Tag Archives: Public buildings

Christchurch Cathedral : Marcus Brandt and the People’s Steeple Project

christchurch-cathedral-steeple-by-country-farm-garden-photos-cfgphoto-com-render1-1

While Bishop Victoria and the Anglican church property trust (CPT) continue to sit on their hands perhaps awaiting devine intervention, who knew, it turns out that a group of stalwart people in New Zealand – with an incredible level of international assistance – are busy planning a very special Cathedral project.

From: Mark Belton
Sent: Sunday, February 26, 2017 11:11 PM
To: [Elizabeth Kerr + RCC Mailing List]
Subject: Introducing The People’s Steeple

Dear Cathedral Restoration supporters

Below is a link to a video clip of the People’s Steeple proposal being demonstrated by its creator Marcus Brandt. Marcus has been in CHCH this last week promoting the People’s Steeple Project.

The People’s Steeple is a mind blowing proposal…audacious, visionary, inspiring. Lifting telescoping timber sections of the spire 60 metres into the sky…powered by about 500 trained people working 16 capstan winches placed around Cathedral Square, watched by up to 50,000 people in the Square.

The US based Timber Framers Guild (TFG), a professional organisation of engineers and timber framers has offered to be the lead contractor to build, assemble, and erect the People’s Steeple. The lead NZ engineers would be renowned CHCH timber engineer – Prof Andy Buchanan whose report on the project is attached.

Skilled TFG members from the US and around the world would gift their time, working in the Square preparing and assembling the timbers, and then helping lead the steeple’s erection. Up to 300 TFG members along with locals could be involved working in the Square over a period of about 6 months.

The TFG have successfully undertaken 75 community building projects over the last 25 years in the US and around the world. They are super keen to offer their services to CHCH. The TFG emphasise their projects are about ‘building communities’.

Marcus says would take only 2-3 hrs to lift and secure the telescoping sections. Flooring and bells would be assembled the same day and in the evening the bells would ring out…proclaiming to the world – ‘Christchurch is back’….and a Hangi feast would be opened…for a crowd of 50,000! International media would broadcast the event around the world…the whole enterprise being about engaging our community in the most positive way…and it would ignite fund raising for the restoration of the cathedral. It is envisaged the construction of the People’s Steeple would lead restoration of the cathedral and the Square.

It is noted huge pro bono contributions from the Guild’s members are being offered, and Blakely Pacific NZ Ltd, a US based forestry company has offered to provide the timbers at no cost from giant 125-year-old Port Orford Cedar from its Pioneer Forest in South Canterbury.

The Restore Christchurch Cathedral Group is strongly supportive of the People’s Steeple.

We hope this inspiring project will help engage and enthuse Christchurch people with recovery of the cathedral, and help get the cathedral restoration programme underway.

Warm regards

Mark Belton
Co-Chair, Restore Christchurch Cathedral

Mark Belton
Managing Director
Permanent Forests NZ Limited
PO Box 34, Lyttelton 8841, New Zealand

See attached reports by Marcus Brandt, Andy Buchanan, and the TFG.
TFG People’s Steeple Project approach notes-10-2-16
Steeple 16-8-12
M Belton report on Timber Framers Guild conf and People’s Steeple 23-9-16
Engineering the People’s Steeple v9

