Tag Archives: Cumulative adverse effects

Cycleways and scattered nails

bike - fixed gear track racing [humancyclist.wordpress.com] 1

### radionz.co.nz 24 June 2016 at 9:23 pm
RNZ News
Cycleway truce called as review set up
By Michael Cropp
Wellington’s beleaguered cycleway programme will not be getting the shot in the arm some were hoping for – instead it will be reviewed, refreshed and recommissioned. The outcome of that process – a ‘refreshed cycleways programme’ – would go to the Wellington City Council’s transport committee in August, the council announced today. Meanwhile, Island Bay Residents’ Association had reached a truce with cycling advocates and councillors, and was planning to start on its own consultation. A New Zealand Transport Agency report this month on the council’s ability to implement its programme stated the fallout from the Island Bay project had jeopardised the council’s other cycleway initiatives, and had eroded the public’s faith in the council. It said the council had lost the confidence of officials and ministers. Today’s announcement was intended to provide a pathway to regaining that trust.
Read more

IDEAS !!!!

nails 1 [hdwires.in]

Earlier this year, nails were scattered on the cycleway and the local residents’ association threatened a rates revolt if it wasn’t dug up.

### radionz.co.nz 1 June 2016 at 6:44 pm
RNZ News
WCC told it let spokes fall off cycleway plan
By Michael Cropp
The way Wellington City Council conducted the rollout of a controversial cycleway in Island Bay has hurt its city-wide ambitions for the bike routes, an independent review has found. The report into the city’s cycleways, which was commissioned by New Zealand Transport Agency (NZTA), concluded people felt the path in the southern suburb was a poor solution that was delivered without proper community engagement and consultation. It recommended it be reviewed and modified after further community consultation.
Read more

Read the report commissioned by NZTA (PDF, 1.3MB)

Related RNZ stories:
Legal costs mount in battle over Southland cycleway
Modified Hutt Rd cycleway plans welcomed
Capital cycleway faces strong opposition

****

Meanwhile at Dunedin…. plodding incompetence. A recent series of city council-led (earworms: Spokes Dunedin and NZTA) technical planning and cycleway construction FAILURES, at Exorbitant Expense forced on Ratepayers. All this while South Dunedin core infrastructure maintenance and upgrades received little if no DCC attention, ultimately leading to Council-fuelled multimillion-dollar flood damage. And now, the ODT Editor exhibits gut-wrenching Cheek to devoutly urge DCC to YES, Build Cycleways!

Fri, 24 Jun 2016
ODT Editorial: Learning from cycleway errors
OPINION After a long year of construction, mistakes, remedial work, wasted money and public dissatisfaction the South Dunedin Cycle Network has finally been shunted down the council’s cycleway queue. In an Otago Daily Times report this month council infrastructure networks general manager Ruth Stokes said she could not say when the South Dunedin network would be completed. The new focus, she said, was to employ the limited available resources on fixing the Portobello Rd cycleway and the central city network.

“Build them well, build them smart and build them efficiently.” (ODT)

SPOKES Dunedin speaks out for cycling in Dunedin, New Zealand and represents everyone who rides a bike or would like to ride a bike in the city. SPOKES is a local volunteer cycling advocacy group founded in 1996 as an affiliate of the New Zealand Cycling Advocates Network. SPOKES Dunedin is an incorporated society registered under the Incorporated Societies Act 1908.

bike dog jun co-passage [hbr.org]

We look forward to working with the Dunedin City Council to develop a real cycle network for Dunedin. (Spokes)

God Almighty! Read this:

█ SPOKES DUNEDIN SUBMISSION ON DRAFT 2016-2017 ANNUAL PLAN
Posted on April 6, 2016 by spokesdunedin

Summary
A change of scope is needed for Dunedin’s cycling network, but it is unclear what the DCC’s change in scope actually means, and higher standard cycleways are only part of the story. Spokes Dunedin has a vision for successfully realising the cycle network. We want everyone to be able to cycle from North Dunedin to South Dunedin, out both sides of the Harbour, and through the tunnels to Green Island and Mosgiel on a connected framework of city-spanning arterial routes that are safe, direct, and convenient to use. This will focus work where there is a clear need for improved safety rather than on streets that are already relatively safe, and will create a solid initial network that can grow and develop in response to future demand. The great thing is that there already exists some cycling infrastructure on many of the routes for this initial network. Several things can be achieved by the end of this year that will help Dunedin catch back up to where it should be.

