Tag Archives: Mudtanks

Regional state of emergency lifted in Otago (incl Dunedin & Waitaki)

Otago’s state of emergency has been lifted.
Emergency Management Otago this morning lifted the state of emergency which existed since deluges and heavy wind battered Otago’s eastern coast over the weekend. The region has now officially entered a recovery phase with teams moving on to assessing the damage and checking on the needs of those affected by the devastating floods. Emergency Management Otago group controller Chris Hawker, in Dunedin, said the move towards recovery did not signal any reduction in effort.

● Dunedin City Council (03) 477-4000
● Federated Farmers 0800 FARMING (0800 327 646)
● Otago Rural Support Trust 0800 787 254
http://www.rural-support.org.nz

****

DUNEDIN CITY COUNCIL

Dunedin July Severe Weather update
10.45am Monday 24 July 2017

State of Emergency lifted

The Dunedin State of Emergency was lifted at 9am today. Under the Civil Defence Emergency Act 2002 we are now operating under a Notice of Local Transition Period as we move into the recovery phase.
The transition period is in force for 28 days (expires 9am 21 August) unless extended or ended earlier. The notice still gives the local authority powers to carry out essential emergency-related work.
More information about the work happening as part of the recovery phase will be provided today. The work will be led by Dunedin City Council Recovery Manager Simon Pickford.

Evacuation map – Upper Taieri Pond (PDF, 3.3 MB)
Mill Creek ponding area (PDF, 2.3 MB)

██████ DCC TWITTER FEED AUTOMATICALLY UPDATING

Continue reading

64 Comments

Filed under Business, Central Otago, DCC, Dunedin, Emergency services, Fire and Emergency NZ, Health & Safety, Housing, Infrastructure, Media, New Zealand, North Otago, NZTA, ORC, People, Police, Property, Public interest, Queenstown Lakes, South Dunedin, Transportation

DCC ORC : Heavy rain warnings preparations #PublicNotice

See new post : Regional state of emergency declared in Otago in support of Dunedin & Waitaki

██████ DCC TWITTER FEED AUTOMATICALLY UPDATING

****

(sp) Oturehua, Ida Valley, Central Otago

****

At Facebook:

### ODT Online Fri, 21 Jul 2017
Storm hits: what you need to know

Oamaru
Oamaru and surrounds are bearing the brunt of the storm, with widespread surface flooding and some homes flooded.

Mosgiel
There is surface flooding in Mosgiel, which is being closely monitored.

Sandbags
Mosgiel people concerned about rising water can access sandbags and sand from the Memorial Park car park beside the stadium/Mosgiel Memorial Gymnasium.
Sandbags are also available in South Dunedin at the car park behind St Clair Tennis Club, Victoria Road.
Where possible, people should bring a shovel to fill the bags, although contractors are available on-site at both locations to assist with filling and loading.

Information centres
As a precaution the council has opened information centres in South Dunedin, in The Mercy Room, Catholic Social Services, 42 Macandrew Rd, and at Mosgiel Fire Station Theatre, 3 Cargill St.

Freedom Campers
Due to the weather the Dunedin City Council recommends all freedom campers find alternative accommodation rather than staying at either of the council’s two freedom camping sites tonight.

Roads
NZ Transport Agency has issued road warnings for surface water and flooding across Otago, including SH1 from Waipahi to Waitaki Bridge.
Warnings are also in place for SH88 from Dunedin to Port Chalmers, SH 87 from Kyeburn to Outram.
SH83 from Pukeuri to Duntroon is also affected by flooding and is closed between Gray Rd And Horse Gully Rd.
In Canterbury SH 82 Waimate To Kurow is closed.
SH1 is now closed between Pukeuri to Morven

Rivers
The Kakanui, Shag and Taieri Rivers, the Silver Stream, Water of Leith and the Lindsay Creek are all rising steadily.

Flights cancelled
Flights to and from Dunedin Airport have been cancelled this afternoon.
The cancelled flights include Air New Zealand flights to and from Auckland and Christchurch.
The Jetstar flight from Dunedin to Auckland at 4.15pm has been cancelled.
Air New Zealand is advising customers booked to travel to and from Dunedin to consult the arrivals and departures information on our website here for up to date schedule information.

Sports grounds
The Dunedin City Council has closed all sports grounds for the weekend because of the weather.
The club rugby semi-finals may still go ahead at Hancock Park on Saturday depending on the weather. The decision will be made by the Otago Rugby Football Union.

Power cuts
There are reports of power cuts in Oamaru. In Dunedin power has been cut to about 100 customers in Green Island, Fairfield and Abbotsford suburbs of Dunedin after a power line came down.
Aurora Energy says it has a response crew working to fix the fault and power was expected to be restored by 5pm.

General preparedness
The Dunedin City Council is encouraging all residents and businesses across the city to make their own preparations.
Residents in low-lying areas who feel concerned should make plans to self-evacuate themselves to stay with friends or family who live on higher ground should it be required later on.
Check on neighbours, particularly if they are vulnerable.
Check spoutings and drainage channels for blockages and clear them if necessary
If your basement is prone to flooding lift items that could be damaged by water off the floor. Be sure garden sprays and other chemicals won’t be affected
Check grates near your house for blockages and keep them clear of leaves and other debris to avoid water building up and affecting your property.
https://www.odt.co.nz/regions/storm-hits-what-you-need-know

Continue reading

22 Comments

Filed under Business, DCC, Dunedin, Health & Safety, Housing, Infrastructure, ORC, Property, Public interest, South Dunedin

Dunedin’s second generation district plan (2GP) —notes on Natural Hazards

Received from Neil Johnstone
Wed, 3 May 2017 at 7:19 p.m.

Message: Last Thursday (27 April) I presented the remainder of my submission on Natural Hazards. Notes attached in case they might help anybody’s further efforts.

{The notes from Mr Johnstone are public domain by virtue of the consultative 2GP hearing process. -Eds}

****

2GP PRESENTATION NOTES: LANDSLIDES
Neil Johnstone

I have no property interest in any landslide hazard area (although I did previously), nor in the Water of Leith catchment, nor in South Dunedin. My main purpose in appearing at this stage is to bring to the panel’s attention that the expert (so-called) opinions received from Otago Regional Council’s (ORC) natural hazard analysts are often deficient to the detriment of the 2GP process and the city’s residents.

I am a long-term resident of Dunedin and am highly experienced in flood control issues and solutions. I am appearing here on my own behalf, therefore not strictly as an Expert Witness in this instance, although I have done so in past years both in both the High Court and the Environment Court. I also acted as lead technical advisor to the NZ Govt investigation into the massive 1999 Clutha flood. My detailed investigations have ranged from simple issues such as the Water of Leith (as Investigations Engineer at Otago Catchment Board and ORC) to the entire Clutha catchment (in varying roles). These investigations have often incorporated the construction and operation of accurate, properly verified models.

I am now semi-retired MIPENZ, but still running my own consultancy on a reduced basis. I am a highly experienced expert in flood issues, I am much less so wrt landslide identification and mitigation (but I know a nonsensical report when I read one). ORC hazard analysts responsible for the landslide buffer zones originally imposed across my former property (and many others) need to accept that their approach was seriously flawed, and far from expert. Paul Freeland has mentioned to me in a recent phone conversation that Dunedin City Council (DCC) should be able to have confidence that ORC hazard analysts are expert. I have no strong criticism of Mr Freeland, but those days have passed – in this region at least – when expertise was based on proven performance, and not on a position’s title. A property previously owned by my wife and me in Porterfield Street, Macandrew Bay was quite ridiculously misrepresented in ORC’s landslide report of September 2015. The landslide hazard zone on that property has apparently now been removed, but uncaring damage has been done to us, and no doubt to many others. The Hazard 2 zone was reportedly imposed without site inspection, or without anybody properly reviewing output or checking accuracy of references.

[Reason for submitting: Natural Hazards section of 2GP dominated (undermined) by ORC hazards staff input and DCC failure to verify/review; DCC presumption that ORC “experts” do/should have appropriate expertise. We appear to be witnessing a proliferation of Hazard Analysts in NZ Local Government with little relevant experience or skill.]

****

2GP PRESENTATION NOTES: SOUTH DUNEDIN
Neil Johnstone

The comments re South Dunedin flood hazard contained in my original written submission were written prior to DCC’s producing its inaccurate flood reports in respect of the South Dunedin flooding of early June 2015 in which high groundwater levels were held to blame. These DCC reports were eventually released in late November 2015 and April 2016 respectively. My analyses (well after my original submission) demonstrated that the prime cause of widespread flooding in South Dunedin was DCC’s failure (in order of probable significance) to utilise the bypass facility at Tahuna Wastewater Treatment Plant, to fully utilise its stormwater pumping capacity at Portobello Road, and to maintain its stormwater infrastructure (mudtanks etc). Inflow of “foreign” water from the St Clair catchment added to the depth of inundation in some areas. All these can be remedied by a diligent Council. Some have already been remedied, as positively demonstrated in the admittedly rather over-hyped rain event of the subtropical cyclone remnant around this past Easter.

ORC natural hazard analysts were probably responsible for the origin of the groundwater myth as a cause of the South Dunedin flooding in their Coastal Otago Flood Event 3 June 2015 report. Reference was made there to “elevated” ground water levels. They followed up with a contentious report (The Natural Hazards of South Dunedin, July 2016). This opens by stating that the June 2015 flooding was caused by heavy rainfall and high groundwater levels, with no mention of mudtanks, or pumping failures (plural). Such reporting cannot be treated as balanced, nor its authors credible. Elsewhere, ORC essentially conceded the groundwater myth in Rebecca Macfie’s excellent NZ Listener article entitled Flood Fiasco (June 11, 2016).

Shortly after, however, ORC produced the aforementioned South Dunedin Hazards report (backed up by an embarrassingly inaccurate video presentation) that seems to reflect a desire to preach doom rather than convey a balanced defendable scientific analysis of South Dunedin realities and solutions where needed.

One of the worst features of the report and subsequent video was the depiction of projected permanently inundated areas of South Dunedin based on ORC modelling of rising sea level effects. These depictions made front page news in the Otago Daily Times with flow-on reporting nationally. The mapped areas of inundation are actually taken from an earlier ORC report entitled The South Dunedin Coastal Aquifer and Effect of Sea Level Fluctuations (October 2012). The modelling was based on limited information, and the findings would therefore be expected to be of limited reliability. The 2012 report essentially confirms this, noting that modelling of existing conditions overestimates actual groundwater levels (by the order of half a metre in places). Figure 2 (Scenario 0) of that report shows significant permanent ponding for current conditions. None exists in reality. Almost lost (in Section 3.8) are the following (abbreviated, and amongst other) concessions:

• Uncertainty of input data
• Potential inaccuracy of model predictions
• High level of uncertainty
• Groundwater system is poorly to moderately well characterised
• Aquifer properties are poorly understood or quantified
• Each of these uncertainties could have the effect of overestimating the groundwater ponding in the current setting.

The reader is advised to read the full Section 3.8 to ensure contextual accuracy. In my view (as an experienced modeller), a study that cannot even replicate known existing relationships is imperfectly calibrated and unverified. It cannot therefore be relied on. Strictly speaking, it does not qualify as a model. The relationship between possible sea level rise and consequent groundwater impact remains highly uncertain.

Unfortunately, the 2016 ORC South Dunedin Hazards report (and video) chose to reproduce the 2012 ponding predictions using more recent data (but without any better appreciation of aquifer characteristics), but the predictions are similar. It is noted that no Scenario 0 mapping is included in the latter report, nor are the model’s inherent weaknesses described. No admission of the potential modelling inaccuracies is presented other than the following note in Section 4.1: “Further discussion of the original model parameters, model calibration and potential pitfalls is included in the ORC (2012a) report, which can be accessed on the ORC website”. I believe that all parties were entitled to know unequivocally that the modelling was unreliable and unverified.

The 2016 report also makes reference to the fact that dry-weather ground water levels at the Culling Park recorder are at or below mean sea level. This is attributed by the authors to leakage of ground water into the stormwater and wastewater sewers. If that is correct (I would reserve judgement as to whether there may be other factors), then we are witnessing just one example of how an engineered solution could be utilised to dissipate increasing depth of groundwater. Such solutions are canvassed in the BECA report commissioned by DCC several years back.

To summarise, South Dunedin’s exposure to flood (current or future) is poorly described by ORC hazard analysts. The 2GP process seems to have seen these analysts “adopted” by DCC planners as their experts. I consider that to be an inappropriate approach to the detriment of our citizens.

The proposal to require relocatable housing in South Dunedin seems premature, and based on highly questionable information. The proposal for relocatable housing in South Dunedin also rather pre-empts the currently-planned DCC study of overseas approaches to sea level rise solutions.

Requiring relocatable houses will likely simply mean that aged houses that should in time be replaced will be repaired instead. Who is going to build a new relocatable house if they have nowhere to relocate to and probably insufficient money to acquire the requisite land? The proposal to require relocatable housing is ill-considered and premature in my opinion.

With respect to ground water issues across South Dunedin, the 2016 Hazard Report presents –

The reason for my pointing out these facts is to encourage Commissioners to take a step back from the current hysteria surrounding South Dunedin. Had the 2015 flooding extent been restricted (as it should have been) to that which occurred in a slightly larger rainfall event in March 1968, the event would have already been forgotten. Seemingly, at least partly as a result of that hysteria, the proposal to require relocatable housing in South Dunedin seems premature, and based on highly questionable information. Just as ORC floodplain mapping contradicts its in-place flood protection philosophy, so does the proposal for relocatable housing in South Dunedin also rather pre-empt the currently planned DCC study of overseas approaches to sea level rise.