The People’s Steeple | Whare Films Published on Feb 23, 2017

christchurch-cathedral-tonyhphotography-co-nz-bw-render1-1

The People’s Steeple
Rebuilding the Bell Tower at Christchurch Cathedral

Marcus Brandt: An Introduction

For the last thirty years or so, I’ve been restoring historic stone and timber buildings, mostly in Southeastern Pennsylvania. I’m a working master carpenter and stone mason. Most of the historic buildings I am called to work on are 150 to 300 years old. Solid and well crafted, these old buildings tend to age well, but neglect and damage can take a toll. Much of my effort is spent in repairing and strengthening the timber frames of barns, bridges, houses, gristmills and churches. I’ve had several commissions to build new structures in the old style. I have organized and led many barn raisings, in which hundreds of volunteers gather to raise a barn’s frame in a day. A good crew will have the sides and roof on too.
Straightening, plumbing and repairing damaged stone walls is often called for. It is not uncommon to straighten a wall 10 meters high that is out of plumb by 400 or 500 mm. Having studied and worked with several Scots masons, I’m a strong believer in lime based mortars and good masonry practice. The interface between stone and timber is of particular interest to me.
Since 1989, I’ve been a professional member of the Timber Framers Guild (TFG) and a member of the Traditional Timberframe Research and Advisory Group (TTRAG). That part of the Guild focuses on understanding the past practice of the craft with a view that the past might help inform future practice. I have advised many historical and preservation societies and sat on many review boards.
As a result of my participation in Guild efforts and projects, I was invited to go to both Scotland and China to investigate “lost” technologies for the Public Broadcast Service series NOVA. We built working siege weapons in Scotland and in China we built a bridge design that hadn’t been built since the Mongol invasion.
I teach Traditional building skills at Lehigh University, Bethlehem, PA. I’m particularly interested in ways that the pre-industrial past practice can inform building in the greener, sustainable post-industrial world of the future.
I serve as a sailor, boson and ship’s carpenter aboard the tall ship Gazela (www.Gazela.org). That experience has taught me much about rigging and raising heavy loads in confined spaces. It’s taught me about erecting tall, secure, flexible, stable structures that get tossed about and shaken mercilessly. A sea captain in her own right, my wife serves as First Mate aboard Gazela. She out-ranks me, and helps keep me humble.
Since 22 February, I have been working as much as possible to develop a method to rebuild the Bell tower at Christchurch. With the help of friends and students, and the forbearance of my wife, I developed a plan that is beautiful, solid, strong, flexible, earthquake resistant, buildable, durable, and familiar. But more than anything, I want to use the rebuilding of the steeple as a vehicle for rebuilding and strengthening the community. And, once built, serve as an outward witness to the inward love we have for each other as fellow humans.
I look forward to doing this project with the able help of my best friends in the world…many of whom I haven’t yet met.

█ More information about the People’s Steeple Project and participants at http://thepeoplessteeple.org/

christchurch-cathedral-detail-mygola-com-tweaked

Related Posts and Comments:
23.12.15 Christ Church Cathedral: practical news from govt mediator…
14.7.12 Rival newspaper on historic heritage #cathedral
2.3.12 Christ Church, Cathedral Square

Posted by Elizabeth Kerr

This post is offered in the public interest.

christchurch-cathedral-detail-with-chalice-sisson-photography-photoshelter-com

christchurch-cathedral-mudbirdceramics-blogspot-co-nz

christchurch-cathedral-5-aug-2003-by-cindy-staticflickr-com-tweaked

*Images: Christchurch Cathedral – (from top) colour render by whatifdunedin [photo source: Country Farm Garden Photos at cfgphoto.com]; black white render by whatifdunedin [photo source: Tony H Photography at tonyhphotography.co.nz]; colour photo of steeple detail [mygola.com]; cathedral with chalice by Sisson Photography [via photoshelter.com]; black white photo by Mudbird Ceramics [mudbirdceramics.blogspot.co.nz]; colour photo by Cindy taken on 5 Aug 2003 [via staticflickr.com]

33 Comments

Filed under #eqnz, Architecture, Business, Construction, Democracy, Design, Economics, Education, Events, Finance, Fun, Geography, Heritage, Heritage NZ, Innovation, Inspiration, Leading edge, Name, New Zealand, People, Project management, Property, Public interest, Resource management, Site, Structural engineering, Technology, Tourism, Town planning, Urban design

DCC LGOIMA Response : Wall Street Mall and Town Hall Complex

Email correspondence.

From: DCC Governance Support
Sent: Friday, 20 January 2017 8:48 a.m.
To: Elizabeth Kerr
Subject: Official information response 280070 Council Buildings WOF

Dear Ms Kerr,

Official information request for information about COUNCIL BUILDINGS WOF

I refer to your official information request dated 28-November-2016 for the following information. Our response to each question is in red font [italics at this website -Eds]:

1. Does the council-owned Wall Street Mall (211 George St, Dunedin) have a current building warrant of fitness, and if not why not?

