley spoke to Dunedin city councillor Kate Wilson, chairwoman of the infrastructure services committee, about why the city is investing in cycle infrastructure.
Read more

█ The Dunedin City Council is sleep-walking to yet another poorly thought out cycleway project. (ODT)

### ODT Online Thu, 20 Aug 2015
Time to put brakes on cycleway
By Hilary Calvert
OPINION Somehow, the Dunedin City Council has been so beguiled by the gift-horse that is the New Zealand Transport Agency (NZTA) that it seems to have completely forgotten to carry out its proper role of looking after the interests of the citizens of Dunedin in respect of the State Highway 1 cycleway plans.
Read more

ODT 26.8.15 (page 8)
– shot in a half-lit Dunedin café off the beaten cycle paths

ODT 26.8.15 Letter to editor Wilson Diehl Hopkins p12

█ Proposed: Separated cycle lanes to run along north and south one way routes, between Botanic Garden and Queens Gardens.

### ODT Online Thu, 10 Sep 2015
Dedicated cycle lanes get closer
By Craig Borley
Nationally-funded separated cycle lanes along Dunedin’s one way system are now two steps closer as the project moves swiftly through the New Zealand Transport Agency machine.
Read more

NZTA said it had resolved to:
• Incorporate high turnover short term parking for businesses, particularly those reliant on short stay kerbside parking and deliveries
• Incorporate medium term parking close to the hospital and museum.
Updated plans were now being prepared to show where the parking would be included. The plans will be available for public comment at the end of the month.

ODT 11.9.15 (page 16)

ODT 11.9.15 Letters to editor Hopkins Pillans Oaten (1) p16

Related Posts and Comments:
● 3.9.15 Dunedin support for extensive cycle lanes and Free bicycles
● 22.8.15 DCC cycleway$ now tied to more ‘urban de$ign’ $pend….
● 18.7.15 DCC Cycleways: SEEING RED, apology NOT accepted
● 10.4.15 DCC cycleways propaganda continues #SpendSpendSpend
20.3.15 DCC Shame: First, John Wilson Dr … now Portobello Rd cycleway
11.2.15 Dunedin Cycleways: Pet project staff, ‘entitlement’? #irony
3.12.14 Cycling at Dunedin —boring debate, network spending continues #DUD
22.5.14 DCC Transportation Planning —ANOTHER consultation disaster
6.5.14 Roading network screwed by council staff
● 14.2.14 DCC: Broadband AND bicycles #fraudband speed
14.1.14 DCC: Hospital area parking changes #cyclelanes
5.1.14 Norman Foster: SkyCycling utopia above London railways #ThinkBig
24.12.13 Daaave’s $47 million Christmas present to Jinty. We’re paying.
4.12.13 Dunedin cycleways: Calvin Oaten greeted by DCC silence
17.11.13 Dunedin cycleways: Calvin Oaten’s alternative route
17.11.13 Cull and MacTavish… “Have you fixed the debt crisis?”
14.11.13 Cycle lane explosions and puncture kits (SPOKES grenades launch)
8.11.13 Dunedin Separated Cycle Lane Proposal [how to make a submission]
29.10.13 DCC (EDU) invents new job! [GigatownDunedin]
19.10.13 Cycle lobby games and media tilts
24.9.13 Mediocrity and lack of critical awareness at DCC [council reports]
8.7.13 Bloody $tupid cycleways and Cull’s electioneering… [route maps]
28.3.13 DCC DAP 2013/14: Portobello Harington Point Road Improvements
26.2.13 DCC binge spending alert: Proposed South Dunedin cycle network
22.2.13 DCC: Council meeting agenda and reports for 25 February 2013
31.1.13 Who? 2010 electioneering
21.11.12 Safe cycling -Cr Fliss Butcher
5.11.12 DCC, NZTA: Cycle lanes controversy

Posted by Elizabeth Kerr

15 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Enterprise Dunedin, Geography, Hot air, Media, Name, New Zealand, NZTA, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Transportation, University of Otago, Urban design, What stadium

Cycling at Dunedin —boring debate, network spending continues #DUD

procrastination [davewalkercartoons.com]

Link received Wed, 3 Dec 2017 at 2:52 a.m.
Message: For Toll read Cycle

[Or, ‘Madhead’ Daaave plays Dunedin like Monopoly. We lose.]

