Tag Archives: Hall Brothers Transport Ltd

Traffic lights: Anzac Avenue/Frederick Street intersection

Four questions put to DCC Transportation Planning today:

● What work is needed to activate the traffic lights at Anzac/Frederick?
● Why it is requiring remediation?
● How much it will cost?
● Why weren’t the lights just switched on as planned in early December immediately after the site [Hall Brothers yard – Anzide Properties Ltd] was cleared?

The argument goes like this: there was a break made in a fibre optic cable during site clearance at Hall Bros yard. Chorus billed the property owner for the breakage. The property owner didn’t know the cable existed or that it had been attached to one of their buildings on site.

Meanwhile, DCC says the cable issue isn’t connected to the traffic lights not working.

So back to those questions:

DCC says new medians and yellow-dot pads are being added at crossings, and ‘green boxes’ for cyclists are being re-scoped — for improved traffic management, and cycle and pedestrian safety; the 5-way intersection is being turned to a *4-way* intersection (with the access way formerly used by Hall Bros being removed) — simplifying the intersection and lights control of it.

Tony Avery 3DCC says all work to cost circa $100,000.

Timelines as such around the holiday break meant the traffic lights weren’t turned on earlier [in December, immediately following site clearance by Hall Bros].

DCC says Tony Avery will likely handle media statements on completion of the project.
(why is Mr Avery still at DCC, he’s retained until the new GM arrives in February)

The real story?

Hall Bros had to clear their site by a certain date in December 2014. They did.
Chorus turned up the next day saying the property owner had broken the cable.
Chorus had no easement. The cable should not have been there.

The irony of the lights not working because they were connected illegally to a building on the land that had to be cleared because the lights were illegally installed, is THE ANSWER.

Remember, DCC says the cable issue isn’t connected to the traffic lights not working.

Ye Gods of Irony, please do not explode.

DCC Webmap - Anzac AvenueDCC Webmap – Anzac Avenue/Frederick Street [click to enlarge]

Posted by Elizabeth Kerr —with thanks to correspondents for their wording, collaged

*Image: Tony Avery – tweaked by whatifdunedin

30 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Fun, Geography, Hot air, Name, People, Politics, Project management, Property, Site, Town planning, Urban design, What stadium

Emerson’s Brewery #Dunedin

Richard Emerson 2014-05-22_at_10_34_58_am [stoppress.co.nz]Founder Richard Emerson (via stoppress.co.nz)

█ Premium Craft Beer | Emerson’s Brewery Dunedin http://www.emersons.co.nz/

### NZ Herald Online 11:08 AM Wednesday Apr 10, 2013
Lion paid $8m for Emerson’s brewery
By Christopher Adams
Brewing giant Lion paid $8 million for Dunedin craft beer maker Emerson’s last year, according to documents filed with the Companies Office. At the time of the November takeover the Auckland-based company did not disclose the multi-million dollar price tag it paid for the South Island firm, which was founded in 1992, making it one of the most established and well-known craft brands in the country. But Lion is required to file its financial statements with the Companies Office due to its foreign ownership by Japanese brewer Kirin.
Read more

****

Emerson’s Brewery On The Move
Monday, 20 October 2014, 3:22 pm
Press Release: Emerson’s

Dunedin, New Zealand – Emerson’s, with support from Lion, has today purchased a new site in Anzac Ave, Dunedin where they plan to build a brand new spiritual home for this iconic New Zealand craft brewery. The new site will allow Emerson’s to meet increasing demand for its high quality beers whilst continuing to bring new and interesting beers to beer lovers. This is the fourth move in the Emerson’s journey and Founder Richard Emerson says the new site will be a vast improvement on the place they currently call home.
“Moving brewhouses and tanks is not new to us but this time, we want to create a place where people can touch, smell, taste and experience more about Emerson’s and its story,” says Emerson.
Emerson’s, supported by Beca who will be project managing the development locally, are progressing well with the plans for the site which will house a new brewery, warehousing, retail store and bar area where visitors can enjoy a beer matched with good food. Improved staff facilities are also a key consideration for the new development.
Lion’s Managing Director, Rory Glass says today marks the start of another exciting chapter in Emerson’s history and Lion is delighted to be able to help them reach their full potential.
“We stand by our commitment of allowing Emerson’s to continue doing what they do well – experimenting and brewing great beer and we are genuinely excited about helping Emerson’s to build a new home in which they can realise their growth aspirations now and in the future” says Glass.
Work is expected to get under way on the site in December 2014 with a target completion date for the new Emerson’s Brewery in early 2016. Final plans for the site will be shared more widely in due course but Emerson’s have extended their current lease at Wickliffe Street to cover them until the new site is fully operational.
For now however, it is business as usual for Emerson’s and the team remain focused on creating great beers for Emerson’s fans to enjoy.
Link to Scoop

****

DCC Webmap (Anzac Avenue 2006-07)DCC Webmap [click to enlarge]

Cr Hall had been in dispute with the council over access to his land for three years, after realignment of State Highway 88 during Forsyth Barr Stadium’s construction.