The Wall Street Mall at 211 George Street does not have a building warrant of fitness. The current status of the Wall Street Mall building warrant of fitness is that a Letter in Lieu was issued for the Specified Systems 15.3, 15.4, 15.5 because a full 12 months’ worth of daily inspections had not been completed. We can confirm that since July, 2015, these daily checks have been in place and this will not be an issue for subsequent warrants of fitness.

Please note that where a Letter in Lieu is issued this means the Independent Qualified Person (IQP) confirms that the systems in the building are working as they should and are compliant.

2. Since the construction of Wall Street Mall was completed in what years has it had a current building warrant of fitness issued, and if not why not?

Mar 2012 – Outstanding form 12A for Specified System 6 (Riser Mains).
Mar 2013 – Letter in lieu issued for Specified System 6 (Riser Mains).
Nov 2013 – Building Warrant of Fitness Received.
Sep 2015 – Letter in lieu issued for 2014/15 & 2015/16 compliance year for Specified System 15/3.
Regarding the reasons for this, please refer to the comments of the Manager, City Property below.

3. Does the council-owned Dunedin Town Hall complex, including Glenroy Theatre, Metro Cinema, and Municipal Chambers, have a current building warrant of fitness(s), and if not why not?
Since the major Dunedin Town Hall Redevelopment Project was completed (including Glenroy Theatre, Metro Cinema, and Municipal Chambers) in what years has it had a current building warrant of fitness(s) issued, and if not why not?.

There is no building warrant of fitness in place for these premises. Instead the Dunedin Town Hall complex, including the Municipal Chambers, Dunedin Centre and the Metro Theatre, have a Certificate of Public Use in place. This means the buildings are safe to use.

These buildings do not have a current Building Warrant of Fitness as, at time of writing, no current Code of Compliance has been issued following the completion of the redevelopment work as there were some building elements requiring attention relating to fire engineering. These elements have been completed and the documentation submitted to DCC Building Compliance for Final Inspection and issue of the Code Compliance. Once the Code Compliance Certificate has been issued there will be nothing to prevent the issue of a warrant of fitness at the next inspection.

If you wish to discuss this information with us, please feel free to contact Property Manager Kevin Taylor on 03 477 4000. Mr Taylor has prepared the following report for the chief executive. This is provided for your information:

The DCC Property department has previously engaged an outside contractor to administer and manage the BWOF compliance on DCC properties, in particular the Wall St Mall. In early 2015, the Building Compliance aspect was sold to Logic Project Management Consultants and a new company called Logic FM was formed and took over the majority DCC BWOF administration.

Our experience as we undertake building audits is that previous advice may have been too lax or liberal in assessing the building’s compliance with particular codes, specifically around fire protection and fire cells. We have also found that the inspections that were contracted to have been undertaken were not fulfilled, leaving gaps in the compliance processes. Thus the BWOF could not be issued by deadline or due dates.

Subsequently, it has been our experience that Logic FM has been interpreting code compliance components beyond that required by the law and schedules to the Acts governing the specified systems. Thus we have experienced a number of “notice to fix” instructions issued which are in error.

To satisfy ourselves that the BWOF is being managed and administered as it should be, DCC Property has engaged independent experts, especially structural and fire engineers, to review the building’s specified systems and as-built safety components. These independent audits have been completed and the required reports and Letters in Lieu issued to enable the DCC Building Authority to issue the BWOF.

The BWOF owners inspections have been brought in-house and are undertaken by the property team’s asset management staff. IQP inspections continue with the specific trades as required.