### newsbiscuit.com Dec 1, 2014
Stonehenge development: ley lines closed during 2015 while toll lanes added
By Adrian Bamforth
The government has announced a radical up-grade to Britain’s dilapidated ley-line network with major closures on all lines and charges being brought in on certain routes when the network re-opens. ‘For years Britain’s natural mystic energy has been having to cope on an out-dated system,’ said David Cameron dressed in a rainbow baggy jumper wearing a large purple feather as an earring. ‘It might have been adequate for the Bronze Age when it was first laid out, but is entirely unsuitable to 21st Century new age Britain.’

Executive ley lines with controversial tolls are to be introduced in 2015, for those who do not wish to wait for their intangible cosmic earth energy. ‘It will mean demolishing Stonehenge…’ said the Prime Minister, but we are confident that the British people will understand that this is definitely worth it.’ Read more

****

QUIET STREETS and OTHER ALTERNATIVES TO SH1 SEPARATED CYCLEWAYS

### ODT Online Thu, 27 Nov 2014
Opinion: Your Say
Why Dunedin needs (some) separated cycleways
By GregDawes
Diane Yeldon raises some important questions. She aligns herself with the ‘vehicular cycling’ movement, which argues that the best place for cyclists is in among the traffic, obeying the same rules as all other road users. On this basis, she questions whether we really need separated cycleways.
As a cyclist I follow the vehicular cycling principles every day. I ride my bike in much the same way as I drive my car, claiming the space I need on the road, while trying to share the carriageway considerately with other road users.
On roads with low traffic volume, relatively slow speeds, and no heavy vehicles, this works well. But it requires a lot of confidence to ride this way on busy roads, when cars are passing at speed and there are trucks and buses.
Read more + Comments

Related Posts and Comments:
22.5.14 DCC Transportation Planning —ANOTHER consultation disaster
6.5.14 Roading network screwed by council staff
14.2.14 DCC: Broadband AND bicycles #fraudband speed
14.1.14 DCC: Hospital area parking changes #cyclelanes
5.1.14 Norman Foster: SkyCycling utopia above London railways #ThinkBig
24.12.13 Daaave’s $47 million Christmas present to Jinty. We’re paying.
4.12.13 Dunedin cycleways: Calvin Oaten greeted by DCC silence
17.11.13 Dunedin cycleways: Calvin Oaten’s alternative route
17.11.13 Cull and MacTavish… “Have you fixed the debt crisis?”
14.11.13 Cycle lane explosions and puncture kits (SPOKES grenades launch)
8.11.13 Dunedin Separated Cycle Lane Proposal [how to make a submission]
29.10.13 DCC (EDU) invents new job! [GigatownDunedin]
19.10.13 Cycle lobby games and media tilts
24.9.13 Mediocrity and lack of critical awareness at DCC [council reports]
8.7.13 Bloody $tupid cycleways and Cull’s electioneering . . . [route maps]
28.3.13 DCC DAP 2013/14: Portobello Harington Point Road Improvements
26.2.13 DCC binge spending alert: Proposed South Dunedin cycle network
22.2.13 DCC: Council meeting agenda and reports for 25 February 2013
31.1.13 Who? 2010 electioneering
21.11.12 Safe cycling -Cr Fliss Butcher
5.11.12 DCC, NZTA: Cycle lanes controversy

Posted by Elizabeth Kerr

15 Comments

Filed under Business, Cycle network, DCC, Democracy, Design, Economics, Hot air, Media, Name, New Zealand, NZTA, People, Pics, Politics, Project management, Property, Site, Sport, Town planning, Urban design, What stadium

DCC staff-led CBD projects that impact ratepayers | consolidated council debt

DCC Envision Princes Street INVITATION 1Invitation [click to enlarge]

