Tag Archives: Affected parties

Cracking the truth : June 2015 South Dunedin flood

OPINION received from Neil Johnstone
Sat, 10 Sep 2016 at 12:42 a.m.

Richard Stedman produces (below) a succinct review of the causes of, and failures after, the South Dunedin flood of June 2015. His frustrations appear to match those of Hilary Calvert that were published a few hours earlier. My reviews previously published on What if? Dunedin commencing back around February give more detail.

For your readers’ further consideration, Richard has highlighted the ‘200mm increase’ in flood level as a result of Portobello Road pumping station failures. The figure was derived by me, and appears in my review of the first DCC flood report. To my knowledge the only clear comparable DCC concessions have come from chief executive Sue Bidrose who admitted the figure publicly at the 20 June 2016 (yes, 2016) South Dunedin Action Group-organised public meeting, and subsequently.

The first DCC flood report (30 Nov 2015) is adamant that high groundwater was the cause of the flooding, and enough Councillors bought right into that excuse at the following Infrastructure Services Committee meeting. Just go back and view the video, if you’ve forgotten.

Dunedin City Council Published on Dec 7, 2015
Dunedin City Council – Council Meeting – November 30 2015
Discussion of the report starts at 1:09:52

The second (mudtank) DCC report of 26 April this year states: “Although Portobello Road’s performance did explain some of the length of time flooding was evident, much of the flooded area was below road level…” (para 31). No mention of increased depth of flooding there either, you will note.
[View report at Infrastructure Services Committee: Agenda & Reports 26 April (Part A, Item 5) pp 6-27.]

Neither DCC report mentions the additional depth of flooding caused by inaction at the Musselburgh pumping station.

History and ongoing design may rely on written commentaries. For the wellbeing of South Dunedin people, we must therefore continue to counter the misinformation contained in DCC reports, and in the more recent ORC (DCC-backed) South Dunedin “hazards” report. Even if ODT has switched off.

Related Posts at What if? Dunedin
8.3.16 [Review 1] Johnstone independent review of DCC report
19.5.16 [Review 2] Johnstone review of 2nd DCC report

Correspondence supplied
7.3.16 Letter, Chief Executive Sue Bidrose to Neil Johnstone
10.3.16 Response from Neil Johnstone to CE Bidrose

sue-bidrose-south-dunedin-a-changing-environment-radionz-co-nz-detailSue Bidrose at ORC/DCC hazards presentation [radionz.co.nz]

****

OPINION received from Richard Stedman
Fri, 9 Sept 2016 at 8:24 p.m.

The ODT editorial department is peopled by closed minds, a number of whom subscribe to the climate change/rising sea level mantra and therefore manipulate their content to support their distorted view of the world. Mr Morris is captured by the former/present regime at city hall, a fate which befalls every reporter assigned to that round once they get their feet under the table.

Two weeks ago I prepared an opinion piece re the election and South Dunedin, outlining some of the issues as I see them in the hope that it might be published. I thought it was honestly held opinion, but it was rejected because it added “nothing new” to the debate, yet they run to Cull at every turn and run column after column of repetitive nonsense.

The following is my submission submitted on 24/8 and rejected the same day in this message: “Thanks for this submission, but we have had a “deluge” of flood letters and op eds from all sides so I don’t feel the need to highlight the issue again at the moment – certainly if there’s not anything new in it, as such”.

I have seen little evidence of the cited “deluge”.

The South Dunedin flood of June 2015 may be a tipping point during next month’s local body election. Many voters will look at the burgeoning candidates list for the Dunedin City Council and ask “who will provide the cornerstone elements of responsibility, accountability and integrity?”

Residents and business owners in South Dunedin have been sorely tested in recent times through the failure of the DCC to maintain its infrastructure. Among those adversely affected were elderly residents at Radius Fulton Home, including a number of dementia patients, the most vulnerable in our community, who were subjected to floodwaters containing sewage and transferred from the safety of their home in a crisis beyond acceptance. Some were accommodated as far away as Balclutha and Oamaru and three months passed before the facility was re-opened.

Following the flood, obfuscation clouded the failures that led to the inundation of homes and businesses and the investigation and report into the affair was 12 months in gestation. Officials and councillors, captured by the twin mantras of climate change and rising sea level, avoided any suggestion of culpability to limit the likelihood of litigation, and offered no solace that might have been construed as admission of liability.

The mayor and others were quick to blame rising sea level causing increased groundwater, combined with an “extreme weather event”, the result of climate change, and went so far as suggesting that a planned retreat from South Dunedin may be necessary in the future. The rainfall was described as a one-in-100-year event then gradually downgraded, but none of these pretexts are realistic. Questions arise over who is responsible for what, and how serious are the threats of rising sea level, more frequent adverse weather caused by climate change, and the “sinking of South Dunedin”, not to mention “retreat”.

Dunedin and environs have been subjected to much larger weather events in the past. Flooding of the entire city is well recorded and in particular photographs of the 1923 flood depict rowing in floodwaters in the city as well as inundation in South Dunedin. During a storm in 1898 large tracts of St Clair Esplanade were destroyed by the sea which damaged many houses, leaving some partly suspended. More recently, the storms of 1968 were greater than last year’s, delivering 10% more rainfall. In 1968 there were 90 properties invaded by floodwater, whereas last year some 1200 properties were flooded and many contaminated with effluent. Clearly last year’s event was exceptional only for the damage created and lives disrupted.

At a public meeting in South Dunedin on June 20, more than 12 months after the event, those affected had an opportunity to hear an explanation in the hope that someone might take responsibility for the extent of the damage. Despite a good representation of councillors there was no empathy and no likelihood of accountability. What the meeting heard was a long explanation of how the three-waters system works, or doesn’t work, as the case may be, and of failure at the pumping station from chief executive, Dr Sue Bidrose and other staff. The question is “when did the city’s councillors abdicate?”

south-dunedin-flood-june-2015-radionz-co-nzSouth Dunedin June 2015 [radionz.co.nz]

It can be argued that the damage and distress was the result of neglect, but the DCC says problems at the pumping station added only 200mm to the flooding which would have occurred anyway. Which 200mm was it? Maybe the first 200mm flowed across the ground, reached blocked drains then deepened throughout the area, or perhaps the last 200mm increased the depth and entered homes and business premises carrying undesirable flotsam. Without the extra 200mm would the water have stopped at the thresholds rather than flowing inside?

What of the rising sea level threat? Is it as urgent and as devastating as the commissioner for the environment, some DCC councillors and the Green Party say? The Greens proffer that the Government should help to pay for the reconfiguration of South Dunedin. Why? There has been no disaster on the scale of the Canterbury earthquakes and there is no immediate danger condemning South Dunedin, for if sea level were to rise according to some projections, north Dunedin and other areas are also in jeopardy meaning protection on the coast is futile because the flat land would be inundated from the harbour.

