Tag Archives: Delta at Noble

City council “justifiably proud of its fiscal discipline” —Cull The Delusional

ODT 30.11.15 (page 8)

ODT 30.11.15 Letter to editor Dickie p8 (1)

Comments received at other threads:

photonz
Submitted on 2015/11/30 at 9:34 am
Several more blocked drains seen later on Friday and also more on Saturday, including some so bad they were flooding right across the road.

And today in the ODT we have the Mayor slapping ratepayers across the face again with the laughable claim that rate rises are due to rises in the cost of bitumen and pipes.

Considering how much is spent on bitumen and pipes, compared to wages and interest, that sounds [like as] big a lie as “the drains are properly maintained”.

The ODT should call Mayor Cull on this – because blaming year after year of rate rises on the costs of bitumen and pipes sounds like a big fat lie.

[Published in abridged form at ODT Online: Your Say:
DCC not responsible for flooding? Yeah right]

photonz
Submitted on 2015/11/27 at 9:26 am
Just posted to the ODT website –

“Taking the kids to school this morning, the drain at the end of our road is blocked and water is flowing across the street. So I started counting blocked drains on my short journey to Queens and Tahuna schools. Grand total – 14 blocked drains, including three bad enough for large amounts of water to be flowing right across the street.

Similarly a relative’s business in town has been flooded several times, every time because of blocked drains. Often they are left with the choice of going out in the rain to unblock it themselves, or hiring a private contractor to suction-pump it.

Because even though the DCC know it’s a problem, they still don’t maintain it.

Do the DCC not realise that all they do is make themselves look like either incompetent fools or liars, when they make the laughable claim that the drains are well maintained and do not contribute to flooding?”

photonz
Submitted on 2015/11/27 at 11:36 am
Several more blocked drains seen on the way into town, including two so bad the water is flowing right across the road. And it wasn’t even raining very hard at that stage.

At least three of those flood across the road very time it rains hard – ie 10-20 times a year.

Posted by Elizabeth Kerr

21 Comments

Filed under Business, Carisbrook, Citifleet, Construction, CST, Cycle network, DCC, DCHL, DCTL, Delta, Democracy, Dunedin, DVL, DVML, Economics, Enterprise Dunedin, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Police, Politics, Pools, Project management, Property, Site, Sport, Stadiums, Town planning, Transportation, Urban design, What stadium