Requiring relocatable houses will simply mean that aged houses that should in time be replaced will be repaired instead. Who is going to build a new relocatable house if they have nowhere to relocate to and probably no money to acquire the requisite land? The proposal for relocatable housing is ill-considered and premature in my opinion.

****

2GP PRESENTATION: URBAN STREAM HAZARDS
Neil Johnstone

Urban Stream Comment re Leith and Lindsay Streams:

ORC’s mapping is said to be of residual flooding (post-flood protection works of the past 80-plus years), but actually represents what might have been envisaged many decades back in something considerably greater than the record 1929 flood with none of the very significant channel works of the 1930s, 1940s and 1960s; or even those lesser improvement of the 2010s in place. The ORC 2GP mapping includes areas that didn’t get flooded in 1923 or 1929. I agree with some potential dangers of stream blockage (especially in Lindsay Creek, and to a lesser extent at Clyde Street and Rockside Road), but one can only consider locations of feasible blockage in today’s conditions. Furthermore, accepted professional practice for flood plain mapping requires detailed hydrology, probability analyses, climate change allowance, hydrograph routing, in-channel modelling (allowing for stream capacity variability), and overland flow modelling. ORC’s flood mapping incorporates none of these fundamentals; instead, it reads as little more than a colouring-in exercise, when a professionally researched technical document is required. In short, ORC’s hazard analysts have carried out no fit-for-purpose analysis for a District Plan process.

Interestingly, the concerns expressed by ORC hazard analysts re channel blockage are entirely inconsistent with ORC’s own design philosophy and consent application evidence for the recent Flood protection scheme (so called). Design Philosophy minimises the issue.

Very briefly, the mapping is challenged for the following reasons (inter alia):

No descriptions of the effective flood protection initiatives (OHB -1920s and 1930s, DCC -1940s, OCB -1960s) are included. These works have ensured that overtopping is practically impossible in the George Street to Cumberland Street reach, the Clock Tower reach and Forth Street to Harbour reaches. Flood protection in these areas are all built to a much higher hydraulic standard than the so-called ORC scheme of the past decade, and to a far, far higher standard than existed pre-1929.

It is further noted that ORC’s own Design Philosophy Report (OPUS for ORC, 2005) for the proposed Leith/Lindsay flood protection scheme is adamant that debris traps recently (then) constructed at Malvern Street and Bethunes Gully would further mitigate any debris problems. Refer paras 7.7 and 10.6 of that document.

Ponding is mapped where water couldn’t even reach in 1929 (peak flood currently estimated at 220 cumecs, and predating flood protection measures) in the wider CBD area. Flows along George Street in the 1920s only occurred south as far as about Howe Street, then re-entered the river. Nowadays, the accelerating weir above George Street and the structural high velocity channel immediately downstream provide much more clearance than existed in 1929. [Most outflow then from the river occurred much further downstream.] In those downstream reaches, many of the bridges have been replaced or upgraded. Possible remaining points of interest are the hydraulically insignificant extension (circa 2015) of the St David Street footbridge, the historic Union Street arch footbridge, and the widened (circa 2012) Clyde Street road bridge. The flimsy St David Street bridge would not survive any hydraulic heading up so there would likely be of little flood consequence, and backing up upstream of Union St would be largely inconsequential because of the height of the Clock Tower reach banks immediately upstream. The Clyde Street bridge is acknowledged as being lower than optimum, but it has not created any issues in its half century existence. Any overtopping there could only impact on a limited area between the bridge and the railway line.

Overland lows beyond (east of) the rail line remain highly improbable because of the ongoing blocking effect of road and rail embankments. Flows as far as the railway station to the west of the rail line are also highly improbable nowadays as only the Clyde Street area could conceivably contribute.

The 1923 photograph showing ponding along Harrow Street is presented by ORC with an unfortunate caption stating that the water is sourced from the Leith. Some undoubtedly was, but the whole of the city was subject to “internal” stormwater flooding from Caversham tunnel, across South Dunedin to the CBD and beyond. To illustrate further, a NIWA April 1923 flood summary (accessible online) provides a summary of some of the information more fully described in technical reports and newspaper accounts, including:

• Portions of Caversham, South Dunedin, St Kilda, the lower portions of central and northern areas of the City and North East Valley were completely inundated.
• Water in South Dunedin was waist deep.
• The Water of Leith rose considerably and burst its banks in many places, causing extensive damage along its banks and flooding low-lying areas.

Today’s stormwater infrastructure is rather more extensive and effective (when maintained), and DCC has a continuing legal obligation to provide to maintain that service.

The levels plotted across Lindsay Creek seem highly pessimistic. Levels are shown to be of the order of 2 metres above North Road in some locations at least. I have [no] knowledge of any such levels ever having been approached. Care must be taken not to include unfloodable areas in the mapping. I don’t however discount localised channel blockage, and the channel capacity is substandard in many areas. The valley slope ensures that overland flow will achieve damaging velocities. Such velocities are noted in the NIWA summary.

Of greater concern to me, however, is that ORC’s mapping appears to have seriously underestimated the significance of potential Woodhaugh flood issues:-

The river channel through here is both steep and confined. The influences of Pine Hill Creek (immediately upstream) and Ross Creek (immediately downstream) add to turbulence and bank attack. The area was ravaged in 1923 and 1929, and there have been evacuations in some much lesser events in later decades. These areas are at considerable risk in a 50- to 100-year plus event. Hardin Street, Malvern Street had houses evacuated in the 1960s flood. High velocity, rock laden flows and mudslides can all be anticipated, and difficult to counter. Area below camping ground / Woodhaugh was overwhelmed in floods of the 1920s – a focus for flooding depth and velocity.

If the 2GP process is to include urban flood maps, these should be diligently derived, based on historical record and appropriate modelling. The mapping should reflect the real flood risks (including likelihood, velocity and depth). The decreasing flood risk from Woodhaugh (potentially high impact) through North East Valley (moderate impact) through to the main urban area south of the Leith waterway (localised and of little-to-zero impact) should be reflected in the mapping.

[ends]

2GP Hearing Topic: Natural Hazards
https://2gp.dunedin.govt.nz/2gp/hearings-schedule/natural-hazards.html

█ For more, enter the terms *johnstone*, *flood* and *south dunedin* in the search box at right.

Related Posts and Comments
6.6.16 Listener June 11-17 2016 : Revisiting distress and mismanagement #SouthDunedinFlood
10.6.16 “Civic administration” reacts to hard hitting Listener article

[DCC Map differs from what was notified]

Posted by Elizabeth Kerr

This post is offered in the public interest.

8 Comments

Filed under DCC, Democracy, District Plan, Dunedin, Education, Geography, Health & Safety, Housing, Infrastructure, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, South Dunedin, Town planning, Urban design

DCC leases space for South Dunedin community hub at Cargill Enterprises

How many years has this taken DCC
It’s still only “temporary” accommodation….

South Dunedin has been waiting for a public library since the time of borough amalgamation.

Dunedin City Council – Media Release
Home found for South Dunedin pop up hub

This item was published on 02 May 2017

A home has been found for the South Dunedin pop up community hub. The Dunedin City Council this week signed a two year lease to set up a temporary hub in part of the Cargill Enterprises premises at 199 Hillside Road.

[screenshot – click to enlarge]
DCC Webmap – 199 Hillside Rd, South Dunedin JanFeb 2013

Group Manager Arts and Culture Bernie Hawke says, “We are delighted to have a confirmed location for the pop up hub. This is a well known, central location and we look forward to providing a range of services on site for local residents.”

The DCC is leasing about 200sq m, which includes space for community activities, meeting areas, DCC service centre and library activities, and kitchen and toilet facilities. The hub will also provide access to Gig wifi for the South Dunedin community. It is hoped the pop up hub will be open about mid year. As well as providing access to DCC services, the hub will provide an opportunity for the community to have input into the development of the permanent South Dunedin Community Hub. While the opening hours for the pop up hub are still to be confirmed, the hub is expected to be open about 25 hours a week, across five days and including one evening and Saturday morning.

Cargill Enterprises Chief Executive Geoff Kemp says, “Cargills are thrilled to be in a position to accommodate the city’s South D interim hub initiative. “A community centre and library adjoining the main facility will give our 94 staff easy access to the many services planned, particularly the opportunity to explore a wide range of reading material and multimedia. We view the hub as complementing our employer-led numeracy and literacy training programme. Very exciting!”

Mayor of Dunedin Dave Cull comments, “The establishment of the pop up hub shows the Council’s commitment to South Dunedin and is a key part of a much wider engagement with the South Dunedin community and agencies working in the area.”

DCC Chief Executive Officer Dr Sue Bidrose says, “When the pop up hub has been established, we will turn our attention to the location and development of the permanent hub. The signing of a lease for the pop up hub is an important step in this process. In addition to the pop up hub development, our Community Development team has been working alongside groups within South Dunedin to look at the social and economic needs and strengths of this community. As part of this, on 18 May we are organising a number of local community-based groups and individuals to meet to see if a collective action plan to support improved social and economic wellbeing can be created within the South Dunedin area.”

Contact DCC on 03 477 4000.
DCC Link

Posted by Elizabeth Kerr

This post is offered in the public interest.

8 Comments

Filed under Business, DCC, Dunedin, Economics, Education, Finance, Infrastructure, People, Pet projects, Politics, Project management, Property, Public interest, Site, South Dunedin, Technology, Town planning, Transportation, Urban design, What stadium

Baron de Gurgelaars on “Accountability” @ #DUD #Delta

bender-futurama-cartoonswallpapers-net-1

Received.
Tue, 22 Nov 2016 at 7:34 p.m.

The Pimp from hell is back.

Le Baron de Gurgelaars on de French political system.

Le Interviewer: a qvestion

Le Cull de Mare- Cur, can you pls advise your council’s response to the suggestion that Delta is not involved in electricity generation.

Le Cull de Mare- Ve vill not find any vone guilty.

Le Interviewer- During 2016 your council has stuffed up on flooding, mud tank cleaning, paying Delta for a truck that did not exist in Dunedin, reducing the value of all houses in South Dunedin and not charging for water takeoff on the peninsula. What do you have to say about diese errors of judgement.

Le Cull de Mare- Ve vill not find any person guilty, particularly me.

During 2016, You personally blamed the flooding of South Dunedin on climate change. Do you believe that heavy rain did not fall on Dunedin prior to man’s intervention?

Le Cull de Mare- naturlich- Dunedin was a Desert.

During 2016- Fulton Hogan was exposed for not having any vehicle capable of cleaning the mud tanks and thus completing their mud tank contract. Did you consider a drawback of over $200,000 on their unperformed contract?

Le Cull de Mare- Nein, how can DCC staff get their Christmas bonuses without recourse to increase in rates unless they are allowed contractual licence (see poetic licence)

Le Interviewer- Today Cull de Mare, some properties in South Dunedin particularly Victoria street had reduced QV values. Whilst that will reduce their rates by 1%, their valuations can cause mortgagee sales by banks, increased weekly payments apart from divorces and suicides.

Le Cull de Mare- vot are you saying, you blame me for naming climate change for causing these personal catastrophes, you tink I am ze cause, vot u think I vant diese resulten?

Do u think I am Adolf Hitler?

De Interviewer-

Not Yet.

But power corrupts and absolute power corrupts absolutely.

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: cartoonswallpapers.net – Futurama Bender the Pimp

Leave a comment

Filed under Aurora Energy, Business, Climate change, Delta, Democracy, Design, Dunedin, Economics, Events, Finance, Geography, Health, Housing, Infrastructure, Name, New Zealand, OAG, Ombudsman, People, Pet projects, Politics, Project management, Property, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

Meanwhile . . . . #SouthDunedin

Received from Douglas Field
Tue, 20 Sep 2016 at 1:06 p.m.

cull-barks

Press Release: Greater South Dunedin Community Group

MEDIA RELEASE
18 September 2016

South Dunedin to grill election candidates this week

South Dunedin has emerged as a significant issue in the upcoming local body elections and as a result two candidate forums for councillors and mayoral candidates have been organised this week by the Greater South Dunedin Community Group, acting chair of the Greater South Dunedin Community Group Philip Gilchrist said today.

The forum meetings will hosted in the Mayfair Theatre on Tuesday 20th and Wednesday 21 September from 6.30pm – 9pm in order to provide all candidates with an opportunity to provide their views on the challenges and opportunities for this important part of the city.

An electronic survey sent out to the candidates before the forums has drawn responses from 34 of the 44 candidates standing for the Dunedin City Council. We believe the large number of responses is a recognition that issues concerning the future of South Dunedin are high on their list of priorities.

At the forums, candidates will be asked a question and then given two minutes to respond, and there will also be about 90 minutes when questions can be asked of the candidates from the floor. Previous meetings that our group has hosted have prompted vigorous and relevant questioning from the public and it is expected that this meeting will provide the similar level of interaction as the people of South Dunedin are now, at last, having their voices heard. The June 2015 flood has certainly brought South Dunedin to New Zealand’s attention.

We are pleased to be hosting the event in the magnificent Mayfair Theatre, which is the significant Heritage Building in South Dunedin, Mr Gilchrist said.