Could it be that models of sea level rise around New Zealand are exaggerated and distorted by the multiplier effect have been grossly over stated? And do the $7 million apartment complex at the Esplanade to be completed next year and the DCC’s belated discussion on a South Dunedin hub indicate mixed messages on the subject?

There is no doubt that the infrastructure must be maintained to the highest level and upgrading implemented with haste. The seafront calls for a level-headed approach to protect the sandhills which shelter the city from the ocean. In the past a network of groynes captured the sand, maintaining a broad beach to dissipate the energy of the waves. The network succeeded for nearly 100 years, but without maintenance fell victim to the ocean, so is it time to reinstate a similar system and then plan carefully for the next 100 to 200 years?

Council says that infrastructure will require “tens of millions of dollars” we cannot afford, but plans to spend some $37 million on George Street and the Octagon, followed by development of the harbourside. These “tens of millions” surely must be re-allocated to South Dunedin for infrastructure, to build a second pumping station, and provide realistic coastal protection.

Dunedin needs new councillors who will make hard decisions, reduce spending on fripperies and attend to basics; people who are prepared to drill deep into reports and costings and who are not afraid to make unpalatable decisions when needed rather than govern with slogans and platitudes.

Declaration: Conrad Stedman is my nephew.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

4 Comments

Filed under Business, Climate change, DCC, Democracy, Dunedin, Economics, Education, Events, Finance, Geography, Health, Heritage, Housing, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

Labour messing with South Dunedin, like Cull, unbidden

Not Listening [octavehighereast.com]Not Listening [octavehighereast.com]

There is little or no RISING GROUNDWATER at South Dunedin – this is an attack on the local community by Anthropogenic Global Warming (manmade climate change) believers like Curran, Clark, and Cull.

So-called ‘authorities’ are running their Politics over the top of the local Community, Failing to canvass the views of the local residents, property owners, service providers and businesses through agreed consultation methods Before pronouncing upon the area. This is disrespectful, dangerous behaviour. Unwarranted.

A lot of us will remember Labour MP David Clark’s importune speech on climate change at the public meeting held at South Dunedin on 20 June. He completely didn’t register the mood and understandings of the local audience.

Greenie Cull and the Labour Party are deliberately or inadvertently using South Dunedin as a Political Football. There are few votes to be earned from bullying and interference, thank god.

Listening —what is that.

Speaking after the tour, Mr Little said the area was a “prime candidate” for urban renewal under the party’s proposed Affordable Housing Authority.

### ODT Online Tue, 26 Jul 2016
Labour timeline for South renewal
By Timothy Brown
South Dunedin’s renewal will be showing “good progress” within six years of electing a Labour government, party leader Andrew Little says. Mr Little toured South Dunedin with Dunedin Mayor Dave Cull, Dunedin South MP Clare Curran, Dunedin North MP Dr David Clark and list MP David Parker after the area was earmarked by the Opposition as one urgently needing urban renewal. The group walked from Bathgate Park School, in Macandrew Rd, down Loyalty St into Nicholson St and on to Nelson St before returning to the school. They were accompanied by members of various social groups from South Dunedin.
Read more

****

### Dunedintv.co.nz Mon, 25 July 2016
Labour leader tours South Dunedin
Labour Leader Andrew Little has visited South Dunedin today, alongside a contingent of MPs and social service agency stakeholders. The group wandered around the areas hardest hit by last year’s floods, looking at the handful of houses still empty more than a year on. And Little took the opportunity to offer up his party’s plan to fix some of the issues.
Ch39 Link

Channel 39 Published on Jul 24, 2016
Labour leader tours South Dunedin

DUNEDIN – JUNKET CITY FOR LGNZ
“How do we Efficiently capture NZ Ratepayers’ Money for our Comfy Salaries”

### Dunedintv.co.nz Mon, 25 July 2016
Local government conference kicks off
The country’s annual Local Government conference is back in Dunedin for the first time in almost a decade. More than 560 delegates have piled into the Town Hall to discuss how to make New Zealand a better place to live and work. But it’s also serving as a way to address the tension between local and central governments.
Ch39 Video

LAWRENCE YULE GO HOME

█ For more, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes*, *listener* or *lgnz* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

Listening ear-hand [mrhudyma.com]Larry King - Listen [via linkedin.com]

*Images: mrhudyma.com – Listening | linkedin.com – Larry King, Listen

94 Comments

Filed under Architecture, Baloney, Business, Climate change, Construction, Corruption, Cycle network, Democracy, Design, District Plan, Dunedin, Economics, Events, Finance, Geography, Health, Heritage, Hot air, Housing, Infrastructure, LGNZ, Media, Name, New Zealand, OAG, Ombudsman, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

Johnstone disputes Opus review #SouthDunedinFlood

### ODT Online Thu, 7 Jul 2016
Flood review clears DCC staff findings
Dunedin City Council staff have been vindicated by peer reviews which backed their findings over the cause of last June’s devastating floods. The reviews, carried out by infrastructure consultancy firm Opus, backed the council’s findings South Dunedin and other parts of the city would have been flooded even if the city’s stormwater system was running at full capacity.
Read more

Opus peer reviews of DCC flood reports received (same day) following a LGOIMA request made on 7 July 2016:

DCC Nov2015 rpt review-final (PDF, 395 KB)

DCC Apr2016 rpt review-final (PDF, 329 KB)

****

A truly independent inquiry into the council’s performance around last year’s South Dunedin floods remains long overdue, writes Dunedin engineer Neil Johnstone.

### ODT Online Thu, 14 Jul 2016
Opinion: Report skims surface of South Dunedin flood saga
By Neil Johnstone
OPINION Readers of the Dunedin City Council-funded independent peer review of its post-flood reporting (ODT, 7.7.16) should be wary. The council’s delight with the review may prove short-lived. In brief, the Opus review:

● Recognises the 1968 rainfall event was bigger than that of June 2015 (contrary to repeated council claims).
● Fails to explore the reasons why the 2015 flood was a disaster, and the 1968 event was not.
● Makes assumptions about groundwater levels without referencing the actual data.
● Appears to consider the council’s assumption of zero ground infiltration has merit (note: the data disproves this).
● Believes mud-tank blockage impacts of the flood were “localised” (too bad if you were a local), but fails to consider the likely widespread impacts on South Dunedin of blocked mud-tanks in the St Clair catchment.
● States council reviews “suggest” its failures at the Portobello Rd pumping station caused an increase in flood levels of about 200mm.
● In fact, the first council review leaves the reader with no more than an opportunity to infer this, while the second council review only states that the failures may have influenced “the length of time flooding was evident”.
● I do not recall the council actually publicly admitting the 200mm figure before the South Dunedin Action Group meeting of June 21.
● Fails to address the flood impacts of the council’s total failure to operate its Musselburgh pumps for stormwater relief.
● Makes general statements to the effect that “primary” flooding would have occurred under any circumstance. South Dunedin residents know that “overwhelming” of stormwater infrastructure was not the concern; the avoidable flooding of our people’s houses and businesses was.