To do in 2016
1. Support NZTA to begin construction of the SH1 separated lanes by the end of this year.
2. Fix Portobello Road – it’s already been two years. We don’t need fancy landscaping, we just need the median barrier realignment so the road looks like a road and the cycleway looks like a cycleway.
3. Complete the Wharf/Roberts intersection as agreed – it’s already been two years. This intersection presents an identified safety risk on a high demand route.
4. Continue the SH88 path through the rail corridor to the railway station, thereby providing an alternative to the cycle lanes on Anzac Ave (heavy freight route and high risk).
5. Create a separated cycle lane from the intersection of Andersons Bay/Strathallan, along The Oval, to Crawford Street in place of the existing cycle lane between two lanes of fast-moving traffic.
6. Develop plans for a separated cycle lane on North Road and safety improvements for the Opoho intersection to tie in with NZTA’s forthcoming separated cycle lanes on SH1. This route is of very high strategic priority.

Introduction
Dunedin is a pro-cycling city, where a significant proportion of the population regularly cycles for recreation, transportation, or both. Year after year, cycling is one of the most strongly supported and heavily submitted-on topics in the annual plan. One of the biggest public consultation events in Dunedin history was held in 2013 regarding the proposed SH1 separated cycle lanes. In addition to widespread media coverage, NZTA and DCC staff solicited input from the public at information booths in busy locations including the Golden Center, Toitu, and the University. With over 2000 written submissions and roughly 800 survey responses, the SH1 separated cycle lanes received one of the highest response rates of any topic ever consulted on. The result was overwhelming support for the proposed separated cycle lanes. Independently, the AA undertook a survey of their local membership, with over 70% of the nearly 1500 respondents supporting the proposed separated lanes. The overwhelming public demand and support for better cycling in Dunedin cannot be denied.
In response to this demand, the City rightly undertook to develop a Strategic Cycle Network. But the South Dunedin portion of the cycle network has not delivered on the ambitions of the cycle network plan adopted in 2011. Nothing has progressed in the last year, leaving half-finished elements scattered around, with other things ripped out without consultation.
Some might argue that we should throw up our hands in despair, abandoning the possibility of future success under the fear of past failures. But others know that setbacks are par for the course when charting new waters and trying new things. Where would we be if the likes of Cook, Columbus, or Magellan had turned around after the first storm and torn sail? Those leaders stayed the course, their sailors gained experience, and they ultimately changed the world.
Read more

“SPOKES, CYCLE-SAIL OFF THE EDGE OF THE WORLD WHY NOT”
Sail wagon [en.wikipedia.org] 1

█ For more, enter the terms *cycle* and *christmas present* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

*Images: (from top) humancyclist.wordpress.com – fixed track racing | hdwires.in – nails | hbr.org – bike dog jun co-passage | en.wikipedia.org – sail wagon

19 Comments

Filed under Business, Cycle network, DCC, Democracy, Design, District Plan, Dunedin, Economics, Education, Finance, Geography, Health, Housing, Infrastructure, Media, Name, New Zealand, NZTA, OAG, Ombudsman, People, Pet projects, Politics, Project management, Proposed 2GP, Public interest, Resource management, South Dunedin, Sport, Tourism, Town planning, Transportation, University of Otago, Urban design, What stadium

Bloody DCC —superlative cost blowout #cycleways #SUCKS

#GreaterDunedinNOTsustainable
#DaveCullNOTsustainable
#KateWilsonNOTsustainable
#JintyMacTavishNOTsustainable
#CouncilStaffManagersNOTsustainable

Cycling [screenshot at YT].jpgNo photograph of Kate in lycra could be found. The Mayor and MacTavish were both camel shackled when our photographer called (say no more).

### ODT Online Thu, 22 Oct 2015
Dunedin cycleway cost blowout
By Craig Borley
Building Dunedin’s cycleways could cost “three to four times” more per metre than first thought. That news was delivered to the Dunedin City Council’s infrastructure services committee this morning by the council’s infrastructure and networks general manager Ruth Stokes

The committee voted to continue with the rollout of the network, ensuring the design and finish were of the more expensive, higher quality option.

Read more

█ Council Reports available at What if? via (12.10.15)https://dunedinstadium.wordpress.com/2015/08/22/dcc-cycleways-now-tied-to-more-urban-design-spend-after-rehash-numero/#comment-66330

Sandy Graham advises there is one amended page (item 6 ph 6.8) – a map was altered for clarity. The website copy will be updated with the amended page.