Yours sincerely

Governance Support Officer
Dunedin City Council Continue reading

19 Comments

Filed under Architecture, Business, Construction, DCC, Democracy, Design, Dunedin, DVML, Economics, Education, Finance, Fire and Emergency NZ, Heritage, Infrastructure, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Public interest, Resource management, Site, Structural engineering, What stadium

Dezeen: Harbin Opera House, north east China | MAD

Harbin Opera House by MAD Architects_Beijing - aerial 1 [photo Hufton + Crow]Harbin Opera House by MAD Architects_Beijing - exterior 2 [photo Adam Mørk]Harbin Opera House by MAD Architects_Beijing - exterior 3 [photo Hufton + Crow]

### dezeen.com 16 December 2015
MAD’s sinuous Harbin Opera House completes in north-east China
Beijing studio MAD has completed an opera house in the Chinese city of Harbin, featuring an undulating form that wraps two concert halls and a huge public plaza. The opera house is the first and largest building that MAD has designed as part of Harbin Cultural Island, a major new arts complex among the wetlands of the Songhua River. The 79,000-square-metre building features a three-petalled plan. One houses a grand theatre with space for up to 1,600 visitors, while the other is a more intimate performance space for an audience of 400. The building is designed to mirror the sinuous curves of the marsh landscape, with an exterior of smooth white aluminium panels and glass. These contrast with the rooftops, where a textured surface of ice-inspired glass pyramids allows light in from above. According to MAD, the building is designed “in response to the force and spirit of the northern city’s untamed wilderness and frigid climate”. “We envision Harbin Opera House as a cultural centre of the future – a tremendous performance venue, as well as a dramatic public space that embodies the integration of human, art and the city identity, while synergistically blending with the surrounding nature,” said studio founder Ma Yansong.

MAD architects [website homepage i-mad.com 26.12.15]

█ MAD Architects: http://www.i-mad.com/

MAD has designed several cultural buildings, including an artificial island of art caves, an icicle-shaped wood sculpture museum also in Harbin and Chicago’s proposed George Lucas Museum. Curved surfaces are a recurring theme through them all, picking up Ma’s ambition for a new style of architecture, referencing the landscapes of traditional Chinese paintings.

“We treat architecture as a landscape,” he told Dezeen in an interview last year.

Harbin Opera House by MAD Architects_Beijing - interior 1 [photo Adam Mørk]

The smooth surfaces of the opera house’s exterior continue inside.
Read more + Images

█ Photography by Adam Mørk and Hufton + Crow.

Harbin Opera House by MAD Architects_Beijing [photo Hufton + Crow]

Related stories:
China Wood Sculpture Museum by MAD
MAD reveals concept design for George Lucas’ Chicago art museum
MAD Architects unveils slimmed-down design for Lucas Museum in Chicago

Related movie:
MAD wants to “invent a new typology” for high-rise architecture, says Ma Yansong
In this exclusive video interview filmed in Venice, Ma Yansong of Chinese architects MAD explains his concept for a “shan-shui city”, a high density urban development inspired by traditional Chinese paintings of mountain ranges.

Posted by Elizabeth Kerr

Harbin Opera House by MAD Architects_Beijing - plaza 1 [photo Adam Mørk]Harbin Opera House by MAD Architects_Beijing - exterior detail 1 [photo Hufton + Crow]

Leave a comment

Filed under Architecture, Business, Concerts, Construction, Coolness, Democracy, Design, Economics, Geography, Infrastructure, Innovation, Inspiration, Leading edge, Media, Name, People, Project management, Property, Site, Structural engineering, Tourism, Town planning, Urban design

Christ Church Cathedral: practical news from govt mediator Miriam Dean QC

Updated post
Sat, 26 Dec 2015 at 3:25 a.m.

### beehive.govt.nz 23 December, 2015
Gerry Brownlee Media Release
Report confirms ChristChurch Cathedral can be reinstated

Minister for Canterbury Earthquake Recovery Gerry Brownlee says the decision by the Anglican Church to progress investigations into reinstating the ChristChurch Cathedral will be greatly appreciated by the wider community.
The Church Property Trust, which owns the Anglican Cathedral in Cathedral Square, has received an independent report from a Government-appointed consultant, who has reviewed the engineering options for the iconic city building.
“All of the parties’ engineers agree that the reinstatement of the Cathedral would require a combination of repair, restoration and reconstruction,” Mr Brownlee says. “The issue then comes back to cost and that is something the Church Property Trust will need absolute certainty of before it can commit to any work going ahead.”
Mr Brownlee says CPT is keen to enter further discussions with the Government in regard to progressing towards a reinstatement plan for the ChristChurch Cathedral, and that will happen in the New Year.
“And that is why we need to gain certainty about the affordability of this project and be able to work through the options. The positive outcome here is that there are now options to work through and that CPT is willing to do so.”
Link

███ Report on facilitated discussions with engineers on engineering options for repair, restoration or replacement of ChristChurch Cathedral. (PDF, 11.22 MB)

220211 News:Don Scott/The Press Christchurch earthquake. The Cathedral with its spire missing.Christchurch Cathedral 1 [Stuff.co.nz]Photos: Don Scott – The Press

Most of the building is intact – the scaremongering re the safety and cost of a rebuild is just that.

