Tag Archives: NZ Listener

South Dunedin stormwater pipes —getting past the desktop ICMP

Dunedin City Council (website) on Stormwater:

Stormwater is rain or snow runoff that does not soak into the soil.
When an area is developed, stormwater generally increases due to runoff from impermeable surfaces (eg roofs, roads, carparks, or compacted soil). It flows naturally from higher to lower ground, and ultimately discharges into natural watercourses such as wetlands, creeks, rivers or the sea. Land development results in the creation of both private and public stormwater systems, which collect and transfer stormwater to lower ground more efficiently. The public stormwater system is a network of drains, gutters, pipes, mud tanks, detention ponds, stormwater reserves and other associated infrastructure.

At other threads (here and here), contributor JimmyJones has cited the South Dunedin Integrated Catchment Management Plan (ICMP) to draw attention to the actual or perceived state of the stormwater pipes at South Dunedin. He believes the type of pipeways and the deteriorating condition of the pipes contributed to the June 2015 South Dunedin “flood event”, and will require budgeted upgrade.

But is the South Dunedin ICMP correct about the underground pipes and their condition?

Largely, the ICMP was a desktop assessment carried out by consultants for the Dunedin 3 Waters Strategy. Namely, Opus International Consultants and URS New Zealand (now trading as Aecom) in association with Dunedin City Council.

South Dunedin ICMP – Integrated Catchment Management Plan
Sth Dunedin ICMP (PDF, 11.1 MB)
Sth Dunedin Mapbook (PDF, 12.0 MB)

Read more about the 11 ICMPs for Dunedin here.

DCC says ICMPs are used for planning and management of the stormwater system. For each stormwater management area, or catchment, issues are identified and prioritised, and solutions are identified and implemented. The ICMPs are mainly in the metropolitan Dunedin area (including Mosgiel and Port Chalmers). They inform investigation and planning decisions and help focus council priorities for future operational and capital works. Implementing the ICMPs is also a key requirement of DCC consents to discharge stormwater into the coastal marine area. Further information is available on the Stormwater monitoring page, see also the Stormwater responsibilities page.

The Pipes at South Dunedin
Local water and drainage experts familiar with the stormwater system say:

Received.
Sat, 18 Jun 2016 at 10:52 a.m.

The South Dunedin ICMP report has been read, it’s “ok”. But it’s also described as “…glossy and costly for the consultant(s). Basically, such reports tell the Council stuff they neither read nor understand, but would have mostly been trivial knowledge (where accurate)” to local experts familiar with the design and day-to-day workings of the stormwater system.

“You can believe any part of [the ICMP] or not. It’s a desktop study, which speculates on pipe condition. Robinson and Hendry have read it and obviously don’t agree. Pipes last for an eternity with limited maintenance (other than blockage removal) provided there isn’t ground movement or corrosion (these pipes are concrete).”

Listener, June 11-17 2016, pp22-29 (not yet available online):

[excerpt —click to enlarge]
Listener11-17 Jun 2016 pp26-27_0003

ODT 13.2.16
“Mr Hendry believed South Dunedin’s infrastructure, which he spent six years helping build as a surveyor in the 1960s, would have been good enough to prevent much of the damage had it been properly maintained. […] My view is that these people out here, a lot of them have got nothing. Now they have got a hell of lot less. It’s not fair on them. Nobody’s come out and said ‘we were wrong. Something wasn’t done right’.”

█ Come to the Public Meeting in South Dunedin on Monday evening, hosted by the South Dunedin Action Group.

