Tag Archives: Bikes

Te Ara I Whiti – light path #sharedway Auckland

Elevated illuminated space is exciting but how long until the shine wears off – this bad taste won’t even make it to Kitsch.

Light Path NelsonSt1-e1449104198336 [transportblog.co.nz - Patrick Reynolds]Light Path soaring-cycling-sensation [aucklandcouncil.govt.nz]

“This is a great day for Auckland’s inner city cycling network. The cycleway is a new and exciting urban space, creating a city centre where people feel safer and confident to ride a bike.” –Minister Simon Bridges

Comment #13 by David Bridewell  (2 days ago)
I think the cycle – and I trust walkway – is a good idea. But whoever chose that vile colour should be hauled into the centre of Aotea square and mercilessly flogged.

### nbr.co.nz Thu, 3 Dec 2015
‘Magenta Adventure’ cycleway opens in Auckland
By Emerson Howitt
Auckland cyclists are in the pink with today’s launch of the city’s latest piece of cycle-friendly infrastructure. The $18 million magenta coloured Light Path cycleway – already dubbed “Magenta Adventure” – was opened with a ribbon cutting ceremony presided by Transport Minister Simon Bridges, followed by schoolchildren cycling along the re-vamped Nelson St motorway off-ramp. […] The off-ramp was closed in 2005 after an upgrade to the central motorway junction left it surplus to requirements. […] The Light Path features interactive lighting along one side that will illuminate the structure at night.
Read more + 34 comments

iion Published on Dec 3, 2015
Te Ara I Whiti – The Light Path #LightPathAKL
@BikeAKL celebrated the opening of #LightPathAKL with hundreds of cyclists taking to the newly opened cycleway. We went along to see their reactions and join in the festivities. Interactive Light Installation by iion http://iion.co.nz

Light Path Canada-St-Bridge_5179 [transportblog.co.nz - Patrick Reynolds] 1Light Path Canada St Bridge [Patrick Reynolds]

### transportblog.co.nz Thu, 3 Dec 2015
Te Ara I Whiti – the lightpath
By Matt L
Auckland’s newest and certainly it’s most colourful cycleway (so far) was officially opened today by Transport Minister Simon Bridges. And I must say, Simon gave a fantastic speech showing he gets it, talking up the environmental, health, congestion and economic benefits of investing in cycling – this view was reinforced in discussion with him later. […] The new bridge connecting Canada St to the old offramp has been given the name of Te Ara I Whiti or the lightpath and combined is a fantastic addition to Auckland. […] One of the most surprising things about the project is just how little time it has taken from inception to delivery.
Read more

█ Video via TVNZ On Demand
Better Together: The Nelson Street Cycleway (4:51)
Get the inside track on the merging of the creative ideas of carver Katz Maihi and landscape architects and urban designers Monk Mackenzie + Land Lab, that have helped shape Auckland’s ambitious new cycleway design.
Link: https://www.tvnz.co.nz/content/tvnz/ondemand/shows/m/microsoft-better-together/s1/e3.html

Light Path [TVNZ On Demand Better Together - The Nelson Street Cycleway] screenshots[screenshots]

### NZ Herald Online 2:14 PM Saturday Dec 5, 2015
Pedal to the new metal
By Catherine Smith
I don’t usually claim to have much in common with engineers – putting things together is not my strong suit. But on Tuesday, when I donned a fluoro vest and rode the newest piece of Auckland’s cycling infrastructure with project manager Stephen Cummins of GHD, I couldn’t get enough of the geeky details of the shared pathway, formerly known as the old Nelson St off-ramp.

It is barely a year since the Lightpath Te Ara I Whiti (it got a fancy pants name at Thursday’s opening), first got the nod. New York’s glamour former tsar of transportation, Janette Sadik-Khan, was in town to talk up how she transformed the Big Apple’s car-clogged streets to plazas given over to people and bikes. She was less than flattering about Auckland’s un-connected bits of cycle paths. The “three Ls” who shape Auckland – mayor Len Brown, design head Ludo Campbell-Reid and chair of Auckland Transport Lester Levy – keen to impress Sadik-Khan, fell over themselves to promise Barbara Cuthbert of Bike Auckland in front of an audience of over 1500 city-lovers that they would convert the abandoned motorway into a connector between the aging Northwestern cycleway, the new Grafton Gully path and the rest of the city.