█ We attach a link to the survey responses:
The results are un-edited and can be downloaded or read online.
https://www.dropbox.com/sh/5xylrw1b16ciaet/AACcsRBhqCw1XpJRqVecerGHa?dl=0

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

1 Comment

Filed under Business, Democracy, District Plan, Dunedin, Economics, Finance, Geography, Health, Heritage, Hot air, Housing, Infrastructure, Name, New Zealand, OAG, Ombudsman, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

Johnstone on ORC report : ‘The Natural Hazards of South Dunedin’ (July 2016)

The Natural Hazards of South Dunedin – July 2016 [read online]
Otago Regional Council
ISBN: 978-0-908324-35-4
Report writers:
Michael Goldsmith, ORC Natural Hazards Manager
Sharon Hornblow, ORC Natural Hazards Analyst
Reviewed by: Gavin Palmer, ORC Director Engineering, Hazards and Science
External review by: David Barrell, Simon Cox, GNS Science, Dunedin

Received from Neil Johnstone
Sun, 29 Aug 2016 at 8:17 p.m.

Message: Misinformation on the causes of the June 2015 South Dunedin flood have abounded since the event. As if the victimised residents haven’t suffered enough from others’ inactions (before and during the event), they are now being subjected to a hazards discovery process whose vigour appears to be exceeded only by its own recklessness. Following are a commentary of the hazards approach adopted by the Otago Regional Council (ORC), and a summary of my investigations into the flood event that I commenced after the publication of Dunedin City Council’s first flood report back in November 2015.

You can download Neil Johnstone’s report or read it below (formatted slightly differently to suit the WordPress template).

█ Download: A REVIEW OF ORC REPORT THE NATURAL HAZARDS OF SOUTH DUNEDIN (1) (PDF, 587 KB)

AN APPRAISAL OF RECENT REPORTING OF SOUTH DUNEDIN HAZARDS

N.P JOHNSTONE, BEng (Civil), MIPENZ

1. Introduction

There is some irony that DCC and ORC should be planning “drop in” sessions for residents in respect of South Dunedin hazard issues during September 2016, some 15 months after the major flood. The prime cause of flooding in June 2015 was DCC’s failure to maintain its infrastructure (not just mudtanks), and its failure to operate its pump stations to their intended capacities. The subsequent spread of misconceptions (i.e. groundwater levels, rainfall significance etc) surrounding the flood causes was at least partly due to inaccurate ORC analyses and reporting.

Repetitive and new doubtful information emanating from ORC via its latest report has been noted. Presentations and an over-simplistic video production have been observed. A footnote covering these observations is included at the end of this appraisal.

Long-delayed DCC reports on causes of the South Dunedin flooding have already been strongly criticised by the author. Specifically discredited are misrepresentations of sea level, groundwater and rainfall ranking. Accepted now by DCC as factors (somewhat grudgingly, and depending on the audience) are mudtank blockage and Portobello Road pump station failures (plural); still to be fully acknowledged are the failures at Musselburgh Pumping Station.

Attention is now turned to significant parts of hazard reports produced by the Otago Regional Council and utilised by DCC.

2. Coastal Otago Flood Event 3 June 2015 (ORC, published October 2015)

This report deals with a wider area than South Dunedin. It is apparent that ORC staff never visited the flooding areas of South Dunedin on 3 June, but took advantage of fine weather to take some water level readings the following day. The opportunity for useful progressive surface water level recording was thus lost. Levels were collected at some 150 points on 4 June. ORC’s main conclusion was that “localised variations in topography were probably the main driver of flood depth”. Or, put another way, water depth was deepest where the ground was lowest. This seems hardly surprising, and even trivial. No attempt was made to explain the photographic images presented of extensive ponding remaining well after the rains had ceased. The phenomena of blocked mudtanks and unutilised pumping capacity went seemingly unnoticed.

The report does usefully reference ORC’s four borehole recorders of groundwater, but makes the somewhat misleading assessment that groundwater levels were “elevated” prior to the rainstorm. This misinformation was seized upon by agencies such as DCC and the Office of the Parliamentary Commissioner for the Environment to highlight climate change impacts.

Having obtained the actual groundwater level data from ORC via the LGOIMA process, the author was able to reveal this “groundwater fallacy” in reviews from February 2016, but it was not until the publication of NZ Listener’s article (June 11-17, 2016) entitled ‘FLOOD FIASCO’ that ORC admitted that pre-flood groundwater levels were in fact “just a little bit above average”. ORC now seems intent on resurrecting this fallacy.

The ORC report fails to address the real and key issues of pumping station failures (Portobello Road and Musselburgh), or comparisons with much lesser flood impacts in the larger rainfall event of March 8/9 1968.

The report states that the 2015 24-hour rainfall was the largest since 1923. This was patently incorrect, but again was utilised by DCC to divert blame from their role in the disaster.

3. The Natural Hazards of South Dunedin (ORC, published July 2016)

The report states unambiguously in its Opening Summary that the major flooding of June 2015 was “a result of heavy rainfall, surface runoff, and a corresponding rise in groundwater”. By now, most people are aware that the causes of the flooding’s disastrous impact were failure to optimally operate pumping stations, failure to clear mudtanks, and failure to deploy staff to key areas during the event. Again, none of these factors is addressed in ORC’s report.

The report presents a table on its second page entitled “Factors Which Can Influence Flood Hazard”. Examples of exaggerated negativity include:

1. Heavy Rainfall:
– Many recorded instances of rainfall leading to surface flooding.
– Heavy rainfall events have occurred frequently over the last decade.

Comment: These conclusions do not appear to be supported by the report’s text, and are vague, factually challengeable and alarmist. Prior to 2015, no major flooding had occurred in South Dunedin since 1968, and even that was minor by comparison.

2. Sea Level:
– Groundwater level fluctuates (by up to 0.5m near the coast) on a twice-daily cycle in response to normal ocean tides.

Comment: All of South Dunedin is near the coast; most of the area does not experience such large fluctuations. This should have been made clear by the inclusion of groundwater data from all 4 ORC sites across the plain, not just from Kennedy Street.

3. Seismic:
– Large earthquakes could result in increased flood hazard on the South Dunedin plain, due to liquefaction-related land subsidence or direct, sudden, changes in land elevation relative to sea level.

Comment: All areas of NZ have some susceptibility to earthquake damage. Dunedin is amongst the areas at lowest risk; no incidences of even minor liquefaction have ever been reported in South Dunedin, and little or no clearly liquefiable materials have been identified (Refer GNS, 2014*). Continue reading

27 Comments

Filed under Baloney, Business, Climate change, DCC, Democracy, District Plan, Dunedin, Economics, Finance, Geography, Health, Heritage, Housing, Infrastructure, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

South Dunedin mainstreet Hub : no direct relevance to distant Gasworks

as well as (pre-Election)
DESPICABLE DCC / ORC CLIMATE CHANGE MASSAGE

[click to enlarge]
DCC Webmap - South Dunedin Hub area incl gasworks museum JanFeb2013DCC Webmap – GREAT DISTANCE except by computer or Segway….
South Dunedin | from King Edward St (red) to Gasworks Museum (blue) via Lorne and Braemar Sts (green) – colour overlays by whatifdunedin.

█ DCC doesn’t need Athfield Architects to justify the LONG DURATION need and solution. No disrespect to colleague, the late Ian Athfield —or the current firm (love them heaps).

DCC, DO NOT OVER THINK THIS, FOR CRISSAKES
Give South Dunedin a community facility as was Promised YEARS AGO. Leave the goodie-two-shoes Gasworks Museum lobbyists out of it, or very much to the side. They mean well, but for too long they’ve been praying on the feckless DCC, soaking up Ratepayer dollars with little justification, and they keep wanting more.

COLLECTIVELY, WE HAVE LOCAL SOLUTIONS – WE DON’T NEED TO BE HELD BY THE HAND TO SET UP SOMETHING SO INCREDIBLY SIMPLE AS AN ECONOMICAL WELL-CRAFTED COMMUNITY HUB IN KING EDWARD STREET

How many people is this “out of control” Dunedin City Council wanting to Massage – BEFORE the October Local Body Elections.

VOTE BUYING
The CULL Stench around this is SO DISGUSTING.

Dunedin City Council – Media Release
Drop-in sessions start of community conversation on South Dunedin’s future

This item was published on 22 Aug 2016

A series of drop-in information sessions hosted by the Dunedin City Council and Otago Regional Council early next month are the start of a community conversation around South Dunedin’s future. The sessions will be at the Dunedin Gasworks Museum on Thursday, 1 September and Friday, 2 September.

DCC chief executive Sue Bidrose will be presenting information about what happened in the 2015 flood, how the current stormwater system works, and how the DCC plans to invest and work with the community in the future.

Ms Bidrose said that it was important to plan carefully for South Dunedin’s changing environment. It was also important to take the time to involve the community in the decision making along the way, rather than to just do things on their behalf.

“Addressing the challenges of the future requires the DCC and ORC starting to have conversations with the community about the challenges, and the expectations and options for what can be achieved. The rest of Dunedin’s population needs to be involved as well. There is a great opportunity to turn some of the challenges into opportunities and give confidence for long-term investment in the area. These drop-in sessions are the beginning of the process. The DCC will be actively seeking local people’s thoughts on these issues and working with the ORC on what the long-term responses might be. I’m looking forward to seeing as many people as possible from the South Dunedin area at the sessions.” –Bidrose [employed by ????]

ORC director of stakeholder engagement Caroline Rowe said the drop-in sessions were part of a wider South Dunedin community engagement plan, aimed at developing a conversation with locals and groups about managing the risks associated with the changing environment. Ms Rowe said they follow the recent release of the ORC’s Natural Hazards of South Dunedin report. The [BULLSHIT ORC] technical report pulls together information and analysis gathered over the past seven years on natural hazards facing the area, particularly the increased likelihood of surface flooding associated with rising sea level. [FALSE AND MISLEADING BULLSHIT]

Presentations, with accompanying video, will be at each session and people will have an opportunity to talk individually to staff from both councils. The hour-long sessions will be repeated several times, with Thursday sessions starting at 10am, 11.30am, 1pm, 4.30pm and 7pm. The Friday sessions will start at 10am, 11.30am, and 1pm.

Ongoing engagement planned for the next few weeks also includes briefings for support service agencies and other specific interest groups such as the South Dunedin Business Association, the Otago Chamber of Commerce, and school and early childhood centres.

Contact Sue Bidrose, chief executive DCC on 03 477 4000.

DCC Link

█ Feedback on the proposal can be provided online on the council’s website at http://www.dunedin.govt.nz/council-online/currently-consulting-on/current-consultations/south-dunedin-community-hub

The feedback period runs from Saturday, 20 August until 4pm on Monday, 29 August.

****

Mon, 22 Aug 2016
ODT: South D hub proposal unveiled
The Dunedin City Council is calling for feedback from residents on its preferred option for a library and community hub in South Dunedin before a report is presented to councillors next month. Council services and development general manager Simon Pickford and architect Jon Rennie, of Athfield Architects, presented the council’s preferred option to about 50 people at the Dunedin Gasworks Museum on Saturday morning. Under the $5.25 million proposal, a library would be built in the former BNZ building in King Edward St and the facility linked to the Gasworks Museum through Lorne St. Some facilities, such as a café, would be based at the museum. Mr Pickford said residents had until August 29 to provide feedback to the council on the proposal.

█ For more, enter the terms *south dunedin*, *flood*, *hazard*, *vandervis* (sane) and *cull* (VOTE Cull OUT) in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

40 Comments

Filed under Architecture, Business, Climate change, Construction, Cycle network, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Events, Finance, Geography, Health, Heritage, Hot air, Housing, Infrastructure, Media, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

ORC, DCC continuing Deceptions : Natural Hazards for #SouthDunedin

W H A T ● P L A N ?

ORC stakeholder engagement director Caroline Rowe said the sessions were part of a wider “South Dunedin community engagement plan”.

### ODT Online Tue, 9 Aug 2016
Sessions on natural hazards
By John Gibb
South Dunedin residents will be able to learn more about natural hazards facing the area through drop-in sessions to be held at the Dunedin Gasworks Museum early next month.
The Otago Regional Council is organising the September 1 and 2 sessions, in collaboration with the Dunedin City Council. The drop-in session on the first day will run from 1.30pm to 7pm, and on the second day from 10am to 2.30pm.
Last month the ORC released a report titled “Natural Hazards of South Dunedin”. This report consolidated information and analysis gathered over the past seven years on the natural hazards facing the area, particularly the “increased likelihood of surface flooding associated with rising sea level”.
Read more

W H A T ● R I S K S ?
Answer ……. M I S I N F O R M A T I O N via ORC Hazard Plans and Maps

F I G H T >>> To Protect Your Property Values

“In a report to be tabled at the ORC’s technical committee tomorrow, Ms Rowe said South Dunedin was “an integral part of the wider Dunedin community” and many people and groups had an interest in how its risks would be managed. The report said the ORC also planned several other communication activities over the hazards plan, this month and next.” –ODT

ORC : Combined Council Agenda 10 August – Public.pdf
● Go to Agenda Item 5 (pp 34-35)
2016/0988 South Dunedin Community Engagement Report
The report outlines the approach management is taking to the community engagement as was verbally communicated at the Technical Committee meeting held on 20 July 2016 where Council received the report entitled “The Natural Hazards of South Dunedin” and made the decision to “endorse further community and stakeholder engagement within a timely manner”.

[screenshot – click to enlarge]
ORC Report 4.8.16 South Dunedin Engagement Plan [ID- A924516]

General reading (Otago including Dunedin City District)
ORC : Natural Hazards

● Information coming to this ORC webpage: ORC committee report – natural hazards of the Dunedin district: technical documents

Natural Hazards of South Dunedin – July 2016

● See also, the DCC second generation district plan (2GP) hazard zone information and maps based on ORC data, via the 2GP Index page.