Posted by Elizabeth Kerr

*Image: [screenshot] youtube.com – Cycling Training Program – Crashing on a bike

57 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Geography, Media, Name, New Zealand, NZTA, OAG, Ombudsman, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Transportation, Urban design, What stadium

Cr Kate ‘Cycleways’ Wilson —(disingenuous) fails constituents

█ Cr Kate Wilson says cycleways will bring myriad benefits to Dunedin.

ODT Online Sat, 25 Jul 2015
Why Dunedin is investing in cycling
By Craig Borley
Dunedin appears divided over the cycle network. Some see it as unnecessary. Others see it as vital. ODT reporter Craig Borley spoke to Dunedin city councillor Kate Wilson, chairwoman of the infrastructure services committee, about why the city is investing in cycle infrastructure.
Read more

█ The Dunedin City Council is sleep-walking to yet another poorly thought out cycleway project. (ODT)

### ODT Online Thu, 20 Aug 2015
Time to put brakes on cycleway
By Hilary Calvert
OPINION Somehow, the Dunedin City Council has been so beguiled by the gift-horse that is the New Zealand Transport Agency (NZTA) that it seems to have completely forgotten to carry out its proper role of looking after the interests of the citizens of Dunedin in respect of the State Highway 1 cycleway plans.
Read more

ODT 26.8.15 (page 8)
– shot in a half-lit Dunedin café off the beaten cycle paths

ODT 26.8.15 Letter to editor Wilson Diehl Hopkins p12

█ Proposed: Separated cycle lanes to run along north and south one way routes, between Botanic Garden and Queens Gardens.

### ODT Online Thu, 10 Sep 2015
Dedicated cycle lanes get closer
By Craig Borley
Nationally-funded separated cycle lanes along Dunedin’s one way system are now two steps closer as the project moves swiftly through the New Zealand Transport Agency machine.
Read more

NZTA said it had resolved to:
• Incorporate high turnover short term parking for businesses, particularly those reliant on short stay kerbside parking and deliveries
• Incorporate medium term parking close to the hospital and museum.
Updated plans were now being prepared to show where the parking would be included. The plans will be available for public comment at the end of the month.

ODT 11.9.15 (page 16)

ODT 11.9.15 Letters to editor Hopkins Pillans Oaten (1) p16

Related Posts and Comments:
● 3.9.15 Dunedin support for extensive cycle lanes and Free bicycles
● 22.8.15 DCC cycleway$ now tied to more ‘urban de$ign’ $pend….
● 18.7.15 DCC Cycleways: SEEING RED, apology NOT accepted
● 10.4.15 DCC cycleways propaganda continues #SpendSpendSpend
20.3.15 DCC Shame: First, John Wilson Dr … now Portobello Rd cycleway
11.2.15 Dunedin Cycleways: Pet project staff, ‘entitlement’? #irony
3.12.14 Cycling at Dunedin —boring debate, network spending continues #DUD
22.5.14 DCC Transportation Planning —ANOTHER consultation disaster
6.5.14 Roading network screwed by council staff
● 14.2.14 DCC: Broadband AND bicycles #fraudband speed
14.1.14 DCC: Hospital area parking changes #cyclelanes
5.1.14 Norman Foster: SkyCycling utopia above London railways #ThinkBig
24.12.13 Daaave’s $47 million Christmas present to Jinty. We’re paying.
4.12.13 Dunedin cycleways: Calvin Oaten greeted by DCC silence
17.11.13 Dunedin cycleways: Calvin Oaten’s alternative route
17.11.13 Cull and MacTavish… “Have you fixed the debt crisis?”
14.11.13 Cycle lane explosions and puncture kits (SPOKES grenades launch)
8.11.13 Dunedin Separated Cycle Lane Proposal [how to make a submission]
29.10.13 DCC (EDU) invents new job! [GigatownDunedin]
19.10.13 Cycle lobby games and media tilts
24.9.13 Mediocrity and lack of critical awareness at DCC [council reports]
8.7.13 Bloody $tupid cycleways and Cull’s electioneering… [route maps]
28.3.13 DCC DAP 2013/14: Portobello Harington Point Road Improvements
26.2.13 DCC binge spending alert: Proposed South Dunedin cycle network
22.2.13 DCC: Council meeting agenda and reports for 25 February 2013
31.1.13 Who? 2010 electioneering
21.11.12 Safe cycling -Cr Fliss Butcher
5.11.12 DCC, NZTA: Cycle lanes controversy

Posted by Elizabeth Kerr

15 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Enterprise Dunedin, Geography, Hot air, Media, Name, New Zealand, NZTA, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Transportation, University of Otago, Urban design, What stadium

Portobello Road Consultation —Public Meeting | Monday 13 May

Portobellomeeting copy

Here is the latest web update for the Portobello Community.