For all of the above reasons, and more, the Opus finding the council report’s conclusions were “robust” is concerning. A truly independent inquiry into the council’s performance pre, during and post-flood, at staff and political levels, is long overdue. ODT Link

Related Posts and Comments:
● 7.7.16 Where is the unreserved DCC apology to … South Dunedin ?
● 4.7.16 Presentations available —a) 4 July USA —b) 20 June SDAG
● 28.6.16 The Star and RNZ on raised flood levels #SouthDunedin
● 27.6.16 CULL commingled #AGWbullsfeatherartists
● 21.6.16 Mayoral Statement to South Dunedin
● 20.6.16 Public Meeting: South Dunedin Action Group #tonight
18.6.16 South Dunedin stormwater pipes —getting past the desktop ICMP
● 17.6.16 So we’re going to play it this way #SouthDunedinFlood
● 16.6.16 Public Meeting: South Dunedin Action Group #AllWelcome
● 6.6.16 Listener June 11-17 2016 : Revisiting distress and mismanagement
6.5.16 South Dunedin Action Group: Notes of meeting with DCC (3 May 2016)
14.4.16 South Dunedin flood risk boosters #ClimateChangeCrap #PissOffPCE
26.2.16 Mudtanks and drains + Notice of Public Meeting #SouthDunedinFlood
● 31.12.15 2016, have mercy !@$#%^&*
10.4.15 DCC: Natural Hazards

*Bullet points indicate comments entered after the public meeting 20 June.

█ For more, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *opus*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

4 Comments

Filed under Business, Climate change, DCC, Democracy, District Plan, Dunedin, Economics, Events, Finance, Geography, Health, Heritage, Housing, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design

Where is the unreserved DCC apology to the Community of South Dunedin ?

Updated post
Thu, 7 Jul 2016 at 5:45 p.m. [link to peer reviews via LGOIMA]

And where are the Opus International ‘peer reviews’ for public scrutiny.

All we have is the self-congratulatory propaganda from DCC and the motley crew, propagated by friends at ODT.

Flood review clears DCC staff findings

SHAME

We hear from inside DCC that the peer reviews are not up to much.

Opus, you say?

Hmm.

News. Farce. Like an incessant rash.

Reasons for political Removal.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

70 Comments

Filed under Business, Climate change, DCC, Democracy, District Plan, Dunedin, Economics, Finance, Geography, Health, Heritage, Housing, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, South Dunedin, Town planning, Transportation, Travesty, What stadium

Presentations available —a) 4 July USA —b) 20 June SDAG

Link received.
Mon, 4 Jul 2016 at 12:29 p.m.

Sam Eagle Uploaded on Jun 27, 2008
Stars & Stripes FOREVER!
I, Sam the Eagle, present a musical salute to America.
(c) 2009 The Muppets Studio, LLC

From: [Dunedin City Council]
Sent: Monday, 4 July 2016 11:55 a.m.
To: Elizabeth Kerr
Subject: Response to Information Request

Dear Ms Kerr,

Official information request for CEO SPEECH SOUTH DUNEDIN

I refer to your official information request dated 27-June-2016 for “a full copy of DCC Chief Executive Sue Bidrose’s speech and overhead slides presented to the public meeting hosted by the South Dunedin Action Group on 20 June at Nations Church, King Edward St.”

The information you have requested is available on our website at:

Click to access SC2200115516062812500.pdf

If you wish to discuss this further with us, please feel free to contact the chief executive and request an appointment.

Yours sincerely

[Dunedin City Council]

Download: Sue Bidrose – South Dunedin and stormwater June 20 2016
(PDF, 1 MB)

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

4 Comments

Filed under Business, Climate change, DCC, Democracy, District Plan, Dunedin, Economics, Finance, Geography, Health, Heritage, Housing, Infrastructure, Name, New Zealand, Ombudsman, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Sport, Tourism, Town planning, Transportation, Travesty, Urban design, What stadium

Ray Macleod, letter to editor

ODT 2.7.16 (page 30)

ODT 2.7.16 Letter to editor Macleod p30

****

Received from Lyndon Weggery
Tue, 21 June 2016 at 7:29 p.m.

Message: In the light of concerns last night [South Dunedin public meeting] about the effects of the Proposed 2GP on South Dunedin, suggest you extract the Hazard Zone portion and post it on What if?

South Dunedin Hazard Zone (PDF, 2 MB)

The following report by Anna Johnson shows that very little was done [public consultation] in 2014. In fact only 17 people turned up to the DCC workshop in South Dunedin and their Appendices show that less than 10 people commented on their draft natural hazard policy.

Preferred Options Report (1) (PDF, 2 MB)

Related Posts and Comments:
● 28.6.16 The Star and RNZ on raised flood levels #SouthDunedin
● 27.6.16 CULL commingled #AGWbullsfeatherartists
● 23.6.16 Sa pièce de résistance @ #DUD
● 21.6.16 Mayoral Statement to South Dunedin
● 20.6.16 Public Meeting: South Dunedin Action Group #tonight
18.6.16 South Dunedin stormwater pipes —getting past the desktop ICMP
● 17.6.16 So we’re going to play it this way #SouthDunedinFlood
● 16.6.16 Public Meeting: South Dunedin Action Group #AllWelcome
● 6.6.16 Listener June 11-17 2016 : Revisiting distress and mismanagement
6.5.16 South Dunedin Action Group: Notes of meeting with DCC (3 May 2016)
14.4.16 South Dunedin flood risk boosters #ClimateChangeCrap #PissOffPCE
26.2.16 Mudtanks and drains + Notice of Public Meeting #SouthDunedinFlood
● 31.12.15 2016, have mercy !@$#%^&*
10.4.15 DCC: Natural Hazards

*Bullet points indicate comments entered after the public meeting 20 June.

█ For more, enter the terms *flood*, *sea level rise*, *climate change*, *pce*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered on the public interest.