Related Post and Comments:
6.8.16 LGOIMA trials and tribulations with peer reviews #SouthDunedinflood

█ For more, enter the terms *flood*, *hazard*, *south dunedin* and *southdunedinflood* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

10 Comments

Filed under Baloney, Business, Climate change, Construction, Corruption, Democracy, Design, District Plan, Dunedin, Economics, Finance, Geography, Health, Heritage, Housing, Infrastructure, Media, New Zealand, OAG, Ombudsman, ORC, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

South Dunedin stormwater pipes —getting past the desktop ICMP

Dunedin City Council (website) on Stormwater:

Stormwater is rain or snow runoff that does not soak into the soil.
When an area is developed, stormwater generally increases due to runoff from impermeable surfaces (eg roofs, roads, carparks, or compacted soil). It flows naturally from higher to lower ground, and ultimately discharges into natural watercourses such as wetlands, creeks, rivers or the sea. Land development results in the creation of both private and public stormwater systems, which collect and transfer stormwater to lower ground more efficiently. The public stormwater system is a network of drains, gutters, pipes, mud tanks, detention ponds, stormwater reserves and other associated infrastructure.

At other threads (here and here), contributor JimmyJones has cited the South Dunedin Integrated Catchment Management Plan (ICMP) to draw attention to the actual or perceived state of the stormwater pipes at South Dunedin. He believes the type of pipeways and the deteriorating condition of the pipes contributed to the June 2015 South Dunedin “flood event”, and will require budgeted upgrade.

But is the South Dunedin ICMP correct about the underground pipes and their condition?

Largely, the ICMP was a desktop assessment carried out by consultants for the Dunedin 3 Waters Strategy. Namely, Opus International Consultants and URS New Zealand (now trading as Aecom) in association with Dunedin City Council.

South Dunedin ICMP – Integrated Catchment Management Plan
Sth Dunedin ICMP (PDF, 11.1 MB)
Sth Dunedin Mapbook (PDF, 12.0 MB)

Read more about the 11 ICMPs for Dunedin here.

DCC says ICMPs are used for planning and management of the stormwater system. For each stormwater management area, or catchment, issues are identified and prioritised, and solutions are identified and implemented. The ICMPs are mainly in the metropolitan Dunedin area (including Mosgiel and Port Chalmers). They inform investigation and planning decisions and help focus council priorities for future operational and capital works. Implementing the ICMPs is also a key requirement of DCC consents to discharge stormwater into the coastal marine area. Further information is available on the Stormwater monitoring page, see also the Stormwater responsibilities page.

The Pipes at South Dunedin
Local water and drainage experts familiar with the stormwater system say:

Received.
Sat, 18 Jun 2016 at 10:52 a.m.

The South Dunedin ICMP report has been read, it’s “ok”. But it’s also described as “…glossy and costly for the consultant(s). Basically, such reports tell the Council stuff they neither read nor understand, but would have mostly been trivial knowledge (where accurate)” to local experts familiar with the design and day-to-day workings of the stormwater system.

“You can believe any part of [the ICMP] or not. It’s a desktop study, which speculates on pipe condition. Robinson and Hendry have read it and obviously don’t agree. Pipes last for an eternity with limited maintenance (other than blockage removal) provided there isn’t ground movement or corrosion (these pipes are concrete).”

Listener, June 11-17 2016, pp22-29 (not yet available online):

[excerpt —click to enlarge]
Listener11-17 Jun 2016 pp26-27_0003

ODT 13.2.16
“Mr Hendry believed South Dunedin’s infrastructure, which he spent six years helping build as a surveyor in the 1960s, would have been good enough to prevent much of the damage had it been properly maintained. […] My view is that these people out here, a lot of them have got nothing. Now they have got a hell of lot less. It’s not fair on them. Nobody’s come out and said ‘we were wrong. Something wasn’t done right’.”

█ Come to the Public Meeting in South Dunedin on Monday evening, hosted by the South Dunedin Action Group.

Related Posts and Comments:
17.6.16 So we’re going to play it this way #SouthDunedinFlood
● 16.6.16 Public Meeting: South Dunedin Action Group #AllWelcome
10.6.16 “Civic administration” reacts to hard hitting Listener article
● 6.6.16 Listener June 11-17 2016 : Revisiting distress and mismanagement
● 4.6.16 Johnstone review … DCC Infrastructure Services meeting 26.4.16
3.6.16 DCC —godsakes, how did it get to this? #flood #property damage
● 19.5.16 Johnstone review of 2nd DCC report #SouthDunedinFlood
29.4.16 Vandervis emails batch 2 #Dunedin #infrastructure #flood #mudtanks
27.4.16 Vandervis emails batch 1 #Dunedin #infrastructure #flood #mudtanks
27.4.16 DCC meeting and apology NOT Enough— #SouthDunedinFlood
20.4.16 DCC Politics : Release of Infrastructure Report #SouthDunedinFlood
14.4.16 South Dunedin flood risk boosters #ClimateChangeCrap #PissOffPCE
31.3.16 DCC: Infrastructure report 2 pending —Mudtanks & stormwater…
● 8.3.16 Johnstone independent review of DCC report #SouthDunedinFlood
2.3.16 DCC compels extensions on LGOIMA requests #SouthDunedinFlood
26.2.16 Mudtanks and drains + Notice of Public Meeting #SouthDunedinFlood
21.2.16 DCC infrastructure … report (30.11.15) subject to ‘internal review’ only
● 13.2.16 South Dunedin Flood (3 June 2015): Bruce Hendry via ODT
4.2.16 2GP commissioner appears to tell Council outcome… #hazardzones
4.2.16 Level responses to Dunedin mayor’s hippo soup #Jun2015flood
30.1.16 DCC Rates: LOCAL CONTEXT not Stats —Delta and Hippopotamuses
● 25.1.16 DCC: South Dunedin Integrated Catchment Management Plan (ICMP)
19.1.16 Listener 23.1.16 (letter): South Dunedin #Jun2015flood
16.1.16 NZ Listener 16.1.16 (letter): South Dunedin #Jun2015flood
14.1.16 ‘Quaking!’ Dark day$ and tide$ to come #Dunedin #Jun2015flood
10.1.16 Infrastructure ‘open to facile misinterpretation’…. or local ignore
5.1.16 Hammered from all sides #fixit [dunedinflood Jun2015]
24.12.15 Site notice: posts removed
● 3.11.15 South Dunedin Flood | Correspondence & Debriefing Notes released by DCC today #LGOIMA

Downloads:
Kerr, Elizabeth LGOIMA Correspondence Hendry and Williams 2015
Kerr, Elizabeth LGOIMA Flood Debrief Notes 2015

█ For more, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

12 Comments

Filed under Business, Climate change, Construction, Democracy, Design, District Plan, Dunedin, Economics, Education, Events, Finance, Geography, Health, Heritage, Housing, Infrastructure, Media, Name, New Zealand, Ombudsman, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

So we’re going to play it this way #SouthDunedinFlood

ODT 17.6.16 (page 10) —[click to enlarge]

ODT 17.6.16 Letter to editor Johnstone p10

whatifdunedin:

1. The claim of “factual errors” is surely able to be substantiated or thrown out by a suitably qualified (named) EXTERNAL peer reviewer acceptable to DCC and engineer Neil Johnstone. The ‘matter of degree’ (serious ?) is a matter for the peer reviewer to comment on. As are issues of professional competencies —which only an independent and transparent peer reviewer with nationally recognised engineering expertise can deal to. Not an in-house operational.

2. Neil Johnstone has issued three reviews, two of these deal to DCC’s formal reports on the June 2015 South Dunedin “flood event”, dated 30 Nov 2015 and 26 Apr 2016 respectively; and the third deals to comments (video recorded by Ch39 and published at DCC’s Youtube channel) during the DCC Infrastructure Services Committee meeting held on 26 April 2016. The reviews are published at this website – enter the term *johnstone* in the search box at right.

3. Neil Johnstone has requested that factual errors noted by DCC be made discoverable. DCC appears to be side-stepping qualification and quantification of its verbal assertions every which way.

4. It is highly likely that no expert external peer reviews exist or they would have been made public by now. More than a year after the “flood event”, we wait.

5. A peer review(s) is not something to hide. Why is DCC doing secret squirrel when challenged to substantiate its earlier comments (publicly stated on more than one occasion, recorded by mainstream media – for example, by Mayor Cull and Transportation’s Ian McCabe, who later resigned) – that external peer reviews of its formal reports did happen. After the fact is a little squiffy, if DCC is writing them now.

“Technical qualifications and experience with stormwater infrastructure design and management” are not provided. Rhetorical.

Holes being dug, an epitaph.

█ For related posts and comments, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

17 Comments

Filed under Business, Climate change, Construction, Democracy, Design, District Plan, Dunedin, Economics, Events, Finance, Geography, Heritage, Hot air, Housing, Infrastructure, Media, Name, New Zealand, Ombudsman, ORC, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

Public Meeting: South Dunedin Action Group #AllWelcome

SDAG Meeting Notice 20 Jun 2016 Nations Church 6pm[click to enlarge]

Date: Monday, 20 June 2016
Venue: Nations Church, 334 King Edward St, South Dunedin
Time: 6:00pm (1800 hours)

Facebook: South Dunedin Action Group
https://www.facebook.com/SouthDunedinActionGroup/

Message to Mayor David Cull

M E M O R Y • P R O B L E M S • C A N • H A P P E N • A T • A N Y • A G E
keep managed retreat and climate change out of local body politics

ODT 16.6.16 (page 12) —[click to enlarge]

ODT 16.6.16 Letters to editor Stedman Oaten p12

█ For related posts and comments, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

58 Comments

Filed under Business, DCC, Democracy, District Plan, Dunedin, Economics, Education, Events, Finance, Geography, Health, Heritage, Housing, Infrastructure, Media, Name, New Zealand, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Urban design, What stadium

“Civic administration” reacts to hard hitting Listener article

Election Year. This post is offered in the public interest.

S o u t h • D u n e d i n • F l o o d

Truth and decency are owed to the flood affected people of South Dunedin.

Interpretations post flood and in the months since —appear without technical evidence, making false claim to Climate Change (the ‘end is nigh’ if only to avoid local government liability), in contradiction to data and analysis provided by local engineers, ORC, MetService and former council staff, amongst others.

Listener 11-17 Jun 2016 p22 [20160606_154423] 36 June 2016
[post] Listener June 11-17 2016 : Revisiting distress and mismanagement #SouthDunedinFlood

‘Our leader’ is in a self-flagellating hole —prepared to say anything to attract votes in the October local body elections. Serious ? Genuine ?

We owe it to ourselves.
The Mayor of Dunedin should not get a third term.

‘Leadership’ has involved neglect of core council business – specifically, maintenance of key infrastructure network and services.

This has done too much damage: tens of millions of dollars of damage at South Dunedin. A massive hit sustained by constituents and insurers. Yet today ‘the administration’ rattles and unsettles the community it has comprehensively failed, with latest wanton burble at the opinion pages of the Otago Daily Times.

The Mayor should immediately resign his office at Dunedin City Council.

Bullshit from the Mayor and underlings is UNACCEPTABLE.
South Dunedin has a stormwater system that when properly maintained is well able to take rainstorms equivalent to that experienced a year ago.

Systems can always be improved but the current stormwater system is not all that old and has been designed with sufficient control mechanisms and stopgaps.

The Administration failed (for years) to deliver on budget, contracts, drain and mudtank maintenance; failed to check pump performance and screens at pumping stations during the June 2015 storm event; as staffing changed, failed to set in place procedures for weather events; failed to understand Civil Defence requirements for the most densely settled suburb of Dunedin; failed to adequately consider storm run-off from surrounding hill areas and the increase of impermeable surfaces as The Flat developed; failed to release stormwater to the ocean, etc etc……. but ultimately FAILED to put proper thought and planning to AVOIDANCE of Endangerment to the lives, health and livelihoods of thousands of South Dunedin residents.

Seriously. That’s the sort of ‘care and concern’ the gold-chained opinion-writer represents at ODT today. Further, there are Absolutely No Grounds to grease up the loophole backside of the technically inexpert Parliamentary Commissioner for the Environment.

The Listener article raises the issue of “mismanagement” during the rains of early June 2015. The liability rests at council doors.
That is a hammering public fact.

█ For related posts and comments, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

19 Comments

Filed under Architecture, Baloney, Business, Carisbrook, Climate change, Construction, Corruption, Cycle network, Democracy, District Plan, Dunedin, Economics, Events, Finance, Geography, Health, Hot air, Housing, Infrastructure, Media, Name, New Zealand, Other, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Stadiums, Town planning, Transportation, Travesty, Urban design

Listener June 11-17 2016 : Revisiting distress and mismanagement #SouthDunedinFlood

Listener 11-17 Jun 2016 p22 [20160606_154423] 3

R E S O N A T E S
Get the latest issue of New Zealand Listener (pp 22-29), more soon….

█ For related posts and comments, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

*Image: phoneshot at a diner by whatifdunedin [click to enlarge]

10 Comments

Filed under Business, Climate change, DCC, Democracy, District Plan, Dunedin, Economics, Events, Finance, Geography, Heritage, Housing, Infrastructure, Inspiration, Media, Name, New Zealand, ORC, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

Johnstone review following DCC Infrastructure Services meeting 26.4.16 #SouthDunedinFlood

Election Year. This post is offered in the public interest.