### ODT Online Tue, 21 Oct 2014
Brewery’s big plans revealed
By Vaughan Elder
An expanding Emerson’s Brewery is set to become a ”world-class” tourist destination now an agreement has been reached to buy a new site. The development – expected to cost in the millions – will be open for tours and house a new brewery, warehousing, retail store plus a bar and restaurant. The 22-year-old Dunedin brewery’s purchase of two adjacent pieces of land in Anzac Ave, belonging to the Dunedin City Council and Cr Doug Hall, also resolves a long-running access dispute over the land.
Read more

****

The global environment in which we operate has always meant swings and roundabouts for New Zealand goods and services.

### ODT Online Mon, 27 Oct 2014
Editorial: Swings and roundabouts
It has been a tale of two fortunes for city businesses this month. […] And as one door closes [Donaghys], another opens. Dunedin’s Emerson’s Brewery last week announced it had bought land on Anzac Ave, and would move from its nearby Wickliffe St site to build a multimillion-dollar expanded operation with a new brewery, warehousing, retail store, bar and restaurant. The company envisaged it would become a “world-class” tourist destination and the expansion would create jobs.
Read more

Emersons-1200 [3news.co.nz] 2 bwImage via 3news.co.nz

Related Posts and Comments:
2.9.13 SH88 realignment: decision to Environment Court?
3.8.13 SH88 notice of requirement [more maps]
30.4.13 DCC governance = management ?
20.11.12 DCC vs Anzide Properties decision: The road “has no legal basis”
27.5.12 SH88 realignment – information
25.5.12 SH88 realignment costs (injunction)
27.2.12 Bringing DCC, related entities and individuals to account…
23.8.11 Stadium project tangles
4.11.10 SH88 realignment for stadium disrupts traffic
21.7.10 SH88 realignment – update
7.7.10 Goodbye to great store buildings in Parry St
21.4.10 SH88 realignment – update
31.3.10 SH88 realignment
24.2.10 SH88 realignment: Are ratepayers buying the land twice?
20.11.09 Interesting. SH88 realignment.
2.9.09 SH88 realignment past stadium

Posted by Elizabeth Kerr

28 Comments

Filed under Architecture, Business, Construction, DCC, Design, Economics, Heritage, Innovation, Inspiration, Media, Name, New Zealand, NZTA, People, Pics, Politics, Project management, Property, Site, Stadiums, Tourism, Urban design, What stadium

SH88 realignment: decision to Environment Court?

Updated Post 3.9.13 at 1:30pm

SH88 realignment [ODT Graphic]### ODT Online Mon, 2 Sep 2013
Decision on SH88 looms
By Debbie Porteous
The Dunedin City Council has until Friday to determine whether it will make a decision on the controversial designation of land for the realignment of State Highway 88 near Dunedin’s Forsyth Barr Stadium – or hand the responsibility for the decision to the Environment Court.
To opt for the latter would be a first for the council, which is both the authority requesting the land be designated, and the authority that would require it to be designated. It publicly notified the requirement for the land last month, after a previous non-notified designation was quashed by the court following the council’s admission it had not followed the proper consultation process. The new road has been built, but final measures including traffic lights have been in limbo while the designation issue is resolved.

Mr Hall has already indicated publicly he would ”fight” the proposed designation as notified because it still did not provide safe access to his property.

Doug Hall 1One of the affected landowners, Doug Hall, who is running for the DCC, took the council to court to argue the original designation was illegal because he was not notified as an affected party, and sought an injunction stopping the traffic lights from being switched on until the resolution of safety issues at that intersection and around access to his property as a result of the realigned road. Affected parties, including Mr Hall, were consulted on the new designation late last year, and again earlier this year after the notification of the requirement was delayed while negotiations with Mr Hall continued.
The council had received 13 submissions by Friday, the end of the submission period. Submitters included the University of Otago, Port Otago Ltd, the NZ Transport Agency, the Otago Regional Council and several heavy transport companies among others, but not Mr Hall, or his representatives.
Read more

ODT Correction 3.9.13 (page 3):

Submissions from companies owned by Doug Hall, one of the parties affected by the realignment of State Highway 88 in Dunedin, were received by the Dunedin City Council within the statutory timeframe and will be included in the process for designating the land for realignment. The submissions from Anzide Properties Ltd, Hall Brothers Transport Ltd, and Dunedin Crane Hire (2005) Ltd were received by deadline on Friday, but were not processed until yesterday.