19 Comments

Filed under Architecture, Business, Climate change, Construction, DCC, Democracy, Design, District Plan, Dunedin, Economics, Finance, Geography, Health, Heritage, Housing, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Structural engineering, Town planning, Transportation, Travesty, Urban design, What stadium

The Star and RNZ on raised flood levels #SouthDunedin

The Star 23.6.16 (page 9)

[click to enlarge]
The Star 23.6.16 Tense moments at South D meeting p9 [water insert]

### radionz.co.nz 8:45 am on 21 June 2016
RNZ News
Dunedin council concedes flood worsened by faulty pumping station
By Ian Telfer in South Dunedin
Dunedin City Council has admitted a faulty pumping station made last year’s South Dunedin flood 20cm deeper than it would have otherwise been. The Council made the admission at a rowdy public meeting at the Nations Church last night about the flooding a year ago which damaged 1200 homes and businesses. Chief executive Sue Bidrose […] made a major concession, saying the council now accepted a key pumping station was blocked, adding an extra 20cm of water to the area. […] Shortly after the flooding, Mr Cull linked the event to climate change and warned South Dunedin may have to beat a managed retreat. Local woman Kathinka Nordal Stene said she was shocked Mr Cull undermined the community at the time when it most needed his support. She said the future of South Dunedin had become a major election issue, on which Mr Cull would be judged. Mr Cull was not at the meeting because he was visiting China. […] Leaders of the newly formed South Dunedin Action Group accused the council and its leaders of having a secret plan to abandon the suburb and blame it on climate change.
RNZ Link

23.6.16 Ch39: Candidates using flooding for political gain (+ Video)
21.6.15 ODT: Anger about South Dunedin’s future

Related Posts and Comments:
● 23.6.16 Sa pièce de résistance @ #DUD
● 21.6.16 Mayoral Statement to South Dunedin
● 20.6.16 Public Meeting: South Dunedin Action Group #tonight
18.6.16 South Dunedin stormwater pipes —getting past the desktop ICMP
● 17.6.16 So we’re going to play it this way #SouthDunedinFlood
● 16.6.16 Public Meeting: South Dunedin Action Group #AllWelcome
● 6.6.16 Listener June 11-17 2016 : Revisiting distress and mismanagement
6.5.16 South Dunedin Action Group: Notes of meeting with DCC (3 May 2016)
14.4.16 South Dunedin flood risk boosters #ClimateChangeCrap #PissOffPCE
26.2.16 Mudtanks and drains + Notice of Public Meeting #SouthDunedinFlood
● 31.12.15 2016, have mercy !@$#%^&*
10.4.15 DCC: Natural Hazards

*Bullet points indicate comments entered after the public meeting 20 June.

█ For more, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

9 Comments

Filed under Business, Climate change, DCC, Democracy, District Plan, Dunedin, Economics, Events, Finance, Geography, Health, Heritage, Hot air, Housing, Infrastructure, Media, Name, New Zealand, Ombudsman, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

Sa pièce de résistance @ #DUD

Monday, 20 June 2016
South Dunedin’s Future : It’s in your hands
Public meeting called by South Dunedin Action Group

au Sud Dunedin

Mock turtles on a Monday, and [a moment of meeting remembrance]
mon Dieu! Voix, la sienne! (my God! Voices, hers!) pronouncing la séparation des “poos” et “wees” —wastewater (grey water) from drinking water and stormwater as la raison d’être pour la stratégie de “Three Waters”……..
méfiez-vous ce qui sort du robinet (beware what comes out of the tap!) ou, était que la bouche (or, was that the mouth)

Flood, The People —inondation, inonderait le peuple
but, DON’T use politics against those “responsable” fr.

Channel 39 Published on Jun 22, 2016

### dunedintv.co.nz Thu, 23 June 2016
Candidates using flooding for political gain
A heated public meeting earlier this week brought last year’s South Dunedin floods back to the fore. The discussion around what to do for those still affected is one that members of the Dunedin City Council’s executive say they’re taking seriously. But there’s concern some involved parties are using the situation for political gain.

Malhereusement! Ceci est du jeu de puissance ineptes, d’elle-même
(Sadly! This is inane power play, of itself)

POST FLOODS

WHY WOULDN’T CANDIDATES CAMPAIGN FOR A BETTER COUNCIL TO SERVE AND REPRESENT THE PEOPLE OF SOUTH DUNEDIN AND ALL CITY RESIDENTS AND RATEPAYERS

CANDIDATES THAT IF ELECTED CAN KNUCKLE CIVIC CENTRE OPERATIONALS TO RESTORE POSITIVE TEAMWORK AND ENGINEERING EXPERTISE

Huh ?

This is THE time for Dunedin Politics and Examination of Dunedin City Council down to the last foul or stormwater, sewer.

Hourra !

Related Posts and Comments:
● 21.6.16 Mayoral Statement to South Dunedin
● 20.6.16 Public Meeting: South Dunedin Action Group #tonight
18.6.16 South Dunedin stormwater pipes —getting past the desktop ICMP
● 17.6.16 So we’re going to play it this way #SouthDunedinFlood
● 16.6.16 Public Meeting: South Dunedin Action Group #AllWelcome
● 6.6.16 Listener June 11-17 2016 : Revisiting distress and mismanagement
6.5.16 South Dunedin Action Group: Notes of meeting with DCC (3 May 2016)
14.4.16 South Dunedin flood risk boosters #ClimateChangeCrap #PissOffPCE
26.2.16 Mudtanks and drains + Notice of Public Meeting #SouthDunedinFlood
● 31.12.15 2016, have mercy !@$#%^&*
10.4.15 DCC: Natural Hazards

*Bullet points indicate comments entered after the public meeting 20 June.

█ For more, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

Posted by Elizabeth Kerr

10 Comments

Filed under Architecture, Baloney, Business, Climate change, Construction, Democracy, Design, District Plan, Dunedin, Economics, Education, Events, Finance, Geography, Health, Heritage, Hot air, Housing, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

Mayoral Statement to South Dunedin

Follows:
Mayor David Cull’s ten-page speech for last night’s public meeting called by the South Dunedin Action Group.

Mayoral apology: At China on “DCC business”.

Acting Mayor Cr Andrew Noone orated the Mayoral Statement.
Dated: Monday, 20 June 2016

[excerpt, from pages 1-2]

Mayor Speech Meeting 20 June 2016 SD [excerpt pp1-2]

Readers may involve themselves with the full statement.

█ Download: Mayor Speech Meeting 20 June 2016 SD (PDF, 1 MB)

****

ODT Online Tue, 21 Jun 2016
Anger about South Dunedin’s future
By Vaughan Elder
Unanswered questions about the long-term future of South Dunedin and the city’s response to climate change loomed large at a heated public meeting last night. Residents concerned about the risk of flooding during future rain events were among about 170 people who packed the Nations Church for the meeting organised by the South Dunedin Action Group (SDAG) and attended by councillors and senior staff members. Attendees heard about the short-term measures the council had taken or was about to take to ensure South Dunedin’s infrastructure would run at full capacity should there be a repeat of last June’s devastating flood.
Read more

****

Oh hurrah. What the council has been doing in planning annual expenditure on pet projects in the interests of some private groups, not Core 3-Waters Infrastructure for South Dunedin:

“She said next year the council would invest $5m in South Dunedin’s community hub, $500,000 in a local hockey turf and more money to buy buildings to expand the area’s Gasworks Museum.” (via RNZ)

### radionz.co.nz 8:45 am Tue, 21 Jun 2016
RNZ News
Dunedin council concedes flood worsened by faulty pumping station
By Ian Telfer in South Dunedin
Dunedin City Council has admitted a faulty pumping station made last year’s South Dunedin flood 20cm deeper than it would have otherwise been. The Council made the admission at a rowdy public meeting at the Nations Church last night about the flooding a year ago which damaged 1200 homes and businesses. South Dunedin residents have been waiting for a year for its council to front up for the flooding – and last night it did so en masse. At least eight city councillors, the chief executive and her two deputies were quizzed by 200 locals about what happened last June, and what will stop it happening again. […] But it will take more than [the chief executive’s] words to sort out the ill feeling with residents, who said they felt neglected and betrayed by the council, and especially by Dunedin Mayor Dave Cull. Shortly after the flooding, Mr Cull linked the event to climate change and warned South Dunedin may have to beat a managed retreat. Leaders of the newly formed South Dunedin Action Group accused the council and its leaders of having a secret plan to abandon the suburb and blame it on climate change.
Read more

Tue, 21 Jun 2016 RNZ: Morning Report
Council admits it made South Dunedin floods 20cm worse
The Dunedin city council has admitted it made last year’s South Dunedin flood 20 centimetres worse.
Audio | Download: OggMP3 (3′37″) –listen to local voices!

****

Tue, 21 Jun 2016
ODT: ‘Significant benefits’ for city in pipeline
DCC Asset and Commercial Manager Tom Osborn says old cracked earthenware wastewater pipes, mostly laid in the 1900s, have been allowing groundwater to enter the wastewater system, leading to flooding after heavy rain, resulting in overflows. “This also adds to flooding in areas such as the northwest corner of South Dunedin, when pipe flows coming from Kaikorai Valley meet flows from other parts of the city and flatten out, creating a bottleneck effect.”

DCC media release: Kaikorai Valley works enter new phase

Facebook: South Dunedin Action Group

Related Posts and Comments:
● 20.6.16 Public Meeting: South Dunedin Action Group #tonight
18.6.16 South Dunedin stormwater pipes —getting past the desktop ICMP
● 17.6.16 So we’re going to play it this way #SouthDunedinFlood
16.6.16 Public Meeting: South Dunedin Action Group #AllWelcome
● 6.6.16 Listener June 11-17 2016 : Revisiting distress and mismanagement
6.5.16 South Dunedin Action Group: Notes of meeting with DCC (3 May 2016)
14.4.16 South Dunedin flood risk boosters #ClimateChangeCrap #PissOffPCE
26.2.16 Mudtanks and drains + Notice of Public Meeting #SouthDunedinFlood
● 31.12.15 2016, have mercy !@$#%^&*
10.4.15 DCC: Natural Hazards

*Bullet points show comments entered after the public meeting 20 June.

█ For more, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

26 Comments

Filed under Architecture, Baloney, Business, Climate change, Construction, Democracy, Design, District Plan, Dunedin, Economics, Education, Events, Finance, Geography, Health, Heritage, Hot air, Housing, Infrastructure, Media, Name, New Zealand, OAG, Ombudsman, People, Perversion, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Stadiums, Town planning, Transportation, Travesty, Urban design, What stadium

Public Meeting: South Dunedin Action Group #tonight

SDAG Meeting Notice 20 Jun 2016 Nations Church 6pm[click to enlarge]

Date: Monday, 20 June 2016
Venue: Nations Church, 334 King Edward St, South Dunedin
Time: 6:00pm (1800 hours)

Facebook: South Dunedin Action Group

█ For related posts and comments, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.

Posted by Elizabeth Kerr

Election Year. This post is offered in the public interest.

13 Comments

Filed under Business, Democracy, District Plan, Dunedin, Economics, Education, Events, Finance, Health, Heritage, Housing, Infrastructure, Ombudsman, People, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

Hold on! DCC Annual Plan 2016/17 #CommunityEngagement

Tabled at the full Council meeting held on Monday, 22 February 2015

Report – Council – 22/02/2016 (PDF, 84.1 KB)
Community Engagement Plan for 2016/17 Annual Plan
Report from Corporate Policy

DCC uneducated 22.2.16 Kate Wilson grey

Posted by Elizabeth Kerr

*Await release of the DCC meeting video (via 39 Dunedin Television) on YouTube for a full transcription.

31 Comments

Filed under Business, DCC, Democracy, Dunedin, Economics, Events, Geography, Heritage, Hot air, Infrastructure, Name, People, Perversion, Politics, Project management, Property, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium

DCC consents subdivisions without full consultation on stormwater & drainage

Guidelines on the New Zealand Bill of Rights Act 1990
Introduction to sections 27(1) to 27(3): The right to justice Link

Introduction to sections 27(1) to 27(3): The right to justice
Section 27(1) The right to the observance of the principles of natural justice
Section 27(2) The right to a judicial review of determinations
Section 27(3) Proceedings involving the Crown same as proceedings between individuals

█ RE: COUNCIL LIABILITY AND RISK | COST TO PROPERTY OWNERS AND RATEPAYERS —Non-notified v Notified Resource Consents

GUILTY PARTIES:
Mayor and Councillors, Hearings Committee, Chair of Infrastructure Services Committee, Chief Executive, General Manager Infrastructure and Networks, General Manager Services and Development, Group Manager Water and Waste, City Planning, City Development Team, Resource Consents Team et al.

ODT 12.9.15 (page 30)

ODT 12.9.15 Letters to editor Baldwin Lewis Poole p30

Related Posts and Comments:
27.8.15 DCC: Non-notified … consent Leith Valley 19-lot subdivision #ULCA
7.6.12 Dunedin stormwater: more differences between ORC and DCC
[240 Portobello Road and more]

Posted by Elizabeth Kerr

Leave a comment

Filed under Architecture, Business, Construction, DCC, Democracy, Design, Economics, Geography, Media, Name, New Zealand, Ombudsman, People, Politics, Project management, Property, Site, Town planning, Urban design, What stadium

DCC: Non-notified resource consent Leith Valley 19-lot subdivision #ULCA

259 Malvern Street Dunedin (LUC-2014-631)
This consent was an application to/for earthworks to form building platforms for 19-lot residential subdivision at 259 Malvern Street Dunedin. This was considered by the Council’s Senior Planner (Consents) on 1 January 2008.

DCC Non-notified Consent Decisions (2015) LUC-2014-631 [page 8 as at 26.8.15]
Source: DCC Non-notified Consent Decisions, page 8 as at 26.8.15

DCC Webmap - 259 Malvern Street (JanFeb 2015)DCC Webmap – 259 Malvern Street (Jan/Feb 2013)

Received from Jeff Dickie (Woodhaugh)
Wed, 26 Aug 2015 at 10:10 a.m.

Subject: dodgy valuations

There’s a 19-lot subdivision underway in Malvern Street, just past the bridge after Patmos Avenue. What makes this odd is that it was granted non-notified consent.

There is a ground swell of anger that this has been allowed. None of the residents knew anything about it until it was through.