This week we look at the road widening project and the proposed changes that the City Council has made to the initial plan. The City Council will be giving the community another opportunity to have your say on the proposal and the changes they have made to the plan since the consultation period in March 2013. This is an important issue for our township and community and the meeting is to be held at 7:00 pm on Monday, 13 May 2013 at the Coronation Hall. Pass this message onto your friends, neighbours, colleagues and whanau.

Regards
Paul Pope – Chairman, Portobello Incorporated

● The meeting will be attended by council staff, Cr Jinty MacTavish, and Otago Peninsula Community Board members.

Related Post and Comments:
28.3.13 | Updated 29.3.13
DCC Draft Annual Plan 2013/14: Portobello Harington Point Road Improvements Project

Posted by Elizabeth Kerr

9 Comments

Filed under Business, Construction, DCC, Design, Economics, Geography, Heritage, Name, Politics, Project management, Property, Site, Tourism, Urban design

‘Heartbreak Hotel’ —Grahame Sydney

Received Thursday, 18 April 2013 11:23 a.m.

Wharf Street Hotel: time for some answers
By Grahame Sydney

With the DCC’s Resource Consent panel now sitting on its evidence, the full Council prevented from commenting on the proposal, and Dunedin ironically about to indulge in a celebration of its invaluable built heritage, isn’t it time a few things were clarified for the Dunedin public ? Time for a few truths to be told, instead of the shamefully dishonest propaganda from the promoters of the Wharf Street Hotel ?

Let’s start with the promotional video released on May 11, 2012 and voiced on behalf of his clients by Steve Rodgers of “Betterways Advisory”.

This sophisticated promo is a must-watch for all Dunedin residents, because within its 3 minute 49 second running time they will discover a Dunedin totally unlike the one they know: this is a fantasy Dunedin, whose tranquil waterfront bears no resemblance whatever to the facts. It is neat and orderly, blessed with open park spaces, and tied to its wharfs are luxury yachts and container ships. Rows of new, unrecognisable buildings have miraculously appeared behind every view of the towering glass monolith, and as the CGI camera sweeps across this fictional CBD towards the Stadium (curiously glimpsed only from overhead) and down its oddly-scaled roadways citizens will puzzle to identify any of the many buildings occupying the land in the vicinity of the Railway Station.

Perhaps the developers have bolder plans than a single hotel ? Certainly the Dunedin presented in this video sales pitch is not today’s city. It’s a scrubbed up, redesigned, blatantly re-scaled quasi-Auckland Viaduct vision in which the hideous proportions of the hotel appear more comfortable and the truth is deliberately ignored.

Dunedin eNZed May 13, 2012
http://www.youtube.com/watch?v=BhiKqnDT06M

As you watch, hit the Pause button at 33 seconds, at 53, at 1.14, at 1.21, at 1.39, at 2.22….. what ARE those buildings ? Where did they come from ? Have I been asleep these last decades ? Am I in the right city here ? Would someone please be honest here ?

Having extolled the virtues of the city’s marvellous heritage buildings, and noting that they are one of the major reasons why “tourists love this city”, Mr Rodgers proceeds to extol the virtues of “my clients’ grand design”, which so brutally desecrates that heritage.

Who are these visionary clients, so hellbent on bestowing gifts ? We are slowly learning: the “Otago Businesswoman” behind the proposal is an ex-accountant locally, now consultant and wine promoter living in Queenstown. Ms Song has the good fortune to be married to Ping Cao, reportedly “one of China’s top construction company owners”. That marriage, incidentally, took place in another New Zealand city with which she reported fell instantly in love: Nelson. No “gifts” for Nelson, however. How fickle is love.

Being pushed forward now as the public face of the project, Ms Song’s repeated professions of love for Dunedin are no substitute for expertise, or indeed sensitivity. It is evident she and her entrepreneur husband belong to the camp which believes Dunedin’s Victorian and Edwardian built heritage has less appeal than the monstrously ugly Dunedin Stadium, and that they anticipate a brighter future for the city when more of the same charmless, cheap, dated design has overwhelmed the city’s essential historic character.