The result is extraordinary. This bridge, complete with art works of pulsing lights, pohutukawa trees and a stunning perspective of the city’s favourite bits is no dull bit of infrastructure. Cummins, possibly punch-drunk from lack of sleep, reckons that a project of this complexity would typically take a minimum of two years, but every one of the suppliers was so excited by this build that they pulled out all the stops to whittle that time to eight months. Despite reporting to many “parents” (this is an NZ Transport Agency project as the stretch of road is part of the national motorway), the design team was tight and fast-moving: GHD was lead designer, with architects Monk Mackenzie and engineers from the Agency.

Early thoughts were to plunk something clunky and temporary between the back of K Rd and the old off-ramp. Fortunately, saner heads (and money from minister Simon Bridges’ urban cycleways programme) funded a much better option. Already it’s been named in the World Architectural Festival, design mags are raving.
Read more

Posted by Elizabeth Kerr

Light Path Nelson-St-at-Night-Brett-Blue [transportblog.co.nz]Light Path Nelson-St-at-Night-Brett-Green [transportblog.co.nz]blue green [transportblog.co.nz]

*Images: (top of page) transportblog.co.nz – cyclists by Patrick Reynolds, pictured at right; aucklandcouncil.govt.nz – Light Path soaring-cycling-sensation

8 Comments

Filed under Architecture, Business, Construction, Cycle network, Democracy, Design, Economics, Events, Fun, Geography, Infrastructure, Innovation, Inspiration, Media, Name, New Zealand, NZTA, People, Pics, Project management, Site, Structural engineering, Tourism, Town planning, Transportation, Urban design

John Evans: ‘Always Follow the Money Honey’ #DunedinCyclewayCRIME

Fair Go [tvnz.co.nz]
Fair Go in FrameScrollCornerJPRfinished

Received from John Evans
Wed, 28 Oct 2015 at 7:55 p.m.

Tonight on Fair Go – https://www.tvnz.co.nz/ondemand/fair-go/28-10-2015 – we find that the Bike Barn franchise has been in breach of the Sale of Goods Act and is being investigated by the Commerce Commission.

The great shame is that the councillors on the DCC will spend $47 million of your money to advance the commercial interests of a private business group.

When will we get some non naïve councillors – apart from Hilary and Lee.

For Jehovah’s sake Dunedin

WAKE UP.

Your representatives are naïve and being conned by outside interests and inside corruption.

[ends]

Posted by Elizabeth Kerr

Image: 4.bp.blogspot.com – ScrollCornerJPRfinished, frame added by whatifdunedin

13 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Dunedin, Economics, Geography, Hot air, Media, Name, New Zealand, NZTA, OAG, Ombudsman, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Transportation, Urban design, What stadium

DCC cycleways propaganda continues #SpendSpendSpend

GREATER DUNEDIN ELECTIONEERING ALERT

cycle hero [www.odopod.com]

Dunedin City Council – Media Release
Another Busy Year Ahead With Cycleways

This item was published on 10 Apr 2015

Dunedin residents will be able to make the most of safer cycle routes in coming months as the city’s cycleway network continues to expand. Dunedin City Council Infrastructure Services Committee Chair Cr Kate Wilson says cycleways make the streets safer for all road users and hopefully encourage more people to get on bikes.

“For years people have been asking the Council for enhanced cycleways in Dunedin. We have a responsibility to provide networks that give people travel choices, whether that be cycling, walking or taking a bus or car. The more of the network that is completed, the more we can provide for people who want to use cycleways, whether it’s a child cycling to school, an adult cycling recreationally, or anything in between.”

It is also a central government priority to rapidly expand and enhance networks of cycleways around the country, recognising the benefits to health, the economy and the environment. The DCC has received $570,000 from the Government’s Urban Cycleway Fund and the Council has decided the funding will be used to enhance and expand the South Dunedin Cycle Network. The DCC also receives funding from the NZ Transport Agency to build the network.

“Taking advantage of Government funding now is important as we have a limited window of opportunity to capitalise on our position as one of only a few cities with the requisite Strategic Cycle Network Plan. We are a financially constrained Council and the more funding we get from outside sources the less we need from ratepayers.”

In August 2011, the Council adopted the Strategic Cycle Network for Dunedin, which gave the South Dunedin network of routes the highest priority for design and construction. Cr Wilson says 40% of people living in South Dunedin do not have access to a car, which is a key reason for South Dunedin cycle routes being prioritised.

“We understand introducing cycleways to our streets has been a big change for some people, but we’ve got a great opportunity here to improve our city in a very positive way for current and future generations.”

