Aurora with yet another headache

At Facebook:

****

****

Note this particular meat from Richard Healey’s Facebook post:
[my emphasis]

“If you have a property where the lines were built before 2001, then Aurora owns everything up to the house. The only exceptions are where the lines have been brought up to standard and a letter has been sent to the property owner transferring ownership of the lines or a prior agreement is in place. That has almost never happened in Dunedin. If you think that you have been billed, and shouldn’t have been, write to Aurora. If you don’t get redress file a claim.
If you would like to read the appropriate legislation, look up the electricity act 1992 and search for the definition of “point of supply”.
What does that mean? It means that it’s probable that thousands of Dunedin residents have been charged for maintenance to lines and poles that they do not own.”

Electricity Act 1992
Reprint as at 18 October 2016
http://www.legislation.co.nz/act/public/1992/0122/latest/DLM281858.html

Posted by Elizabeth Kerr

This post is offered in the public interest.

2 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Housing, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Stadiums, Tourism, Town planning, Travesty

Letter of opinion draws wide support, view not shared by deathly DCHL

ODT 9.1.16 (page 6)

odt-9-1-16-letters-to-editor-pillans-p6-1

Posted by Elizabeth Kerr

This post is offered in the public interest.

11 Comments

Filed under Aurora Energy, Business, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Sport, Stadiums, Tourism, Town planning, Travesty

Otago’s dangerous electricity network —Aurora’s INCONSPICUOUS and INEFFECTIVE public safety messaging

aurora-energy-safety-message-odt-online_2017-01-08-11-11-33

[smartphone screenshot 2017-01-08]

The advertisement (safety message!) appears at ODT Online.
Blink and you miss it!

This is what Aurora Energy puts out for You to access Public Safety information. A yellow box with some branding, lost amongst news stories within a plethora of webpages.

Did anybody read ODT Online this summer ?
Did anyone see the ad ?
Did anyone notice the weblink ?
Did anybody click on the link ?
Did anyone do up their seat belt or wear a life jacket ?
How do you stay SAFE around a dangerous power network ?
What do you look out for ?
What do you avoid ?
In an emergency, what do you do ?
What sort of emergency ?
Clear guidelines ?

Or, read as ‘So what’ from the DCC-owned company.

****

How extensive is Aurora’s public safety messaging across all available media these holidays —and typically, across a year ?

Is Aurora’s public safety messaging evolving to provide clear informational content to keep the public SAFE around the DANGEROUS and DEGRADED electricity network ?

****

The adverteaser, and the related web information (reproduced below) is at the very low end of public safety information required to prevent personal injury or death. There is little informational value beyond the obvious.

Real life scenarios you should guard against, what are they ?

Other lines companies create graphics, audio and short videos that clearly explain what to do and what NOT to do around electrical facilities and in emergency situations involving live electricity.

Not so Aurora.

This YELLOW-BLOCK commercial branding exercise is cheap, casualised, determinedly ineffective and fully irresponsible. Further, it merely links to what has been up at the Aurora website for some time, which is basic and untelling.

Here’s the Aurora Energy link and their bland factless webpage content:

http://www.auroraenergy.co.nz/safety/

Aurora Energy puts your safety first. We want all our customers, employees, contractors and the wider community to be safe around electricity. Always keep a safe distance from electrical equipment and take extra care when working around electricity.

You can take some simple steps to make sure that you, and others around you, know how to keep yourself safe when around electricity.
● Treat all electricity as live and never touch electrical equipment
● Report electricity faults to your electricity retailer via their faults number
● Phone 111 immediately if there is an injury or risk of a fire
● Follow safe work practice near electrical equipment
● If you see a tree that is growing near or into a power line, contact Delta to arrange pruning services
● Inform others around you of the dangers of electricity
● Be prepared in the event of a natural disaster or extended power outage.
 
Read our free guide to working safely around Aurora Energy’s electricity network (PDF) before working near our electricity network. We’re here to help and can provide you information and services to help you stay safe.
 
Our Public Safety Management System controls hazards that present significant risk of serious harm or major property damage. The System complies with the requirement of the Electricity (Safety) Regulations 2010. To report a potential hazard, please complete the Report a Hazard form or contact Delta.

****

If Aurora has conducted a full PUBLIC SAFETY CAMPAIGN IN OTAGO
across all available media – including dailies, community newspapers, schools, public libraries, council service centres, magazines, online noticeboards, radio, television, instant text messaging, flyers, billboard posters etc
—we have missed it.

It’s not ‘just’ dangerous poles and lines – it’s the condition of the other dangerous and degraded network assets (including conductors, transformers, cast iron potheads, cables, oil-filled switchgear, airbrakes etc) that the public needs to be concerned about.