B A C K G R O U N D
On and about 3 June 2015, South Dunedin was severely affected by stormwater flooding – the Council has since discussed why and how council-owned infrastructure failure occurred. The extent of stormwater damage to private property and the upheaval and distress for affected residents, property investors and businesses is undeniable. Council operationals refer to this as the “June 2015 Flood Event” in formal reports.

A public meeting coordinated by Dunedin South MP Clare Curran was held at South Dunedin on Monday, 7 March 2016. At the meeting the South Dunedin Action Group(SDAG) was formed. Group representatives headed by spokesman Ray Macleod have since met with the Mayor and council officials – the first meeting was held on Tuesday, 3 May 2016. A meeting with council staff has followed more recently.

Local media, the Otago Daily Times and Channel 39, are presently covering the anniversary and aftermath of the “flood event”. Noticeably, the city council has yet to formally apologise to all the many people affected by the lack of council-owned infrastructure maintenance and stewardship at South Dunedin during the rain event of June 2015.

Council ‘not liable for flood damage’ (ODT 27/11/15)
“The Dunedin City Council says it is not liable for private property damage caused by the South Dunedin flood, despite admitting problems with its pumping network prolonged the pain for residents …. The issue had been considered by the council’s lawyers and insurers, but the advice from both was the council was not liable, [council infrastructure and networks general manager] Mrs Stokes said.”

Otago Daily Times Published on Jun 4, 2015
Raw aerial video of Dunedin Flooding [Video courtesy One News]

DCC Reports and Responses:

● 30 November 2015 –Council
Agenda – Council – 30/11/2015 (PDF, 39.6 KB)
Report – Council – 30/11/2015 (PDF, 553.9 KB) ‘Infrastructure Performance During June 2015 Flood Event’ (McElhone)
Minutes – Council – 30/11/2015 (PDF, 121.8 KB) | Meeting Video

● 7 March 2016 –Letter, DCC Chief Executive [supplied by DCC]
Sue Bidrose to Neil Johnstone 7.3.16 (PDF, 653 KB)

● 20 April 2016 –DCC Media Release
Report on South Dunedin infrastructure performance during June 2015 flood released

● 26 April 2016 –Infrastructure Services Committee
Agenda – ISC – 26/04/2016 (PDF, 6.3 MB) [agenda and reports]
Item 5 Report, ‘South Dunedin Public Infrastructure Performance during June 2015 Flood Event Follow up’ (Stokes), pp 6-27
Minutes – ISC – 26/04/2016 (PDF, 123.0 KB) | Meeting Video

WEBSITE DISCLAIMER
The following content from consulting engineer Neil Johnstone is provided for your information and convenience. However, the site owner cannot accept any liability for its accuracy or content. Visitors who rely on this information do so at their own risk.

Reviews previously published at this website:
● 8.3.16 Johnstone independent review of DCC report #SouthDunedinFlood
● 19.5.16 Johnstone review of 2nd DCC report #SouthDunedinFlood

█ Third Review | dated 31.5.16
[With minor formatting changes for the WordPress template only. -Eds]

SOUTH DUNEDIN FLOODING JUNE 2015
A Follow-up Review subsequent to DCC Infrastructure Services Committee meeting 26 April 2016

By N.P. Johnstone, MIPENZ

DCC has produced 2 reports on infrastructure performance during the flooding that reportedly entered approximately 1000 houses and caused in excess of 100 million dollars of damage. I have previously produced 2 independent reviews that are highly critical of DCC’s Stormwater Infrastructure Report (November 2015) and its “follow up” (the “mudtank report”, April 2016).

I also attended DCC’s Infrastructure Services Committee meeting on April 26, and have sighted video recordings of that meeting, which were belatedly posted by DCC close to a month later. I have formed an opinion that DCC has not fully acknowledged its role in failing to prevent much of the flood damage, but (often unreasonably) blames external influences and alleged historical design deficiencies.

I had originally intended to present a blow by blow comment on proceedings of the meeting, but that has proved a bigger task than my time allows, and would probably prove as tedious as the meeting itself. I have preferred not to align statements with the individual staff or councillor that made them, but the reader can view the recording of the meeting at leisure. I can however, not resist the temptation to present the comments of one councillor who stated: I am heartened by how well staff have responded to the challenges…and we can be comforted, I think by the feeling that you are treating our assets like you would your own. South Dunedin residents who had their assets ruined might see things rather differently.

1. THE FLOOD EVENT OF MARCH 8/9 1968
The rainfall event of March 1968 was of the order of 10% greater than that of June 2015, on any comparison. This is incontrovertibly clear from readily available data, and thus demonstrates that the much greater flooding in the recent event should not have happened. DCC has consistently underestimated the significance of the 1968 rainfall.

2. PRE-EXISTING GROUNDWATER LEVELS
DCC has misinterpreted ORC reporting that groundwater levels prior to the onset of rainfall were significantly elevated. DCC has extrapolated this error to claim that no infiltration of rainfall into the ground was possible, thereby explaining away the record surface flooding. ORC’s data is readily available, and demonstrates that groundwater levels only started to increase in concert with the June 3 rainfall, proving that infiltration was both significant and (probably) normal.

3. RAINFALL SIGNIFICANCE
DCC, relying on superficial analyses of other agencies, have claimed that the 24-hour rainfall experienced in June 2015 was a 150-year event, then 100, then 60, then 100 again. The selection of 24-hour duration rainfalls is not entirely appropriate (being rather too long). Nevertheless, the March (or April) 1923 24-hour rainfall was much greater, the 1968 rainfall slightly higher (but ignored in analyses), and at least 2 others between the 1890s and late 1920s were similar, and possibly slightly lower. Analyses of shorter duration events would likely further reduce the assessed recurrence interval of the June flood. I believe it was a 30-year rainfall event at worst.

4. LANDUSE CHANGES
Increased impermeable areas have certainly increased runoff rates; based on DCC-supplied estimates of changes, I have estimated that these changes could have increased flood levels by up to 150mm. Ex-DCC engineers have expressed doubt as to the degree of landuse change. In any case, I would have expected additional stormwater infrastructure to have been installed to compensate.

5. MUDTANK BLOCKAGE
The degree of blocked mudtanks across the catchment was underestimated by DCC, until the release of the mudtank report in April 2016. The extent of the mudtank issue was finally confirmed then, at no great surprise to South Dunedin residents. An unseemly blame game ensued, and may not be over. DCC then took the stance that the plethora of blocked mudtanks had no impact on the depth of flooding across South Dunedin, but may have prolonged the flooding. The claim defies reason, and in part relies on DCC’s adherence to the zero infiltration myth.

6. PORTOBELLO ROAD PUMPING STATION
The partial blockage – and difficulties experienced in the clearing – of the screens at this pumping station has been well publicised, and may have added approximately 200mm to the depth of flooding. Less well publicised are the facts that no emergency staff visited the pump station until about noon on the day of the flood, and (apparently) only attended the station to attempt clearing the screens between visits to other locations during the latter part of the day. Equally poorly understood is that not all of the station’s pumps were operating throughout the flood event due to the manner in which pump cut-ins were programmed. No decision to override the pumps’ programming was made. No information on which pumps remained inoperative has been made available, so it is not possible to attribute the depth of flooding caused by the inability to clear screens, compared with that caused by poor pump management.

7. MUSSELBURGH PUMPING STATION
This pumping station has the ability to bypass the wastewater treatment plant and discharge sewage-contaminated stormwater directly to the ocean at Lawyers Head. The option was not taken in the June 2015 flood. By contrast, in the 1968 event the pumping option at Musselburgh was fully utilised to the extent that approximately 5m3/s was pumped to the ocean for a period of 24 hours. Such pumping would have proved effective as long as individual property gully traps were submerged by stormwater, and may have reduced flood depth by more than half a metre. It is not known (by me) whether a comparable benefit could be achieved under June 2015 conditions, but a very significant opportunity was apparently lost. No information on the Musselburgh station’s pumping operation in the June flood is included in either of DCC infrastructure performance reports.

8. INFRASTRUCTURE DESIGN LIMITATIONS
DCC has relied heavily on the belief that the stormwater system can only handle rainfall intensities of 4.1mm/hr, and therefore regular flooding cannot be avoided. This is contrary to historic reality. The 4.1mm/hr limitation only applies if DCC’s assumption of zero infiltration applies. The assumption has no validity, and the existing infrastructure is far more capable than DCC is stating.

9. EXTERNAL PEER REVIEW
One of the main reasons for the extraordinary delay in the presentation of the “mudtank” report was that a robust external peer review was to be obtained. Reference to such peer review has surfaced occasionally since, but no review has been published. I have sought a copy of any such review – or even confirmation of its existence – from DCC. No such review has yet been confirmed to exist.

10. INFRASTRUCTURE SERVICES COMMITTEE MEETING
Many of the above topics were discussed to a greater or lesser level of detail at the Committee Meeting on April 26. From sitting through the majority of the meeting and viewing video coverage of it later, it became apparent that Councillors’ understanding of the June 2015 flood causes was generally weak, and that many of their questions directed to staff were inadequately or confusingly answered, if they were answered at all. These included:

10.1 Pre-existing Groundwater Levels
Selective reference was made to ORC report text, but no data was referenced. The data disproves the assertion of high groundwater and zero infiltration.

10.2 Mudtanks
According to staff, mudtank blockage didn’t increase flood levels, yet a raised vegetable patch could.

10.3 Portobello Road Pumping Station
No information on unused pump capacity or its impact on flood levels was given (or sought); and the final word on the subject was that the only issue at the station had been debris blockage, now fixed.

10.4 Musselburgh Pumping Station
In response to a question re pumping rates at this station, the reply was to the effect that “we have no data on this, is there a follow-up question?” There wasn’t a follow-up question on the subject, despite its fundamental importance.

10.5 Infrastructure Design Limitation
The existing infrastructure was repeatedly deemed to be inadequate on the basis that only 4.1mm/hr of rainfall could be accommodated, once pipe storage was exhausted. There was no proviso given that this determination required the impossible condition of zero infiltration of rainwater into the ground.

This review does not exhaust my concerns with the technical presented at the meeting, but I can conclude the following with confidence:

i. Maintenance prior to the flood was inadequate;
ii. Emergency management during the event was poor;
iii. DCC’s understanding and reporting of flood issues remains unconvincing, especially without the benefit of promised external peer review.

31 May 2016

[ends]

█ For more, enter the terms *flood* and *south dunedin* in the search box at right.

Posted by Elizabeth Kerr

12 Comments

Filed under Business, DCC, Democracy, District Plan, Dunedin, Economics, Events, Finance, Geography, Heritage, Housing, Infrastructure, Media, Name, New Zealand, Ombudsman, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, What stadium

DCC —godsakes, how did it get to this? #flood #property damage

Rain_Madness01 [cartoonstock.com]

ONE YEAR AFTER THE JUNE 2015 FLOOD EVENT………………
“D for prolonged distress”

### ODT Online Fri, 3 Jun 2016
In limbo, sleeping in car (+ video)
By Vaughan Elder
A Green Island mother’s “nightmare” since last June’s flood has culminated in her being separated from her son, homeless and sleeping in her car. Tina Conway has pointed the finger at Dunedin City Council for her plight after staff repeatedly failed to discover a council mains pipe was leaking water on to her property, causing a bank to slip away in the June 3 Dunedin floods. It was almost 10 months after the floods and only after the Earthquake Commission (EQC) called in a private engineering company that the council fixed the pipe at the end of March.
Read more

Otago Daily Times Published on Jun 2, 2016
Dunedin South MP Clare Curran has called on the council to act quickly to remedy the situation.

“The first reaction of the DCC when faced with a situation whereby private property is damaged – particularly by water – is to run for the hills, disclaim any responsibility whatsoever and blame anything else.” Cont/
russandbev at ODT Online

A N N I V E R S A R Y
█ Read more about the aftermath of Dunedin’s June 2015 flood event at ODT tomorrow, Saturday.

Posted by Elizabeth Kerr

Election Year —this post is offered in the public interest.

*Image: cartoonstock.com – Rain_Madness01 | tweaked by whatifdunedin

16 Comments

Filed under Business, Climate change, DCC, Democracy, Dunedin, Economics, Events, Finance, Geography, Health, Housing, Infrastructure, Media, Name, New Zealand, People, Politics, Project management, Property, Public interest, Resource management, Site, South Dunedin, Travesty, What stadium

DCC stormwater drainage fails again #Dunedin (today!)

Jeff Dickie 20160523_085845Jeff Dickie 20160523_085800Jeff Dickie 20160523_085755Jeff Dickie 20160523_085738

Received from Jeff Dickie
23/05/2016 2:31 pm (GMT+12:00)

Subject: DCC DRAINAGE FAILS AGAIN

This is what flooding looked like at 3 Malvern St, Woodhaugh at 9.00am today. Residents were unable to access the property or easily vacate it for that matter. As with June 3 1915, flooding in this area was caused by a blocked mudtank. However, the mudtank itself is so far below specification that even when cleared it is not able to cope.

This was hardly a one in a 100-year rain event! This has consistently caused property damage and huge inconvenience.

The DCC has continually failed to attend to core business such as this. The mayor and council have been distracted with trivia, such as frivolous trips overseas, failed expensive projects such as cycleways and financially disastrous failed Delta property ventures.

The complete failure of such a basic core service as drainage is symptomatic of an administration and a mayoralty [not coping…] to the core! 