Related Posts and Comments:
3.8.13 SH88 notice of requirement [more maps]
30.4.13 DCC governance = management ?
20.11.12 DCC vs Anzide Properties decision: The road “has no legal basis”
27.5.12 SH88 realignment – information
25.5.12 SH88 realignment costs (injunction)
27.2.12 Bringing DCC, related entities and individuals to account…
23.8.11 Stadium project tangles
4.11.10 SH88 realignment for stadium disrupts traffic
21.7.10 SH88 realignment – update
7.7.10 Goodbye to great store buildings in Parry St
21.4.10 SH88 realignment – update
31.3.10 SH88 realignment
24.2.10 SH88 realignment: Are ratepayers buying the land twice?
20.11.09 Interesting. SH88 realignment.
2.9.09 SH88 realignment past stadium

Posted by Elizabeth Kerr

45 Comments

Filed under Business, Construction, CST, DCC, Democracy, Design, Economics, Geography, Media, Name, New Zealand, People, Pics, Politics, Project management, Property, Site, Sport, Stadiums, Town planning, Urban design, What stadium

SH88 notice of requirement

DIS-2013-1 Location Map 1

DIS-2013-1 Fredrick St - Ravensbourne Rd (detail)Affected Party: Anzide Properties Ltd

Doug Hall, who was informed about the designation process on Thursday, said he was going to fight the issue. ”I have no choice. It is a safety issue. Someone is going to get killed on that road.”

### ODT Online Sat, 3 Aug 2013
Hall to oppose designation
By Hamish McNeilly
Dunedin businessman Doug Hall remains defiant after the Dunedin City Council confirmed it was revisiting the designation process for an affected area of State Highway 88. Yesterday, the council announced it had lodged a notice of requirement to restart the designation process, after negotiations stalled following a botched handling of the original process.
DCC general manager infrastructure and networks Tony Avery said the section of road had not been legally designated and the council acknowledged it had made process mistakes when trying to designate it earlier.
Last year, the Otago Daily Times reported the council had spent $485,000 over 18 months to try to find a solution, and it was too early to say how much the designation process would add to the final tally.
Read more

● Submissions on the notice of requirement, which is publicly notified today, close on August 30.

Dunedin City Council – Media Release
Designation Process for Part of State Highway 88

This item was published on 02 Aug 2013.

The Dunedin City Council has lodged a Notice of Requirement to start afresh the designation process for the section of State Highway 88 near Anzac Avenue.
The Notice of Requirement is a formal process to have land designated as road. It will be publicly notified tomorrow.
DCC General Manager Infrastructure and Networks Tony Avery says the new section of SH88 has been in use since July 2011, but has not been legally designated. The DCC has previously acknowledged that it made process mistakes during an earlier attempt to designate the road.
Temporary traffic controls have been in place since the new section of road was opened, while the DCC negotiated with an adjacent landowner over access arrangements.
“Those negotiations were ultimately unsuccessful, despite the best intentions of all parties, so we are now proceeding with the formal legal process to have the road designated.”
Once the designation proposed is approved, traffic lights at the intersection of Anzac Avenue and Frederick Street would be activated, and the Ward Street bridge ramp would be re-opened to provide much-needed access to the Harbourside area, Mr Avery says. Access to the adjacent properties is to be provided as well, consistent with acceptable standards and in a safe manner.
The DCC is confident the changes are in the best interests of the public.
Submissions on the Notice of Requirement will close on 30 August.

Contact General Manager Infrastructure and Networks on 477 4000.
DCC Link

DIS-2013-1 Layout PlanDIS-2013-1 Fredrick St – Ravensbourne Rd Layout Plan

Territorial Authority’s Requirement for Two Designations
DIS-2013-1 Fredrick Street – Ravensbourne Road

The requirement is for:
The Notice of Requirement seeks to designate two areas of land. Designation 1 is for part of the Dunedin Harbourside Arterial and will link Anzac Avenue (D465) with Ravensbourne Road (D845) to the south of Parry Street West. Designation 2 is for the Dunedin Harbourside Arterial – Access Road which will provide access from the Designation 1 area to the site at 80 Anzac Avenue.
Read more + Official Documents/Maps