Far too many unanswered questions remain, and honest answers would be enlightening. Continue reading

8 Comments

Filed under Architecture, Business, Construction, DCC, Design, Economics, Geography, Heritage, Name, People, Politics, Project management, Property, Site, Stadiums, Tourism, Town planning, Urban design

Delta and the GOBs #DCHL #DCC

### ODT Online Tue, 20 Dec 2011
Jacks Point depot proposal draws nine opposing submissions
By Olivia Caldwell
A [macrocarpa] hedge drew attention at a resource consent hearing last week for Henley Downs Farm Ltd’s application to establish a Delta services depot at Jacks Point. Henley Downs, owned by Jacks Point developer John Darby, proposed the subdivision and land-use consent to operate the depot within the resort zone, as the infrastructure specialists look to expand their depot from their Ladies Mile-Frankton site. It would include eight buildings, two of which would exceed the 4m height limit, and three storage containers, all covering 1sq km. The proposal attracted 11 submissions, nine in opposition.
Read more

Posted by Elizabeth Kerr

Leave a comment

Filed under Construction, DCHL, Design, Economics, Geography, People, Politics, Project management, Site

WILD about Wanaka

### ODT Online Sat, 14 Aug 2010
Developments dismay landscape architect
By Matthew Haggart
As residential subdivisions in Wanaka continue to expand the town’s boundaries, the approach of some developers has saddened the Queenstown Lakes District Council’s top landscape consultant. Dr Marion Read, the chief landscape architect at QLDC’s regulatory authority Lake Environmental, says major earthworks associated with some Wanaka developments are destroying parts of the landscape’s most distinctive features.
Read more

****

### ODT Online Sat, 14/08/2010 – 10:14pm.
Comment by qksmith on Landscape Issues
While I am the first to be critical of landscape issues in the district, I think we have to accept that where land is zoned for LDR that we are dealing with a highly modified environment.
Read more

LDR = Low Density Residential

****

Don’t mind my aportioning blame, rightly or wrongly it’s a considered opinion…more like a bad reaction. Of course, Dunedin isn’t free of sprawl at the hands of some people active in Wanaka.

### ODT Online Sun, 15/08/2010 – 6:52pm.
Comment by ej kerr on Wanaka is sprawl

Being an experienced planner or not is hardly relevant when the adverse cumulative effects of house building are totalled for the Wanaka district landscape.

I fully support the comments, as reported, of Dr Marion Read.

My most recent visit to Wanaka two days ago has again reinforced how inadequate the local district plan is to counter unwarranted housing sprawl.

Half the battle might be with the drive of property owners to create (uncritically) an acontextual, uncompromising slice of suburbia in the extraordinarily picturesque, wild and weathered countryside.

Developers of the subdivisions (a small group of influential citizens whom we know by name), like the property owners, are equally uncritical of the environmental impacts of the sprawl they foster, and derive their not inconsiderable profits from.

This hedonistic activity – speculative building – which does not spring from best practice in landscape architecture, architecture (by registered architects), or sustainable environmental design – is supported (‘controlled’) by an ineffectually dull, unresponsive fabric of arbitrary local authority ‘planning’ decisions (zone rules) constraining the use of colour, gables, materials, height plane angles, non reflective surfaces, bulk and location, density et al.

The result is an impoverished sameness, an unspeakably heavy dreariness in the now over-built environment. An eyesore almost without end that submerges/denies the incredible three-dimensional topographical variances of the natural landscape. It might be expensive, it might be what the market demands, it might be what the bulldozer invites, but this is dumbed down contemporary building development at its illogical worst.

The full battle most probably rests with ‘regional planning’ education and professional practice development in New Zealand that is rather too dependent on quasi-legal/legal experiment with the RMA clause and bland generalities of rural zoning – without mandatory professionally accredited multi-disciplinary training in contextual design processes and environmental sustainability.

The collective forces suburbanising Wanaka should be halted. This is not sustainable.

A moratorium, a re-think. District intelligence must be raised for the stewardship and protection of landscape values, inviting informed sympathetic design responses for the making of comfortable ‘dwelling place’…there should be no need for hackles and loss of hair with each visit to Wanaka.

This is a district for smart design, not stuffy inert planning that expects less of the development community than it has to give.

Elizabeth Kerr, Dunedin

Post by Elizabeth Kerr

8 Comments

Filed under Architecture, Construction, Design, Economics, Geography, Heritage, Politics, Project management, Site, Town planning, Urban design