Delta | Infinity | CCC staff collude to defeat Yaldhurst residents (again)

Yaldhurst Subdivision (former Noble Subdivision)

S T A T E ● O F ● P L A Y

Christchurch City Council is failing to ensure compliance with the subdivision consent and is then assisting the developer Noble/Delta – Infinity/Delta, to screw the Yaldhurst residents.

[click to enlarge]

****

About five of the affected Yaldhurst residents gave deputations to the full meeting of the Christchurch City Council on Thursday, 6 July 2017.

Prior to the meeting, the Infinity Joint Venture of which Delta is a majority partner (with its $13m gift investment from Dunedin City Council) had convinced CCC staff to sway Christchurch City councillors to vote for the dedication of private roads as opposed to vesting ownership in the Council. This in the attempt to first defeat land covenants the affected residents have over the property registered in 2003 to protect their inclusion in any subdivision. However, Land Information New Zealand (LINZ) cannot accept roads vesting in ownership with the Council when there are any encumbrances on the land – such as the residents’ covenants.

For the residents, Colin Stokes, at the council meeting, distributed to councillors a review of what CCC staff have done over the years.

Of course, as the facts flow they continue to entwine around Delta.

The residents are fighting to protect and enforce their rights in the subdivision consent; and to halt Delta and their Southern associates’ onslaught against them.

****

Received from Colin Stokes (Yaldhurst resident and caveator)
Wed, 12 Jul 2017 at 9:16 a.m.

Thanks for your ongoing support Elizabeth

Chris Hutching’s piece (The Press 10.7.17) is weak and void of facts that present our case.

● We have Land Covenants registered over all the land in 2003 to protect our inclusion in any subdivision – our specific Access Lot road has to be formed and vested to Christchurch City Council standards with CCC as a term of extinguishment of the covenants.
● The encumbrance on the land prevent vesting of roads as LINZ won’t allow roads to vest with the council with them on.
● Infinity/Delta behind closed doors with CCC staff came up with a scheme to dedicate the roads under old rules (not compliant with the RMA and the subdivision consent) so as to circumvent our covenant protection.
● The real story is that CCC is breaking rules and NOT requiring compliance with the subdivision consent so as to cheat the residents of their protection and their interests protected by that protection so as CCC and the developer can cut them out of the subdivision.
● CCC and the developer Noble/Delta – Infinity/Delta have taken conditions out of the consent, varied the consent, and permitted non-complying undersized infrastructure that makes our part of the subdivision impossible – specifically stormwater pipes and basins required on the lower lying developers’ land which is where the consent (and physical topography and site layout) requires our stormwater to go.
● CCC failing to enforce the conditions of the consent as the law requires means our Access Lot road cannot be formed, meaning we can not subdivide.
● Delta with the misuse of mortgagee powers passed the property to itself, or at least part of the property ($13.4m of an $18.35m “sale” = 73% of which $12.5m was left in the property in passing it to Infinity in the orchestrated “sale”).

[ends]

****

Prepared Summary and Review with subdivision plans as tabled at Christchurch City Council’s meeting (6 July), to assist understanding:

███ D 2017 07 04 Summary and Review of Circumvention of Covenants for Councillors Yaldhurst (16 pages)

1 Plan RMA92009135

2 Plan RMA92009135 hlite

The coloured plan shows the residents’ Access Lot between green lines going from Yaldhurst Rd and then dog-legging east to west. What is inside the yellow border is what is within the Subdivision Consent (note there is an internal yellow small 2 sites that are NOT in the consent – and 3 other of the residents’ lots in common ownership on the NS leg are not included in the consent).

It is this east west leg of the Access Lot that requires widened roading to enable the Lots each side to be subdivided pursuant to:-
– 2002 Agreements for sale and purchase (and 2008 further agreement)
– 2003 Registered Land Covenant Protection [see Summary and Review, page 1 para 2 for terms of extinguishment]
– 2009 Subdivision Consent (Condition 5 and stormwater Conditions for it 9.) [see Summary and Review, page 5 para 12]

The problem is
– the Security Sharing Joint Venture (Noble/Delta/Gold Band) SSJV designed and constructed their part of the subdivision such that it made the East West Access Lot owners (residents) parts of the subdivision impossible AND that the Council permitted this.

– Undersized stormwater infrastructure was corruptly installed without consent to NOT include the residents’ subdivisions (all the while falsely assuring residents it did).