The Anglican Church has agreed to consider “reinstating” the Christ Church Cathedral at a press conference today.

### Stuff.co.nz Last updated 18:14, December 23 2015
The Press
Anglican Church to consider reinstating Christ Church Cathedral video
By Michael Wright
[…] A report by Government-appointed mediator Miriam Dean QC found the cathedral could be either reconstructed to be “indistinguishable” from its pre-quake self or replaced.
[…] Restoration campaigner Philip Burdon, co-chair of the Great Christchurch Buildings Trust, said he was “delighted and relieved” to learn the cathedral could be repaired, and was certain the necessary funds could be raised. “It had been the argument of the church that the building was unrepairable. The question of whether restoration was possible or not has been answered – I think that will be a considerable relief to the community.”
Read more

Yes, the Bishop is dragging her heels but MONEY might change her mind. Watch the Press video for her public statement and body language.

Earlier documents commissioned by Great Christchurch Building Trust (GCBT), documents received 10 July 2012 via Mark Belton at Restore Christchurch Cathedral:

Christchurch Cathedral Structural engineering Review Final 27June2012
(PDF, 94.8 KB)

Christchurch Cathedral MRO prelim sketches (F)
(PDF, 3.9 MB)

Related Posts and Comments:
14.7.12 Rival newspaper on historic heritage #cathedral
2.3.12 Christ Church, Cathedral Square

Posted by Elizabeth Kerr

37 Comments

Filed under #eqnz, Architecture, Business, Construction, Democracy, Design, Economics, Heritage, Heritage NZ, Infrastructure, Inspiration, Media, Name, New Zealand, People, Politics, Project management, Property, Resource management, Site, Structural engineering, Tourism, Town planning, Urban design

Rival newspaper on historic heritage #cathedral

The Press editorial, today. Balanced.

### stuff.co.nz Last updated 08:31 14/07/2012
Editorial: Anglican diocese should give account
The pause in the demolition of Christ Church Cathedral is a positive sign that the building’s fate is not sealed. Its destruction, which had seemed the inevitable outcome of the Anglican Church’s stand, is now less certain as the Government and the diocese consider the Greater Christchurch Building Trust’s report that sets out a plan for the cathedral’s conservation. The result is the sense that, for the first time, the contending parties are in dialogue.

As The Press wrote about the consecration of the cathedral, in 1881, the building is “a symbol to our children and their descendants of the spirit which animated those who projected the settlement of Canterbury, a spirit which we who have come after have, however imperfectly, endeavoured to give form and shape to”.

The previous lack of serious dialogue had raised the temperature of the debate, causing unnecessary division in a city in need of unity. Positions had become entrenched, personal accusations were too common and the tone was embittered. The pause to consider eases that tension, at least temporarily. Even if the Anglican hierarchy remains committed to demolition, the advocates of retention will at least have the consolation of knowing that they were listened to.
They certainly have given their cause the best chance of success by producing the Building Trust report. It is a considered document from prestigious engineers that gives a detailed account of how the cathedral can be saved with most of its features intact. The somewhat vague assertions that salvage was possible have now been hardened into a clear plan of action.
Read more

Commissioned by Great Christchurch Building Trust (GCBT), documents received 10 July via Mark Belton at Restore Christchurch Cathedral:

Christchurch Cathedral Structural engineering Review Final 27June2012
(PDF, 94.8 KB)

Christchurch Cathedral MRO prelim sketches (F)
(PDF, 3.9 MB)

Related Post:
2.3.12 Christ Church, Cathedral Square

Posted by Elizabeth Kerr

6 Comments

Filed under Architecture, Business, Construction, Design, Economics, Geography, Heritage, Inspiration, Media, NZHPT, People, Politics, Property, Site, Urban design

Friday stuff – Architecture

### guardian.co.uk Thursday 11 June 2009 08.30 BST
Shortlist for Britain’s top public architecture prize announced
By David Batty

An environmentally friendly ringroad and a school sports hall made from recycled freight containers are among the 24 finalists competing for Britain’s top public architecture prize.