{Moderated. -Eds}

DCC Webmap - 3 Malvern St, Dunedin JanFeb 2013DCC Webmap – 3 Malvern St, Dunedin JanFeb 2013 [click to enlarge]

Posted by Elizabeth Kerr

71 Comments

Filed under Business, DCC, Democracy, District Plan, Dunedin, Economics, Geography, Housing, Infrastructure, Name, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, Town planning, Transportation

Johnstone review of 2nd DCC report #SouthDunedinFlood

Updated post
Sat, 4 Jun 2016 at 4:11 p.m.

DCC publications:

● 30 Nov 2015 (McElhone)
Infrastructure Performance During June 2015 Flood Event | Meeting Video

● 20 Apr 2016 (Media Release)
Report on South Dunedin infrastructure performance during June 2015 flood released

● 26 Apr 2016 Agenda (and reports) Infrastructure Services Committee
Item 5 (Stokes, pp 6-27) South Dunedin Public Infrastructure Performance during June 2015 Flood Event Follow up | Meeting Video

WEBSITE DISCLAIMER
The following content from consulting engineer Neil Johnstone is provided for your information and convenience. However, the site owner cannot accept any liability for its accuracy or content. Visitors who rely on this information do so at their own risk.

Received: 18 May 2016 [full text]

An Independent Review of DCC Report : ‘South Dunedin Public Infrastructure Performance during June 2015 Flood Event Follow up’

By N. P. Johnstone, MIPENZ

1. This review complements my peer review of DCC’s first flood report, published in November 2015. This review assesses the content of the second report (described henceforth as “the report”) published in late April 2016, and contextual statements made elsewhere by DCC staff and elected members. The author of the report is Ms R. Stokes. The technical qualifications and relevant experience of the report’s author are not stated.

2. I consider that there is a need for such a review for reasons of historical accuracy and context, the identification of solutions (which can only be achieved be if the problem is understood and acknowledged) and – most importantly – to provide a considered assessment of what South Dunedin’s current flood risk really is, noting that two events (of which only the recent one caused major inundation) in five decades does not suggest a current flood risk much different from that existing in many other established New Zealand communities, despite some landuse changes. It is emphasised that the flood had nothing to do with climate change, nor therefore does this review. The failure to understand the issues may lead to inaction or to inappropriate and expensive actions.

3. This review may be criticised for being repetitive on some issues, but the repetition is at least partly driven by the number of times challengeable information on the flood event and its causes has been circulated by DCC. In many respects, the report under review could be seen as a concentration of such challengeable information. The report is solely based on my research, knowledge and experience; any errors are therefore mine, but hopefully, few.

4. This review has led to the following conclusions:
4.1 Council’s continued insistence that the June 2015 rainfall event was the largest since 1923 remains erroneous;
4.2 Pre-existing groundwater levels were unexceptional, and had no impact on the flooding, contrary to claims made in the report, previously and subsequently;
4.3 South Dunedin does not have a significant imminent exposure to stormwater flooding. This finding is based on the original design parameters, historical performance, an absence of groundwater issues, and provided existing infrastructure is properly maintained, monitored and operated;
4.4 Problems at the Portobello Road Pumping Station caused elevated flood levels and prolonged the period of inundation, but the report acknowledges only the latter;
4.5 Similarly, the now-admitted failures to ensure that mudtanks were properly maintained impacted adversely on flood levels attained in some locations at least, and prolonged the period of inundation in many areas;
4.6 Comparisons with the 1968 flood event can be instructive in assessing the impact of Council failures in 2015 in terms of water level, disruption and cost. The report fails to make such assessments.

5. My review of the first report, written by Ms L. McElhone, was driven by DCC claims that the prime causes of the flood were high sea and ground water levels, a 150-year, then a 100-year, then a 63-year (and incidentally and extraordinarily now again a 100-year*) rainfall event, and confirmed that Portobello Road pumping station issues added not less than 200mm to peak flood levels. That review also demonstrated that the rainfall event of March 1968 was demonstrably larger than that of June 2015, but caused much less damage, and that land use changes added up to 150mm to flood levels (based on DCC’s unconfirmed data on impermeable areas). Any consented landuse changes should, in my opinion, have been compensated for in past years with additional infrastructure to maintain drainage standards and South Dunedin’s protection standards.
(*Ms Stokes to John Campbell on Checkpoint, 21 April 2016).

6. Exaggerated assessments of both the historical significance of the 2015 rainfalls and groundwater levels, and the absence of mudtank information originally helped DCC promote its position of zero liability. The mudtank maintenance failures are at last largely revealed in the new report; significant mudtank maintenance issues were previously reported by Cr Lee Vandervis as early as 2014, but were seemingly largely ignored by DCC. Paragraph 37 of the report which reads: “Mudtank maintenance and performance in general has been the subject of focus for a number of years”, appears vague, and therefore requires elaboration. The statement, if accurate makes the failures more disturbing. There is still some unfortunate reliance on the groundwater myth (paragraphs 2 & 32), and to the underestimation of the 1968 event (paragraph 20). There appear to be newly-entrenched positions at DCC that the existing stormwater system is inadequate, presumably based on the report’s paragraphs 23-27, and reinforced in recent public statements from Ms Stokes and Mayor Cull, that the flood would have occurred (or that a serious flood would have occurred) even if the current system including the mudtanks had operated at optimum. This review strongly disputes such claims, and uses the well-documented event of March 1968 as a very useful “model” for key comparisons between a contained flood (1968) and a disaster (2015).

7. The general understanding was that DCC’s second review was to concentrate in detail on the performance of mudtanks, and was to be peer reviewed. Detailed reporting and peer review processes were understood to be the reason for the extraordinary delays in publication. In reality, only paragraphs 33-61 deal with mudtanks issues and no peer review is included. It is noted that Mayor Cull confirmed to John Campbell on Radio NZ’s Checkpoint programme (22 April 2016) that peer reviews of the report had been produced. The peer review(s) could usefully have been attached to the report; failing that, the report’s author should have explained their absence. Continue reading

32 Comments

Filed under Business, Construction, DCC, Democracy, Design, Dunedin, Economics, Housing, Infrastructure, Name, New Zealand, People, Politics, Project management, Property, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design

South Dunedin Action Group: Notes of meeting with DCC (3 May 2016)

Received.
Friday, 6 May 2016 6:02 p.m.

From: Clare Curran [Dunedin South MP]
Subject: Notes from the Meeting with DCC on 3 May
Date: Fri, 6 May 2016 00:31:05 +0000
To:

Dear everyone
Further to my last email here is the notes taken by office from the meeting with the Mayor and senior Council management on 3 May.
This is to keep you informed and for transparency purposes.

A new meeting date will be set up soon and I will keep you all informed

Kind regards

Clare Curran

[begins]

Notes from meeting 3 May 2016
South Dunedin Action Group (SDAG) and mayor + senior management

Mayor Cull
– acknowledged that there was collective concern, that they were pleased to meet with the group and that the meeting provided the best place to provide clarifications
– Acknowledged that the process had been lengthy and frustrating, and “sloppy”
– Council was now very sceptical about evidence relating to the flood and had been let down. He added that they would not make any changes to anything without evidence.
– If the event occurred again even with the proper maintenance there would have been severe flooding
– Determined to make the system we have work the best that it can
– Agreed need another mechanism other than the ODT to communicate with the community
– Will consider the discussion and come back with a proposal for the next meeting with a smaller group

Laura McElhone. Group Manager Water and Waste
– All mudtanks had been cleaned in South Dunedin (marked with green spray)
– Screen has been redesigned at pumping station, work about to go to tender, installation expected July/August
– Screen currently cleaned weekly by contract with photograph for proof
– Proposed screen modifications would see a 4 part screen to allow for safer and easier cleaning – could not confirm bar spacing
– Approx. 100 manholes had been lifted (Oct/Nov 2015) to identify any siltation – none identified as a problem – map can be provided of manholes checked – this exercise will be repeated in Oct/Nov 2016
– Confirmed that with the work carried out or in progress expected reduction in level of water would be about 200mm – however difficult to predict because too many variable to undertake modelling
– On issue of foul sewage infiltration confirmed that work being undertaken in Kaikorai Valley was to reduce the pressure on the system before it came through to Caversham
– On the issue of diverting foul sewage to Green Island treatment works stated that it was only able to handle a certain amount as it had been set up for a different type of sewage
– With regard to pumping out to sea, confirmed that they now know who to contact at the ORC and will maintain valves to enable this to happen if necessary
– Advised Musselburgh pumping capacity cannot run at maximum [this is disputed by Darrel]
– Forecast received on 2 June was for 1/3 less rain – only after midday on 3 June did they receive prediction on the size of the event
– Definitely had contractors and staff monitoring and out in South Dunedin, but did not have enough people to cover the scale of event
– Door-knocking by DCC did not record the number of flooded houses [DCC has not been back to check]
– 1968 flood had two peaks so had time to recover [disputed by Darrel]
– Too many variables to accurately measure topographical data
– Understand need to reassure and quantify but have to be careful not to give false impression
– Advised that 4/5 engineers employed in planning and 6/7 at the delivery end – acknowledged the identified lack of a storm water specialist – currently under recruitment

Ruth Stokes. Infrastructure and Networks General Manager
– Contractors have been asked to verify status of periphery areas
– Need to build resilience in the community – have recognised need to contact secondary schools and community groups and extend beyond the ‘What’s the plan Stan” initiative

Sue Bidrose. Chief Executive
– Unable to provide a figure on the number of roads closed by DCC as the water washed the cones away.
– Civil defence, Fire and Police all advised DCC that only 20-30 houses had been flooded – suggested that volunteers sandbagging were not part of the information loop and therefore message did not get through to emergency services

Kate Wilson. Councillor
– Have been advocating for a rain radar for a number of years on the Taieri

David B-P. Councillor
– Not just South Dunedin affected but other areas also, we need answers to give the community reassurance that the system is operating

[ends]

█ For more enter the term *flood* in the search box at right.

Posted by Elizabeth Kerr

12 Comments

Filed under Business, DCC, Democracy, Dunedin, Economics, Housing, Infrastructure, Name, New Zealand, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin

DCC meeting and apology NOT Enough— #SouthDunedinFlood

Election Year : The following post is offered in the public interest. -Eds

Received today.

android-email-app [carleton.ca]From: Hilary Calvert
To: Dave Cull
Cc: Golds [Godfrey Dodd], All Elected Members, Vaughan Elder [ODT]
Subject: Re: Flooding

Thanks for copying us in.

May we know when you requested that the mudtanks were cleaned thoroughly?

I had thought that it was an initiative from Ruth Stokes, as part of the looking into and reporting back on the flood.

I am also interested in your “fact” that the stormwater system is not capable even at optimal condition and performance……. Do you mean that it was not then, or that it would not be even if we made adjustments and sorted out the mudtanks and fixed the screen/pump and made changes which we have signalled to the general stormwater system which flows through South Dunedin?

If council modelling showed the extent of the flooding would be precisely as it was in the event of that magnitude, what relevance had the problems with the screen/pump and the mudtanks? I guess all the problems in South Dunedin during the flood were localised problems and many of them as a result of water lying about, so did our modelling show that as well?

I understood that there was still more work to be done to understand what we could best do particularly about the interconnection between the water from various sources and what we could afford of the options available.

Do you see the governance part of the Council completely blameless in this process?
Since you have apparently arranged for the mudtanks to be cleared, surely you/we could have done something sooner.

Do we have a role at all in your view, apart from advising people they are wrong when it turns out we may have incomplete information?

As seems true for all of the information surrounding this horrible flood, the more information we receive the more questions we have.

Kind regards,

Hilary

_______________________________

On 26/04/2016, at 5:30 AM, Dave Cull wrote:

Dear Mr Dodd,
Thank you for your email. I am puzzled by the apparent assertion that I have blamed the 2015 June flooding on Climate Change. While that may be the root cause I don’t recall saying that. The cause of the flooding, as has finally been comprehensively reported (for a meeting today) was the fact that the stormwater system in South Dunedin is not capable, even at optimum condition and performance, of coping with the amount of rain that fell over that period. That is a simple calculation given the capacity of the system in both volume and pumping terms, and the severity of the event. The mudbank maintenance failure was reprehensible from both a contractor and staff oversight perspective, especially as exactly the same issue had been raised some four years ago and assurances given that it would not happen again. The fact that some mudbanks were not up to scratch may have caused some localised problems and perhaps prolonged the water lying, but they did not cause the extent of the flooding. That was exactly as Council’s modelling showed it would be in an event of that magnitude.
Six years ago Council received reports stating (among other conclusions) two things. First that more frequent and severe rain events were likely. Second that the stormwater system in South Dunedin was not capable of handling those. So flooding was very likely. Last year the Parliamentary Commissioner for the Environment issued a report showing that rising ground water, pushed up by sea level rise will increasingly afflict South Dunedin.
It’s most important to recognise that while stormwater and groundwater can each affect the other, they are different and have different causes.
The failure was operational and managerial as Council was repeatedly assured that maintenance was up to scratch.
Council’s challenge now is to address both stormwater and groundwater issues. We have already, at my request, ensured that the stormwater system is in the best shape possible as winter approaches, by having all the mudbanks cleaned properly. Additionally the screen at the Portobello Rd pumping station, which was blocked by debris carried by the overwhelming amount of water, will be replaced by July.
Council will consider that report which has taken such a frustratingly long time to get to us, and determine the next necessary steps.
At your request I have copied this to all elected members.