– The stormwater is required to be on land the residents transferred to the developer in return for this stormwater and other provisions. It is required to be there for numerous reasons including physical and legal reasons;
* Residents transferred the land in return for this provision
* 2003 Land Covenants protect this land for that provision (required for the Access Lot Road to be formed and vested)
* 2009 The Subdivision Consent requires it to be on the developers’ land (Condition 9.5 which “disappeared”) [see Summary and Review, page 5 para 12 and page 10 email 16 Feb 2010]
* Residents that are part of that subdivision consent have the legal rights to the stormwater (s134 RMA) – the Council is refusing to enforce the conditions of the consent; and permitted the developer to NOT comply with the conditions.
* Land topography and layout physically requires it to go there. The land slopes High NWest to SEast Low

– Delta went ahead and constructed the infrastructure without legal consent – [see Summary and Review, page 10 email 22 Aug 2012]
* This is akin to a builder building a house without consent.
* Council failed to issue an abatement notice for works being complete without consent, and to non-complying standards.

For all the Council staff failings, and the consent holders and JV partners’ failings and corruption of making the residents parts of the subdivision impossible:-
– Delta/Infinity and Council staff are recommending to the Elected Council to vote to circumvent the residents’ Land Covenants so:-
* the residents roading and subdivisions will no longer be protected and will be impossible;
* the JV Infinity/Delta will make more profit by not having to comply with the conditions of the consent that requires the residents’ roading and inclusion (as above)
* Council staff “mistakes” and wrongdoing of permitting non-complying works and not enforcing the conditions of the consent (as required by law) will be covered up.

– Delta and DCC was the facilitator of transferring the property from the Delta/Gold Band/Noble Joint Venture to the Delta/Infinity Joint Venture.
– Delta (illegally) owned 67.5% of the 1st mortgage and controlled Gold Band through their Security Sharing JV.
– Delta’s assurances it had nothing to do with the mortgagee sale is a lie.
– Delta refused to allow Gold Band to accept offers to redeem the 1st mortgage (illegal under s102 & s103 Property Law Act).
– DCC refused to allow redemption of the 1st mortgage.
– DCC (and Delta) refused to accept assignment of the 1st mortgage when Colin Stokes and another (as parties with interests in the land entitled to redeem) offered it to them
* had they done, Delta could have registered about an additional $16m in agreements to mortgage they were sitting on
* all that was required in return was “our little road” which is a LEGAL REQUIREMENT of the subdivision consent in any event.

[ends]

As reported by The Press, the eight-year dispute involving the stalled Yaldhurst subdivision has now gone to mediation between the property owners and the developers.
The dispute has been aired in several High Court cases between the private landowners and the developers, which are continuing.

Related Post and Comments:
11.7.17 Delta has deep fingers into 8-year subdivision dispute at Yaldhurst

█ For more, enter the terms *delta*, *aurora*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

Leave a comment

Filed under Business, Construction, Corruption, DCC, DCHL, Delta, Democracy, Design, Dunedin, Economics, Education, Finance, Geography, Housing, Infrastructure, Media, Name, New Zealand, OAG, People, Politics, Project management, Property, Public interest, Resource management, Site, Stadiums, Town planning, Transportation, Travesty, What stadium

Delta has deep fingers into 8-year subdivision dispute at Yaldhurst

Blind Justice (detail) by Beeler – Columbus Dispatch 2016 [caglecartoons.com]

****

### Stuff.co.nz Last updated 17:37, July 10 2017
Delta and Infinity’s Yaldhurst subdivision dispute at mediation
By Chris Hutching – The Press
An eight-year dispute involving developers and a group of property owners in a stalled Christchurch subdivision has gone to mediation. Late last year Dunedin City Council agreed to authorise its Delta Utilities company to refinance a $13.4 million outstanding debt to go ahead and complete the Yaldhurst development along with Wanaka-based developer, Infinity. To allow the development to proceed, Christchurch City Council staff recently recommended the unusual step of “dedicating” the access road rather than “vest” it with the council. But a representative of the private property owners, Colin Stokes, told city councillors that his group’s rights to compensation for land for the road had not been addressed. […] The dispute has been aired in several High Court cases between the private landowners and the developers, which are continuing. Most people who originally signed up to buy properties at the subdivision have pulled out and meanwhile Christchurch’s residential property market has cooled significantly.
Read more