One of the projects, picked from 125 submissions of new work from the public sector, will be chosen to win the ninth Prime Minister’s award for Better Public Building in October.

The competition was set up to try to improve standards not only in public sector architecture but throughout the building process, from procurement to interior decoration.
Read more

Public architecture award 2009 (15 pictures)
The Prime Minister’s Better Public Building award aims to show how ‘architecture of the everyday’ – streets, schools, bridges and stations – ranks among the most imaginative and beautiful designs being built today.
Selected highlights

****

### Engineering News 1 May 2009
Stadium projects safe and sustainable – Jordaan
By Philippa Levenberg

As the infrastructural phase of the 2010 FIFA World Cup preparation project nears completion, concerns emerge around whether the acquired assets, which will cost the South African government over R20-billion on completion, will be used after the final goal is scored.

In an interview with Engineering News, 2010 FIFA World Cup Organising Committee South Africa (OC SA) CEO Dr Danny Jordaan assures that the project, including five greenfield stadium projects, five stadium upgrades and the development of associated public transport infrastructure, will deliver maximum returns on the investment for South Africa.

“In a developing country, the most important question to ask when planning and implementing a project of this nature is what the postevent use of the infrastructural investment will be,” says Jordaan.
Read more

****

### AIArchitect September 19, 2008
Miami Marine Stadium Wins Historic Designation
By Russell Boniface, Associate Editor

How do you . . . lead a restoration effort for an architecturally and regionally significant structure?

The City of Miami’s Historic and Environmental Preservation Board has nominated the Miami Marine Stadium for historic landmark status from the National Trust for Historic Preservation. Miami-based Friends of Miami Marine Stadium, under the umbrella of Dade Heritage Trust, has been working with AIA Miami in seeking to restore the 1964 concrete Modern structure that sits on the Virginia Key barrier island facing Biscayne Bay and features a view of the downtown Miami skyline.
Read more

****

### Architecture Week – Page D1.1 . 26 April 2006
Design Department
Recreational Morphing
By Brian Libby

A generation ago, the University of Cincinnati was a commonplace American commuter school riddled with surface parking lots, the campus severed by a busy thoroughfare. Despite being nestled in the heart of a large city, it felt suburban. But over the ensuing years, the university has undergone a billion-dollar makeover.
Read more

Brian Libby is a Portland, Oregon-based freelance writer who has also published in Metropolis, The New York Times, Christian Science Monitor, and Architectural Record.

****

### Architecture Week – Page D4.1 . 19 August 2009
Design Department
Magic Blue Box
By Terri Peters

A giant blue cuboid has sprung up in Copenhagen, Denmark. This striking scaffolding box wrapped in translucent blue fabric is the new Copenhagen Concert Hall. Designed by Pritzker Prize-winning French architect Jean Nouvel, with acoustic design by noted Japanese consultants Nagata Acoustics, the building is the new permanent home for the Danish National Symphony Orchestra.

Visitors arriving by train will find the immediate context of the concert hall strange and uninhabited, aside from the giant blue box. At first glance, there seems to be little more to this neighbourhood than a train platform. Seemingly marooned in a vast dusty wasteland — Nouvel has said he imagined the building as an asteroid crash-landed on the site — the building’s simple form comes alive at night as a massive projection screen for video and images, a glowing lantern surrounded by canals.

Nouvel has managed to create a world-class national concert venue for Copenhagen — something the city previously lacked — as well as the local heart for a growing community, mixing practical and high-performance Danish modernism with jubilant and theatrical French avant garde.
Read more

Terri Peters is a writer and designer based in Copenhagen and London.

5 Comments

Filed under Architecture, Design, Economics, Geography, Inspiration, Stadiums