Dave Cull

_______________________________

From: Golds [Godfrey Dodd]
Sent: Monday, April 25, 2016 7:07 PM
To: mayor @dcc.govt.nz
Subject: FW: Flooding

Dear Mayor
I am sending you this email in that it may make you understand how one ratepayer views your complete failure in the flooding in South Dunedin
WE all know that climate warming is a fact but your glib PR spin and articles in the paper does nothing for your credibility and your lack apology shows that you and the council do not except responsibility for this lack of governance
It is sad that only one of the council appears to have enough bottle to ask you to do in an old fashion way the decent thing
My wish is that you pass this email as part of an agenda item a the next council meeting on how one ratepayer views your lack of understanding in the way a Mayor should carry out his role
I would interested in your reply

Regards
Godfrey Dodd

_______________________________

From: Golds [Godfrey Dodd]
Sent: Friday, April 22, 2016 10:00 AM
To: Andrew Whiley [DCC]
Subject: Flooding

Hi Andrew
It is with disappointment reading the failure of governance by the council I was a chairman in those days that was the title of a high school board If the school had a problem which effected the community you had to stand up and take the blame
I do not expect the council elected members to clean mud tanks but when there is failure of this size then the expectation of the community that something is seriously wrong with the governance of the council The glib excuses as regards rise in sea level is the catch cry of the council which you as a member are part of
In my view the council members should of put on gumboots and gone out with the CEO and inspected the mud tanks instead of waiting a year for a report It saddens me to find that people in South Dunedin were not accorded this Instead we had articles written that showed how out of touch the council members were These articles were part of the green PR spin which now blights any decision that this particular council makes All that was needed was clean mud tanks and clear governance by the members of the council not excuses I hope that this is a lesson that you as a council member takes on board when making decisions in the future
Kindest Regards

Godfrey Dodd

ODT 25.4.16 (letter to the editor)

ODT 25.4.16  Letter to editor Vandervis p10

Tue, 26 Apr 2016
ODT: Vandervis forcing mud-tank issue [+ Letters]
A series of emails released by Dunedin city councillor Lee Vandervis show he was raising concerns about the state of Dunedin’s mud-tanks as long ago as 2011. Cr Vandervis said he released the emails because only publicity forced the council to change its ways. “This publicity is going to make sure it really is sorted once and for all this time.” The release of the emails follows a report released by the Dunedin City Council last week into last June’s flood, which found 75% of mud-tanks in South Dunedin were not properly maintained.

Tue, 26 Apr 2016
ODT: Staff apology for mud-tank failure
Council staff were responsible for not properly overseeing mud-tank maintenance in South Dunedin, not councillors or the mayor, a senior staff member says. Council infrastructure and networks general manager Ruth Stokes started today’s council infrastructure services committee meeting by apologising on behalf of council staff for the failings identified in a report on last June’s flood. Dunedin Mayor Dave Cull and Crs David Benson-Pope and Lee Vandervis were among those who had raised mud-tank performance prior to the South Dunedin floods, and been given incorrect information by staff. “For that I would like to, on behalf of the executive, apologise,” Ms Stokes. The failure was a management failure and not governance one, she said.

lee pushing head in mudtank words [Douglas Field 26.4.16] detailDouglas Field 26.4.16 (detail)

Comment at ODT Online:

Mayor Dave Cull outraged
Submitted by JimmyJones on Tue, 26/04/2016 – 1:49pm.

Mayor Cull says he is outraged at the failure of Fulton Hogan and council staff to adequately ensure that the mudtanks were in working condition. He should also be outraged at his own poor leadership and failure to respond to developing problems. Under his leadership the city continued to build up a backlog of worn-out stormwater pipes and equipment waiting for funding to be allocated. With this lack of funding we have seen the inevitable result of a deteriorating stormwater system. The poor state of the stormwater system was the primary cause of the severity of the flooding at Kaikorai, Mosgiel and South Dunedin last year.

This under-funding of the stormwater renewals is not an accident. Every year the DCC Mayor and councillors decide and vote on this spending – and every year they vote to under-fund the stormwater renewals because they think that a new stadium and a new swimming pool and more bicycle lanes are more important than a functioning stormwater system. The Annual Plan shows that the under-funding will continue next year. Expect the deterioration to continue.

Related Post and Comments:
20.4.16 DCC Politics : Release of Infrastructure Report #SouthDunedinFlood

█ For more, enter the term *flood* in the search box at right.

Posted by Elizabeth Kerr

*Email image: carleton.ca – android-email-app

53 Comments

Filed under Business, Climate change, DCC, Democracy, District Plan, Dunedin, Economics, Events, Finance, Geography, Heritage, Hot air, Housing, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Urban design, What stadium

DCC Politics : Release of Infrastructure Report #SouthDunedinFlood

Election Year : The following post is offered in the public interest. -Eds

Flooding South Dunedin June 2015 photo by Paul Allen [listener.co.nz]Photo: Paul Allen

New Report [excerpt]—
DCC Flood Report 2 (2016) excerpt

Next meeting of the Infrastructure Services Committee will be held on Tuesday, 26 April 2016 at 1:30 pm or at the conclusion of the Planning and Regulatory Committee meeting (whichever is later) – Edinburgh Room, Municipal Chambers

PUBLIC AGENDA
1 Public Forum (page 4)
2 Apologies (4)
3 Confirmation of Agenda (4)
4 Declaration of Interest (5)
PART A REPORTS (Committee has power to decide these matters)
●● 5 South Dunedin Public Infrastructure Performance during June 2015 Flood Event Follow up (6-27)
6 Recycling Markets and Bin Contamination (28)
7 Northern Wastewater Schemes’ Options (34)
PART B REPORTS (Committee has power to recommend only on these items
8 Resolution to Stop a Portion of Peel Street, Allanton (44)
9 Road Name – Three Hills Subdivision (54)
PART A REPORTS (Committee has power to decide these matters)
10 Notification of Agenda Items for Consideration by the Chair

Agenda – ISC – 26/04/2016 (PDF, 6.3 MB)
The agenda and reports are located together in this file.

Dunedin City Council – Media Release
Report on South Dunedin infrastructure performance during June 2015 flood released

This item was published on 20 Apr 2016

The report on the South Dunedin infrastructure performance during the June 2015 flood event was released today as part of the agenda for the Infrastructure and Services Committee meeting next week.

The report concludes that while a number of factors contributed, the main factor was the highest 24-hour rainfall total in Musselburgh since 1923.

General Manager Infrastructure and Networks Ruth Stokes says the report outlines the known challenges with managing the South Dunedin catchment and highlights concerns about the performance of mudtanks and the Portobello Road pumping station during the event.

“Changes in the South Dunedin catchment since the stormwater network was designed, combined with operational challenges and high ground water levels, all contributed to the effects of the extreme rainfall event that occurred in June 2015.”

Mrs Stokes says the report shows that mudtanks weren’t maintained as required. As a result, a number of steps, including a full review and retendering of road maintenance contracts have been adopted. Other measures include accurately capturing data on the status of the mudtanks, a redesign of the Portobello Pumping station screen and the development of a communications plan to inform the community of the local infrastructure challenges and how to best plan for future events.

“However, given the volume of rainfall and the system at capacity during the June event, the water would have been unable to enter the network even if all mudtanks were clear.”

She says the DCC must now look at what measures can be taken to mitigate such events in future.

The DCC will soon be engaging with the community about these issues and what the long term responses might be.

Contact Ruth Stokes, General Manager Infrastructure and Networks on 477 4000.

DCC Link

Otago Daily Times Published on Jun 4, 2015
Raw aerial video of Dunedin Flooding
Video courtesy One News.

█ For more, enter the term *flood* in the search box at right.

Posted by Elizabeth Kerr

94 Comments

Filed under Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Events, Finance, Geography, Heritage, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

“O Oysters, come and walk with us!” #SouthDunedinFlood

Douglas Field Published Mar 31, 2016 | Republished Aug 17, 2016
The walrus and the carpenter

THE TIME HAS COME!!!!
We’re cabbages
And kings!!!!

Posted by Elizabeth Kerr

█ For more, enter the term *flood* in the search box at right.

5 Comments

Filed under Business, Democracy, Dunedin, Economics, Infrastructure, Name, New Zealand, Ombudsman, People, Politics, Project management, Property, Resource management, Site, South Dunedin

DCC: Infrastructure report 2 pending —Mudtanks & stormwater drainage #SouthDunedinFlood

Douglas Field Published on Mar 30, 2016 | Updated Jul 30, 2016
busy doin’ nonth’

Comments from Lyndon Weggery:

2016/03/31 at 11:12 am
Newsflash!!! – According to my DCC source the long awaited MudTank report will be tabled on Tuesday 26 April 2016 to the Infrastructure Services Committee. That’s nearly 11 months after the infamous event.

2016/03/31 at 3:34 pm
Elizabeth – aside from our patient waiting for the Mudtank report we are also waiting for any progress on a Council formal resolution dated 30 November 2015 requesting staff to implement a work programme etc to alleviate the flooding dangers to South Dunedin. So far nothing has happened and in the course of a polite discussion with Councillor Aaron Hawkins on Facebook on related matters I have asked him to check on progress. To his credit he has agreed to do so.

● ODT 5.3.16 New contractor for mud tanks
● ODT 25.1.16 April date for report on flooding

Council meeting 30 Nov 2015

Minutes – Council – 30/11/2015 (PDF, 121.8 KB)

Report – Council – 30/11/2015 (PDF, 553.9 KB)
Infrastructure Performance During June 2015 Flood Event [report 1]

17
INFRASTRUCTURE PERFORMANCE DURING JUNE 2015 FLOOD EVENT

A report from Water and Waste Services provided an overview of the extreme rain event of 3 June 2015, its impacts and the performance of the drainage infrastructure. It focused primarily on the impact of the events that were experienced in South Dunedin, as that had been an area of particular public interest.

The analysis presented in the report was based on a flow balance model that had been developed for the purposes of assessing the impact of pumping station performance. The flow balance model had also been used to assess the relative impacts of the high groundwater levels in South Dunedin that significantly increased the amount of runoff generated by the rainfall.

The rain event significantly exceeded the capacity of the stormwater system in South Dunedin. The post event analysis had identified some opportunities to improve the performance of the existing infrastructure in large scale rain events, but would not prevent serious flooding in a similar future rain event.

Work was already underway to redesign the screens at the Portobello Road pumping station to make it easier to keep them clear during large events and was expected to be completed during the current financial year.

The planned infrastructure improvements would slightly reduce the impact of future flooding. However extensive flooding of low lying areas in large scale rain events or long duration rain events remained highly likely, particularly if the rain event coincided with high groundwater conditions.

The General Manager Infrastructure and Networks and Group Manager Water and Waste commented on various aspects of the report and responded to questions from Councillors.

Councillor Thomson left the meeting from 3.52 pm to 3.55 pm and Councillor Staynes left the meeting from 3.54 pm to 4.35 pm during the course of questions. Councillor Vandervis left the meeting from 4.36 pm to 4.38 pm and Councillor Peat left the meeting at 4.38 pm.

Following questions it was moved (The Mayor/Wilson):

“That the Council:

a) Notes the report on Infrastructure Performance during the June 2015 Flood Event.”

b) Notes the serious implications and consequences of rising ground water levels in parts of Dunedin.

c) That staff investigate and report back on a work programme to address the issues caused by rising ground water levels in South Dunedin and other parts of the city.

d) Notes that the report should include:
i) Possible responses to a range of sea level and climate change scenarios.
ii) Budgetary, infrastructural and community implications of both scenarios and responses.
iii) Catchment wide stormwater systems, ownership and effective management.

e) Notes that Council’s long term aims, as much as possible, are:
i) that the environment of affected parts of Dunedin is improved to an acceptable level.
ii) that no Dunedin citizen, ratepayer or householder is seriously disadvantaged as a result of any measures taken to deal with the challenges of ground water and rising sea levels.”

Councillor Peat returned to the meeting at 4.42 pm.

During discussion the work of staff was acknowledged during the time of the flooding.

Following discussion Motion (a) was put and carried on a division 14:0 with one abstention.
For: Councillors Benson-Pope, Bezett, Calvert, Hall, Hawkins, Lord, MacTavish, Noone, Peat, Staynes, Thomson, Whiley, Wilson, The Mayor
Council minutes – 30 November and 14 December 2015 7
Abstention: Councillor Vandervis, on the grounds that the motion did not identify the major flood causes as he understood them

Motions (b) – (d) were put and carried on a division 13:1 with one abstention.
For: Councillors Benson-Pope, Bezett, Calvert, Hall, Hawkins, Lord, MacTavish, Noone, Peat, Staynes, Thomson, Wilson, The Mayor Against: Councillor Whiley Abstention: Councillor Vandervis

Motion (e) was put and carried on a division 12:2 with one abstention.
For: Councillors Benson-Pope, Bezett, Hall, Hawkins, Lord, MacTavish, Noone, Peat, Staynes, Thomson, Wilson, The Mayor Against: Councillors Calvert, Whiley Abstention: Councillor Vandervis

It was moved (The Mayor/Staynes):
“That the meeting adjourns for ten minutes.”
Motion carried

The meeting adjourned from 5.35 pm to 5.47 pm.
[Item 17 ends]

Dunedin City Council Published on Dec 7, 2015
Dunedin City Council – Council Meeting – November 30 2015
Agenda Item 17 from 1:09:50

Posted by Elizabeth Kerr

16 Comments

Filed under Business, Democracy, Dunedin, Economics, Infrastructure, Media, Name, New Zealand, Ombudsman, People, Politics, Project management, Property, Resource management, Site, South Dunedin

Cr Andrew Whiley easily points up Greenie Hawkins’ inadequacy #SouthDunedinFlood

LOUD Applause for Cr Andrew Whiley —whom Cr Hawkins thought he could sting with a little pop gun that blows bubbles. Greenie Hawkins is particularly keen was it(?) to stand in Waikouaiti Coast-Chalmers Ward at the next election, if that is his game in moving to Port Chalmers recently.

