Tag Archives: Interested parties

DCC consents subdivisions without full consultation on stormwater & drainage

Guidelines on the New Zealand Bill of Rights Act 1990
Introduction to sections 27(1) to 27(3): The right to justice Link

Introduction to sections 27(1) to 27(3): The right to justice
Section 27(1) The right to the observance of the principles of natural justice
Section 27(2) The right to a judicial review of determinations
Section 27(3) Proceedings involving the Crown same as proceedings between individuals

█ RE: COUNCIL LIABILITY AND RISK | COST TO PROPERTY OWNERS AND RATEPAYERS —Non-notified v Notified Resource Consents

GUILTY PARTIES:
Mayor and Councillors, Hearings Committee, Chair of Infrastructure Services Committee, Chief Executive, General Manager Infrastructure and Networks, General Manager Services and Development, Group Manager Water and Waste, City Planning, City Development Team, Resource Consents Team et al.

ODT 12.9.15 (page 30)

ODT 12.9.15 Letters to editor Baldwin Lewis Poole p30

Related Posts and Comments:
27.8.15 DCC: Non-notified … consent Leith Valley 19-lot subdivision #ULCA
7.6.12 Dunedin stormwater: more differences between ORC and DCC
[240 Portobello Road and more]

Posted by Elizabeth Kerr

Leave a comment

Filed under Architecture, Business, Construction, DCC, Democracy, Design, Economics, Geography, Media, Name, New Zealand, Ombudsman, People, Politics, Project management, Property, Site, Town planning, Urban design, What stadium

DCC: Non-notified resource consent Leith Valley 19-lot subdivision #ULCA

259 Malvern Street Dunedin (LUC-2014-631)
This consent was an application to/for earthworks to form building platforms for 19-lot residential subdivision at 259 Malvern Street Dunedin. This was considered by the Council’s Senior Planner (Consents) on 1 January 2008.

DCC Non-notified Consent Decisions (2015) LUC-2014-631 [page 8 as at 26.8.15]
Source: DCC Non-notified Consent Decisions, page 8 as at 26.8.15

DCC Webmap - 259 Malvern Street (JanFeb 2015)DCC Webmap – 259 Malvern Street (Jan/Feb 2013)

Received from Jeff Dickie (Woodhaugh)
Wed, 26 Aug 2015 at 10:10 a.m.

Subject: dodgy valuations

There’s a 19-lot subdivision underway in Malvern Street, just past the bridge after Patmos Avenue. What makes this odd is that it was granted non-notified consent.

There is a ground swell of anger that this has been allowed. None of the residents knew anything about it until it was through.

It also appears to be within Dunedin’s Leith Valley Urban Landscape Conservation Area [ULCA24], that incidentally was foisted on me. I spent $25,000 fighting this including appealing to the Environment Court. I employed a QC, a barrister and an Environmental Planner. In summary, the Judge said I had a right to feel aggrieved. However, he was reluctant to make a ruling that could potentially open the floodgates to other cases against a local authority [DCC].

It meant people like me, and all the other affected re-zoned owners were privately funding a public visual amenity, a de facto reserve.

The reason I felt so aggrieved is that it has happened to me before with an eight and a half acre section directly opposite Millbrook in Queenstown. My partners and I have owned this for about 26 years and have been obstructed for that entire time. Surrounding us everywhere is quite intensive development and ours remains an island of undeveloped land. Our intentions had been for very restrained use, unlike our more successful neighbours, who are clearly “better connected” than us!

The Leith Valley case is odd. The ULCA was supposed to protect the rocky escarpment and bush area and the latest development doesn’t do that.

I’m not certain, but I’ve been told the developer is John Dunckley, a valuer.
He used to live on-site but now lives in Motueka. Ironically, he objected to a neighbour’s subdivision on the grounds of spoiling his view. One has to wonder how on earth this was granted by the DCC. A reward for favours past?

John Dunckley is the ‘stadium valuer’. He put the eye-watering $225M value on the just completed well over budget stadium. That in effect validated the cost overruns.

[ends]

It appears the developer Dunckley has chosen to push through with subdivision prior to public consultation of the proposed 2GP this year. Very possibly, the existing overlay of ULCA24 should have been one of the factors necessitating full public notification of the application for (land use) consent. The decision should be investigated or challenged due to the number of potentially affected / interested parties not made formally aware of the land owner’s or indeed the city council’s (covert) process and intentions.

DCC Rates Book - 259 Malvern Street - Three Hills Limited

Ratepayer: Three Hills Limited

NZ Companies Register:
THREE HILLS LIMITED 5547070
Incorporation Date: 23 Dec 2014
Company Status: Registered
Registered Office: 147b Redwood Valley Road, Rd 1, Richmond 7081
Address for service: 147b Redwood Valley Road, Rd 1, Richmond 7081

Directors (1 of 1):
John DUNCKLEY – 259 Malvern Street, Glenleith, Dunedin 9010

Total Number of Shares: 100
Shareholders in Allocation:
Allocation 1: 100 shares (100.00%)
John DUNCKLEY – 259 Malvern Street, Glenleith, Dunedin 9010
Ellen Jane DUNCKLEY – 259 Malvern Street, Glenleith, Dunedin 9010
Stuart James MCLAUCHLAN – 3 Walsh Lane, Maori Hill, Dunedin 9010

Subject Site at Leith Valley [screenshot]
DCC Compare Existing and Second Generation District Plans [259 Malvern Street + ULCA24]

█ For interactive comparative maps, go to District Plan Maps

Definition (Dunedin City District Plan):
Urban Landscape Conservation Areas – means those areas addressed in the Townscape Section and identified on the District Plan Maps which provide a landscape setting for the urban areas.

Dunedin City District Plan Volume 1
District Plan – Section 3: Definitions
District Plan – Section 13: Townscape

Dunedin City District Plan 13.8 ULCA

Source: Townscape, page 13:47 [screenshot]

█ The 2GP appears to reduce Dunedin City’s biodiversity in residential areas due to Dunedin City Council’s unconstrained support for private speculator/developers to subdivide property holdings and intensify/densify construction, resulting in the removal of existing ULCAs from significant and potentially regenerative conservational environments.

DCC on Natural Environment and Biodiversity
– in reference to the proposed second generation district plan (2GP)

Review of Urban Landscape Conservation Areas
A review of Urban Landscape Conservation Areas (ULCA) has determined that it has been applied in most cases to public reserves. A large number of these reserves are sports grounds with limited vegetation cover and do not meet the intent of a ULCA. Instead the ULCA Zone has functioned as a default reserves zone. The preferred approach in the new Plan [2GP] is to zone large reserves as part of a new Recreation Zone which will better recognise the values of reserves (refer to Q&A: Community and Recreation Activities). This will reduce the need to include such areas as a ULCA.

The approach to be taken with reserves in the 2GP provides an opportunity to reconsider the remaining ULCA areas and whether there are alternative approaches. Some large reserves, such as the Dunedin Town Belt contain extensive areas of vegetative cover that play a significant role in providing corridors for biodiversity and these values need to be recognised with a method that manages biodiversity. The ULCA also includes areas of private land, generally the vegetated steep sides of valleys or gullies, such as the Leith Valley, that provide biodiversity corridors. It is proposed to recognise their values in any method that manages biodiversity.
DCC Link

Posted by Elizabeth Kerr

18 Comments

Filed under Business, Construction, DCC, Democracy, Economics, Geography, Heritage, Name, New Zealand, People, Pics, Politics, Project management, Property, Site, Stadiums, Town planning, Urban design

DCC governance = management ?

