![Listener 11-17 Jun 2016 p22 [20160606_154423] 3](https://dunedinstadium.files.wordpress.com/2016/06/listener-11-17-jun-2016-p22-20160606_154423-3.jpg?w=500&h=628)
R E S O N A T E S
Get the latest issue of New Zealand Listener (pp 22-29), more soon….
█ For related posts and comments, enter the terms *flood*, *sea level rise*, *stormwater*, *hazard*, *johnstone*, *hendry*, *south dunedin action group*, *debriefing notes* or *listener* in the search box at right.
—
Posted by Elizabeth Kerr
Election Year. This post is offered in the public interest.
*Image: phoneshot at a diner by whatifdunedin [click to enlarge]
Like this:
Like Loading...
Filed under Business, Climate change, DCC, Democracy, District Plan, Dunedin, Economics, Events, Finance, Geography, Heritage, Housing, Infrastructure, Inspiration, Media, Name, New Zealand, ORC, People, Pet projects, Politics, Project management, Property, Proposed 2GP, Public interest, Resource management, Site, South Dunedin, Town planning, Transportation, Travesty, Urban design, What stadium
Tagged as 3 June 2015 Flood, 3 Waters Strategy, Commercial development, Contract supervision, Cyclical maintenance and repair, DCC, DCC Infrastructure Services, DCC Infrastructure Services Committee, Drainage, Drains, Dunedin, Dunedin City Council, Flood, Flood damage, Groundwater level, Historical storm events, Infiltration, Information DELAY, Infrastructure, Insurance debacle, Lack of accountability, Legal advice, Liability and risk, Listener, Maintenance contracts, Media, Monitoring and supervision, Mudtanks, NZ Listener, Obfuscation, ORC, Otago Regional Council, Peer reviews, Rebecca Macfie, Reports, Sea level rise, South Dunedin, South Dunedin Integrated Catchment Management Plan (ICMP), Stormwater DAMAGE, Stormwater drainage, Stormwater pumping stations, Unliveable houses