ODT 16.3.16 (page 14)

ODT 16.3.16 Letter to editor Hawkins p14 (1)

█ VIDEO Dunedin City Council – Council Meeting – November 30 2015
Published on Dec 7, 2015

### ODT Online Tue, 8 Mar 2016
South Dunedin needs some love from city
By Andrew Whiley [Councillor]
OPINION It is amazing how the future of South Dunedin has become such a political issue since the flood of June 3, 2015. […] It is a great community, with a vital shopping area, wonderful schools and proud citizens. It is a valuable area that just needs attention with the appropriate investment in services and maintenance. In my opinion, the flood of June 3 was exacerbated by the poor maintenance of the mud tanks and the issues around the Portobello Rd pumping station. The mud tank report has yet to come to the council but any resident in the area will tell you there was an issue with maintenance.
Read more

****

SOUTH DUNEDIN FLOOD | Stormwater Infrastructure Failure
After the DCC chief executive’s non-technical response to Neil Johnstone’s independent peer review of the DCC Water and Waste Services report 30 Nov 2015 [see too Neil Johnstone’s response to the chief executive’s letter]…. if I was Cr Andrew Whiley I wouldn’t put too much faith in DCC Transport’s forthcoming mudtank / stormwater drainage report —due for public release in April.

Remember that in advance of the two VERY LATE infrastructure performance reports was the DCC’s media statement that its lawyers and insurers had determined that the city council had no liability in connection with the [majorly devastating] flood event at South Dunedin on and about 3 June 2015.

█ 27.11.15 ODT: Council ‘not liable for flood damage’
“The Dunedin City Council says it is not liable for private property damage caused by the South Dunedin flood, despite admitting problems with its pumping network prolonged the pain for residents. […] The issue had been considered by the council’s lawyers and insurers, but the advice from both was the council was not liable, Mrs Stokes said.”

More:
12.10.15 ODT: Floods not expected to affect premiums
8.7.15 ODT: $2.75m flood bill for city
10.6.15 ODT: Mud-tanks did not worsen floods: DCC
9.6.15 ODT: Stream of complaints over mud-tank maintenance
8.6.15 ODT: Drains blocked, residents claim

****

MUDTANKS AND STORMWATER DRAINAGE

******Failed LGOIMA Request lodged by Elizabeth Kerr

From: Elizabeth Kerr
Sent: Monday, 25 January 2016 9:24 p.m.
To: Sandy Graham; DCC LGOIMA Information Request
Cc: Kristy Rusher; Elizabeth Kerr
Subject: LGOIMA Request – Ref No. 531420

Further to my use of the online form at DCC website:

Dear Sandy

LGOIMA Request – South Dunedin mudtanks and stormwater drains
Reference No. 531420

I request the following information:

1. Can Dunedin City Council tell me if all mudtanks and stormwater drains in the South Dunedin catchment have been physically cleared in the time elapsed since the 3 June 2015 flood?

2. How many times have these mudtanks and stormwater drains been checked and cleared since the 3 June 2015 flood?

3. Which contractor / subcontractor has been responsible for this monitoring and clearance work since the 3 June 2015 flood?

4. Who (name and staff position) at Dunedin City Council has been directly responsible for checking the contractor / subcontractor work since the 3 June 2015 flood?

5. Are there any items of stormwater infrastructure in the South Dunedin catchment that are known to be blocked or cannot be cleared (if for any reason), since the 3 June 2015 flood?

I look forward to your reply in digital format by email.

Kind regards, Elizabeth

Response

From: Kristy Rusher
Date: 26/01/2016 8:36 am (GMT+12:00)
To: Elizabeth Kerr, Sandy Graham, DCC LGOIMA Information Request
Subject: RE: LGOIMA Request – Ref No. 531420

Hi Elizabeth,

Thank you for your LGOIMA request. I have forwarded your questions to our Group Manager, Transport [Ian McCabe -Eds] for a response. As you are aware, a decision on your request will be made within 20 working days.

Regards,
Kristy Rusher

Kristy Rusher
Manager Civic and Legal, Civic
Dunedin City Council

Notice of Extension 1

From: Kristy Rusher
Sent: Tuesday, 23 February 2016 5:47 p.m.
To: Elizabeth Kerr
Subject: LGOIMA request – Mudtanks number: 531420

Hi Elizabeth,

The DCC is extending your request for information for 5 working days as meeting the time limits for the original request would unreasonably interfere with the operations of the Council (section 14(1)(a) of the Local Government Official Information and Meetings Act 1987).

Regards,

Kristy Rusher
Manager Civic and Legal, Civic
Dunedin City Council

Notice of Extension 2

——– Original message ——–
From: Kristy Rusher
Date: 02/03/2016 8:29 am (GMT+12:00)
To: Elizabeth Kerr
Subject: Re: LGOIMA request – Mudtanks number: 531420

Hi Elizabeth,

The DCC is currently extending your information request for a further 15 working days (section 14(1)(a) LGOIMA 87). This is because meeting the timeframes would unreasonably interfere with organisational priorities.

Regards,
Kristy

Sent from my iPhone

REQUEST DECLINED

From: Kristy Rusher
Sent: Monday, 14 March 2016 8:21 a.m.
To: Elizabeth Kerr
Subject: Information Request – Mudtanks.

Dear Elizabeth,

Your information request concerning mudtanks in the South Dunedin area has been declined, as this information will soon become publicly available in a report to Council in coming months (section 17(d) Local Government Official Information and Meetings Act 1987).

As we have declined your request, we are required to advise you that you may have this decision reviewed by the Ombudsman. The Ombudsman may be reached on the following contact details:

Email: info @ombudsman.parliament.nz

Free phone: [numbers deleted -Eds]

Regards,
Kristy Rusher
Manager Civic and Legal, Civic
Dunedin City Council

While the above correspondence was in play the following letter to the editor by John Evans (ODT 17.2.16) received reply from Mr Ian McCabe. Hmm.

ODT 17.2.16 letter to editor Evans p12 (1)

And further, Ms Ruth Stokes declared (ODT 5.3.16) that CityCare had been awarded the contract to clear South Dunedin mudtanks:

New contractor for mud tanks
The companies responsible for keeping South Dunedin’s mud tanks clean, and stamping new markings on the city’s cycleways, are set to lose $15 million worth of contracts with the Dunedin City Council. The decisions were confirmed yesterday, as it was also announced City Care – a Christchurch City Council-owned company already working in Dunedin – would clean all 1500 mud tanks in South Dunedin over the next month.
Read more

Related Posts and Comments:
● 8.3.16 Johnstone independent review of DCC report…
● 2.3.16 DCC compels extensions on LGOIMA requests #SouthDunedinFlood
26.2.16 Mudtanks and drains + Notice of Public Meeting #SouthDunedinFlood
● 21.2.16 DCC infrastructure report (30.11.15) subject to ‘internal review’ only…
● 13.2.16 South Dunedin Flood (3 June 2015): Bruce Hendry via ODT
4.2.16 2GP commissioner appears to tell Council outcome… #hazardzones
4.2.16 Level responses to Dunedin mayor’s hippo soup #Jun2015flood
30.1.16 DCC Rates: LOCAL CONTEXT not Stats —Delta and Hippopotamuses
25.1.16 DCC: South Dunedin Integrated Catchment Management Plan (ICMP)
19.1.16 Listener 23.1.16 (letter): South Dunedin #Jun2015flood
16.1.16 NZ Listener 16.1.16 (letter): South Dunedin #Jun2015flood
10.1.16 Infrastructure ‘open to facile misinterpretation’…. or local ignore
5.1.16 Hammered from all sides #fixit [dunedinflood Jun2015]
● 24.12.15 Site notice: posts removed
● 3.11.15 South Dunedin Flood | Correspondence & Debriefing Notes released by DCC today #LGOIMA

█ For more, enter the terms *flood*, *hazard* or *south dunedin* in the search box at right.

Posted by Elizabeth Kerr

17 Comments

Filed under Business, Climate change, Cycle network, DCC, Democracy, District Plan, Dunedin, Economics, Events, Geography, Heritage, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Resource management, Site, South Dunedin, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

Johnstone independent review of DCC report #SouthDunedinFlood

Semi-retired consulting engineer Neil Johnstone was invited to speak to his independent review of the DCC report, Infrastructure Performance During June 2015 Flood Event (30 Nov 2015), at Monday night’s public meeting held in South Dunedin.

Large numbers of local householders and business people, together with news media, filled Nations Church Auditorium at 334 King Edward Street, to examine why South Dunedin “flooded” on 3 June of last year.

Dunedin City Council personnel who didn’t bother to show up included Mayor Cull, CE Bidrose and members of the Executive Leadership Team (RLT). How many elected council representatives turned up —one, Cr Mike Lord (the question was nearly rhetorical although a couple of councillors had forwarded their apologies).

A fortnight ago Mr Johnstone sent a copy of his review to DCC chief executive Sue Bidrose. Notably, it took until the day of the public meeting for Ms Bidrose to acknowledge receipt and respond to the review by letter —DCC made sure to effect personal delivery to Mr Johnson’s home in Macandrew Bay, followed by an electronic copy some time later.

Copies of the review were circulated at the public meeting —these were in some demand!

Following the close of meeting, the reviewer kindly supplied What if? Dunedin with copy for publication.

WEBSITE DISCLAIMER
The following content from consulting engineer Neil Johnstone is provided for your information and convenience. However, the site owner cannot accept any liability for its accuracy or content. Visitors who rely on this information do so at their own risk.

An Independent Review if DCC Report
‘Infrastructure Performance during the June 2015 Flood Event’

1. Having lived most of my life in Dunedin and its environs (though never in South Dunedin), and having had a long career in natural hazard identification and mitigation, I am concerned with the standard of understanding and reporting of current natural hazard issues by our local Councils and, to a lesser extent by Government Agencies. I spent many years as Investigations Engineer at the Otago Catchment Board from 1986, and held a similar position at the Otago Regional Council until 2002. During those years I analysed numerous recent and historic flood events; none was more straightforward than the South Dunedin flood event of June 2015, and many were far more complicated. Now semi-retired, I still operate my own small consultancy.

2. In my opinion the DCC Report might best have been produced by independent experts, or – at the very least – have been subject to rigorous expert peer review. Current “victims” of the in-house reporting approach appear to include residents of South Dunedin who were affected by the June 2015 flood, and the wider population of the city and beyond who have been presented with information of questionable validity.

3. I have no personal interest in the South Dunedin area, but do jointly own a property elsewhere in Dunedin City. This paper only peer reviews DCC’s Report Infrastructure Performance During the June 2015 [Flood] Event. Further reviews of other hazard reports are planned. The reader can access online both DCC’s Report on the June 2015 flood event (referred herein to as “the DCC Report”) and ORC’s report Coastal Otago Flood Event, 3 June 2015 (referred herein to as “the ORC Report”). The latter is frequently referenced in the DCC Report.

4. The DCC Report is lacking in detail and thoroughness. It is short, but neither concise nor accurate, in my view. No reason is given why such a simplistic document took virtually six months to produce. By contrast, an earlier DCC report on the South Dunedin flood of 9 March 1968 took about a week to prepare following that event. My review is intended to provide alternative and more plausible explanations for the flooding experienced in June to those given in the DCC Report and accepted and promoted by some Councillors. I have used almost exclusively data provided by ORC and DCC publications. My approach is reasonably “broad-brushed”, but to a level of accuracy I believe limited only by the quality of data available.

5. Specifically, the DCC Report lacks objectivity in that it:

A. exaggerates the historical significance of the June 2015 rainfall,

B. repeatedly (and contrary to very clear evidence) identifies high groundwater levels as a prime cause of the flooding,

C. fails to discuss why staff did not (apparently) continuously attempt clearance of pumping station screens,

D. fails to adequately address the impacts on total runoff volume of reduced ground surface permeability due to land use change,

E. promotes a simplistic flow volume model that contains a key erroneous assumption,

F. fails to quantify ingress of “foreign” water from other sub-catchments, especially St Clair,

G. refers only briefly to the Shore St (Tainui) sub-catchment, and then fails to note that flooding was much less significant there than in the South Dunedin catchment or to explain the reason why,

H. defends the maintenance performance of mudtanks without providing any supporting evidence.

6. With respect to the above lettered points:

Point A: DCC has persistently exaggerated the significance of recent rainfall in the city. Initial claims regarding the June rainfall had it as a 150-year event, and (with respect to a disadvantaged peninsula property owner) reportedly claimed rainfall intensities increasing by 82% as a result of climate change. Now the June [flood] is stated in the Report to be a 63 year event. Such claims are all substantially in error. Rainfall in the March 1968 event is conceded in the DCC Report to be higher than in June 2015, yet the earlier event is omitted from consideration of flood frequency. Inclusion of the 1968 rainfall must substantially reduce the assessed return period of the 2015 rainfall.

Continue reading

65 Comments

Filed under Business, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Events, Geography, Heritage, Hot air, Infrastructure, Name, New Zealand, Ombudsman, People, Politics, Project management, Property, Proposed 2GP, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium