Tag Archives: Aurora Energy Ltd

Richard Healey : How Aurora’s lines killed in-calf dairy cows and some sheep

No, really.

M A N D A T O R Y ● R E A D I N G ● F O R
Y O U R ● P E R S O N A L ● S A F E T Y ● A R O U N D ● L I N E S

The following note at Facebook also includes a LGOIMA request directed to Grady Cameron, CE Aurora/Delta, and his interim reply.

Death on the Taieri
Richard Healey · Friday, 27 January 2017
Why should you care about eight dead cows and a dozen dead sheep? Let me explain… In 2010 eight cows were electrocuted on a farm on Maungatua Rd. You can read the story here. Have a close look at this photo:

dead-cows-via-richard-healey-at-facebook-odt-files

The black line about a quarter of the way down from the top is 33,000 Volt powerline. The round object attached to it, just to the right of center, is the top section of an insulator that has failed. Now look carefully at this photo…

https://www.facebook.com/notes/richard-healey/death-on-the-taieri/10156045815054848

****

Reiteration of the SAFETY VIDEO showing at Richard’s Facebook note – please share it widely.

Fortis Alberta Published on Jun 17, 2013
Step and Touch potential
Watch what to do and not to do in the event of a power line contact.

Related Posts and Comments:
24.1.17 Aurora Energy lines, Lindsay Rd, Caversham, Dunedin
21.1.17 Mayor ignores serious plight of DCC’s FAILED Otago power network in favour of urban cycleways and CBD
● 19.1.17 Jarrod Stewart is EXACTLY RIGHT [what would Steve Thompson know]
18.1.17 Basic questions arising for the City, unpublished by the newspaper
18.1.17 Scandal : DCC / Delta obfuscate over destruction of Heritage Rose Collection
17.1.17 Whistleblower continues campaign vs #AuroraEnergy #DeltaUtilityServices
14.1.17 DCC/DCHL responsible for failed rollout of ‘gigatown’ #dangerouspoles
13.1.17 Aurora with yet another headache
12.1.17 No Integrity | Cull’s FULL INSULT to Ratepayers and Residents
12.11.17 How to drop Crombie and the mafia from City boards
9.1.17 Letter of opinion draws wide support, view not shared by deathly DCHL
8.1.17 Otago’s dangerous electricity network —Aurora’s INCONSPICUOUS and INEFFECTIVE public safety messaging
6.6.17 Message to Aurora/Delta : Upper Clutha dangerous poles DON’T MIX with Holiday Campers

█ For more, enter the terms *aurora*, *delta*, *dchl*, *dangerous*, *poles*, *richard healey*, *gigatown*, *roses*, *grady*, *cameron*, *crombie*, *luggate*, *jacks point*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: odt.co.nz – dead dairy cows by Stephen Jaquiery, Maungatua Rd, 2010

2 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Stadiums, Travesty

Aurora Energy lines, Lindsay Rd, Caversham, Dunedin

iPhone Videos by Rose McRobie

Aurora Energy lines in residential Lindsay Rd, Caversham during the heavy winds last week. The street is located not far north of Lookout Point on the west side of the Southern Motorway.

● Some of the lines in the videos are supported by red-tagged poles.
● Delta has previously said the concrete poles here are prone to concrete cancer – the surface has pitted allowing moisture to corrode their steel reinforcing.
● Some lines are touching one another or tangling in the heavy winds.
● One resident when standing in his section can nearly touch the sagging lines in no-wind conditions….

idunedin Published on Jan 23, 2017
Aurora Energy lines (1 of 3)
IMG 1910 –

idunedin Published on Jan 23, 2017
Aurora Energy lines (2 of 3)
IMG 1911 –

idunedin Published on Jan 23, 2017
Aurora Energy lines (3 of 3)
IMG 1912 –

Posted by Elizabeth Kerr

This post is offered in the public interest.

1 Comment

Filed under Aurora Energy, Business, Delta, Democracy, Dunedin, Economics, Education, Electricity, Events, Finance, Geography, Health, Housing, Infrastructure, OAG, Ombudsman, People, Pics, Politics, Project management, Property, Public interest, Site, Travesty, What stadium

DCC Draft Annual Plan 2017/18

Council Chamber, Municipal Chambers, Dunedin [architecturenow.co.nz] 1Council Chamber, Municipal Chambers [architecturenow.co.nz]

An ordinary meeting of the Dunedin City Council will be held on Monday 23 January 2017 in the Edinburgh Room, Municipal Chambers, The Octagon, starting at 9.00am.

Agenda
https://infocouncil.dunedin.govt.nz/RedirectToDoc.aspx?URL=Open/2017/01/CNL_20170123_AGN_482_AT_WEB.htm

1 Introduction                                                                                           
2 Apologies                                                                                              
3 Confirmation of Agenda
4 Declaration of Interest    
REPORTS
5 Draft 2017/18 Annual Plan Budget Material
6 Draft 2017/18 Budget – Water and Waste Group
7 Emissions Trading Scheme Liabilities and Proposed Carbon Management Policy
8 Draft 2017/18 Budget – Solid Waste
9 Update on the Tertiary Precinct Safety and Accessibility Upgrade
10 Draft 2017/18 Budget – Transport Group
11 Draft 2017/18 Budget – Parks and Recreation Group
12 Draft 2017/18 Budget – Property
13 Draft 2017/18 Budget – Arts and Culture Group
14 Draft 2017/18 Budget – Customer and Regulatory Group
15 Te Ao Tūroa Environment Strategy Funding
16 Review of the Allocation of Funding to Applicants to the Biodiversity Fund
17 Draft 2017/18 Budget – Community and Planning Group
18 Draft 2017/18 Budget – Enterprise Dunedin
19 Draft 2017/18 Budget – Corporate Services
20 Draft 2017/18 Budget – Corporate Support Services
21 Draft 2017/18 Budget – Waipori Fund
22 Draft 2017/18 Budget – Investment Account                                                            
 
Council Open Attachments under separate cover
[see item 9 Update on the Tertiary Precinct Safety and Accessibility Upgrade]
https://infocouncil.dunedin.govt.nz/RedirectToDoc.aspx?URL=Open/2017/01/CNL_20170123_ATT_482_EXCLUDED_WEB.htm

Council Supplementary Agenda
23 2017/18 Rating Method
24 Notices of Motion                
https://infocouncil.dunedin.govt.nz/RedirectToDoc.aspx?URL=Open/2017/01/CNL_20170123_AGN_482_AT_SUP_WEB.htm

█ Document Source:
http://www.dunedin.govt.nz/your-council/agendas-minutes

Posted by Elizabeth Kerr

This post is offered in the public interest.

27 Comments

Filed under Business, DCC, Democracy, Dunedin, Economics, Finance, Geography, Infrastructure, LTP/AP, OAG, Ombudsman, Otago Polytechnic, Pet projects, Politics, Project management, Property, Public interest, University of Otago, What stadium

Mayor ignores serious plight of DCC’s FAILED Otago power network in favour of urban cycleways and CBD

Dunedin Mayor Dave Cull said one factor behind recent delays was the council “definitely screwed up” with the South Dunedin cycleway.

Mr Cull said he understood the NZ Transport Agency was about to start work at the north end of the one-way system. He was looking forward to the NZTA building its planned separated cycle network on the city’s one-way streets. “I’ll be very pleased when they actually get something going, because it has taken too long.”

### ODT Online Sat, 21 Jan 2017
Cycleway work to crank up
….The Dunedin City Council will spend $2.6million of government money on links between the Portsmouth Dr shared cycleway and the city, and State Highway 88 and the Dunedin Railway Station. Those improvements will help link cycleways on West Harbour and the Otago Peninsula. Council spending has been delayed on the peninsula, with $3million spent this financial year instead of an expected $10.3million. […] There were no plans for more cycleways in South Dunedin, other than remedial work on five intersections there, following botched work in 2015.
….The cycleway budget will be discussed at a meeting on Monday to consider the annual plan for the next financial year. […] The strategic cycle network budget would return to the long-term plan next year for community consultation.
Read more

****

In which THE BLOODY CLUELESS (see italics) needs a freaking rocket.

Comments at ODT online (our italics):

Boldor Sat, 21/01/2017 – 7:06am #
My my Mr I’ve got no agendas is back to wanting to spend untold millions of dollars of ratepayers hard earned money on useless cycleways this money would be be better spent on infrastructure and a small but important thing known as the power grid and poles.

AJPemberton Sat, 21/01/2017 – 10:40am #
A quick rebuttal to Boldor : Cycleways are infrastructure and far from useless. It is not untold millions: they mention costs in the article. And it is a small fraction of the total spend on roads. The NZTA won’t be funding Delta to replace power poles either, that money is only for the cycleways. I was unaware Delta’s power grid maintenance was funded by Dunedin ratepayers, when did that happen?

█ For more, enter the terms *cycle*, *cycleway*, *cycling*, *bicycle* or *$47 million* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

5 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, Cycle network, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, Economics, Education, Electricity, Finance, Geography, Health, Hot air, Infrastructure, Media, Name, New Zealand, NZTA, OAG, Ombudsman, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Queenstown Lakes, Resource management, SFO, Site, South Dunedin, Stadiums, Structural engineering, Tourism, Town planning, Transportation, Travesty, Urban design

Jarrod Stewart is EXACTLY RIGHT [what would Steve Thompson know]

At Facebook:

Dunedin City Council-owned company [Aurora Energy Ltd] was showing signs it would return to its old ways as soon as public pressure began to lift.

ODT Online Thu, 19 Jan 2017
Claim Aurora facing $1b bill
By Vaughan Elder
The former director of Aurora Energy’s $30 million accelerated pole replacement programme says it is doomed to fail and believes the company faces a billion-dollar spend to upgrade its network. Jarrod Stewart says he quit the role last month in part because he believed the programme to replace thousands of compromised poles would be mishandled so badly someone would be injured. “I don’t enter jobs with the premise that I am going to fail,” Mr Stewart said. His claims were yesterday disputed by Aurora and Delta chairman Steve Thompson, who said they were “exaggerated” and it was disappointing he had gone public after leaving the company.
Read more

For real change to happen there needed to be a clean-out of management and the appointment of a “fixer” chief executive with an appetite for change and a willingness to make unpopular decisions.

At Facebook:

Posted by Elizabeth Kerr

This post is offered in the public interest.

21 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, Economics, Education, Electricity, Finance, Geography, Health, Hot air, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Stadiums, Tourism, Town planning, Travesty

Whistleblower continues campaign vs #AuroraEnergy #DeltaUtilityServices

Last year’s news….

grady-cameron-delta-ce-on-tv3-newshub-co-nz-1[Story/Newshub]

Back when….
Grady Cameron said on national television … “We Have A Safe Network” …
Did Grady get a tour of dangerous poles three years ago – or not ?
Was he shown just ONE pole at Green Island/Abbotsford.
Who would we rather believe.
Not Grader.

### newshub.co.nz 31/10/2016
Delta CEO fronts up on dangerous, toppling power poles
By Jendy Harper
A fortnight ago, we brought you the story of thousands of dangerous power poles which are putting lives at risk and have already been responsible for a death. The poles are the responsibility of lines company Delta and are dotted around Otago. A whistle-blower walked out on a 30-year career in electricity to speak out because he said management weren’t listening to his safety concerns. Richard Healey estimated there are 3000 power poles which need to be replaced. Today, Delta said they need to make dramatic changes and they will borrow $26 million dto replace 3000 power poles by the end of next year. Why did it take one man’s death and a whistleblower to speak out before the company acted? Delta CEO Grady Cameron finally speaks to Story.
MUST SEE Video [full Story report]

****

At Facebook yesterday:

richard-healey-facebook-16-1-17

█ Deloitte’s Aurora report (Dec 2016)

█ For more, enter the terms *aurora*, *delta*, *dchl*, *dangerous*, *poles*, *gigatown*, *grady*, *cameron*, *crombie*, *luggate*, *jacks point*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

7 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Stadiums, Tourism, Town planning, Travesty

DCC/DCHL responsible for failed rollout of ‘gigatown’ #dangerouspoles

14.1.17 ODT: Old poles choking Gigatown
13.1.17 ODT: Connecting to fibre not possible on red tag pole

Related Post:
13.1.17 Aurora with yet another headache

WHO IS DIRECTLY AND FINANCIALLY RESPONSIBLE ?

● Dunedin City Council
● Dunedin City Holdings Ltd
● Aurora Energy Ltd
● Delta Utility Services Ltd

IN OLDER NEWS

### ODT Online Wed, 26 Mar 2014
Safety liabilities stop with directors
By Simon Hartley
Company directors are set to be held more accountable for employee injury or death under tougher new health and safety regulations, highlighted by Gloria Davis’ recent conviction over the eight deaths attributed to the sinking of the Easy Rider fishing vessel last year. The national Institute of Directors backs the expectations placed on directors, regardless of the company size or number of employees, saying ultimately the “buck stops” with company directors. […] Professional Dunedin director Stuart McLauchlan, national president of the Institute of Directors and former Otago institute branch chairman, says directors must get to grips with the new health and safety requirements and that “reporting” of health and safety issues, and acting on them, was “the key” for directors. Nothing has changed in terms of liability. After people advise administration on health and safety issues they must act; ultimately the buck stops there with directors,” he said when contacted in Kuala Lumpur yesterday. […] Mr McLauchlan said the directors’ institute and the Ministry for Business, Innovation and Employment last year ran roadshows together around the country, specifically outlining directors’ health and safety responsibilities, and have a template on the institute’s website, on health and safety requirements and obligations.
Read more

Related Post:
25.3.14 Delta blues . . . and Easy Rider

The Deloitte report for Aurora Energy was released publicly on 12 Dec 2016.

Stuart McLauchlan ceased being a director of the council owned companies Aurora Energy and Delta Utility Services on 12 Dec 2016. Commencement date for his directorships of both companies: 1 Jun 2007.

Aurora Energy Ltd – http://www.companies.govt.nz/co/471661
Delta Utility Services Ltd – http://www.companies.govt.nz/co/453486
Dunedin City Holdings Ltd – http://www.companies.govt.nz/co/559098

█ For more, enter the terms *aurora*, *delta*, *dchl*, *dangerous*, *poles*, *gigatown*, *grady*, *cameron*, *crombie*, *luggate*, *jacks point*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

1 Comment

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Stadiums, Tourism, Town planning, Travesty, Urban design

Aurora with yet another headache

At Facebook:

****

****

Note this particular meat from Richard Healey’s Facebook post:
[my emphasis]

“If you have a property where the lines were built before 2001, then Aurora owns everything up to the house. The only exceptions are where the lines have been brought up to standard and a letter has been sent to the property owner transferring ownership of the lines or a prior agreement is in place. That has almost never happened in Dunedin. If you think that you have been billed, and shouldn’t have been, write to Aurora. If you don’t get redress file a claim.
If you would like to read the appropriate legislation, look up the electricity act 1992 and search for the definition of “point of supply”.
What does that mean? It means that it’s probable that thousands of Dunedin residents have been charged for maintenance to lines and poles that they do not own.”

Electricity Act 1992
Reprint as at 18 October 2016
http://www.legislation.co.nz/act/public/1992/0122/latest/DLM281858.html

Posted by Elizabeth Kerr

This post is offered in the public interest.

2 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Housing, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Stadiums, Tourism, Town planning, Travesty

How to drop Crombie and the mafia from City boards

Or read, how the new city council will continue to undermine the Ratepayers and Residents of Dunedin, as well as the power consumers and district councils of Otago, just like before…. by allowing ill-considered (shoulder tap) appointments of a ‘class of morons’ to the boards of the City companies.

Troughers Unite.

ODT 11.1.17 (page 4)

odt-11-1-16-in-brief-p4-1

Posted by Elizabeth Kerr

This post is offered in the public interest.

8 Comments

Filed under Aurora Energy, Carisbrook, Central Otago, Construction, Corruption, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Events, Finance, Geography, Health, Highlanders, Housing, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Site, Sport, Stadiums, Tourism, Town planning, Travesty

Letter of opinion draws wide support, view not shared by deathly DCHL

ODT 9.1.16 (page 6)

odt-9-1-16-letters-to-editor-pillans-p6-1

Posted by Elizabeth Kerr

This post is offered in the public interest.

11 Comments

Filed under Aurora Energy, Business, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Sport, Stadiums, Tourism, Town planning, Travesty

Otago’s dangerous electricity network —Aurora’s INCONSPICUOUS and INEFFECTIVE public safety messaging

aurora-energy-safety-message-odt-online_2017-01-08-11-11-33

[smartphone screenshot 2017-01-08]

The advertisement (safety message!) appears at ODT Online.
Blink and you miss it!

This is what Aurora Energy puts out for You to access Public Safety information. A yellow box with some branding, lost amongst news stories within a plethora of webpages.

Did anybody read ODT Online this summer ?
Did anyone see the ad ?
Did anyone notice the weblink ?
Did anybody click on the link ?
Did anyone do up their seat belt or wear a life jacket ?
How do you stay SAFE around a dangerous power network ?
What do you look out for ?
What do you avoid ?
In an emergency, what do you do ?
What sort of emergency ?
Clear guidelines ?

Or, read as ‘So what’ from the DCC-owned company.

****

How extensive is Aurora’s public safety messaging across all available media these holidays —and typically, across a year ?

Is Aurora’s public safety messaging evolving to provide clear informational content to keep the public SAFE around the DANGEROUS and DEGRADED electricity network ?

****

The adverteaser, and the related web information (reproduced below) is at the very low end of public safety information required to prevent personal injury or death. There is little informational value beyond the obvious.

Real life scenarios you should guard against, what are they ?

Other lines companies create graphics, audio and short videos that clearly explain what to do and what NOT to do around electrical facilities and in emergency situations involving live electricity.

Not so Aurora.

This YELLOW-BLOCK commercial branding exercise is cheap, casualised, determinedly ineffective and fully irresponsible. Further, it merely links to what has been up at the Aurora website for some time, which is basic and untelling.

Here’s the Aurora Energy link and their bland factless webpage content:

http://www.auroraenergy.co.nz/safety/

Aurora Energy puts your safety first. We want all our customers, employees, contractors and the wider community to be safe around electricity. Always keep a safe distance from electrical equipment and take extra care when working around electricity.

You can take some simple steps to make sure that you, and others around you, know how to keep yourself safe when around electricity.
● Treat all electricity as live and never touch electrical equipment
● Report electricity faults to your electricity retailer via their faults number
● Phone 111 immediately if there is an injury or risk of a fire
● Follow safe work practice near electrical equipment
● If you see a tree that is growing near or into a power line, contact Delta to arrange pruning services
● Inform others around you of the dangers of electricity
● Be prepared in the event of a natural disaster or extended power outage.
 
Read our free guide to working safely around Aurora Energy’s electricity network (PDF) before working near our electricity network. We’re here to help and can provide you information and services to help you stay safe.
 
Our Public Safety Management System controls hazards that present significant risk of serious harm or major property damage. The System complies with the requirement of the Electricity (Safety) Regulations 2010. To report a potential hazard, please complete the Report a Hazard form or contact Delta.

****

If Aurora has conducted a full PUBLIC SAFETY CAMPAIGN IN OTAGO
across all available media – including dailies, community newspapers, schools, public libraries, council service centres, magazines, online noticeboards, radio, television, instant text messaging, flyers, billboard posters etc
—we have missed it.

It’s not ‘just’ dangerous poles and lines – it’s the condition of the other dangerous and degraded network assets (including conductors, transformers, cast iron potheads, cables, oil-filled switchgear, airbrakes etc) that the public needs to be concerned about.

Aurora Energy is NOT telling you about these : the condition of other network assets after 20-30 years of Dunedin City Council-owned companies’ inept management and criminal neglect of Otago’s power supply.

What would make the best Public Safety Campaign ?

****

The Aurora report by Deloitte made public on 12 December 2016 says:

Refer page 8 (1.5.9 Summary of Recommendations | Health & Safety), and page 31 (4.6. Health & Safety recommendations) – bolding by whatifdunedin:

The Board and management of Aurora need to adopt a more transparent approach with staff and the public. There needs to be acknowledgement of the state of the network along with detailed plans on how these issues are going to be rectified.

****

ODT 13.12.16
– “The Deloitte report did not include a detailed investigation of health and safety issues, but said risk had been increased by a lack of investment. “It is inevitable that this increases the level of risk inherent in the network that could have implications for staff and/or members of the public,” it said.”
– “Mr Cull also refrained from saying the network was unsafe, instead saying: “I don’t think it is as safe as it should be.”
– “[Richard] Healey said he was satisfied for the most part with the report, but not with the response from Mr Cull, DCHL chairman Graham Crombie and Mr [Steve]Thompson, who he said were all still trying to minimise the extent of the problem.”

ODT 21.12.16
– Grady Cameron: ““The accelerated programme uses additional internal and external resources to get the job done quicker. What won’t change are the safety, risk management and work practice measures we have for the safety of workers, contractors and the public.” The programme would prioritise the removal or repair of condition-zero poles close to schools, camping sites and other “high social” areas.”

ODT 24.12.16 ‘Poles spared as condition reassessed’
– “[Queenstown Lakes Mayor Jim Boult] asked Aurora to stabilise or replace condition-zero poles in the Queenstown, Wanaka and Arrowtown central business areas before Christmas.”

It’s not just about the poles.

Related Posts and Comments:
12.12.16 Deloitte report released #Delta #Aurora
30.12.16 Hilary Calvert on Deloitte report for Aurora/Delta
6.1.17 Message to Aurora/Delta : Upper Clutha dangerous poles DON’T MIX with Holiday Campers

█ For more, enter the terms *delta*, *aurora*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

20 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Sport, Stadiums, Tourism, Town planning, Travesty

Message to Aurora/Delta : Upper Clutha dangerous poles DON’T MIX with Holiday Campers

Four “condition zero” poles identified in Upper Clutha as needing to be replaced or reinforced before busy holiday period.

Other poles inside camping grounds identified as needing to be checked regularly by Delta staff during same period.

### ODT Online Fri, 6 Jan 2017
Problem power poles getting regular checks
By Tim Miller
Potentially dangerous power poles in Upper Clutha camping grounds are being checked regularly by lines company staff over the holidays. Before Christmas, Aurora Energy identified and checked the condition of poles in what were considered high-traffic holiday areas, such as camping grounds and parks in Upper Clutha. The company consulted the Queenstown Lakes District Council to identify the high traffic areas.
Read more

█ All 1181 condition zero poles in Otago expected to be replaced by April 2017.

****

At Facebook:

Related Posts and Comments:
1.1.17 A successful Lines company….
30.12.16 Hilary Calvert on Deloitte report for Aurora/Delta
28.12.16 Just beginning…. inquiries into council company rogues
27.12.16 Michael Lewis : The Undoing Project —Interview… #RNZ
25.12.16 The very idea
22.12.16 What GIVES : Aurora/Delta/DCHL/DCC…Energy Safety…ComCom ??
20.12.16 Aurora/Delta : RNZ’s Kathryn Ryan with Rod Oram
16.12.16 Tim Hunter, NBR —Aurora/Delta, DCC and ComCom
16.12.16 Delta #EpicPowerFail 8 —Stuart McLauchlan : contamination, code…
15.12.16 DCHL/Aurora/Delta unravelling
14.12.16 Bev Butler queries invoices for Delta hospitality at Stadium #LGOIMA
14.12.16 Aurora/Delta : Richard Healey on the [SOON departing] CEO
13.12.16 DCHL/Aurora/Delta ‘PR fashion statements’ fb DCC rates increases
12.12.16 Deloitte report released #Delta #Aurora
9.12.16 Deloitte report pending —Public Notice at ODT | Facebook entry
7.12.16 Delta/Aurora : Nobody’s willing to call it after misrepresentations
7.12.16 Audit and Review, Deloitte
3.12.16 Delta/Aurora : The Dirty Twist —EXTREME Misrepresentation…
1.12.16 Oi Grady— “It’s Us, Delta’s Electrical Workforce, unanimously!”
30.11.16 Delta #EpicPowerFail 7 : Kyle Cameron —The Money or the Bag?

█ For more, enter the terms *delta*, *aurora*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

3 Comments

Filed under Aurora Energy, Business, Central Otago, Construction, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Hot air, Infrastructure, Media, New Zealand, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Site, Tourism, Travesty, What stadium

Hilary Calvert on Deloitte report for Aurora/Delta

ODT 30.12.16 (page 12)

2016-12-30-17-00-18

aurora-webpage-detail-as-at-30-12-16-safety
Aurora – Safety webpage (detail) 30.12.16

WorkSafe New Zealand
Contact WorkSafe 0800 030 040
http://www.worksafe.govt.nz/worksafe

Energy Safety
Part of WorkSafe New Zealand, Energy Safety acts as the regulator for ensuring the safe supply and use of electricity and gas in New Zealand. Energy Safety is responsible for providing an effective investigation, compliance, enforcement, and conformance regime for achieving electrical and gas safety outcomes.
http://www.energysafety.govt.nz/

Note: On Monday 4 April 2016, the new Health and Safety at Work Act 2015 (HSWA) came into effect. HSWA repeals the Health and Safety in Employment Act 1992, with immediate effect.

aurora-delta-bovver-boys-29-11-16-douglas-field-detail‘Delta’ bovver boys by Douglas Field 29.11.16 (detail)

On 19 October 2016 former Delta manager Richard Healey went public about workplace and public safety concerns at Dunedin and across Otago via TV3’s Story (newshub.co.nz).

From 19 October through November posts and comments at What if? Dunedin, including those by Richard Healey, focused on the dangerous network, and poor governance within the council owned companies Aurora/Delta, within the council’s holding company DCHL, and within the duly elected Dunedin City Council itself [relevant trimesters].

The full extent of the dangerous and deliberately degraded network is attributable to criminal negligence and extreme mismanagement of financial resources (public funds).

The young inexperienced chief executive of the companies Aurora/Delta, Grady Cameron, has personally resisted taking any blame for the dangerous network – note, the findings and advice of the 2010 report by LineTech Consulting, commissioned shortly after Cameron’s appointment, have failed to flow into various Asset Management Plans drafted by Aurora, subsequently.

As a result of Richard Healey’s revelations three investigations were to take place:

1. Deloitte report for DCHL (released 12 Dec 2016)
2. Energy Safety (WorkSafe) investigation (no date given for release)
3. Commerce Commission investigation – industry regulator (no date given)

The courts await.

I N ● J U S T ● O N E ● M O N T H

Related Posts and Comments:
28.12.16 Just beginning…. inquiries into council company rogues
27.12.16 Michael Lewis : The Undoing Project —Interview… #RNZ
25.12.16 The very idea
22.12.16 What GIVES : Aurora/Delta/DCHL/DCC…Energy Safety…ComCom ??
20.12.16 Aurora/Delta : RNZ’s Kathryn Ryan with Rod Oram
16.12.16 Tim Hunter, NBR —Aurora/Delta, DCC and ComCom
16.12.16 Delta #EpicPowerFail 8 —Stuart McLauchlan : contamination, code…
15.12.16 DCHL/Aurora/Delta unravelling
14.12.16 Bev Butler queries invoices for Delta hospitality at Stadium #LGOIMA
14.12.16 Aurora/Delta : Richard Healey on the [SOON departing] CEO
13.12.16 DCHL/Aurora/Delta ‘PR fashion statements’ fb DCC rates increases
12.12.16 Deloitte report released #Delta #Aurora
9.12.16 Deloitte report pending —Public Notice at ODT | Facebook entry
7.12.16 Delta/Aurora : Nobody’s willing to call it after misrepresentations
7.12.16 Audit and Review, Deloitte
3.12.16 Delta/Aurora : The Dirty Twist —EXTREME Misrepresentation…
1.12.16 Oi Grady— “It’s Us, Delta’s Electrical Workforce, unanimously!”
30.11.16 Delta #EpicPowerFail 7 : Kyle Cameron —The Money or the Bag?

█ For more, enter the terms *delta*, *aurora*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

delta-mobile-substation-willis-st-12-11-16-1-img_1206Mobile substation Willis St, Harbourside 12.11.16 [photo: Christchurch Driver]

Posted by Elizabeth Kerr

This post is offered in the public interest.

1 Comment

Filed under Aurora Energy, Business, Carisbrook, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Highlanders, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Site, Sport, Stadiums, Tourism, Town planning, Travesty, What stadium

Just beginning…. inquiries into council company rogues

Updated post
Thu, 29 Dec 2016 at 1:47 p.m.

ODT 28.12.16 (page 12)

2016-12-28-18-44-52

*smartphone tweak by whatifdunedin

****

THANK YOU LEAKS

Another demonstration, published via ODT today (see link below), of Lame Brains and Arrogance —Grady Cameron BULLSHIT and BLUSTER

Grady says !! “one of the largest construction projects in Otago during 2017” because…. since he was first appointed, Grady has COMPLETELY FAILED as chief executive of Delta and Aurora. Increasingly weak and witless. He is criminally negligent under New Zealand’s health and safety legislation. If WorkSafe tries to diminish that truth by applying the soft touch – there will be an Otago Riot.

As for Steve Thompson, given his latest offerings (and his past with Otago Rugby Football Union et al), he appears f’g clueless, a seller of hype, awesomely unfit to be (interim!) chairman of Aurora:

“Mr Thompson also told staff it was an “exciting” time to work for Delta…. “As a new chair and board we’re clear that the network needs modernising, that enough hasn’t been done in the past, that we’ll do more and faster in future.””

Modernising. Modernising.

One man dead.
Very little money at bank.

Whistleblower Richard Healey questioned Mr Brosnan’s appointment, saying his background was in management, not engineering. Delta did not respond to a request for comment yesterday.

grady-cameron-delta-ceo-newshub-co-nz-detail### ODT Online Thu, 29 Dec 2016
Director for $30m pole project
By Vaughan Elder
Lines company Aurora Energy has appointed a director to oversee its $30.25million pole replacement programme. Two memos sent to staff at Aurora’s sister company, Delta, before Christmas have been leaked to the Otago Daily Times. One is from chief executive Grady Cameron and the other from newly appointed chairman Steve Thompson. Mr Cameron outlined progress on the company’s accelerated plan to replace nearly 3000 poles in Aurora’s electricity network which is spread across Dunedin, Central Otago and the Queenstown Lakes area. […] Godfrey Brosnan had been appointed programme director and would report directly to Mr Cameron.
Read more

Not an auspicious start.

[More poles! Let’s pull in slave labour from overseas….. hmm maybe we don’t even have money for that…..]

delta-aurora-hq-10-halsey-st-dunedin-1-recoloured

Lots of legal clouds beginning to hover over Delta/Aurora HQ at 10 Halsey St – how long can Grady Cameron, Gary Johnson, Godfrey Brosnan and Steve Thompson keep their pay ?

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Images: newshub.co.nz – Grady Cameron | 10 Halsey St (web image) tweaked by whatifdunedin

11 Comments

Filed under Aurora Energy, Business, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Highlanders, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Sport, Stadiums, Tourism, Town planning, Travesty

Stadium : Used car and underwear sales down #missdpopularitycontest

The man running Dunedin’s Forsyth Barr Stadium says the venue is still hunting for sell-out concerts, despite being overlooked by a string of top international acts.

### ODT Online Tue, 27 Dec 2016
Concert quest ongoing despite setbacks
By Chris Morris
After a bumper period last year in which Rod Stewart, Fleetwood Mac and Neil Diamond all performed at the stadium, the venue’s international concerts have dried up, the last being Black Sabbath’s show in April. Hopes more big acts would stop in Dunedin this summer were dashed when performers such as British rockers Coldplay and pop superstar Adele opted for shows in Auckland instead…. Dunedin Venues Management Ltd chief executive Terry Davies [said] this summer’s “dry” period for concerts in Dunedin would continue for the first half of 2017.
Read more

****

Listen:
### radionz.co.nz Fri, 12 Dec 2008
Radio NZ National : Nine to Noon with Kathryn Ryan
Carisbrook Stadium in trouble (Link)
09:30 Malcolm Farry, Chairman Carisbrook Stadium Trust; and Jeff Dickie, property investor and outspoken critic of the stadium.
Audio | Download: OggMP3 (13′15″)

The instant the CST and the council started believing in their own hype and spin about Dalai Lama visits, world swimming championships and Royal tours was the moment that this city’s ratepayers were doomed to have to meet all of the “private funding”.
–Russell Garbutt ODT 13.4.12

garrick-tremain-on-the-chin-13-5-12Garrick Tremain – 13 May 2012

At various times, it was imagined that it might host international soccer, rugby league and even swimming; that penguins would frolic in a (converted) adjoining quarry, and not just that the biggest names in rock music would visit, but, perhaps, the Dalai Lama and British royalty.
–Steve Kilgallon Stuff 3.6.12

Then….

### channel39.co.nz Tue, 17 July 2012
Dalai Lama’s proposed visit puts smile on face
The Dalai Lama’s proposed visit to Dunedin has put a wry smile on the face of the man behind Forsyth Barr Stadium.
Video

garrick-tremain-our-room-17-1-14Garrick Tremain – 17 Jan 14

garrick-tremain-punchbag-1-oct-2014Garrick Tremain – 1 Oct 2014

****

Full article:

[before we knew the GOBs were completely buggering Dunedin and Central Otago’s electricity network]

### Stuff.co.nz Last updated 05:00 03/06/2012
House of Blame
By Steve Kilgallon – Sunday Star Times
AMBITIOUS: The Forsyth Barr Stadium has left a city divided and its ratepayers facing vast debts.
….In June 2008, two major concert promoters had told the D-Scene newspaper what should have been self-evident: Dunedin was too small, remote and student-oriented to provide the sales base to attract big-name acts. In February this year, council-owned stadium management company Dunedin Venues Management Limited’s (DVML) chief executive David Davies said concert bookings for the stadium would be “thin” in 2012. “What’s thinner than one?” asks Garbutt. Cull says the council has to leverage the advantage of having a roof, guaranteeing events won’t be rained off. Farry, who wanted to run the stadium for its first two years, is disappointed the council hasn’t attracted more concerts.
Read more

*The same article, retitled, appears at Stuff Sport: Stadium builds under fire

****

### Stuff.co.nz Last updated 12:38 14/09/2012
Councils should stay away from business
By Chalkie – Tim Hunter
There are people who believe local councils should own businesses because they generate returns and ease the burden on ratepayers. Chalkie is not one of them. Your humble correspondent thinks councils should stick to their knitting. The reasons are many and varied. Taking a couple of examples at random:
a) Councils can start to think they are there to make money instead of, say, distribute water; and
b) Councils are not commercially savvy shareholders.
Poppycock, you say. Show me a single case of a council’s emptyheaded pursuit of unprofitable goals. In response, Chalkie invites you to consider Dunedin. In that southern city the council is the proud owner of Dunedin City Holdings, whose job, according to its report, is “to manage the commercial investments of the Dunedin City Council to maximise returns”. The businesses under DCH’s umbrella include electricity network company Aurora, forestry company City Forests, the Taieri Gorge Railway Company and an engineering business called Delta Utility Services. DCH’s 2012 numbers are not yet available, but last year it trumpeted an improvement in revenue and profit and a total cash return to the council of $23.2 million. If you thought that was a good result, you’d be wrong. When you look at several years of DCH numbers a disturbing pattern emerges of ever-increasing millions being borrowed and pumped into underperforming assets. The cashflow statements tell the story.
Read more

Posted by Elizabeth Kerr

This post is offered in the public interest.

25 Comments

Filed under Architecture, Baloney, Business, Carisbrook, Central Otago, Concerts, CST, DCC, DCHL, DCTL, Democracy, Design, Dunedin, Economics, Electricity, Events, Finance, Hot air, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Site, Sport, Stadiums, Tourism, Town planning, Travesty, University of Otago, Urban design

Christmas Lights Displays #Dunedin

[while the power is on, thanks Delta….]
Christmas Lights Displays you can visit at Dunedin
via ODT’s Dave Cannan at The Wash (29.11.16):

68 Campbells Rd, 79 Rudd Rd, 62 Salmond St, 17 Hastings St, 1 Ipswich St, 1 Isadore Rd, 2 Braeside, 6 Forth St, 4 Doon St, 15 William James Cl, 10 Cavan Pl, 26 Gladstone Rd Nth, 21 Shipka St, 503 South Rd, 1 Centennial Rd, 9 Flower St, 6 Alfred Pl, 19 Magdala St, 20 Magdala St, 3 Nelson St, 103 Richardson St, 4 Roy Cres, 8 Viscount Rd.

█ See map published at this page: https://www.facebook.com/groups/DunedinXmasLights

Posted by Elizabeth Kerr

This post is offered in the public interest.

christmas-garland-topsailbeach-org

Leave a comment

Filed under Aurora Energy, DCC, DCHL, DCTL, Delta, Democracy, Dunedin, Education, Electricity, Events, Finance, Fun, Geography, Health, Highlanders, Infrastructure, Inspiration, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Property, Public interest

What GIVES : Aurora/Delta/DCHL/DCC ?? Energy Safety/WorkSafe ?? ComCom ??

topsecret1-googlesnipers-org

Due process and natural justice demand a different outcome in the Delta/Aurora case, writes Robert Hamlin. (ODT)

### ODT Online Thu, 22 Dec 2016
Rotten process needs fixing, too
By Rob Hamlin
OPINION Employment law is a minefield, which only those who assiduously apply due process can navigate. After the publication of the damning report by Deloitte, there have been calls in this community and this newspaper for Grady Cameron, the CEO of Delta, to be removed. Any lawyer will tell you that even with this report in hand, there will be a procedure to be followed before any such removal can occur. […] Enough time has now elapsed since the Deloitte report was published for the boards of Delta and DCHL along with the DCC to make their intentions clear to the community.
Read more

Robert Hamlin is a senior lecturer at University of Otago Department of Marketing, commenting in a personal capacity.

****

Comments at What if? Dunedin:

russandbev
2016/12/22 at 11:45 am
Of course the Dunedin Mayor, DCHL, Aurora and Delta will always say that the network is “safe” because once they admit to it NOT being safe then they are liable. Actually that raises an interesting issue. My understanding is that if an officer of the Council is aware, or made aware, of an unsafe environment or practice on or around any Council property – and that includes roadways, pathways, parks etc and does nothing about it, then that officer is personally liable for any subsequent issue. Surely Cull, as an officer, is now aware through his much delayed meeting with Richard Healey that the network is unsafe. He only needs to read the ODT to learn of the continued failures if he still can’t bring himself to accept the truth from Mr Healey. Why then is Cull not being pursued by Energy Safety or WorkSafe or the DCC internal Health and Safety personnel?

Alex Brown
2016/12/22 at 12:39 pm

Click to access leadership-sme-guide.pdf


Page 2 Directors Duties – “ensure company has appropriate resources and processes to eliminate or minimise those risks and uses them”
Prioritising funds for a sports stadium would not be a defence.
Ask any small business (easy target) slapped with instant fines for incorrect scaffold or any commercial truck driver who receive huge fines for safety issues.
If ever the law should be applied it is in this case. WorkSafe needs to send a clear message to troughers who love sitting on boards under the safety of Council always backed up by the ratepayer.

Alex Brown
2016/12/22 at 12:51 pm
Penalty for the Directors – 5 years imprisonment, $600k fine.
So our lawmakers also intended it be taken very seriously.

█ For more, enter the terms *aurora*, *delta*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: googlesnipers.org – topsecret1

35 Comments

Filed under Aurora Energy, Business, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Sport, Stadiums, Tourism, Town planning, Travesty

Aurora/Delta : RNZ’s Kathryn Ryan with Rod Oram

Updated post
Tue, 20 Dec 2016 at 10:41 p.m.

ODT tomorrow….
On Channel 39 news, editor Barry Stewart says “Half of the Delta executive management team have jumped ship, since the pole scandal erupted.”
http://www.thinkdelta.co.nz/about-us/executive-leadership-team/

rod-oram-radionz-co-nz-1

### radionz.co.nz Tue, 20 Dec 2016 at 11:06 am
Nine to Noon Link
Among the topics Kathryn Ryan talks to Rod Oram about, is the Electricity Authority’s tweaking of its controversial re-pricing of transmission charges, amid a chorus of opposition.
Audio | Download: Ogg MP3 (14′58″)

Within the interview Oram speaks to the Deloitte report for Aurora/Delta.
He finds the report sobering “although the language was very moderate”.
Listen from 04:05 to 08:09

Kathryn Ryan: “…possibly they’ve dodged a really really bad news story and a really really bad event in the process.”

Oram: “They have.”

Oram: “…I just find it pretty inexplicable that council owned companies should have… I’m choosing my language, obviously, carefully here …have had inadequate oversight from the Council over such a long period and that there hasn’t been a disaster as a result of this.”

He goes on to say “the potential for one is identified”…
See Aurora/Delta’s prioritisation of pole replacements around schools and hospitals.

[The numbers for pole replacements in the Deloitte report goes under-reported.]

It will be a very very long while before the dangerous Aurora electricity network is made SAFE. In that time a really really bad news story or more could hit.

Sadly, the death of Delta lineman Roger Allan Steel (63) near Millers Flat on 9 December 2010 was the first really really bad story….

NZ Herald (30.1.13) —“Delta was prosecuted under the Health and Safety in Employment Act and was fined $75,000 in the Alexandra District Court in October 2011 after pleading guilty to a charge of failing to take all practicable steps to ensure the safety of its employees while at work. The charge was laid by the then Labour Department … The pole that fell had earlier been placed by a Delta work gang, in the footing of the pole it replaced … The hazard identification procedure adopted by Delta and its employees was unsuitable and needed to be improved, Coroner David Crerar said.”

Famous last words.
Grady Cameron: “As the coroner noted, Delta has reviewed and made enhancements to our work practices. We wanted to make sure that we never have another workmate in this position again.”

“Cameron said Delta had taken remedial action including red-tagging all poles deemed unsafe to climb, the introduction of systems to quickly locate vehicles and employees wherever they were working and had also made changes to work instruction forms.”

Fast-forward to October 2016. Whistleblower Richard Healey reveals major SAFETY CONCERNS with the Aurora/Delta electricity network. As a consequence, Grady Cameron is found severely wanting in not meeting the claims he made to Coroner Crerar about taking remedial action ….sufficient to safeguard the lives of lines staff and the public. Gross mismanagement and negligence applies.

█ For more, enter the terms *aurora*, *delta*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: radionz.co.nz.co.nz – rod oram

28 Comments

Filed under Aurora Energy, Business, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Health, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Sport, Town planning, Travesty, What stadium

DCC set to take away CBD car parks without Economic Impact research

SOMEBODY please work out how many individual car parks stand to be LOST from the CBD —all down to Council making things TOUGH for vehicle users in the Central City.

Starter list via Central City Plan and other developments:
(calculate how many individual car parks lost for each proposal)

1) Rerouting of SH1 one-way through Warehouse area and Queens Gardens ?
2) New segregated cycleways on SH1 one-way system from Warehouse area to North Dunedin ?
3) Pedestrianisation affecting Octagon, lower Stuart St and sections of George St ?
4) Hotel and apartment building, Filleul St/Moray Place ?
5) ORC Headquarters for Dowling St Carpark ? [a great site for ACC]
6) ACC office building for Frederick St Carpark ?
7) New Hospital, block bounded by Cumberland, Frederick, Castle and Hanover Sts ?
8) ORC bus hub (interchange) for Great King St and vicinity ?
9) Other ???

DCC Webmap or Google Earth will give the relative range of car park numbers. A quick sum will do.

Mayor Cull might wonder why there’s little or no “growth” likely for Dunedin.

Apart from lack of on street car parking, another starter : the city’s ‘health and position’ is undermined by the degraded Aurora power network that offers NO security of supply ahead. What does this mean for Businesses and Ratepayers via increased Rates and Line Charges, how many Business and Ratepayer defaults ??

After 25-30 years of deliberate neglect to the Aurora network, striving for “economic development” at Dunedin is nigh “Mission Impossible”.

DCC can’t afford to bring the Aurora network up to compliance —as Mayor Cull was told last Tuesday in a private meeting, it will cost a Billion Dollars to do renewals in Dunedin and Central Otago (not counting new build facilities to meet demand in Central Otago).

DCC are well and truly caught with their pants down.

THE BEST THING Central Otago people can do is buy their power network. Once made Safe, their network will generate revenue for expansion across CODC and QLDC growth areas ….Leaving sorry old Dunedin to an impecunious spiral of doom and disaster. How to rid the Dunedin millstone should be uppermost in Central Otago leaders’ minds right now.

dcc-webmap-dcc-owned-frederick-st-carpark-janfeb-2013DCC Webmap – Frederick St Carpark JanFeb 2013 (highlighted)

dcc-webmap-dunedin-hospital-and-university-health-sciences-janfeb-2013DCC Webmap – Dunedin Hospital and University health sciences JanFeb 2013

The Mayor and Councillors might think it’s AOK to skip out of an agreement with Southern Partnership Group, the Government-appointed hospital rebuild group…. SDHB and University of Otago had hoped to coordinate their future use of Frederick St carpark; it was a practical and logical proposal for university health sciences and the hospital precinct. Until…. the Accident Compensation Corporation (ACC) came along, with DCC then deciding to go for a quick buck. Why didn’t DCC offer ACC the Dowling St carpark, instead ? —a better centrally located construction site for the Corporation office building would be hard to find, one that could include public parking on its lower levels (and say BYE to ‘ORC imperialism’).

Squirrelling the Frederick St plum to ACC is the dumbest thing this Council could do. Student graduates – if that is the Mayor’s excuse for the Frederick St debacle – are quite capabable of walking to Queens Gardens for future employ.

Really, there never was a more useless ineffectual Southern town on the map. It has every deterrent sign needed for raccoons and new business. Tumbleweeds, cloned by Mayor Cull.

****

But wait.

Is Southern Partnership Group running scared after finding out how much it costs (a massive sum) to deal to Aurora’s transformer installation located inside the block bounded by Cumberland, Frederick, Castle and Hanover Sts – first site option for the hospital rebuild ?

The network facility comprises old transformers that could blow at any time. Of poor design, the transformers are not isolated from each other : if one transformer blows, they all do. To fuel the fireball, the transformers sit in a pool of oil. The cost to replace or relocate the facility is enough to ‘blow’ the hospital rebuild budget.

OTHER site options for the hospital rebuild rapidly gather impetus.

****

wakari-hospital-affinityservices-co-nz-1Wakari Hospital [affinityservices.co.nz]

The “somewhere else” option is likely to be Wakari Hospital.
No final decisions will be made until 2018.

### ODT Online Sat, 17 Dec 2016
Hospital may be relocated
By Eileen Goodwin
The Government is considering shifting Dunedin Hospital away from Great King St. A “long list” of site options for the $300 million hospital rebuild includes shifting “all hospital facilities” to a different part of the city. While there has long been speculation about another site, the possibility was revealed in a press statement from the Government-appointed rebuild group. Southern Partnership Group chairman Andrew Blair declined to release the long-list document to the Otago Daily Times, saying it was a “work in progress” … The list was written by consultants, the Ministry of Health, the Southern District Health Board and the partnership group.
Read more

[click to enlarge]
google-earth-wakari-hospital-context-2016-mapgoogle-earth-wakari-hospital-3d-2016Google Earth – Wakari Hospital 2016

****

If the public hospital was to move from the CBD…..
IMPACTS include:

● Reduced Inner City Vibrancy
● Less Easy Repore and Connection with University of Otago Health Sciences, including Schools of Medicine and Dentistry
● Less Opportunity for NEW Complementary Business Activity/Support in CBD
● Loss of existing Complementary Business Activity and Support in CBD
● Potentially, (ahem) MORE carparks available in the CBD !!
● Distance/Isolation Problem for Hospital patients, their families and supports
● Distance/Isolation Problem for Hospital shift staff between their place of work, homes and CBD
Etc Etc.

THE NEWS

ACC given 12-month exclusive due diligence period with view to buying Frederick St Carpark to build multi-storey building. DCC reneged on previous undertaking to earmark site for Dunedin Hospital redevelopment.

15.12.16
ODT: Councillors ‘railroaded’ into carpark decision
Dunedin city councillors were “railroaded” into their decision about the Frederick St car park, and given inadequate information about the risk of pulling out, Cr Lee Vandervis says. Cr Vandervis has taken issue with the Dunedin City Council for presenting the decision last week as “unanimous”, and the council has admitted that was wrong. […] The discussion and decision were held behind closed doors, and councillors were prevented from speaking publicly. Two councillors – Andrew Whiley and Damian Newell – were informally reprimanded for speaking to the Otago Daily Times about the deal. Cont/

****

University of Otago Chief Operating Officer Stephen Willis says proposed ACC building in the middle of area envisaged for health and education precinct. “You’ve got the two book-end anchor institutes and then you bring another one right in the middle that has nothing really to do with health, education, or research.”

11.12.16
ODT: DCC’s ACC building deal criticised
Reneging on an undertaking to earmark a strategic piece of land for the Dunedin Hospital rebuild has undermined the city’s two leading institutions, former Dunedin City councillor Hilary Calvert says. Ms Calvert has criticised the decision to give the Accident Compensation Corporation (ACC) an exclusive 12-month period to explore options for the Frederick St car park. The council had earlier said it would earmark the site for the health precinct envisaged by the University of Otago. The precinct depends on  Government decisions on the $300 million hospital rebuild, which will not be made until 2018. Cont/

****

8.12.16
ODT: Council backs off land deal
The Dunedin City Council has backed out of its undertaking to allow the Frederick St car park to be used for the $300 million redevelopment of Dunedin Hospital. Instead, the site has been promised to the Accident Compensation Corporation, which is considering consolidating its operations to a proposed multi-storey building there. “That was then,” Mayor Dave Cull said of the council’s change of heart since October when it said the land was earmarked for the hospital. […] ACC has a significant presence in the city, with about 430 roles across the three sites. Cont/

****

15.11.16
ODT: Upgrade on hold till land swap clearer
A planned $8.1 million refurbishment of Hayward College has been postponed because the residential hall might be part of a land-swap with the Southern District Health Board so the area can be used for the Dunedin Hospital rebuild. Yesterday, the University of Otago confirmed it had put off the refurbishment until next year so that it does not go ahead while the Frederick St building’s future is unclear. Cont/

****

“We are aware that it might be important, and that’s why we’re having discussions with them to make sure that we don’t do anything that rules out any use for the site.” –Sue Bidrose, DCC

15.10.16
ODT: Health precinct mooted
Dunedin Hospital could be partly rebuilt on land owned by the University of Otago and become part of a university health precinct under a potential land swap. The university has confirmed it is willing to consider a land swap, whereby it  would own the clinical services building. The Dunedin City Council confirmed it has earmarked the Frederick St car park as a potential part of the plan. The university owns land in the Fraser building block, and on two other sides of the hospital campus. If approved by the Government, it could remove the logistical headache of building on a cramped clinical site. The first business case will go to the Cabinet next year, followed by a detailed one in 2018. Cont/

****

11.2.16
ODT: Green light for $8m cycleways
Construction could begin this year on Dunedin’s $8 million separated cycleways along the city’s one-way system. The New Zealand Transport Agency, which will fund the work, has signed off on a detailed business case setting out the need and basic design of the cycleways. They will be separated from traffic by concrete kerbing and will run along the right-hand side of both the northbound and southbound one-way routes. […] While car parking issues were a potential negative, business owners along the route had offered clever and positive ideas about how those problems could be minimised. Converting the council’s Frederick St car park to a multistorey facility was also “on our radar”, Cr Wilson said. Cont/

****

22.4.14
ODT: DCC mulls Frederick St development
A multi-storey development housing parking and businesses is being considered for the Dunedin City Council-owned Frederick St car park site. A report sent to councillors this week reveals council staff have already had discussions with several parties interested, as tenants or developers, in a development on the site. The report discusses three options for a separated cycle lane through the central city, and a parking study done in the area. It also considers possible ways to mitigate the potential loss of car parks – the major public concern about any new lanes – including possibly providing more commercial parking, such as a parking building. If the council chooses to provide about 100 extra parks on side streets as suggested, the total number of car parks lost to the lane would range from between 80 and 284 under the various options. Cont/

****

20.6.12
ODT: Council seeks $15 million portfolio boost
The Dunedin City Council is sitting on a half-billion-dollar property empire, but the man charged with managing it has big plans to expand … [City Property manager Robert Clark] was appointed to his post in late 2008 … Mr Clark was eyeing several potential projects in Dunedin, including a partnership with an interested private developer to build a $15 million hotel and car-park complex, or one of several variations, on the council’s Dowling St car park. Other plans included an $8 million four-storey car park and retail complex on the existing Frederick St car park. Neither project had been signed off by councillors, but both were expected to be considered later this year, with a possibility one, but not both, would proceed. Cont/

Posted by Elizabeth Kerr

This post is offered in the public interest.

24 Comments

Filed under Business, Construction, DCC, Dunedin, Economics, Electricity, Finance, Geography, Health, Infrastructure, Media, OAG, Ombudsman, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, SDHB, Site, Stadiums, Town planning, Transportation, Travesty, University of Otago, Urban design, What stadium

Tim Hunter, NBR —Aurora/Delta, DCC and ComCom

Essential reading:

National Business Review 16.12.16
Hunter’s Corner by Tim Hunter (page 2)
Opinion: Lines companies: it’s worse than we thought

The article appears in today’s NBR print edition, available at bookstores and supermarkets, and by subscription. Short excerpt at right.

2016-12-16-16-55-48Tim Hunter has appraised the Deloitte report and the activity -or not- of the lines company Aurora Energy and ‘contractor’ Delta Utility Services. He also provides brief overview of the companies’ position as seen (problematically!) by industry regulator, the Commerce Commission. The award-winning business writer typically shows fine ability to crack code, applying thrift and plain sense in noting gross impediments to good governance and operational performance. Mr Hunter could write the book on Aurora/Delta, the ugly sisters, a true Horror Story —not the kitten tale by Deloitte, which anyway gets things rolling. As one of three investigations, Deloitte’s was always going to suffer lack of scope and independence given its commissioners:
the brothers Grimm —DCHL and DCC.

LineTech Report July 2010

█ For more, enter the terms *aurora*, *delta*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: NBR excerpt by smartphone (screenshot)

14 Comments

Filed under Aurora Energy, Business, Central Otago, Delta, Democracy, Dunedin, DVL, DVML, Economics, Electricity, Finance, Geography, Health, Infrastructure, Leading edge, Media, Name, New Zealand, People, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, Stadiums, Travesty

Delta #EpicPowerFail 8 —Stuart McLauchlan : contamination, code brown and farting in church

farting-dog-by-mark-cable

Received from Christchurch Driver [CD]
Fri, 16 Dec 2016 at 1:04 a.m.

Your correspondent has been spending some time in airport bookstores recently, and it is hard to escape the plethora of get-a-plan-and-get-your-life-in-order books that seem to breed like unwanted spawn in such places.

While your correspondent has no truck with such boilerplate muck, he will admit to a quiet sense of satisfaction this week of some goals achieved. It is a good thing to have a goal, and a plan to get there. This year, your correspondent was disgusted by the arrogant lawlessness and simply fantastic level of self interest and waste of public funds by DCC and DCHL directors at the Noble subdivision, Yaldhurst. He made it a goal to put his shoulder to directorial posteriors and assist in the push of the dismal Delta directors into the Delta wood chipper (leased of course). Aided by some insider knowledge (what? – reveal my sources – never !) and plenty of tangential side trips, your correspondent is proud to think he has helped (in some small way) What if? and the majestic Richard Healey achieve a clean out at Aurora and Delta.

This week’s dismissal of Parton and McLauchlan is the start, and more will follow.

Mr McLauchlan’s risible statements in the ODT yesterday show your correspondent was 100% correct when he predicted that blame would be sheeted home to That Bad Man, John Walsh.

Mr McLauchlan’s arrogance was in full view with his claims that his decision to step down was unrelated to the billion dollar problem he has co-authored. Mr McLauchlan cannot admit what all of Dunedin knows – he troughed literally while lines exploded, and failed as a director. To do so would jeopardise his other sinecures, and Mr McLauchlan is nothing but self interest. Mr McLauchlan had absolutely nothing to offer the DCC, Delta or DCHL, and we should be at least grateful to Mayor Cull that the scales appear to have finally have fallen from his eyes and he sees Mr McLauchlan for what he is.

Let us not forget the most telling example of Mr McLauchlan’s invertebratedness : In the 2007 directorial decision to waste $8-9M at Luggate Mr McLauchlan’s sole contribution was : “If the other directors agree the I agree”. Not forgetting also that in the case of the Scenic Circle Dunedin City legal dispute with the JV partner, Mr McLauchlan was found by the Court to be an unreliable witness.

Mr McLauchlan is so toxic he doesn’t just need to be signposted, he is a walking talking accounting contamination.

On the subject of contamination, Kyle Cameron – stand up and take a bow, Kyle Cameron! – has made it very sure that Grady Cameron will never lead either of Delta or Aurora, by recommending that they need separate CEOs. As Mr Healey has said, the board will do to Grady what he has done to many others – disestablished their positions, creating new roles, and of course Grady will not quite have the “most appropriate skill sets” for either role. Sorry about that old chap, terribly close call of course, better luck next time– (in another continent please).
Grady, you have just been right-sized.

Another right-sizing would be to appoint Kyle Cameron to the Aurora board, and remove former ORFU/Highlanders director Mr Thompson with links to the $5M ORFU pokies scandal. Mr Thompson is tight with Mr McLauchlan of course, Mr McLauchlan being the Chairman of the Highlanders at the time the South Auckland pokies scandal was in full swing. McLauchlan – scandal – bees – honey.

Not right-sized, of course, is the matter of the Aurora replacement budget. We all know – now – that Aurora were going to spend $443M in deferred maintenance over 10 years (yes, stop dissembling Grady, it’s $443M, not $417M, but what they haven’t set out is where the money is coming from. Lines charges are fixed, and in very, very broad terms if we, the ratepayers, have to spend $443M to basically maintain what we have – then the very big question is – what is the depreciated, deteriorated asset worth …right now?

[An alarming example that comes to mind is the DCC purchase of the Dunedin Railway Station in the early 1990s. A wonderful asset now (pity about the decks) after a number of millions have gone into its restoration and upkeep over a 10-12 year period ….but what did the DCC pay ? ….the answer ? precisely one dollar.]

Now the Aurora 2016 Annual Report says in its headline “Trend Summary” (aka the good news feel-good piece early in the report at page 12) is that the ratepayers have equity of $183M in Aurora, and equity to assets is 42.1%, but unsurprisingly (this is Grady and the gyroscope we are dealing with here) the very bad news – the debt is $253M and is not going away – doesn’t quite make it into the good news piece.

So if we are charitable and assume that only say $250M of the $443M is actually for direct Dunedin infrastructure renewal and the balance being for actual expanded capacity then, then $250M of shareholder equity is needed for the upgrade. But wait Batman ! We only have $185M of equity. Holy exploding potheads Batman !! What do we do ? Batman: Elementary, my dear Doctor Parton —In the immortal words of Christine Fletcher, mayor of Auckland in 1986 when asked the same question by Fletcher Construction (of the cost to finish the Aotea Centre), “That’s what the ratepayers are for.”

Readers, you might well be thinking at this stage, CD has it wrong again – when I put in a new kitchen and bathroom in my villa in Belleknowes, it was worth more, so it didn’t matter that there was more debt ….because the asset was worth more. However, the value of power networks is determined by the Commerce Commission, who regulate what amounts each network can charge ….based on the value of the asset. Your correspondent surmises that the next scandal to unfold at Aurora is that resident Delta toxicologist, Matt Ballard of Capability and Risk, has overseen a massive overstating of the present value of the network. The bottom line is : with $250 – $400M of work needed FOR MAINTENANCE, ie NOT GENERATING EXTRA CAPACITY, it is worth nowhere near $436M right now. What does that mean? It means, readers, that the “jewel in the crown” of the DCHL, our cash cow HAS NO SHAREHOLDER EQUITY and has 100% debt to equity. Hilary Calvert is correct – if this were DC Ross, or any other private company, the receivers would have been called in long ago. However, accountants like the caustic Mr McLauchlan prefer companies with no shareholder equity because the returns on equity are out of this world…. until something happens.

Readers, what dissembling Mayor Cull will never tell you is that just like in Central Otago, as helpfully described by Nick Loughnan in the ODT a few weeks ago, you are about to experience in your future either some eye watering rates increases or, if the Commerce Commission allows, some similar exponential line charge increases. It’s one or the other. There is no other way.

Mayor Cull is aware of the consequences set out above : he said at the outset of Mr Healey’s crusade that he did not want public confidence shaken.

The questions or scenarios above are not pleasant – as the biblical line goes, these are hard questions, who can answer them ? They are the lines industry equivalent of farting in church – rude, inappropriate but better to get it out in the open before there is a big mess (or at least know the mess is coming). Yes, the air will be blue for a while – a long while. Messrs McLauchlan, Parton, Kempton, Frow, Wood, Thompson have done more than farted, they have created a stinking “code brown” mess. They will not be missed.

[ends]

*Note: New Zealand Companies Office records show McLauchlan and Parton ceased being directors of the Aurora/Delta Boards on 12 December 2016.
Aurora Energy | Delta Utility Services

Legal advice to the DCC on new 3-term limits for CCO directorships ‘may have’ forced this change. Debatable.

█ For more, enter the terms *delta*, *aurora*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: markeweebly.com – farting dog by mark cable, tweaked by whatifdunedin

16 Comments

Filed under Aurora Energy, Business, Central Otago, Corruption, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Highlanders, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Sport, Stadiums, Town planning, Travesty, What stadium

DCHL/Aurora/Delta unravelling


Garrick Tremain – 15 Dec 2016

****

Received from Lee Vandervis
Thu, 15 Dec 2016 7:43 a.m.

From: Graeme Jeffery
Date: Wednesday, 14 December 2016 7:41 pm
To: Aaron Hawkins; Christine Garey; Doug Hall; Marie Laufiso; Mike Lord; Jim O’Malley; Sue Bidrose; Damian Newell; Chris Staynes; Conrad Stedman; Andrew Whiley; Kate Wilson, Mayor Dave Cull
Subject: Re: Delta Milking

Dear Councillors, I was pleased to see Richard Healey was vindicated in his claims about the crisis facing Delta and Aurora. I, however, was disturbed to see the appointment of another accountant, Steve Thompson, onto the board. Part of the problem with the pole replacement program was that for some time an accountant was running it. We need engineers on the board not accountants as the problem here is health and safety and the integrity of the network not financial systems. I was not however surprised to see Thompson on the board and read he is backing Cameron. After all, the company he works for is Deloitte and it awarded Cameron ‘Young CEO of the Year’. What is hard to understand is how Thompson could claim that Cameron has done a good job in difficult circumstances when most of those circumstances were Cameron and the Boards’ own doing. Does he mean, for example, the millions he lost on subdivisions in Luggate, [Jacks Point] and Christchurch or perhaps the fact that he was the first CEO in living memory to lose money in a financial year. Maybe he meant the 20 roading redundancies, 40 in Christchurch, 15 in Alex, a further 50 in Dunedin at Civil, and another 10 in Greenspace this year. A grand total of 150 good people that Cameron sent down the road. Or were those difficult circumstances the investigations he is or has been under by the Audit Office, WorkSafe, Energy Safety, the Commerce Commission, the [Central Otago] District Council, the Queenstown [Lakes] District Council and then Deloitte. Perhaps it was the hundreds of thousands he spent on relocating offices and his failed re-branding or the fact that he and his deputy Ballard have surrounded themselves with people not competent to do the jobs they are assigned to. Or was it maybe the death and at least 5 serious injuries that have happened on his watch? Maybe it was the destruction of asset management systems and his failure to implement inspections such as link boxes, MDI boxes, air break switches and high voltage switch gear that he has knowingly overseen.
Perhaps those difficult circumstances were driving out good people such as Jarrod Stuart who was to oversee the pole replacement program but could no longer work under interfering, incompetent leadership. Or was he worried that he has now appointed a person with no knowledge of electricity networks to run the pole replacement program after realising how his previous appointment of an accountant to do this went so wrong. Maybe he was worried that his minions have been altering the input into the xivic analysis of pole structures so he could claim to have less red tag poles in the system. Or was it really just his utter failure to carry out what was needed when he did the LineTech Report in 2010 which required 1200 poles replaced per year for ten years and the worry that he may [be] and was found out ? Maybe it’s been difficult for poor Grady in the 2 months since he announced the accelerated pole replacement program that he supposedly planned in April [being that] he hasn’t replaced one extra pole. That puts him 140 behind schedule already. Nothing new there. No perhaps it was the fact that he has destroyed morale and goodwill among staff at Delta and is now considered no more than a laughing stock?
Surely the council can see why Richard Healey said it was ‘mind boggling’ that Thompson backed Cameron and his deputy Ballard. Quite frankly it doesn’t say much for the new chairman of the board when he is supporting somebody clearly not fit to run the company. How can any sane person possibly support this man and his so called executive leadership team. I know very few staff at Delta do. It is completely wrong to suggest, as some councillors have, that it doesn’t matter whether Cameron stays or goes, as he has been responsible for the day to day running of the company and his reports to the board and vice versa have clearly been misguided and deficient. Not only that, no-one at Delta can move on or start the huge task ahead, safely or efficiently with the dark clouds of Cameron and co hovering over their heads. After all, Crombie and Mr Benson-Pope said heads should role if the allegations proved correct. They have. Remember safety was the primary motive for Richard exposing what was happening at Delta and Cameron has been shown to be part of this disgrace (eg LineTech Report).

What is truly sad, is that all this was preventable, as many people have told the councils and the boards over the years this was going to happen. As I have said before this was raised to the then mayor (Sukhi Turner), the board and an MP as early as 1998 but the old boys network closed around her and us, just as they may appear to be doing now. It is time we learnt that you need engineers, some more engineers and then more engineers to run these systems and drop the accountants, and lawyers, who are neither qualified or competent to run an organisation of this type and size, when it is facing the biggest infrastructural project in Otago for next year and beyond. PS, The views of many of the councillors who represent the interest of the ratepayers and owners of the asset have been frighteningly absent through this. Have they left the country, are scared or just not interested. Cheers Graeme (Unhappy ratepayer)

——– Forwarded Message ——–
Subject: Delta Milking
Date: Sun, 4 Dec 2016 22:15:38 +1300
From: Graeme Jeffery

To: Aaron Hawkins; Christine Garey; David Benson-Pope; Doug Hall; Marie Laufiso; Mike Lord; Jim O’Malley; Sue Bidrose; Damian Newell; Chris Staynes; Conrad Stedman; Andrew Whiley; Kate Wilson, Mayor Dave Cull

Dear Councillors, I was extremely disturbed to see from the mayor, that the report from Deloitte into public and worker safety and the management of the network may not be made public. Remember this report was to look into management and not on their behalf. The safety of workers and staff is paramount and commercial sensitivity being used as an excuse to censor from public view is inexcusable. Pole replacements, switchgear, transformers, potheads, lines down etc are not let out for contract so commercial sensitivity has no bearing – I fail to see any valid reason why the entire report can’t be made public considering the level of public and worker interest. Remember, you are answerable to the public and ratepayers first and then the board and management are answerable to you, not the other way round which keeping this secret would suggest. We who work on and the owners of the network surely should have the report before us first and the board and management after that. The tail is clearly wagging the dog here. Delta has had at least 5 serious injuries and one death since Cameron took over and Delta has been complicit in at least 2 of the injuries and the death. Roger Steel left behind a widow. How many more women must weep and families like mine worry while the council worries about “commercial sensitivity”, and puts the public’s interests behind the interests of the Delta board and management.
Cameron commissioned a report by LineTech in 2010 that showed he needed to replace 12,773 poles in Dunedin alone (32,406 in total with Central) in the next 10 years to keep the network safe. He and the board have replaced way less than 3,000 in Dunedin in that time. A blind eye or incompetent. Both I’d say. Also the report said inspections, increases in cables maintenance, replacement and equipment had not been adequate, yet I can assure you these have not been stepped up at all, in fact some of these things have stopped all together. For the record, at the recent meeting of Delta staff less than 15 people out of a hundred voted to have a committee and release a joint statement to the media. There was not a No vote taken. A vote of no confidence was proposed but again no vote was taken. I hope there was no confusion that this was a unanimous or popular decision by the workers to support the joint statement. Around 85 of the hundred there didn’t endorse it. Personally I would be disgusted and lose all faith in due process and democracy if this report isn’t released in full and the true owners, the ratepayers, aren’t informed [of] what’s been happening. It may appear to Delta staff and ratepayers alike that the old boys network is closing in on the council and mayor. Remember, you the councillors are answerable first and foremost to the asset owners, the ratepayers, and not the Delta board and management.

[ends]

28.10.16 ODT: Criticism for Cull on poles approach
Whistleblower Richard Healey and Delta staff member Graeme Jeffery were yesterday highly critical of Mr Cull’s response and questioned why he had not yet condemned Delta and Aurora for their health and safety failures.

****

I-Know-Nothing Stuart McLauchlan has no Get Out Of Jail Free card

● McLauchlan was appointed to the Aurora/Delta Boards on 1 June 2007.

Aurora Energy Ltd http://www.companies.govt.nz/co/471661
Delta Utility Services Ltd http://www.companies.govt.nz/co/453486

● McLauchlan served on the Board of Dunedin City Holdings Ltd from 1 June 2007 to 31 October 2011.

Dunedin City Holdings Ltd http://www.companies.govt.nz/co/559098

● McLauchlan ended his stint as Highlanders Board chairman in October 2009. He was appointed in 2004 by NZRU.

As a mere accountant and ‘professional’ receiver of (many sets of) directors fees, Mr McLauchlan is completely out of his depth in regards to property development and subdivision practices per se, however friends and colleagues found themselves assisted towards advantageous pricing of ‘stadium land’. Mr McLauchlan is renowned for having been in the thick of Delta’s ‘lightly investigated’ loss-making Luggate and Jacks Point property speculations. Contemporaneously, Mr McLauchlan and ‘friends’ were behind Delta’s buy-in to the then illegal subdivision at Noble Yaldhurst, Christchurch. That subdivision is set to lose Dunedin ratepayers further millions while bank rolling, once again, certain male protagonists.

We’re not sorry that Mr McLauchlan must take what is coming.

stuart-mclauchlan-ngaitahutourism-co-nz-1Thu, 15 Dec 2016
Stadium hurt renewal plans – McLauchlan
A departing Aurora Energy board member says pressure to pay for Forsyth Barr Stadium meant less was spent on network maintenance. Former Aurora and Delta board member Stuart McLauchlan was reluctant to go into any detail about the findings of a Deloitte review, but was keen to highlight the problems it identified pre-dated the current board. ….He said his resignation after nine years on the boards of the two beleaguered companies had nothing to do with the review’s findings and he was disappointed the connection had been made. Cont/

****

ODT 15.12.16 (page 16)

odt-15-12-16-latters-to-editor-campbell-hubbard-moffat-p16

█ For more, enter the terms *delta*, *aurora*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Image: ngaitahutourism.co.nz – stuart mclauchlan

9 Comments

Filed under Aurora Energy, Business, Carisbrook, Central Otago, Construction, Corruption, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Highlanders, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Sport, Stadiums, Tourism, Town planning, Travesty, What stadium

Bev Butler queries invoices for Delta hospitality at Stadium #LGOIMA

Received.
Another repetitive chore for Mr Cameron while he remains in office.

From: Bev Butler
Sent: Wednesday, 14 December 2016 12:06 p.m.
To: Glenda McGowan [Delta]; Grady Cameron [Delta]
Subject: Fw: Urgent LGOIMA Request: Delta/Aurora dangerous power poles – reason for financial restraints/invoices further details

Wednesday 14 December 2016

Dear Ms McGowan and Mr Cameron

I wish to follow up further on some of the attached invoices.

The following was reported in the ODT (28/11/16):

“On the issue of the corporate suite, Mr Cameron said like any large business, “from time to time we host our customers to strengthen the working relationships”.

In the past financial year, Delta spent about $9000 on food and beverage hosting customers at the suite…….” 

In light of Mr Cameron’s comments in the ODT, there are a number of invoices on which I request further information as follows:

1. Carisbrook Stadium Trust Invoice PSF-26, dated 5 December 2009, 10 Lounge Club Memberships $40,000+gst. Please state the names of those who have access to the 10 Lounge Memberships paid for by Delta. I note on the Forsyth Barr Stadium website the following: “As a Member of Forsyth Barr Stadium you can attend any of our scheduled events and take in the view from your own designated premium seat in the Speight’s Stand (South).”

This is obviously 10 premium seats in the Speight’s Stand on top of the seating in the Delta corporate suite.

2. Invoice 1343, dated 29/06/2012, Highlanders vs Chiefs includes Beverage $711.30+gst and 20 3 course meals @ $67.00 = $1340+gst.

How many of these guests were:

(a) Delta management staff

(b) Other Delta staff

(c) Delta directors

(d) DCHL directors

(e) Mayor and/or councillors

(f) DCC executive management team

(g) DCC staff

(h) Carisbrook Stadium Trustees (CST trustees/rich listers have reputation for receiving ‘gifts’ of tickets/catered meals at the expense of the ratepayers)

(i) Delta clients

(j) other – please state

Please supply the names of those who attended. Continue reading

11 Comments

Filed under Aurora Energy, Business, CST, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Electricity, Events, Finance, Infrastructure, Media, Name, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, SFO, Sport, Stadiums, Travesty

Aurora/Delta : Richard Healey on the [SOON departing] CEO

At Facebook:

grady-cameron-delta-ceo-newshub-co-nz-detail█ For more, enter the terms *delta*, *aurora*, *grady*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

2 Comments

Filed under Aurora Energy, Business, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Sport, Travesty, What stadium

DCHL/Aurora/Delta ‘PR fashion statements’ fb DCC rates increases

Otago Daily Times Published on Dec 11, 2016
Aurora Energy to implement review’s recommendations
A report on beleaguered Dunedin City Council-owned companies Delta and Aurora has called for a major shake-up to the way the companies are run.
[—Aurora had been guilty of placing too much emphasis on providing dividends to the council and keeping debt levels under control as opposed to investing in the network.]

Deloitte review report – Aurora Energy and Delta Utilities (PDF, 1.7 MB)
Review of Aurora Energy Limited/Delta Utility Services Limited – Network Safety Concerns.

What Shocks.

If the Otago Community has a BILLION OR SO DOLLARS WORTH of network replacements owed to it, but for the pleasure the Community must pay these sums Again —as well as having to meet the not insubstantial cost of new build facilities across the growth-focused districts of Central Otago— with the self-congratulatory psychology of the Companies and INDIVIDUALS running the Dangerous and Degraded Aurora/Delta power network, stringing along the bumbling Dunedin City Council as OVERLORD (meanwhile running its ‘static’ city)…….. exactly how does that affect DUNEDIN RATEPAYERS, do you think. [DCC steered by “SpongeBob” running the holding company; the mayor inane factotum to the GOBs.]

So yeah, if there’s no word yet (?) on how the INDIVIDUALS RESPONSIBLE for constant rates increases (exceeding New Zealand’s rate of inflation) will be cleaned out financially themselves (along with their private trusts), with jail sentences to serve…….. Then you stand to be OUTRAGED by anything these knaves are saying.

We can’t call them liars.

But think about what these immoral money stealing mongrel-individuals are costing us. You are being robbed, mercilessly, repeatedly, over and over. Public funds through your rates have gone out both front and back doors in almost limitless fashion. The male mafia have been in your pockets doing what they like —across nefarious deals and rorts for “the past 25 to 30 years”.

You have been fully violated, the power network you rely on is completely stuffed. ‘They mongrels’ are not simply incompetent.

Personally, you bear the price; your extended family and descendants pay the price. ‘They mongrels’ each buy an expensive house or three in Queenstown Lakes, they live off the spoils, in style —while you and yours, your businesses and community run desperately out of hope for better times. Clearly, the Bad are being replaced by more of the Bad with unedifying track records.
Same, same again.

Otago Daily Times Published on Dec 12, 2016
Delta whistleblower Richard Healey
Mayor Dave Cull said the whistleblower, Richard Healey, had been largely vindicated. The poles network was not as safe as it should be.

Newly-appointed chairman Steve Thompson [ex Deloitte head] said chief executive Grady Cameron would not be sacked as a result of the failings identified in the report, as he had confidence in his leadership. “I think he’s done a good job in difficult circumstances.”

### ODT Online Tue, 13 Dec 2016
Shake-up agreed for Delta, Aurora
By Vaughan Elder
Dunedin City Council-owned companies Delta and Aurora are in for a major shake-up. The planned changes come as a result of recommendations included in a review by consultant Deloitte into Delta/Aurora network safety concerns, and in particular accusations Aurora dangerously mismanaged its electricity network and left thousands of poles to rot. The shake-up would involve having separate boards and chief executives for the two companies and introduce a more proactive approach to maintaining the network. After the review, commissioned by Dunedin City Holdings Ltd, was released yesterday, Mayor Dave Cull said the changes could have a significant financial impact on the council, resulting in rates increases.

“I don’t believe it’s unsafe, but we just need to do more work on getting the infrastructure to a better level than it currently is.” –Steve Thompson

Mr Healey said he was satisfied for the most part with the report, but not with the response from Mr Cull, DCHL chairman Graham Crombie and Mr Thompson, who he said were all still trying to minimise the extent of the problem …. Mr Thompson’s claim the network was safe and his continued confidence in Mr Cameron were “mind-boggling”, Mr Healey said.
Read more

bill-english-stuff-co-nz-1Brief me, Paula.

—Without a Safe and Secure power supply for Otago, new Business Development, Tourism and Productivity are severely impacted, Prime Minister.

Who is responsible?
—Dunedin City Council, sir.

Agh, that lag Cull.
—He hasn’t mentioned climate change this time, sir.

█ For more, enter the terms *delta*, *aurora*, *luggate*, *jacks point*, *dchl*, *auditor-general*, *noble*, *yaldhurst* or *epic fraud* in the search box at right.

Posted by Elizabeth Kerr

This post is offered in the public interest.

*Images: stuff.co.nz – Richard Healey | Bill English PM

29 Comments

Filed under Aurora Energy, Business, Central Otago, DCC, DCHL, DCTL, Delta, Democracy, Design, Dunedin, DVL, DVML, Economics, Education, Electricity, Finance, Geography, Health, Hot air, Infrastructure, Media, Name, New Zealand, NZRU, OAG, Ombudsman, ORFU, People, Perversion, Pet projects, Politics, Project management, Property, Public interest, Queenstown Lakes, Resource management, SFO, Site, Sport, Stadiums, Tourism, Town planning, Travesty