It also appears to be within Dunedin’s Leith Valley Urban Landscape Conservation Area [ULCA24], that incidentally was foisted on me. I spent $25,000 fighting this including appealing to the Environment Court. I employed a QC, a barrister and an Environmental Planner. In summary, the Judge said I had a right to feel aggrieved. However, he was reluctant to make a ruling that could potentially open the floodgates to other cases against a local authority [DCC].

It meant people like me, and all the other affected re-zoned owners were privately funding a public visual amenity, a de facto reserve.

The reason I felt so aggrieved is that it has happened to me before with an eight and a half acre section directly opposite Millbrook in Queenstown. My partners and I have owned this for about 26 years and have been obstructed for that entire time. Surrounding us everywhere is quite intensive development and ours remains an island of undeveloped land. Our intentions had been for very restrained use, unlike our more successful neighbours, who are clearly “better connected” than us!

The Leith Valley case is odd. The ULCA was supposed to protect the rocky escarpment and bush area and the latest development doesn’t do that.

I’m not certain, but I’ve been told the developer is John Dunckley, a valuer.
He used to live on-site but now lives in Motueka. Ironically, he objected to a neighbour’s subdivision on the grounds of spoiling his view. One has to wonder how on earth this was granted by the DCC. A reward for favours past?

John Dunckley is the ‘stadium valuer’. He put the eye-watering $225M value on the just completed well over budget stadium. That in effect validated the cost overruns.

[ends]

It appears the developer Dunckley has chosen to push through with subdivision prior to public consultation of the proposed 2GP this year. Very possibly, the existing overlay of ULCA24 should have been one of the factors necessitating full public notification of the application for (land use) consent. The decision should be investigated or challenged due to the number of potentially affected / interested parties not made formally aware of the land owner’s or indeed the city council’s (covert) process and intentions.

DCC Rates Book - 259 Malvern Street - Three Hills Limited

Ratepayer: Three Hills Limited

NZ Companies Register:
THREE HILLS LIMITED 5547070
Incorporation Date: 23 Dec 2014
Company Status: Registered
Registered Office: 147b Redwood Valley Road, Rd 1, Richmond 7081
Address for service: 147b Redwood Valley Road, Rd 1, Richmond 7081

Directors (1 of 1):
John DUNCKLEY – 259 Malvern Street, Glenleith, Dunedin 9010

Total Number of Shares: 100
Shareholders in Allocation:
Allocation 1: 100 shares (100.00%)
John DUNCKLEY – 259 Malvern Street, Glenleith, Dunedin 9010
Ellen Jane DUNCKLEY – 259 Malvern Street, Glenleith, Dunedin 9010
Stuart James MCLAUCHLAN – 3 Walsh Lane, Maori Hill, Dunedin 9010

Subject Site at Leith Valley [screenshot]
DCC Compare Existing and Second Generation District Plans [259 Malvern Street + ULCA24]

█ For interactive comparative maps, go to District Plan Maps

Definition (Dunedin City District Plan):
Urban Landscape Conservation Areas – means those areas addressed in the Townscape Section and identified on the District Plan Maps which provide a landscape setting for the urban areas.

Dunedin City District Plan Volume 1
District Plan – Section 3: Definitions
District Plan – Section 13: Townscape

Dunedin City District Plan 13.8 ULCA

Source: Townscape, page 13:47 [screenshot]

█ The 2GP appears to reduce Dunedin City’s biodiversity in residential areas due to Dunedin City Council’s unconstrained support for private speculator/developers to subdivide property holdings and intensify/densify construction, resulting in the removal of existing ULCAs from significant and potentially regenerative conservational environments.

DCC on Natural Environment and Biodiversity
– in reference to the proposed second generation district plan (2GP)

Review of Urban Landscape Conservation Areas
A review of Urban Landscape Conservation Areas (ULCA) has determined that it has been applied in most cases to public reserves. A large number of these reserves are sports grounds with limited vegetation cover and do not meet the intent of a ULCA. Instead the ULCA Zone has functioned as a default reserves zone. The preferred approach in the new Plan [2GP] is to zone large reserves as part of a new Recreation Zone which will better recognise the values of reserves (refer to Q&A: Community and Recreation Activities). This will reduce the need to include such areas as a ULCA.

The approach to be taken with reserves in the 2GP provides an opportunity to reconsider the remaining ULCA areas and whether there are alternative approaches. Some large reserves, such as the Dunedin Town Belt contain extensive areas of vegetative cover that play a significant role in providing corridors for biodiversity and these values need to be recognised with a method that manages biodiversity. The ULCA also includes areas of private land, generally the vegetated steep sides of valleys or gullies, such as the Leith Valley, that provide biodiversity corridors. It is proposed to recognise their values in any method that manages biodiversity.
DCC Link

Posted by Elizabeth Kerr

18 Comments

Filed under Business, Construction, DCC, Democracy, Economics, Geography, Heritage, Name, New Zealand, People, Pics, Politics, Project management, Property, Site, Stadiums, Town planning, Urban design

SH88 realignment: decision to Environment Court?

Updated Post 3.9.13 at 1:30pm

SH88 realignment [ODT Graphic]### ODT Online Mon, 2 Sep 2013
Decision on SH88 looms
By Debbie Porteous
The Dunedin City Council has until Friday to determine whether it will make a decision on the controversial designation of land for the realignment of State Highway 88 near Dunedin’s Forsyth Barr Stadium – or hand the responsibility for the decision to the Environment Court.
To opt for the latter would be a first for the council, which is both the authority requesting the land be designated, and the authority that would require it to be designated. It publicly notified the requirement for the land last month, after a previous non-notified designation was quashed by the court following the council’s admission it had not followed the proper consultation process. The new road has been built, but final measures including traffic lights have been in limbo while the designation issue is resolved.

Mr Hall has already indicated publicly he would ”fight” the proposed designation as notified because it still did not provide safe access to his property.

Doug Hall 1One of the affected landowners, Doug Hall, who is running for the DCC, took the council to court to argue the original designation was illegal because he was not notified as an affected party, and sought an injunction stopping the traffic lights from being switched on until the resolution of safety issues at that intersection and around access to his property as a result of the realigned road. Affected parties, including Mr Hall, were consulted on the new designation late last year, and again earlier this year after the notification of the requirement was delayed while negotiations with Mr Hall continued.
The council had received 13 submissions by Friday, the end of the submission period. Submitters included the University of Otago, Port Otago Ltd, the NZ Transport Agency, the Otago Regional Council and several heavy transport companies among others, but not Mr Hall, or his representatives.
Read more

ODT Correction 3.9.13 (page 3):

Submissions from companies owned by Doug Hall, one of the parties affected by the realignment of State Highway 88 in Dunedin, were received by the Dunedin City Council within the statutory timeframe and will be included in the process for designating the land for realignment. The submissions from Anzide Properties Ltd, Hall Brothers Transport Ltd, and Dunedin Crane Hire (2005) Ltd were received by deadline on Friday, but were not processed until yesterday.