Here’s an outline of what’s happening with South Dunedin cycleways over the next month.
● Portobello Road (between Timaru Street and Portsmouth Drive) – wider consultation on a revised concept plan for this stretch of road.
● Hillside Road/McBride Street – staff are reviewing the proposed cycleway design after meeting with local businesses.
● Neville/Wilkie Streets – a final decision on the type of cycleway for these streets will be made in April. Construction is scheduled to begin in May.
● Harbourside/Roberts Street – the Harbourside Working Group will meet again in mid April.
● Richardson/Coughtrey, Fingall/Tedder, Bellona/New Streets – Construction of these ‘quiet streets’ and dedicated cycleway should be finished in the next couple of weeks.

Residents, businesses and property owners in areas where cycleways are planned will be contacted directly.

█ General information is also available at http://www.dunedin.govt.nz/sdcn and more details will be added as projects are rolled out.

Contact Cr Kate Wilson, Infrastructure Services Committee Chair on 027 443 8134. DCC Link

cycling getty [blogs.independent.co.uk]

Related Posts and Comments:
20.3.15 DCC Shame: First, John Wilson Dr … now Portobello Rd cycleway
11.2.15 Dunedin Cycleways: Pet project staff, ‘entitlement’? #irony
3.12.14 Cycling at Dunedin —boring debate, network spending continues #DUD
22.5.14 DCC Transportation Planning —ANOTHER consultation disaster
6.5.14 Roading network screwed by council staff
14.2.14 DCC: Broadband AND bicycles #fraudband speed
14.1.14 DCC: Hospital area parking changes #cyclelanes
5.1.14 Norman Foster: SkyCycling utopia above London railways #ThinkBig
24.12.13 Daaave’s $47 million Christmas present to Jinty. We’re paying.
4.12.13 Dunedin cycleways: Calvin Oaten greeted by DCC silence
17.11.13 Dunedin cycleways: Calvin Oaten’s alternative route
17.11.13 Cull and MacTavish… “Have you fixed the debt crisis?”
14.11.13 Cycle lane explosions and puncture kits (SPOKES grenades launch)
8.11.13 Dunedin Separated Cycle Lane Proposal [how to make a submission]
29.10.13 DCC (EDU) invents new job! [GigatownDunedin]
19.10.13 Cycle lobby games and media tilts
24.9.13 Mediocrity and lack of critical awareness at DCC [council reports]
8.7.13 Bloody $tupid cycleways and Cull’s electioneering . . . [route maps]
28.3.13 DCC DAP 2013/14: Portobello Harington Point Road Improvements
26.2.13 DCC binge spending alert: Proposed South Dunedin cycle network
22.2.13 DCC: Council meeting agenda and reports for 25 February 2013
31.1.13 Who? 2010 electioneering
21.11.12 Safe cycling -Cr Fliss Butcher
5.11.12 DCC, NZTA: Cycle lanes controversy

Posted by Elizabeth Kerr

*Image: (from top) odopod.com – cycle hero; blogs.independent.co.uk – cycling getty [Getty images]

41 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Geography, Hot air, Name, New Zealand, NZTA, People, Politics, Project management, Property, Site, Sport, Tourism, Town planning, Urban design, What stadium

Dunedin City Council | Consolidated council debt

DCC mayor and councillors (2013-14) + council staffheads should roll

Recent ODT stories:

██ Mayfair Theatre, South Dunedin, learnt on Monday an adjacent public car park on the corner of King Edward St and Cameron St used by often elderly patrons was for sale, with tenders closing this week.
Car park sale ‘kick in guts’

██ Anger from Caledonian Bowling Club members, who last Friday learnt the council would sell the Andersons Bay Rd land the 135-year-old club was on.
Dismay as club hears of sale plans
Community institution feels the pinch
Bowlers buoyed by support over council sell-off plan
Club will fight sale

██ Council to sell up to 150 plots of surplus land and property over the next two to three years in a move expected to raise about $10 million, targeted for paying off debt.
Councillors urge rethink of land sale
Council may net $10m in sales
Southern suburbs among poorest 10%

****

### ODT Online Wed, 30 Jul 2014
Councillors urge rethink of land sale
By David Loughrey
Some Dunedin city councillors are urging a rethink on the sale of a council-owned car park near the Mayfair Theatre, but Mayor Dave Cull is adamant the sale should not be a political decision. Mr Cull said yesterday council chief executive Sue Bidrose had been delegated to make the sale, and it was not a matter for councillors. “That’s her job.” But three councillors want at least a discussion on the issue.
Read more