### stuff.co.nz Last updated 18:04 20/11/2012
Dunedin City Council fined for road botch up
By Wilma McCorkindale – DScene
A High Court decision has slammed Dunedin City Council’s (DCC) handling of a roading realignment in the city, ordering the cash -strapped authority to pay affected parties more than $185,000 in costs. Justice Alan Mackenzie indicated in a written decision the legality of the stretch of State Highways 1 and 88 through the city remained in question because of the council’s botch up.
Read more

Judgment-221310 (PDF, 109 KB)

Related Post and Comments:
30.4.13 DCC governance = management ?
20.11.12 DCC vs Anzide Properties decision: The road “has no legal basis”
27.5.12 SH88 realignment – information
25.5.12 SH88 realignment costs (injunction)
27.2.12 Bringing DCC, related entities and individuals to account…
23.8.11 Stadium project tangles
4.11.10 SH88 realignment for stadium disrupts traffic
21.7.10 SH88 realignment – update
7.7.10 Goodbye to great store buildings in Parry St
21.4.10 SH88 realignment – update
31.3.10 SH88 realignment
24.2.10 SH88 realignment: Are ratepayers buying the land twice?
20.11.09 Interesting. SH88 realignment.
2.9.09 SH88 realignment past stadium

Posted by Elizabeth Kerr

Leave a comment

Filed under Business, Construction, CST, DCC, Democracy, Design, Economics, Media, Name, People, Politics, Project management, Property, Site, Stadiums, Town planning, Urban design

Dunedin City Council vs Anzide Properties decision: The road “has no legal basis”

Concerning the State Highway 88 realignment, skirting the new stadium.

Judgment-221310 (PDF, 109 KB)

DScene breaks the news at Stuff:

Dunedin City Council fined for road botch up
A High Court decision has slammed Dunedin City Council’s (DCC) handling of a roading realignment in the city, ordering the cash-strapped authority to pay affected parties more than $185,000 in costs. Justice Alan Mackenzie indicated in a written decision the legality of the stretch of State Highways 1 and 88 through the city remained in question because of the council’s botch up.

Related Posts:
9.6.12 City Property to compete more obviously in the market
27.5.12 SH88 realignment – information
25.5.12 SH88 realignment costs (injunction)
27.2.12 Bringing DCC councillors, staff, related entities and individuals to account
23.8.11 Stadium project tangles
24.11.10 SH88 realignment for stadium disrupts traffic
29.10.10 DCC Chief Executive resigns – timing is everything!
21.7.10 SH88 realignment – update
7.7.10 Goodbye to great store buildings in Parry St
21.4.10 SH88 realignment – update
31.3.10 SH88 realignment
24.2.10 SH88 realignment: Are ratepayers buying the land twice?
20.11.09 Interesting. SH88 realignment.
2.9.09 SH88 realignment past stadium
27.8.09 $294.8m investment for Otago region
19.5.09 There’s more, really?
12.2.09 DCC, and the right to ask?

Posted by Elizabeth Kerr

72 Comments

Filed under Business, Construction, DCC, Geography, People, Project management, Property, Site, Stadiums, Town planning, Urban design

Dunedin Fire Brigade Restoration Society

8 March 2011
See advertising feature in today’s ODT (print and digital editions, pages 12-14) which carries more Dunedin Fire Brigade 150th anniversary and related events information.

### ODT Online Sat, 5 Mar 2011
Restoration society rescued
By John Gibb
Cometh the hour, cometh the man.
Dunedin transport firm owner Doug Hall has stepped in, effectively, to save the Dunedin Fire Brigade Restoration Society by providing crucial storage and workshop space at Burnside, shortly before the society had to quit its previous premises.
The society is celebrating its 40th anniversary this year and the Dunedin Fire Brigade is celebrating its 150th anniversary this month, from March 11 to 13.
Read more

****

### ODT Online Sat, 5 Mar 2011
Magazine: All hands to the pump
By Mark Price
Two Dunedin institutions with intertwining histories celebrate their 150th anniversaries this year. One is the Otago Daily Times and the other is the Dunedin Fire Brigade. With the help of brigade historian John Ingram, Mark Price looks back at the danger fire posed in a young, wooden Dunedin and at how the brigade came into existence.

The first fire-engine – donated by the Liverpool and London Fire and Life Insurance Company and relying totally on manpower – was delivered early in 1861 and the first meeting of the Dunedin Volunteer Fire Brigade was held on February 20, 1861.

Read more

Post by Elizabeth Kerr

1 Comment

Filed under Heritage, Inspiration, People