Related Posts and Comments:
3.8.13 SH88 notice of requirement [more maps]
30.4.13 DCC governance = management ?
20.11.12 DCC vs Anzide Properties decision: The road “has no legal basis”
27.5.12 SH88 realignment – information
25.5.12 SH88 realignment costs (injunction)
27.2.12 Bringing DCC, related entities and individuals to account…
23.8.11 Stadium project tangles
4.11.10 SH88 realignment for stadium disrupts traffic
21.7.10 SH88 realignment – update
7.7.10 Goodbye to great store buildings in Parry St
21.4.10 SH88 realignment – update
31.3.10 SH88 realignment
24.2.10 SH88 realignment: Are ratepayers buying the land twice?
20.11.09 Interesting. SH88 realignment.
2.9.09 SH88 realignment past stadium

Posted by Elizabeth Kerr

45 Comments

Filed under Business, Construction, CST, DCC, Democracy, Design, Economics, Geography, Media, Name, New Zealand, People, Pics, Politics, Project management, Property, Site, Sport, Stadiums, Town planning, Urban design, What stadium

SH88 notice of requirement

DIS-2013-1 Location Map 1

DIS-2013-1 Fredrick St - Ravensbourne Rd (detail)Affected Party: Anzide Properties Ltd

Doug Hall, who was informed about the designation process on Thursday, said he was going to fight the issue. ”I have no choice. It is a safety issue. Someone is going to get killed on that road.”

### ODT Online Sat, 3 Aug 2013
Hall to oppose designation
By Hamish McNeilly
Dunedin businessman Doug Hall remains defiant after the Dunedin City Council confirmed it was revisiting the designation process for an affected area of State Highway 88. Yesterday, the council announced it had lodged a notice of requirement to restart the designation process, after negotiations stalled following a botched handling of the original process.
DCC general manager infrastructure and networks Tony Avery said the section of road had not been legally designated and the council acknowledged it had made process mistakes when trying to designate it earlier.
Last year, the Otago Daily Times reported the council had spent $485,000 over 18 months to try to find a solution, and it was too early to say how much the designation process would add to the final tally.
Read more

● Submissions on the notice of requirement, which is publicly notified today, close on August 30.

Dunedin City Council – Media Release
Designation Process for Part of State Highway 88

This item was published on 02 Aug 2013.

The Dunedin City Council has lodged a Notice of Requirement to start afresh the designation process for the section of State Highway 88 near Anzac Avenue.
The Notice of Requirement is a formal process to have land designated as road. It will be publicly notified tomorrow.
DCC General Manager Infrastructure and Networks Tony Avery says the new section of SH88 has been in use since July 2011, but has not been legally designated. The DCC has previously acknowledged that it made process mistakes during an earlier attempt to designate the road.
Temporary traffic controls have been in place since the new section of road was opened, while the DCC negotiated with an adjacent landowner over access arrangements.
“Those negotiations were ultimately unsuccessful, despite the best intentions of all parties, so we are now proceeding with the formal legal process to have the road designated.”
Once the designation proposed is approved, traffic lights at the intersection of Anzac Avenue and Frederick Street would be activated, and the Ward Street bridge ramp would be re-opened to provide much-needed access to the Harbourside area, Mr Avery says. Access to the adjacent properties is to be provided as well, consistent with acceptable standards and in a safe manner.
The DCC is confident the changes are in the best interests of the public.
Submissions on the Notice of Requirement will close on 30 August.

Contact General Manager Infrastructure and Networks on 477 4000.
DCC Link

DIS-2013-1 Layout PlanDIS-2013-1 Fredrick St – Ravensbourne Rd Layout Plan

Territorial Authority’s Requirement for Two Designations
DIS-2013-1 Fredrick Street – Ravensbourne Road

The requirement is for:
The Notice of Requirement seeks to designate two areas of land. Designation 1 is for part of the Dunedin Harbourside Arterial and will link Anzac Avenue (D465) with Ravensbourne Road (D845) to the south of Parry Street West. Designation 2 is for the Dunedin Harbourside Arterial – Access Road which will provide access from the Designation 1 area to the site at 80 Anzac Avenue.
Read more + Official Documents/Maps

### stuff.co.nz Last updated 18:04 20/11/2012
Dunedin City Council fined for road botch up
By Wilma McCorkindale – DScene
A High Court decision has slammed Dunedin City Council’s (DCC) handling of a roading realignment in the city, ordering the cash -strapped authority to pay affected parties more than $185,000 in costs. Justice Alan Mackenzie indicated in a written decision the legality of the stretch of State Highways 1 and 88 through the city remained in question because of the council’s botch up.
Read more

Judgment-221310 (PDF, 109 KB)

Related Post and Comments:
30.4.13 DCC governance = management ?
20.11.12 DCC vs Anzide Properties decision: The road “has no legal basis”
27.5.12 SH88 realignment – information
25.5.12 SH88 realignment costs (injunction)
27.2.12 Bringing DCC, related entities and individuals to account…
23.8.11 Stadium project tangles
4.11.10 SH88 realignment for stadium disrupts traffic
21.7.10 SH88 realignment – update
7.7.10 Goodbye to great store buildings in Parry St
21.4.10 SH88 realignment – update
31.3.10 SH88 realignment
24.2.10 SH88 realignment: Are ratepayers buying the land twice?
20.11.09 Interesting. SH88 realignment.
2.9.09 SH88 realignment past stadium

Posted by Elizabeth Kerr

Leave a comment

Filed under Business, Construction, CST, DCC, Democracy, Design, Economics, Media, Name, People, Politics, Project management, Property, Site, Stadiums, Town planning, Urban design

DCC governance = management ?

QUESTIONS
Mayor & Councillors | City Property | City Planning | Strategy and Development Team | Council-owned Companies | Consenting Processes | Conflicts

On selling council-owned property…. [public notification restricted]

[Mr McLaren] told the Otago Daily Times he was not consulted about the proposal, in part because he was a commercial rival. However, he was also a resident living in a house that overlooked the proposed development site from Braeview Cres….