53,000 ratepayers | DCC Staff-led projects (sample):

Princes Street and South Princes Street Upgrade
Warehouse Precinct Revitalisation Plan
Dunedin Central City Plan
Dunedin City Integrated Transport Strategy 2013
Proposed Cycle Network
The Second Generation Plan for Dunedin

DCC Graphic - Princes St (CPO)Own Vision: Princes Street (entrance to Distinction Dunedin hotel)

DCC Graphic - Vogel StOwn Vision: Vogel Street

DCC Graphic - OctagonOwn Vision: Octagon

DCC Graphic - Queens Garden 1Own Vision: Queens Garden 1

DCC Graphic - Queens Garden 2Own Vision: Queens Garden 2

How much more

The Central City Plan involves these projects:
(er, thanks again Spendthrift Staff)

● Warehouse Precinct Revitalisation Plan
● Central City Heritage Re-use Grants Scheme
● Street Improvements in Bond and Vogel Streets
● Making Crawford and Cumberland Street Two-way
● Queens Garden Upgrade
● Exchange Square Upgrade
● The Octagon Upgrade
● George Street Upgrade
● Princes Street and South Princes Street Upgrade
● Pocket Parks
● Improved Pedestrian and Cycle Safety in the Central City
●●●● Other Projects and Initiatives

What “Other Projects and Initiatives” ?!!

As well as specific place-based projects, the draft Central City Plan outlines other projects and initiatives relevant to the central city area:

● Investigate the location and provision of public toilets and restrooms throughout the central city in a toilet priority plan
● Design a plan for the incorporation of public art in the streetscape
● Investigate opportunities for using a range of public spaces in the central city for events as alternative/additional venues to the Octagon
● Develop a plan to improve the pedestrian experience along the routes from the campus to the ‘warehouse precinct’ (night and day)
● Investigate opportunities for more play equipment in central city spaces, such as the Library Plaza and Albion Lane
● Improve the quality of footpaths, including paving surface, furniture, trees and planting, and making them wider where possible
● Encourage building owners to add decorative lighting to highlight buildings that have heritage/ architectural values
● Improve lighting for pedestrians in some areas
● Improve processes and streamline procedures to help building owners re-use their buildings
● Work on a strategy to overcome procedural and financial barriers to revitalisation in the ‘warehouse district’
● Make District Plan changes to better reflect built form, help and promote quality development, review activity zones and activities, and protect special character in the central city and large-scale retail zone
● Prepare a development resource package telling prospective businesses about the Dunedin facilities, amenities and lifestyle
● Liaise with a building owner/developer to undertake a pilot project to help develop a creative quarter
● Consider the location of key tourist information facilities
● Investigate the desired model for a central city retail management body
● Work on a plan to encourage trucks coming from the Southern Motorway and heading to the port to follow Strathallan and Wharf Streets.
● Investigate the need for the development of a parking building in the light of the vision for a creative quarter
● Work with ORC to consider options for improving public transport flow and provision in the central city
● Assess options to improve pedestrian and cyclist connections across SH1, the railway lines and Thomas Burns Street
● Investigate the need for a transport hub for coach parking, cruise ship passenger drop-off and visitor parking, including campervans
● Improve visitor and information signage throughout the central city
● Build cycle storage facilities in strategic locations
● Undertake detailed investigation of measures need to promote the ‘Western Inner Relief Route’
● Encourage the freeholding of leasehold land.

DCC Link

Jim is back

Someone just stepped into his role, with all the usual friction, complicity and conflicts. They’ll also bring in hairless and carless days.

Posted by Elizabeth Kerr

12 Comments

Filed under Architecture, Business, Construction, Cycle network, DCC, DCHL, DCTL, Delta, Democracy, Design, DVL, DVML, Economics, Events, Geography, Heritage, Hot air, Museums, Name, New Zealand, NZTA, ORC, Otago Polytechnic, People, Pics, Politics, Project management, Property, Site, Sport, Stadiums, Tourism, Town planning, University of Otago, Urban design, What stadium