****

Related Posts and Comments:
15.6.17 Site Notice : post(s) removal [we heard from Steve Thompson’s solicitors]
4.3.17 Christchurch housing : ‘If you build the right thing, buyers will still come’
17.2.17 Gurglars visits the Delta/Noble JV subdivision at Yaldhurst
2.2.17 Hilary Calvert complaint to Auditor-General #DCHL
30.12.16 Hilary Calvert on Deloitte report for Aurora/Delta
12.12.16 Deloitte report released #Delta #Aurora
7.12.16 Audit and Review, Deloitte
26.9.16 Delta #EpicFail —Epic Fraud #14 : The Election and The End Game revisited
22.9.16 DCC : Delta deal 1 Aug 2016 Council meeting (non-public) #LGOIMA
9.9.16 Calvert on DCC, ‘We could have a much more democratic and transparent operation of council’
2.9.16 Delta Yaldhurst : Local Opinion + Update from Caveators via NBR
18.9.16 Delta #EpicFail —Epic Fraud #13 : Councillors! How low can you Zhao ?
26.8.16 Delta #EpicFail —EpicFraud #12 : The Buyer Confirmed
24.8.16 Delta peripheral #EpicFail : Stonewood Homes —Boult under investigation
8.8.16 Delta #EpicFail —Epic Fraud #11 : The Buyer
3.8.16 LGOIMA requests to DCC from Colin Stokes #Delta #Noble #Yaldhurst
1.8.16 Delta #EpicFail —The End Game according to CD
31.7.16 Delta #EpicFail —Epic Fraud #10 : The Beginning of the End : Grady Cameron and his Steam Shovel
29.7.16 Delta #EpicFail —Epic Fraud #9 : The Long & Winding Road…. Leads Back to Delta’s Door
21.7.16 Delta EpicFail #8 : Cr Calvert goes AWOL, 23 Questions for Mr McKenzie —Saddlebags !!
19.2.16 Delta: Update on Yaldhurst subdivision debt recovery
17.7.16 Delta #EpicFail —Epic Fraud #7 : The Long & Winding Back Road
15.7.16 Delta #EpicFail —Epic Fraud #6 : What do you mean, Property Law Act ?
12.7.16 Delta #EpicFail —Epic Fraud #5 – Delta and the ghostly hand of Tom Kain
8.7.16 Delta #EpicFail —Epic Fraud #4 : Tales from the Courtroom….
30.6.16 Delta #EpicFail —Epic Fraud #3 : Security Sharing and not Caring….. who’s got that Constricting Feeling ?
27.6.16 Delta #EpicFail —Epic Fraud #2 : WWTKD – What Would Tom Kain Do ?
5.6.16 Delta #EpicFail —Noble Subdivision —Epic Fraud
13.3.16 Delta #EpicFail —Noble Subdivision : [rephrased] Conflict of Interest
11.3.16 Delta peripheral #EpicFail : Stonewood Homes and ancient Delta history
6.3.16 Delta #EpicFail —Nobel Subdivision : A Neighbour responds
29.1.16 Delta #EpicFail —Yaldhurst Subdivision ● Some forensics
21.1.16 Delta #EpicFail —Yaldhurst Subdivision

█ For more, enter the terms *delta*, *aurora*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

4 Comments

Filed under Business, Central Otago, Construction, DCC, DCHL, Delta, Democracy, Dunedin, Economics, Education, Finance, Geography, Housing, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Town planning, Travesty, Urban design, What stadium

Aurora with yet another headache

At Facebook:

****

****

Note this particular meat from Richard Healey’s Facebook post:
[my emphasis]

“If you have a property where the lines were built before 2001, then Aurora owns everything up to the house. The only exceptions are where the lines have been brought up to standard and a letter has been sent to the property owner transferring ownership of the lines or a prior agreement is in place. That has almost never happened in Dunedin. If you think that you have been billed, and shouldn’t have been, write to Aurora. If you don’t get redress file a claim.
If you would like to read the appropriate legislation, look up the electricity act 1992 and search for the definition of “point of supply”.
What does that mean? It means that it’s probable that thousands of Dunedin residents have been charged for maintenance to lines and poles that they do not own.”