### ODT Online Tue, 30 Apr 2013
Anger over motor caravan park plan
By Chris Morris
The Dunedin City Council will consider allowing a new motor caravan park to be developed near Woodhaugh Gardens, just metres away from a rival camping spot. […] The New Zealand Motor Caravan Association has applied to the council for consent to establish the park at 51, 55 and 57 Woodhaugh St, on a vacant residential site next to houses and the Leith Stream. […] The proposal was deemed non-complying under the district plan, but attracted only four submissions – three of them opposed – after public notification was restricted to surrounding neighbours deemed to be affected.
Read more

****

Only yesterday . . . [heading to non-notified consent]

### ODT Online Mon, 29 Apr 2013
New supermarket plan hailed
By Chris Morris
A planned multimillion-dollar supermarket development in Green Island could bring jobs and investment and trigger wider improvements in the area, a Dunedin city councillor says. Progressive Enterprises is in talks with the Dunedin City Council aimed at developing a Fresh Choice supermarket on land between Main South Rd and Shand St.
Read more

Related Post and Comments:
29.4.13 Green Island activity centre

****

Last year . . . [non-notified application, loss of oldest brewery building on site]

### ODT Online Fri, 17 Aug 2012
Speight’s demolition to make way for expansion
By Chris Morris
Part of the Speight’s Brewery in Dunedin will be demolished to make room for the $29 million expansion of its operation. […] The company announced its intention to redevelop the brewery last year, after earthquake damage to the Canterbury Brewery, and began by relocating its Maltexo production plant to Dunedin in May this year.
Read more

### ODT Online Sat, 18 Aug 2012
Questions over consent for Speight’s
By Chris Morris
Heritage advocates are questioning why the public was not given a say about the demolition of a protected part of Speight’s Brewery in Dunedin.
Read more

****

Property acquisition for the stadium and SH88 developments . . .
[the hornet’s nest]

### stuff.co.nz Last updated 18:04 20/11/2012
Dunedin City Council fined for road botch up
By Wilma McCorkindale – DScene
A High Court decision has slammed Dunedin City Council’s (DCC) handling of a roading realignment in the city, ordering the cash -strapped authority to pay affected parties more than $185,000 in costs. Justice Alan Mackenzie indicated in a written decision the legality of the stretch of State Highways 1 and 88 through the city remained in question because of the council’s botch up.
Read more

Judgment-221310 (PDF, 109 KB)

Related Post and Comments:
20.11.12 Dunedin City Council vs Anzide Properties decision: The road “has no legal basis”

****

Then there was Delta . . . [property acquisition at Jacks Point and Luggate, which names in common]

### ODT Online Thu, 25 Apr 2013
Delta investigation ‘major’
By Chris Morris
The Office of the Auditor-general considers its investigation into land purchases by Dunedin City Council-owned company Delta to be one of its major inquiries for the coming year. Results of the investigation might not be made public for some months, at the earliest. The OAG’s draft annual plan for the 2013-14 year, published last week, detailed work planned for the 12 months from July 1. The plan listed the Delta investigation as one of the “major inquiries” to be reported on during the year. The investigation into Delta’s $14.12 million land purchases in 2008 and 2009 at Luggate, near Wanaka, and Jacks Point, near Queenstown, was confirmed last November.
Read more

Posted by Elizabeth Kerr

22 Comments

Filed under Architecture, Business, Construction, CST, DCC, DCHL, Design, Economics, Geography, Heritage, Hot air, Media, Name, NZHPT, People, Politics, Project management, Property, Site, Stadiums, Tourism, Town planning, Urban design

Dunedin City Council vs Anzide Properties decision: The road “has no legal basis”

Concerning the State Highway 88 realignment, skirting the new stadium.

Judgment-221310 (PDF, 109 KB)

DScene breaks the news at Stuff:

Dunedin City Council fined for road botch up
A High Court decision has slammed Dunedin City Council’s (DCC) handling of a roading realignment in the city, ordering the cash-strapped authority to pay affected parties more than $185,000 in costs. Justice Alan Mackenzie indicated in a written decision the legality of the stretch of State Highways 1 and 88 through the city remained in question because of the council’s botch up.

Related Posts:
9.6.12 City Property to compete more obviously in the market
27.5.12 SH88 realignment – information
25.5.12 SH88 realignment costs (injunction)
27.2.12 Bringing DCC councillors, staff, related entities and individuals to account
23.8.11 Stadium project tangles
24.11.10 SH88 realignment for stadium disrupts traffic
29.10.10 DCC Chief Executive resigns – timing is everything!
21.7.10 SH88 realignment – update
7.7.10 Goodbye to great store buildings in Parry St
21.4.10 SH88 realignment – update
31.3.10 SH88 realignment
24.2.10 SH88 realignment: Are ratepayers buying the land twice?
20.11.09 Interesting. SH88 realignment.
2.9.09 SH88 realignment past stadium
27.8.09 $294.8m investment for Otago region
19.5.09 There’s more, really?
12.2.09 DCC, and the right to ask?

Posted by Elizabeth Kerr

72 Comments

Filed under Business, Construction, DCC, Geography, People, Project management, Property, Site, Stadiums, Town planning, Urban design

SH88 realignment – information

Comment received from daseditor
Submitted on 2012/05/26 at 8:18 pm

[24.5.12] Edmund Anscombe and the Anzac Avenue Trees

With your discussion of the alignment I hope you’ll also take the time to read the article above on the Anzac Avenue trees. The alignment construction looks as though it has severely affected a critical area of the city’s landscape heritage which is linked to the work of prominent architect Edmund Anscombe.

Images supplied by Anonymous*

The image dates relate to Google Earth snapshots: 2005 January, 2006 March, 2009 July, 2011 January, and 2011 September. 2004 is available but heavy cloud cover obscures the view.

SH88 – Google Earth images including the quarry and Logan Park sports field.

SH88 – The same images cropped to SH88 entry and exit points.

SH88 – The Google Maps image which marks the road.

*Several contributors at this website use the title Anonymous.

Related Post with Links:
25.5.12 SH88 realignment costs (injunction)

Posted by Elizabeth Kerr

12 Comments

Filed under Construction, DCC, Design, Economics, Geography, Pics, Project management, Property, Site, Stadiums, Town planning, Urban design

Dunedin City district plan review

A report entitled ‘Plan Review and Preparation of Second Generation District Plan’ from the City Development Manager goes to DCC’s Planning and Environment Committee today.

Report Summary:

The Dunedin City District Plan (the Plan) became operative on 3 July 2006. The Planning Policy Team (now part of the City Development Team) have been working on a programme of rolling reviews using section by section Plan evaluations and reviews followed by plan changes to make improvements and deal with any issues identified.

Over the last year and half, City Development have been undertaking an evaluation of most sections of the District Plan to scope the range of “matters” that ideally should be addressed through a plan review and plan change process.

These matters include required responses to changes to the content requirements of plans through amendments to the Resource Management Act 1991, recent National Policy Statements, changes to Regional Plans, the need to improve integration with other Council strategies, alignment with the draft Spatial Plan, provisions in the Plan that internal and external stakeholders feel are not working and major changes in planning ‘best practice’ since the Plan was first written.

The evaluations have recommended that all operative parts of the plan need changes (this excludes Harbourside).

The City Development Team had a workshop with Councillors on 15 March 2010 to discuss the need for a second generation Plan and areas for improvement to be considered in relation to current ‘best practice’.

This report seeks formal approval for the initiation of the plan review and approval to prepare and notify subsequent changes to the Plan to develop a second generation District Plan.

Report – 08/02/2012 (PDF, 100 KB)
Plan Review and Preparation of Second Generation District Plan

[PEC Agenda]

Posted by Elizabeth Kerr

27 Comments

Filed under DCC, Economics, Geography, Heritage, Politics, Project management, Property, Town planning, Urban design, What stadium