****

Incompetence dcc

SOUTH DUNEDIN CYCLE NETWORK
“Based on what it now knew about costs […] the council would only be able to build 12km of the original 25km cycleway network within its original $4.5 million budget. The network would cost as much as $7.85 million if built as originally approved by the council.” (ODT)

### ODT Online Wed, 30 Jul 2014
Cycle project scaled back
By Debbie Porteous
The Dunedin City Council has been forced to pare back original plans for the controversial South Dunedin Cycle Network, as the true costs of the project become apparent. Despite being reduced by almost half, the curtailed network is expected to cost about $5.5 million – $1 million more than original estimates for the whole network. The blowout may eat into funding set aside for the rest of the city’s cycle network.
Read more

“I’m not surprised given the dickheads we’ve got around that table. It’s just another nail in Dunedin’s coffin; we’ve got a council not focused on business and focused on cyclists, but there are no cyclists.” –Roger Fewtrell

### ODT Online Wed, 30 Jul 2014
Threat to move over cycleway
By Debbie Porteous and Chris Morris on Wed, 30 Jul 2014
A Dunedin business owner potentially affected by changes to an intersection on the route of the new harbourside cycleway has threatened to move his enterprise to Auckland. […] Southern Hospitality managing director Roger Fewtrell said the council’s decision meant his company would consider its options at its board meeting early next month.
Read more

Cycle lane 2 copy24.12.13 Daaave’s $47 million Christmas present to Jinty. We’re paying.

█ For more on DCC’s cycle network project for Dunedin, enter the terms *cycle*, *transportation* or *disaster* in the search box at right.

Posted by Elizabeth Kerr

14 Comments

Filed under Business, Construction, Cycle network, DCC, Democracy, Design, Economics, Hot air, Media, Name, New Zealand, NZTA, People, Pics, Politics, Project management, Property, Site, Sport, Stadiums, Tourism, Town planning, University of Otago, Urban design, What stadium

DCC: Hospital area parking changes #cyclelanes

Parked cars 1

Dunedin City Council – Media Release
Parking Changes for Hospital Area

This item was published on 14 Jan 2014.

Some changes to on-street parking outside Dunedin Hospital are coming soon as part of measures to improve cyclist safety. The changes will occur in the block of Cumberland Street between Hanover and Frederick Streets and should be implemented in late January/early February.

Dunedin City Council Senior Traffic Engineer Ron Minnema says, “The objective of the changes is to reduce the risk to cyclists by reducing the number of conflicts between vehicles manoeuvring into car parks and northbound cyclists.”

The changes will also complement the wider cycle lanes. The changes involve increasing the maximum time period on the 13 pay and display parks from four hours to all day, removing the bus stop, installing no stopping lines immediately south of the entrance to the Hospital car park and construction of two extra mobility parks. That will mean there will be four mobility parks (two more than at present) and 2 P5 parks (one less than at present).

The Southern District Health Board, the NZ Transport Agency, the Automobile Association and the Otago Regional Council have been consulted about the parking changes, Mr Minnema says. The changes, which are part of short-term safety measures to improve cyclist safety in the central city, were discussed by the Council in May 2013.

Once the changes have been made, the DCC will monitor the on-street parks outside the Hospital on Great King, Hanover and Frederick Streets. The results will be discussed with the Health Board to determine whether any further changes are required on these streets.

Earlier in 2013, minor changes to parking took place at 17 sites in the central city. All these parking changes are in response to the Council in November 2012 asking the NZ Transport Agency to identify short-term measures to improve cyclist safety, as well as developing a long-term plan with the same vision.

Part of the long-term plan is a separated cycle lane proposal which involves two preferred long-term options for improving the safety of Dunedin’s one-way sections of State Highway 1. Consultation on this proposal closed on 6 December last year.

Contact Senior Traffic Engineer on 03 474 3706.

DCC Link

Related Posts and Comments:
5.1.14 Norman Foster: SkyCycling utopia above London railways #ThinkBig
24.12.13 Daaave’s $47 million Christmas present to Jinty. We’re paying.
4.12.13 Dunedin cycleways: Calvin Oaten greeted by DCC silence
17.11.13 Dunedin cycleways: Calvin Oaten’s alternative route
17.11.13 Cull and MacTavish… “Have you fixed the debt crisis?”
14.11.13 Cycle lane explosions and puncture kits (SPOKES grenades launch)
8.11.13 Dunedin Separated Cycle Lane Proposal [how to make a submission]
5.11.12 DCC, NZTA: Cycle lanes controversy
19.10.13 Cycle lobby games and media tilts
24.9.13 Mediocrity and lack of critical awareness at DCC [council reports]
8.7.13 Bloody $tupid cycleways and Cull’s electioneering . . . [route maps]
28.3.13 DCC DAP 2013/14: Portobello Harington Point Road Improvements
26.2.13 DCC binge spending alert: Proposed South Dunedin cycle network
22.2.13 DCC: Council meeting agenda and reports for 25 February 2013
31.1.13 Who? 2010 electioneering
21.11.12 Safe cycling -Cr Fliss Butcher

Posted by Elizabeth Kerr
 

127 Comments

Filed under Business, DCC, Design, Economics, Name, NZTA, Politics, Project management, Property, Site, Stadiums, Tourism, Town planning, University of Otago, Urban design, What stadium

Daaave’s $47 million Christmas present to Jinty. We’re paying.

Cycle lane 2 copySOLD OUT: Santa’s in the vocal minority

ODT 14.11.13
OPINION: Cycleways and parking issues
Dunedin City Councillor Jinty MacTavish is happy the cycleway proposal has sparked discussion, but wants to keep the conversation grounded in fact. Cont/

Comment to article:
DCC’s +$47M cycleways project
Submitted by ej kerr on Thu, 14/11/2013 – 11:13pm.
Cr MacTavish has better things to do. She knows it. Her job as a city councillor is to take the air out of her various tyres and acknowledge that her loose-assemblage greenwash ‘political party’ should stop its spendthrift ways. Far better that they bend over backwards on quickly retiring the council’s +$623M consolidated debt. A harder workout than cruising on SH1 with the wind up their tails.

Reply:
Cycleway clarifications
Submitted by Jinty MacTavish on Fri, 15/11/2013 – 11:41am.
It’s an unfortunate urban myth that the DCC intends to spend $47M on cycleways, which seems to have originated from this article which double-counted the cost of a bunch of projects. I’ve asked staff to send through the breakdown and will post again here when I have the full details in front of me. Cont/

Discussion at What if? Dunedin:
JimmyJones
Submitted on 2013/11/17 at 9:25 pm
Sustainable Jinty commented in the ODT article referred to and said It’s an unfortunate urban myth that the DCC intends to spend $47M on cycleways, which seems to have originated from this article which double-counted the cost of a bunch of projects. I’ve asked staff to send through the breakdown and will post again here when I have the full details in front of me.
Here we see her claiming that the $47 million is a myth and that it has been wrongly calculated. She says this while not having the actual figures and not even knowing where it came from.
The figure actually came from the DCC at a forum in May this year involving the DCC and the NZTA ODT: City to lead country in cycle safety. We were told:
Dunedin is set to lead the country in cycle safety.
Projects worth more than $47 million will form a cycle network unlike any other within urban New Zealand, those at a forum in Dunedin heard last night. Mayor Dave Cull welcomed the almost 100 people present and explained why cycle infrastructure deserved significant investment.

It is clear that Jinty lied to us about the double counting. The figures are in the article, and there is no double counting. There is also no double counting in Jinty’s figures, because she doesn’t have any. Her attempt to discredit and minimize this estimated cost of bicycle projects has failed. Note how she re-interprets the claim as being DCC-only spending, whereas the claim has always been DCC + NZTA spending (Straw man). Richard Thomson on Radio Dunedin has been up to the same mischief (12/11/13). I say “mischief” but these statements could be offences against the Financial Reporting Act or other legislation. In any case this is very disappointing because the misinformation seems intentional. Desperation breeds dishonesty.

Reply:
Elizabeth
Submitted on 2013/11/17 at 10:38 pm | In reply to JimmyJones.
JimmyJones, I looked upon Cr MacTavish’s comment on the $47 million (in reply to a comment I made at ODT)… with sheer incredulity. I couldn’t believe what I was reading so didn’t even bother to reply.
However, glad you brought it up. You correctly place the councillor’s comment in context here and of course (!!!) what she says does not shine in a pure angelic or intelligent light. The quality of her ‘homework’ has dropped out the bottom, as ’twere.
Well done, JJ.

Related Post and Comments:
17.11.13 Cull, MacTavish: (to borrow a phrase) “Have you fixed the debt crisis?”

Posted by Elizabeth Kerr

59 Comments

Filed under Business, Construction, DCC, Design, Economics, Hot air, Name, NZTA, People, Politics, Project management, Sport, Tourism, Town planning, Urban design, What stadium