Tag Archives: Rail corridor

Mosgiel (2015): Destroyed community beautification project —a development

Received.
Thu, 29 Oct 2015 at 2:27 p.m.

█ Message: The community board had a choice (2007) of which side of the road the footpath should go; and they chose to destroy the railway beautification project. Please note who the primary mover was. None other than Lester Harvey who received awards and whatever else for the beautification project. Surely he would’ve been the prime mover for the footpath to have been on the other side of the road (??), to preserve the beautification project that he claimed as his own.

AGENDA FOR A MEETING OF THE MOSGIEL TAIERI COMMUNITY BOARD TO BE HELD IN THE DOWNES ROOM, MOSGIEL SERVICE CENTRE ON WEDNESDAY, 27 NOVEMBER 1999, COMMENCING AT 4.00 PM – ma_mtcb_m_2007_09_19.pdf

http://www.dunedin.govt.nz/__data/assets/pdf_file/0012/13053/ma_mtcb_m_2007_09_19.pdf

Item 7. of the agenda makes interesting reading.

MTCB Minutes 27.11.99 (19.9.11) Item 7

Gladstone Road 1aOtago 150th Anniversary plantings scraped away at Gladstone Road

Related Posts and Comments:
26.3.15 DESTROYED, beautification project —two totally different stories
20.3.15 DESTROYED, beautification project —Railway corridor, Gladstone Road

Posted by Elizabeth Kerr

*Image supplied.

2 Comments

Filed under Business, DCC, Democracy, Design, Hot air, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Site, Tourism, Town planning, Urban design

SH88 realignment – information

Comment received from daseditor
Submitted on 2012/05/26 at 8:18 pm

[24.5.12] Edmund Anscombe and the Anzac Avenue Trees

With your discussion of the alignment I hope you’ll also take the time to read the article above on the Anzac Avenue trees. The alignment construction looks as though it has severely affected a critical area of the city’s landscape heritage which is linked to the work of prominent architect Edmund Anscombe.

Images supplied by Anonymous*

The image dates relate to Google Earth snapshots: 2005 January, 2006 March, 2009 July, 2011 January, and 2011 September. 2004 is available but heavy cloud cover obscures the view.

SH88 – Google Earth images including the quarry and Logan Park sports field.

SH88 – The same images cropped to SH88 entry and exit points.

SH88 – The Google Maps image which marks the road.

*Several contributors at this website use the title Anonymous.

Related Post with Links:
25.5.12 SH88 realignment costs (injunction)

Posted by Elizabeth Kerr

12 Comments

Filed under Construction, DCC, Design, Economics, Geography, Pics, Project management, Property, Site, Stadiums, Town planning, Urban design