QUESTIONS
Mayor & Councillors | City Property | City Planning | Strategy and Development Team | Council-owned Companies | Consenting Processes | Conflicts

On selling council-owned property…. [public notification restricted]

[Mr McLaren] told the Otago Daily Times he was not consulted about the proposal, in part because he was a commercial rival. However, he was also a resident living in a house that overlooked the proposed development site from Braeview Cres….

### ODT Online Tue, 30 Apr 2013
Anger over motor caravan park plan
By Chris Morris
The Dunedin City Council will consider allowing a new motor caravan park to be developed near Woodhaugh Gardens, just metres away from a rival camping spot. […] The New Zealand Motor Caravan Association has applied to the council for consent to establish the park at 51, 55 and 57 Woodhaugh St, on a vacant residential site next to houses and the Leith Stream. […] The proposal was deemed non-complying under the district plan, but attracted only four submissions – three of them opposed – after public notification was restricted to surrounding neighbours deemed to be affected.
Read more

****

Only yesterday . . . [heading to non-notified consent]

### ODT Online Mon, 29 Apr 2013
New supermarket plan hailed
By Chris Morris
A planned multimillion-dollar supermarket development in Green Island could bring jobs and investment and trigger wider improvements in the area, a Dunedin city councillor says. Progressive Enterprises is in talks with the Dunedin City Council aimed at developing a Fresh Choice supermarket on land between Main South Rd and Shand St.
Read more

Related Post and Comments:
29.4.13 Green Island activity centre

****

Last year . . . [non-notified application, loss of oldest brewery building on site]

### ODT Online Fri, 17 Aug 2012
Speight’s demolition to make way for expansion
By Chris Morris
Part of the Speight’s Brewery in Dunedin will be demolished to make room for the $29 million expansion of its operation. […] The company announced its intention to redevelop the brewery last year, after earthquake damage to the Canterbury Brewery, and began by relocating its Maltexo production plant to Dunedin in May this year.
Read more

### ODT Online Sat, 18 Aug 2012
Questions over consent for Speight’s
By Chris Morris
Heritage advocates are questioning why the public was not given a say about the demolition of a protected part of Speight’s Brewery in Dunedin.
Read more

****

Property acquisition for the stadium and SH88 developments . . .
[the hornet’s nest]

### stuff.co.nz Last updated 18:04 20/11/2012
Dunedin City Council fined for road botch up
By Wilma McCorkindale – DScene
A High Court decision has slammed Dunedin City Council’s (DCC) handling of a roading realignment in the city, ordering the cash -strapped authority to pay affected parties more than $185,000 in costs. Justice Alan Mackenzie indicated in a written decision the legality of the stretch of State Highways 1 and 88 through the city remained in question because of the council’s botch up.
Read more

Judgment-221310 (PDF, 109 KB)

Related Post and Comments:
20.11.12 Dunedin City Council vs Anzide Properties decision: The road “has no legal basis”

****

Then there was Delta . . . [property acquisition at Jacks Point and Luggate, which names in common]

### ODT Online Thu, 25 Apr 2013
Delta investigation ‘major’
By Chris Morris
The Office of the Auditor-general considers its investigation into land purchases by Dunedin City Council-owned company Delta to be one of its major inquiries for the coming year. Results of the investigation might not be made public for some months, at the earliest. The OAG’s draft annual plan for the 2013-14 year, published last week, detailed work planned for the 12 months from July 1. The plan listed the Delta investigation as one of the “major inquiries” to be reported on during the year. The investigation into Delta’s $14.12 million land purchases in 2008 and 2009 at Luggate, near Wanaka, and Jacks Point, near Queenstown, was confirmed last November.
Read more

Posted by Elizabeth Kerr

22 Comments

Filed under Architecture, Business, Construction, CST, DCC, DCHL, Design, Economics, Geography, Heritage, Hot air, Media, Name, NZHPT, People, Politics, Project management, Property, Site, Stadiums, Tourism, Town planning, Urban design