Related Posts and Comments:
17.6.16 So we’re going to play it this way #SouthDunedinFlood
● 16.6.16 Public Meeting: South Dunedin Action Group #AllWelcome
10.6.16 “Civic administration” reacts to hard hitting Listener article
● 6.6.16 Listener June 11-17 2016 : Revisiting distress and mismanagement
● 4.6.16 Johnstone review … DCC Infrastructure Services meeting 26.4.16
3.6.16 DCC —godsakes, how did it get to this? #flood #property damage
● 19.5.16 Johnstone review of 2nd DCC report #SouthDunedinFlood
29.4.16 Vandervis emails batch 2 #Dunedin #infrastructure #flood #mudtanks
27.4.16 Vandervis emails batch 1 #Dunedin #infrastructure #flood #mudtanks
27.4.16 DCC meeting and apology NOT Enough— #SouthDunedinFlood
20.4.16 DCC Politics : Release of Infrastructure Report #SouthDunedinFlood
14.4.16 South Dunedin flood risk boosters #ClimateChangeCrap #PissOffPCE
31.3.16 DCC: Infrastructure report 2 pending —Mudtanks & stormwater…
● 8.3.16 Johnstone independent review of DCC report #SouthDunedinFlood
2.3.16 DCC compels extensions on LGOIMA requests #SouthDunedinFlood
26.2.16 Mudtanks and drains + Notice of Public Meeting #SouthDunedinFlood
21.2.16 DCC infrastructure … report (30.11.15) subject to ‘internal review’ only
● 13.2.16 South Dunedin Flood (3 June 2015): Bruce Hendry via ODT
4.2.16 2GP commissioner appears to tell Council outcome… #hazardzones
4.2.16 Level responses to Dunedin mayor’s hippo soup #Jun2015flood
30.1.16 DCC Rates: LOCAL CONTEXT not Stats —Delta and Hippopotamuses
● 25.1.16 DCC: South Dunedin Integrated Catchment Management Plan (ICMP)
19.1.16 Listener 23.1.16 (letter): South Dunedin #Jun2015flood
16.1.16 NZ Listener 16.1.16 (letter): South Dunedin #Jun2015flood
14.1.16 ‘Quaking!’ Dark day$ and tide$ to come #Dunedin #Jun2015flood
10.1.16 Infrastructure ‘open to facile misinterpretation’…. or local ignore
5.1.16 Hammered from all sides #fixit [dunedinflood Jun2015]
24.12.15 Site notice: posts removed
● 3.11.15 South Dunedin Flood | Correspondence & Debriefing Notes released by DCC today #LGOIMA

Downloads:
Kerr, Elizabeth LGOIMA Correspondence Hendry and Williams 2015
Kerr, Elizabeth LGOIMA Flood Debrief Notes 2015

█ For more, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

12 Comments

Filed under Business, Climate change, Construction, Democracy, Design, District Plan, Dunedin, Economics, Education, Events, Finance, Geography, Health, Heritage, Housing, Infrastructure, Media, Name, New Zealand, Ombudsman, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

So we’re going to play it this way #SouthDunedinFlood

ODT 17.6.16 (page 10) —[click to enlarge]

ODT 17.6.16 Letter to editor Johnstone p10

whatifdunedin:

1. The claim of “factual errors” is surely able to be substantiated or thrown out by a suitably qualified (named) EXTERNAL peer reviewer acceptable to DCC and engineer Neil Johnstone. The ‘matter of degree’ (serious ?) is a matter for the peer reviewer to comment on. As are issues of professional competencies —which only an independent and transparent peer reviewer with nationally recognised engineering expertise can deal to. Not an in-house operational.

2. Neil Johnstone has issued three reviews, two of these deal to DCC’s formal reports on the June 2015 South Dunedin “flood event”, dated 30 Nov 2015 and 26 Apr 2016 respectively; and the third deals to comments (video recorded by Ch39 and published at DCC’s Youtube channel) during the DCC Infrastructure Services Committee meeting held on 26 April 2016. The reviews are published at this website – enter the term *johnstone* in the search box at right.

3. Neil Johnstone has requested that factual errors noted by DCC be made discoverable. DCC appears to be side-stepping qualification and quantification of its verbal assertions every which way.

4. It is highly likely that no expert external peer reviews exist or they would have been made public by now. More than a year after the “flood event”, we wait.

5. A peer review(s) is not something to hide. Why is DCC doing secret squirrel when challenged to substantiate its earlier comments (publicly stated on more than one occasion, recorded by mainstream media – for example, by Mayor Cull and Transportation’s Ian McCabe, who later resigned) – that external peer reviews of its formal reports did happen. After the fact is a little squiffy, if DCC is writing them now.

“Technical qualifications and experience with stormwater infrastructure design and management” are not provided. Rhetorical.

Holes being dug, an epitaph.

█ For related posts and comments, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

17 Comments

Filed under Business, Climate change, Construction, Democracy, Design, District Plan, Dunedin, Economics, Events, Finance, Geography, Heritage, Hot air, Housing, Infrastructure, Media, Name, New Zealand, Ombudsman, ORC, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

Public Meeting: South Dunedin Action Group #AllWelcome

SDAG Meeting Notice 20 Jun 2016 Nations Church 6pm[click to enlarge]

Date: Monday, 20 June 2016
Venue: Nations Church, 334 King Edward St, South Dunedin
Time: 6:00pm (1800 hours)

Facebook: South Dunedin Action Group
https://www.facebook.com/SouthDunedinActionGroup/

Message to Mayor David Cull

M E M O R Y • P R O B L E M S • C A N • H A P P E N • A T • A N Y • A G E
keep managed retreat and climate change out of local body politics

ODT 16.6.16 (page 12) —[click to enlarge]

ODT 16.6.16 Letters to editor Stedman Oaten p12

█ For related posts and comments, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

58 Comments

Filed under Business, DCC, Democracy, District Plan, Dunedin, Economics, Education, Events, Finance, Geography, Health, Heritage, Housing, Infrastructure, Media, Name, New Zealand, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Urban design, What stadium

“Civic administration” reacts to hard hitting Listener article

Election Year. This post is offered in the public interest.

S o u t h • D u n e d i n • F l o o d

Truth and decency are owed to the flood affected people of South Dunedin.

Interpretations post flood and in the months since —appear without technical evidence, making false claim to Climate Change (the ‘end is nigh’ if only to avoid local government liability), in contradiction to data and analysis provided by local engineers, ORC, MetService and former council staff, amongst others.

Listener 11-17 Jun 2016 p22 [20160606_154423] 36 June 2016
[post] Listener June 11-17 2016 : Revisiting distress and mismanagement #SouthDunedinFlood

‘Our leader’ is in a self-flagellating hole —prepared to say anything to attract votes in the October local body elections. Serious ? Genuine ?

We owe it to ourselves.
The Mayor of Dunedin should not get a third term.

‘Leadership’ has involved neglect of core council business – specifically, maintenance of key infrastructure network and services.

This has done too much damage: tens of millions of dollars of damage at South Dunedin. A massive hit sustained by constituents and insurers. Yet today ‘the administration’ rattles and unsettles the community it has comprehensively failed, with latest wanton burble at the opinion pages of the Otago Daily Times.

The Mayor should immediately resign his office at Dunedin City Council.

Bullshit from the Mayor and underlings is UNACCEPTABLE.
South Dunedin has a stormwater system that when properly maintained is well able to take rainstorms equivalent to that experienced a year ago.

Systems can always be improved but the current stormwater system is not all that old and has been designed with sufficient control mechanisms and stopgaps.

The Administration failed (for years) to deliver on budget, contracts, drain and mudtank maintenance; failed to check pump performance and screens at pumping stations during the June 2015 storm event; as staffing changed, failed to set in place procedures for weather events; failed to understand Civil Defence requirements for the most densely settled suburb of Dunedin; failed to adequately consider storm run-off from surrounding hill areas and the increase of impermeable surfaces as The Flat developed; failed to release stormwater to the ocean, etc etc……. but ultimately FAILED to put proper thought and planning to AVOIDANCE of Endangerment to the lives, health and livelihoods of thousands of South Dunedin residents.

Seriously. That’s the sort of ‘care and concern’ the gold-chained opinion-writer represents at ODT today. Further, there are Absolutely No Grounds to grease up the loophole backside of the technically inexpert Parliamentary Commissioner for the Environment.

The Listener article raises the issue of “mismanagement” during the rains of early June 2015. The liability rests at council doors.
That is a hammering public fact.

█ For related posts and comments, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

19 Comments

Filed under Architecture, Baloney, Business, Carisbrook, Climate change, Construction, Corruption, Cycle network, Democracy, District Plan, Dunedin, Economics, Events, Finance, Geography, Health, Hot air, Housing, Infrastructure, Media, Name, New Zealand, Other, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Stadiums, Town planning, Transportation, Travesty, Urban design

Listener June 11-17 2016 : Revisiting distress and mismanagement #SouthDunedinFlood

Listener 11-17 Jun 2016 p22 [20160606_154423] 3

R E S O N A T E S
Get the latest issue of New Zealand Listener (pp 22-29), more soon….

█ For related posts and comments, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

*Image: phoneshot at a diner by whatifdunedin [click to enlarge]

10 Comments

Filed under Business, Climate change, DCC, Democracy, District Plan, Dunedin, Economics, Events, Finance, Geography, Heritage, Housing, Infrastructure, Inspiration, Media, Name, New Zealand, ORC, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium