Tag Archives: High water table

Johnstone on ORC report : ‘The Natural Hazards of South Dunedin’ (July 2016)

The Natural Hazards of South Dunedin – July 2016 [read online]
Otago Regional Council
ISBN: 978-0-908324-35-4
Report writers:
Michael Goldsmith, ORC Natural Hazards Manager
Sharon Hornblow, ORC Natural Hazards Analyst
Reviewed by: Gavin Palmer, ORC Director Engineering, Hazards and Science
External review by: David Barrell, Simon Cox, GNS Science, Dunedin

Received from Neil Johnstone
Sun, 29 Aug 2016 at 8:17 p.m.

Message: Misinformation on the causes of the June 2015 South Dunedin flood have abounded since the event. As if the victimised residents haven’t suffered enough from others’ inactions (before and during the event), they are now being subjected to a hazards discovery process whose vigour appears to be exceeded only by its own recklessness. Following are a commentary of the hazards approach adopted by the Otago Regional Council (ORC), and a summary of my investigations into the flood event that I commenced after the publication of Dunedin City Council’s first flood report back in November 2015.

You can download Neil Johnstone’s report or read it below (formatted slightly differently to suit the WordPress template).

█ Download: A REVIEW OF ORC REPORT THE NATURAL HAZARDS OF SOUTH DUNEDIN (1) (PDF, 587 KB)

AN APPRAISAL OF RECENT REPORTING OF SOUTH DUNEDIN HAZARDS

N.P JOHNSTONE, BEng (Civil), MIPENZ

1. Introduction

There is some irony that DCC and ORC should be planning “drop in” sessions for residents in respect of South Dunedin hazard issues during September 2016, some 15 months after the major flood. The prime cause of flooding in June 2015 was DCC’s failure to maintain its infrastructure (not just mudtanks), and its failure to operate its pump stations to their intended capacities. The subsequent spread of misconceptions (i.e. groundwater levels, rainfall significance etc) surrounding the flood causes was at least partly due to inaccurate ORC analyses and reporting.

Repetitive and new doubtful information emanating from ORC via its latest report has been noted. Presentations and an over-simplistic video production have been observed. A footnote covering these observations is included at the end of this appraisal.

Long-delayed DCC reports on causes of the South Dunedin flooding have already been strongly criticised by the author. Specifically discredited are misrepresentations of sea level, groundwater and rainfall ranking. Accepted now by DCC as factors (somewhat grudgingly, and depending on the audience) are mudtank blockage and Portobello Road pump station failures (plural); still to be fully acknowledged are the failures at Musselburgh Pumping Station.

Attention is now turned to significant parts of hazard reports produced by the Otago Regional Council and utilised by DCC.

2. Coastal Otago Flood Event 3 June 2015 (ORC, published October 2015)

This report deals with a wider area than South Dunedin. It is apparent that ORC staff never visited the flooding areas of South Dunedin on 3 June, but took advantage of fine weather to take some water level readings the following day. The opportunity for useful progressive surface water level recording was thus lost. Levels were collected at some 150 points on 4 June. ORC’s main conclusion was that “localised variations in topography were probably the main driver of flood depth”. Or, put another way, water depth was deepest where the ground was lowest. This seems hardly surprising, and even trivial. No attempt was made to explain the photographic images presented of extensive ponding remaining well after the rains had ceased. The phenomena of blocked mudtanks and unutilised pumping capacity went seemingly unnoticed.

The report does usefully reference ORC’s four borehole recorders of groundwater, but makes the somewhat misleading assessment that groundwater levels were “elevated” prior to the rainstorm. This misinformation was seized upon by agencies such as DCC and the Office of the Parliamentary Commissioner for the Environment to highlight climate change impacts.

Having obtained the actual groundwater level data from ORC via the LGOIMA process, the author was able to reveal this “groundwater fallacy” in reviews from February 2016, but it was not until the publication of NZ Listener’s article (June 11-17, 2016) entitled ‘FLOOD FIASCO’ that ORC admitted that pre-flood groundwater levels were in fact “just a little bit above average”. ORC now seems intent on resurrecting this fallacy.

The ORC report fails to address the real and key issues of pumping station failures (Portobello Road and Musselburgh), or comparisons with much lesser flood impacts in the larger rainfall event of March 8/9 1968.

The report states that the 2015 24-hour rainfall was the largest since 1923. This was patently incorrect, but again was utilised by DCC to divert blame from their role in the disaster.

3. The Natural Hazards of South Dunedin (ORC, published July 2016)

The report states unambiguously in its Opening Summary that the major flooding of June 2015 was “a result of heavy rainfall, surface runoff, and a corresponding rise in groundwater”. By now, most people are aware that the causes of the flooding’s disastrous impact were failure to optimally operate pumping stations, failure to clear mudtanks, and failure to deploy staff to key areas during the event. Again, none of these factors is addressed in ORC’s report.

The report presents a table on its second page entitled “Factors Which Can Influence Flood Hazard”. Examples of exaggerated negativity include:

1. Heavy Rainfall:
– Many recorded instances of rainfall leading to surface flooding.
– Heavy rainfall events have occurred frequently over the last decade.

Comment: These conclusions do not appear to be supported by the report’s text, and are vague, factually challengeable and alarmist. Prior to 2015, no major flooding had occurred in South Dunedin since 1968, and even that was minor by comparison.

2. Sea Level:
– Groundwater level fluctuates (by up to 0.5m near the coast) on a twice-daily cycle in response to normal ocean tides.

Comment: All of South Dunedin is near the coast; most of the area does not experience such large fluctuations. This should have been made clear by the inclusion of groundwater data from all 4 ORC sites across the plain, not just from Kennedy Street.

3. Seismic:
– Large earthquakes could result in increased flood hazard on the South Dunedin plain, due to liquefaction-related land subsidence or direct, sudden, changes in land elevation relative to sea level.

Comment: All areas of NZ have some susceptibility to earthquake damage. Dunedin is amongst the areas at lowest risk; no incidences of even minor liquefaction have ever been reported in South Dunedin, and little or no clearly liquefiable materials have been identified (Refer GNS, 2014*). Continue reading

27 Comments

Filed under Baloney, Business, Climate change, DCC, Democracy, District Plan, Dunedin, Economics, Finance, Geography, Health, Heritage, Housing, Infrastructure, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

Mayor Cull and the GREAT Asbestos Defeat ….trucks in toxic waste

Dave doesn’t know whether to swallow his kornies or not.

Dave breakfast gruel - Warcraft-All-Nighter-Gamer [cartoonaday.com] tweaked (1)

His hair is turning grey, he’s feeling tired and he looks old.

Meanwhile, someone files divorce papers.
[“I thought we were Green! I can’t understand you anymore! Asbestos for cash?! These are your scarves, your suits, I’m throwing out the window – along with this stupid bike helmet, used camel shackles and all the skanky lycra. Go away!”]

Secretly, young woman seen rubbing hands with glee at so much dosh.

[Stifle obvious questions about what else goes into Green Island landfill. This is Tartan Mafia town.]

DCC receives $millions for landfill dumping of hazardous waste, WHO CARES ABOUT GREEN except for the imprint of Serious Money to bolster Council slush funds, rugby? stadium ? cricket ? – anyone ?

NOO! For Sue’s next trips to Oxford, staff’s Grand Central City Plan, and some left-over to pay planning fees and charges for the VB’s aquarium, hotel and connector bridge to the waterfront.

[Share spoils, maties! Leave suspicious Ratepayers out of it.]

There are no serious equitable plans to improve South Dunedin or Mosgiel drainage systems, or manage coastal erosion.

The dilemmas of High Office and short men.

Cheaper to dump hazardous waste at Dunedin than at Canterbury.
DCC stoopid again, takes a cheap ride instead of bumping up contract price.

Deals worth millions of dollars —council staff cite commercial sensitivity.

### ODT Online Tue, 24 Nov 2015
Asbestos fill headed for Dunedin
By Chris Morris
Up to 12,000 tonnes of asbestos-contaminated fill from Canterbury is destined to be dumped in Dunedin, but that might just be the tip of a toxic – but lucrative – iceberg. The Otago Daily Times understands the Dunedin City Council has more than one contract to accept contaminated material from outside the city at the Green Island landfill.
Read more

The latest inanity. [Comic Sans]
Cull on SDunedin RNZ interview 20.11.15 (2)Source: RNZ News: South Dunedin considers sea level threat.
20 November 2015 at 8:42 a.m. (AUDIO LINK)

[Listen and Learn] At another thread:

JimmyJones
June 17, 2015 at 9:49 am

Hype O’Thermia: YouTube and Wikipedia are good places to find out more about ICLEI. ICLEI teaches the DCC how to inflict the Sustainable Development world view on the citizens by using devious, undemocratic, secret and manipulative methods. ICLEI has helped the DCC to produce “marketing and communication” strategies to break down barriers to their deeply stupid ideas being accepted by the public. The goal is “behaviour change”. East Germany had the Stasi (Staatssicherheit), now we have ICLEI, Dave Cull and Sue Bidrose.

The influence of ICLEI explains a few things – like the DCC’s tendency towards increasingly secret (staff only) decision-making (eg the development and implementation of the Environment Strategy) and the generally severely deficient level of public consultation due to: skimpy information, poor publicity, expanding decisions beyond the scope of the consultation and treating it as just a ceremonial procedure (eg Dave’s Bicycle Network and its implementation). The pursuit of ICLEI’s goals is a direct cause of the underfunding of the city’s deficient (and worsening) infrastructure.

As far as I can tell most DCC councillors don’t know that the DCC has become a member of ICLEI and are unaware of the financial cost and its big influence in forming DCC policy. This demonstrates a problem with the attitude of the staff that councillors need to fix. The collusion between Dave Cull and Sue Bidrose is, however, a barrier to this that needs to be overcome. Councillors need to stop sleepwalking and start to become aware of the decisions that are being made without their involvement.

[ends]

Posted by Elizabeth Kerr

*Image: cartoonaday.com – Dave breakfast gruel [Warcraft-All-Nighter-Gamer tweaked by whatifdunedin]

15 Comments

Filed under Architecture, Business, Cycle network, DCC, Democracy, Design, Dunedin, Economics, Geography, Hot air, Media, Name, New Zealand, NZRU, NZTA, OAG, OCA, Ombudsman, ORFU, People, Politics, Project management, Property, Site, Stadiums, Tourism, Town planning, Transportation, University of Otago, Urban design

Mayor Cull won’t admit lack of maintenance #SouthDunedinFlood

Dave famous last words 1a

Mayor calls on government for help
39 Dunedin Television 20.11.15
A rising issue for seaside suburbs, a new report shows Dunedin is most at risk of suffering the negative effects of rising sea levels due to climate change. South Dunedin residents in particular are likely to experience flooding from rising ground water. Ch39 Link

Preparing New Zealand for rising seas: Certainty and Uncertainty
A report by the Parliamentary Commissioner for the Environment shows Dunedin is one of the most vulnerable areas in the country.

Related Posts and Comments:
● 3.11.15 South Dunedin Flood | Correspondence… released by DCC #LGOIMA
27.10.15 DCC: South Dunedin flood | higher learning for chief executive
16.8.15 June flood: Dunedin drop-in centre open 27 August
11.8.15 DCC’s unmanaged retreat for South Dunedin
22.7.15 DCC Long Term Plan 2015/16 – 2024/25
18.7.15 DCC Cycleways: SEEING RED, apology NOT accepted
14.7.15 DCC strategies needed like a hole in the head
12.6.15 Fairfax: DCC has no insurance cover for flood-damaged roads
● 5.6.15 WEATHER is not climate change; this is not the 100-year flood
4.6.15 Exchange makeover —or pumps and pipe renewals, um
3.6.15 Civil Defence response to Dunedin FLOODING
10.4.15 DCC: Natural Hazards
28.3.15 DCC Draft Long Term Plan 2015/16 to 2024/25 —Consultation Open
14.10.14 ORC: New strategic plan fosters Otago prosperity
12.9.14 ORC: City bus services, submissions
10.12.13 ORC restructures directorates
18.10.13 DCC: Final vote tally + St Clair boat ramp
18.8.13 South Dunedin and other low lying areas
26.2.13 DCC binge spending alert: Proposed South Dunedin cycle network
30.7.12 ORC on hazard risks and land use controls
7.6.12 Dunedin stormwater: more differences between ORC and DCC
25.11.11 South Dunedin and other flood zones

Posted by Elizabeth Kerr

34 Comments

Filed under Architecture, Business, Construction, Cycle network, DCC, Democracy, Design, Dunedin, Economics, Events, Geography, Heritage, Hot air, LGNZ, Media, Name, New Zealand, NZTA, OAG, Ombudsman, People, Politics, Project management, Property, Site, Tourism, Town planning, Transportation, Urban design, What stadium

South Dunedin Flood | Correspondence & Debriefing Notes released by DCC today #LGOIMA

Downloads:

Kerr, Elizabeth LGOIMA Correspondence Hendry and Williams 2015

Kerr, Elizabeth LGOIMA Flood Debrief Notes 2015

See earlier exchanges (via LGOIMA) and other comments at this post:
█ 30.9.15 DCC liability? South Dunedin Flood (June 2015) #LGOIMA [post removed]

Otago Daily Times Published on Jun 4, 2015
Raw aerial video of Dunedin Flooding
Video courtesy One News.

█ For more, enter the terms *flood* and *south dunedin* in the search box at right.

Posted by Elizabeth Kerr

12 Comments

Filed under Business, Construction, DCC, Democracy, Design, Dunedin, Economics, Events, Geography, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Site, What stadium

WEATHER is not climate change; this is not the 100-year flood

Debate is raging, more comments and posts will surface on Greenie Mayor Cull’s witless screwy remarks at Otago Daily Times today.

Flood will cost ratepayers: Cull
Dunedin’s massive deluge will hit ratepayers in the form of delayed projects and funding reallocations, Dunedin Mayor Dave Cull concedes. […] “This kind of downpour is exactly the kind of climatic change that is predicted for the eastern South Island in the event of unfolding climate change.” […] “My feeling is central government and local government will need to co-operate right around the country and this is a bit of a pre-taste of some of the effects we can expect from climate change and sea level rises,” he said. “I think it would be a bit naïve to think this won’t happen again for another 100 years.”
http://www.odt.co.nz/news/dunedin/344767/flood-will-cost-ratepayers-cull

Received from Mick Field
Fri, 5 Jun 2015 at 4:20 p.m.

You might find this interesting in view of all the alarm and hype over the latest flooding. The Green Party is entirely wrong to blame the 3 June Dunedin flooding on climate change. Why? Because they show that the severe flooding two days ago is not new. Unusual, but not unique. A combination of rainfall data and photographs makes these comments as convincing as they were prompt.

22 Apr 1923 Dunedin 230mm in 24 hours
19-20 Mar 1929 Ross Creek (Dunedin outskirts) 279mm in 24 hours
[June 3 2015] was 175mm in 24 hours

The Otago Daily Times said it was double the previous record for a full day since records began in 2006. [But 2006 was only the start of recording rainfall in the city centre rather than Musselburgh, 3 km away.]

Flooding Anzac Ave, looking towards Harrow St - April 1923 [DCC Archives]

Local experts:

### ODT Online Fri, 5 Jun 2015
Don’t blame climate change for city deluge, weather experts say
By Eileen Goodwin
The flooding in Dunedin on Wednesday was not caused by climate change, a University of Otago climatologist says. “I think this is just a weather event,” Dr Nicolas Cullen, of the department of geography, said.
Read more

Comments received:

JimmyJones
Submitted on 2015/06/05 at 12:12 am

….Dunedin has experienced two bad floods, one in 1923 and another in 1929. More rain fell in the 24-hour periods than what we got on Tuesday/Wednesday. In the first 1923 flood, 229mm (9.02 inches) fell (measured at Musselburgh) and in 1929, 279mm (11.0 inches) fell (measured at Ross Creek reservoir). Figures are from City of Dunedin, a history by K C McDonald. Our recent big rain was only 175mm in 24 hours. Probably it wasn’t severe enough to be called a one in 100 year event.

Based on these three measurements, it looks like severe rainfall in Dunedin has become less frequent and less intense. And if Tuesday’s flood was caused by Global Warming, then what caused the other floods? If it was the weather that caused the earlier floods, then why would you think that it wasn’t the weather that caused the recent flood?

A very serious problem for crusaders that blame extreme weather on Global warming is that for at least the last 17 years there has been no warming trend of global temperatures. In fact there has been a slight cooling trend. The conclusion is that anything that has happened over the last 17 years can not have been caused by Global Warming (because there has been none). Don’t expect to get credible scientific advice from the Labour Party, Dave Cull or Jinty MacTavish.

Diane Yeldon
Submitted on 2015/06/05 at 10:51 am

Well, I just did a bit of checking and the Resource Management Act was amended in 2004, putting the responsibility fairly and squarely on to local councils to budget and plan for and take responsibility for reasonably anticipated effects of climate change. There’s a guide about what local councils have a legal responsibility to do on the website for the Ministry for the Environment (mfe.govt.nz – local government and climate change).
So Mayor Cull’s contention that central government will or should bail out Dunedin is as fatuous as a similar claim I read in a past Annual Plan document (2011, I think) that central government would (might?) bail the city out if it got into financial strife after committing to the stadium expenditure. (No central government would set such a precedent, rewarding financial irresponsibility on the part of a local body!)
Mayor Cull’s claims that maintenance is up to scratch and that 100-plus-year-old pipes held up as well as could be expected are ridiculous. He is merely asserting that the DCC is not at fault in any way. And trying to offload the responsibility for any climate change effects on to central government when councils have known since 2004 that it was a local government responsibility. Even if you think climate change is a myth, it seems prudent to protect a city against a 1 in a 100 years weather event. I wonder if the DCC can truthfully say they have been doing that.

Posted by Elizabeth Kerr

183 Comments

Filed under DCC, Democracy, Events, Geography, Hot air, Media, Name, New Zealand, People, Pics, Politics, Project management, Property, Site, Town planning, Urban design, What stadium