Electricity Act 1992
Reprint as at 18 October 2016
http://www.legislation.co.nz/act/public/1992/0122/latest/DLM281858.html

Posted by Elizabeth Kerr

This post is offered in the public interest.

2 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Housing, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Stadiums, Tourism, Town planning, Travesty

Letter of opinion draws wide support, view not shared by deathly DCHL

ODT 9.1.16 (page 6)

odt-9-1-16-letters-to-editor-pillans-p6-1

Posted by Elizabeth Kerr

This post is offered in the public interest.

11 Comments

Filed under Aurora Energy, Business, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Sport, Stadiums, Tourism, Town planning, Travesty

Otago’s dangerous electricity network —Aurora’s INCONSPICUOUS and INEFFECTIVE public safety messaging

aurora-energy-safety-message-odt-online_2017-01-08-11-11-33

[smartphone screenshot 2017-01-08]

The advertisement (safety message!) appears at ODT Online.
Blink and you miss it!

This is what Aurora Energy puts out for You to access Public Safety information. A yellow box with some branding, lost amongst news stories within a plethora of webpages.

Did anybody read ODT Online this summer ?
Did anyone see the ad ?
Did anyone notice the weblink ?
Did anybody click on the link ?
Did anyone do up their seat belt or wear a life jacket ?
How do you stay SAFE around a dangerous power network ?
What do you look out for ?
What do you avoid ?
In an emergency, what do you do ?
What sort of emergency ?
Clear guidelines ?

Or, read as ‘So what’ from the DCC-owned company.

****

How extensive is Aurora’s public safety messaging across all available media these holidays —and typically, across a year ?

Is Aurora’s public safety messaging evolving to provide clear informational content to keep the public SAFE around the DANGEROUS and DEGRADED electricity network ?

****

The adverteaser, and the related web information (reproduced below) is at the very low end of public safety information required to prevent personal injury or death. There is little informational value beyond the obvious.

Real life scenarios you should guard against, what are they ?

Other lines companies create graphics, audio and short videos that clearly explain what to do and what NOT to do around electrical facilities and in emergency situations involving live electricity.

Not so Aurora.

This YELLOW-BLOCK commercial branding exercise is cheap, casualised, determinedly ineffective and fully irresponsible. Further, it merely links to what has been up at the Aurora website for some time, which is basic and untelling.

Here’s the Aurora Energy link and their bland factless webpage content:

http://www.auroraenergy.co.nz/safety/

Aurora Energy puts your safety first. We want all our customers, employees, contractors and the wider community to be safe around electricity. Always keep a safe distance from electrical equipment and take extra care when working around electricity.

You can take some simple steps to make sure that you, and others around you, know how to keep yourself safe when around electricity.
● Treat all electricity as live and never touch electrical equipment
● Report electricity faults to your electricity retailer via their faults number
● Phone 111 immediately if there is an injury or risk of a fire
● Follow safe work practice near electrical equipment
● If you see a tree that is growing near or into a power line, contact Delta to arrange pruning services
● Inform others around you of the dangers of electricity
● Be prepared in the event of a natural disaster or extended power outage.
 
Read our free guide to working safely around Aurora Energy’s electricity network (PDF) before working near our electricity network. We’re here to help and can provide you information and services to help you stay safe.
 
Our Public Safety Management System controls hazards that present significant risk of serious harm or major property damage. The System complies with the requirement of the Electricity (Safety) Regulations 2010. To report a potential hazard, please complete the Report a Hazard form or contact Delta.

****

If Aurora has conducted a full PUBLIC SAFETY CAMPAIGN IN OTAGO
across all available media – including dailies, community newspapers, schools, public libraries, council service centres, magazines, online noticeboards, radio, television, instant text messaging, flyers, billboard posters etc
—we have missed it.

It’s not ‘just’ dangerous poles and lines – it’s the condition of the other dangerous and degraded network assets (including conductors, transformers, cast iron potheads, cables, oil-filled switchgear, airbrakes etc) that the public needs to be concerned about.

Aurora Energy is NOT telling you about these : the condition of other network assets after 20-30 years of Dunedin City Council-owned companies’ inept management and criminal neglect of Otago’s power supply.

What would make the best Public Safety Campaign ?

****

The Aurora report by Deloitte made public on 12 December 2016 says:

Refer page 8 (1.5.9 Summary of Recommendations | Health & Safety), and page 31 (4.6. Health & Safety recommendations) – bolding by whatifdunedin:

The Board and management of Aurora need to adopt a more transparent approach with staff and the public. There needs to be acknowledgement of the state of the network along with detailed plans on how these issues are going to be rectified.

****

ODT 13.12.16
– “The Deloitte report did not include a detailed investigation of health and safety issues, but said risk had been increased by a lack of investment. “It is inevitable that this increases the level of risk inherent in the network that could have implications for staff and/or members of the public,” it said.”
– “Mr Cull also refrained from saying the network was unsafe, instead saying: “I don’t think it is as safe as it should be.”
– “[Richard] Healey said he was satisfied for the most part with the report, but not with the response from Mr Cull, DCHL chairman Graham Crombie and Mr [Steve]Thompson, who he said were all still trying to minimise the extent of the problem.”

ODT 21.12.16
– Grady Cameron: ““The accelerated programme uses additional internal and external resources to get the job done quicker. What won’t change are the safety, risk management and work practice measures we have for the safety of workers, contractors and the public.” The programme would prioritise the removal or repair of condition-zero poles close to schools, camping sites and other “high social” areas.”

ODT 24.12.16 ‘Poles spared as condition reassessed’
– “[Queenstown Lakes Mayor Jim Boult] asked Aurora to stabilise or replace condition-zero poles in the Queenstown, Wanaka and Arrowtown central business areas before Christmas.”

It’s not just about the poles.

Related Posts and Comments:
12.12.16 Deloitte report released #Delta #Aurora
30.12.16 Hilary Calvert on Deloitte report for Aurora/Delta
6.1.17 Message to Aurora/Delta : Upper Clutha dangerous poles DON’T MIX with Holiday Campers

█ For more, enter the terms *delta*, *aurora*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

20 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Sport, Stadiums, Tourism, Town planning, Travesty

Message to Aurora/Delta : Upper Clutha dangerous poles DON’T MIX with Holiday Campers

Four “condition zero” poles identified in Upper Clutha as needing to be replaced or reinforced before busy holiday period.

Other poles inside camping grounds identified as needing to be checked regularly by Delta staff during same period.

### ODT Online Fri, 6 Jan 2017
Problem power poles getting regular checks
By Tim Miller
Potentially dangerous power poles in Upper Clutha camping grounds are being checked regularly by lines company staff over the holidays. Before Christmas, Aurora Energy identified and checked the condition of poles in what were considered high-traffic holiday areas, such as camping grounds and parks in Upper Clutha. The company consulted the Queenstown Lakes District Council to identify the high traffic areas.
Read more

█ All 1181 condition zero poles in Otago expected to be replaced by April 2017.

****

At Facebook:

Related Posts and Comments:
1.1.17 A successful Lines company….
30.12.16 Hilary Calvert on Deloitte report for Aurora/Delta
28.12.16 Just beginning…. inquiries into council company rogues
27.12.16 Michael Lewis : The Undoing Project —Interview… #RNZ
25.12.16 The very idea
22.12.16 What GIVES : Aurora/Delta/DCHL/DCC…Energy Safety…ComCom ??
20.12.16 Aurora/Delta : RNZ’s Kathryn Ryan with Rod Oram
16.12.16 Tim Hunter, NBR —Aurora/Delta, DCC and ComCom
16.12.16 Delta #EpicPowerFail 8 —Stuart McLauchlan : contamination, code…
15.12.16 DCHL/Aurora/Delta unravelling
14.12.16 Bev Butler queries invoices for Delta hospitality at Stadium #LGOIMA
14.12.16 Aurora/Delta : Richard Healey on the [SOON departing] CEO
13.12.16 DCHL/Aurora/Delta ‘PR fashion statements’ fb DCC rates increases
12.12.16 Deloitte report released #Delta #Aurora
9.12.16 Deloitte report pending —Public Notice at ODT | Facebook entry
7.12.16 Delta/Aurora : Nobody’s willing to call it after misrepresentations
7.12.16 Audit and Review, Deloitte
3.12.16 Delta/Aurora : The Dirty Twist —EXTREME Misrepresentation…
1.12.16 Oi Grady— “It’s Us, Delta’s Electrical Workforce, unanimously!”
30.11.16 Delta #EpicPowerFail 7 : Kyle Cameron —The Money or the Bag?

█ For more, enter the terms *delta*, *aurora*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

3 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Hot air, Infrastructure, Media, New Zealand, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Site, Tourism, Travesty, What stadium

Hilary Calvert on Deloitte report for Aurora/Delta

ODT 30.12.16 (page 12)

2016-12-30-17-00-18

aurora-webpage-detail-as-at-30-12-16-safety
Aurora – Safety webpage (detail) 30.12.16

WorkSafe New Zealand
Contact WorkSafe 0800 030 040
http://www.worksafe.govt.nz/worksafe

Energy Safety
Part of WorkSafe New Zealand, Energy Safety acts as the regulator for ensuring the safe supply and use of electricity and gas in New Zealand. Energy Safety is responsible for providing an effective investigation, compliance, enforcement, and conformance regime for achieving electrical and gas safety outcomes.
http://www.energysafety.govt.nz/

Note: On Monday 4 April 2016, the new Health and Safety at Work Act 2015 (HSWA) came into effect. HSWA repeals the Health and Safety in Employment Act 1992, with immediate effect.

aurora-delta-bovver-boys-29-11-16-douglas-field-detail‘Delta’ bovver boys by Douglas Field 29.11.16 (detail)

On 19 October 2016 former Delta manager Richard Healey went public about workplace and public safety concerns at Dunedin and across Otago via TV3’s Story (newshub.co.nz).

From 19 October through November posts and comments at What if? Dunedin, including those by Richard Healey, focused on the dangerous network, and poor governance within the council owned companies Aurora/Delta, within the council’s holding company DCHL, and within the duly elected Dunedin City Council itself [relevant trimesters].

The full extent of the dangerous and deliberately degraded network is attributable to criminal negligence and extreme mismanagement of financial resources (public funds).

The young inexperienced chief executive of the companies Aurora/Delta, Grady Cameron, has personally resisted taking any blame for the dangerous network – note, the findings and advice of the 2010 report by LineTech Consulting, commissioned shortly after Cameron’s appointment, have failed to flow into various Asset Management Plans drafted by Aurora, subsequently.

As a result of Richard Healey’s revelations three investigations were to take place:

1. Deloitte report for DCHL (released 12 Dec 2016)
2. Energy Safety (WorkSafe) investigation (no date given for release)
3. Commerce Commission investigation – industry regulator (no date given)

The courts await.

I N ● J U S T ● O N E ● M O N T H

Related Posts and Comments:
28.12.16 Just beginning…. inquiries into council company rogues
27.12.16 Michael Lewis : The Undoing Project —Interview… #RNZ
25.12.16 The very idea
22.12.16 What GIVES : Aurora/Delta/DCHL/DCC…Energy Safety…ComCom ??
20.12.16 Aurora/Delta : RNZ’s Kathryn Ryan with Rod Oram
16.12.16 Tim Hunter, NBR —Aurora/Delta, DCC and ComCom
16.12.16 Delta #EpicPowerFail 8 —Stuart McLauchlan : contamination, code…
15.12.16 DCHL/Aurora/Delta unravelling
14.12.16 Bev Butler queries invoices for Delta hospitality at Stadium #LGOIMA
14.12.16 Aurora/Delta : Richard Healey on the [SOON departing] CEO
13.12.16 DCHL/Aurora/Delta ‘PR fashion statements’ fb DCC rates increases
12.12.16 Deloitte report released #Delta #Aurora
9.12.16 Deloitte report pending —Public Notice at ODT | Facebook entry
7.12.16 Delta/Aurora : Nobody’s willing to call it after misrepresentations
7.12.16 Audit and Review, Deloitte
3.12.16 Delta/Aurora : The Dirty Twist —EXTREME Misrepresentation…
1.12.16 Oi Grady— “It’s Us, Delta’s Electrical Workforce, unanimously!”
30.11.16 Delta #EpicPowerFail 7 : Kyle Cameron —The Money or the Bag?

█ For more, enter the terms *delta*, *aurora*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

delta-mobile-substation-willis-st-12-11-16-1-img_1206Mobile substation Willis St, Harbourside 12.11.16 [photo: Christchurch Driver]

Posted by Elizabeth Kerr

This post is offered in the public interest.

1 Comment

Filed under Aurora Energy, Business, Carisbrook, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Highlanders, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Site, Sport, Stadiums, Tourism, Town planning, Travesty, What stadium