Aurora Energy is NOT telling you about these : the condition of other network assets after 20-30 years of Dunedin City Council-owned companies’ inept management and criminal neglect of Otago’s power supply.

What would make the best Public Safety Campaign ?

****

The Aurora report by Deloitte made public on 12 December 2016 says:

Refer page 8 (1.5.9 Summary of Recommendations | Health & Safety), and page 31 (4.6. Health & Safety recommendations) – bolding by whatifdunedin:

The Board and management of Aurora need to adopt a more transparent approach with staff and the public. There needs to be acknowledgement of the state of the network along with detailed plans on how these issues are going to be rectified.

****

ODT 13.12.16
– “The Deloitte report did not include a detailed investigation of health and safety issues, but said risk had been increased by a lack of investment. “It is inevitable that this increases the level of risk inherent in the network that could have implications for staff and/or members of the public,” it said.”
– “Mr Cull also refrained from saying the network was unsafe, instead saying: “I don’t think it is as safe as it should be.”
– “[Richard] Healey said he was satisfied for the most part with the report, but not with the response from Mr Cull, DCHL chairman Graham Crombie and Mr [Steve]Thompson, who he said were all still trying to minimise the extent of the problem.”

ODT 21.12.16
– Grady Cameron: ““The accelerated programme uses additional internal and external resources to get the job done quicker. What won’t change are the safety, risk management and work practice measures we have for the safety of workers, contractors and the public.” The programme would prioritise the removal or repair of condition-zero poles close to schools, camping sites and other “high social” areas.”

ODT 24.12.16 ‘Poles spared as condition reassessed’
– “[Queenstown Lakes Mayor Jim Boult] asked Aurora to stabilise or replace condition-zero poles in the Queenstown, Wanaka and Arrowtown central business areas before Christmas.”

It’s not just about the poles.

Related Posts and Comments:
12.12.16 Deloitte report released #Delta #Aurora
30.12.16 Hilary Calvert on Deloitte report for Aurora/Delta
6.1.17 Message to Aurora/Delta : Upper Clutha dangerous poles DON’T MIX with Holiday Campers

█ For more, enter the terms *delta*, *aurora*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

20 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Sport, Stadiums, Tourism, Town planning, Travesty

Message to Aurora/Delta : Upper Clutha dangerous poles DON’T MIX with Holiday Campers

Four “condition zero” poles identified in Upper Clutha as needing to be replaced or reinforced before busy holiday period.

Other poles inside camping grounds identified as needing to be checked regularly by Delta staff during same period.

### ODT Online Fri, 6 Jan 2017
Problem power poles getting regular checks
By Tim Miller
Potentially dangerous power poles in Upper Clutha camping grounds are being checked regularly by lines company staff over the holidays. Before Christmas, Aurora Energy identified and checked the condition of poles in what were considered high-traffic holiday areas, such as camping grounds and parks in Upper Clutha. The company consulted the Queenstown Lakes District Council to identify the high traffic areas.
Read more

█ All 1181 condition zero poles in Otago expected to be replaced by April 2017.

****

At Facebook:

Related Posts and Comments:
1.1.17 A successful Lines company….
30.12.16 Hilary Calvert on Deloitte report for Aurora/Delta
28.12.16 Just beginning…. inquiries into council company rogues
27.12.16 Michael Lewis : The Undoing Project —Interview… #RNZ
25.12.16 The very idea
22.12.16 What GIVES : Aurora/Delta/DCHL/DCC…Energy Safety…ComCom ??
20.12.16 Aurora/Delta : RNZ’s Kathryn Ryan with Rod Oram
16.12.16 Tim Hunter, NBR —Aurora/Delta, DCC and ComCom
16.12.16 Delta #EpicPowerFail 8 —Stuart McLauchlan : contamination, code…
15.12.16 DCHL/Aurora/Delta unravelling
14.12.16 Bev Butler queries invoices for Delta hospitality at Stadium #LGOIMA
14.12.16 Aurora/Delta : Richard Healey on the [SOON departing] CEO
13.12.16 DCHL/Aurora/Delta ‘PR fashion statements’ fb DCC rates increases
12.12.16 Deloitte report released #Delta #Aurora
9.12.16 Deloitte report pending —Public Notice at ODT | Facebook entry
7.12.16 Delta/Aurora : Nobody’s willing to call it after misrepresentations
7.12.16 Audit and Review, Deloitte
3.12.16 Delta/Aurora : The Dirty Twist —EXTREME Misrepresentation…
1.12.16 Oi Grady— “It’s Us, Delta’s Electrical Workforce, unanimously!”
30.11.16 Delta #EpicPowerFail 7 : Kyle Cameron —The Money or the Bag?

█ For more, enter the terms *delta*, *aurora*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

3 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Hot air, Infrastructure, Media, New Zealand, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Site, Tourism, Travesty, What stadium