Received.
Not shooting the messenger.
From: Elizabeth Kerr
Sent: Wednesday, 2 March 2016 9:50 a.m.
To: Kristy Rusher
Cc: Elizabeth Kerr; Sue Bidrose; Sandy Graham; Editor @odt.co.nz
Subject: Re: LGOIMA request – Mudtanks number: 531420Dear Kristy
The extensions are clearly becoming an unnecessary problem.
I will be in touch again on this matter within 48 hours.
Regards
Elizabeth Kerr
Sent from my smartphone network
——– Original message ——–
From: Kristy Rusher
Date: 02/03/2016 8:29 am (GMT+12:00)
To: Elizabeth Kerr
Subject: Re: LGOIMA request – Mudtanks number: 531420Hi Elizabeth,
The DCC is currently extending your information request for a further 15 working days (section 14(1)(a) LGOIMA 87). This is because meeting the timeframes would unreasonably interfere with organisational priorities.
Regards,
KristySent from my iPhone
On 23/02/2016, at 5:46 PM, “Kristy Rusher” wrote:
Hi Elizabeth,
The DCC is extending your request for information for 5 working days as meeting the time limits for the original request would unreasonably interfere with the operations of the Council (section 14(1)(a) of the Local Government Official Information and Meetings Act 1987).
Regards,
Kristy Rusher
Manager Civic and Legal, Civic
Dunedin City Council
[my emphasis in Kristy’s email messages]
—
DCC forwarded the following request to new group manager transport Ian McCabe, for reply:
From: Elizabeth Kerr
Sent: Monday, 25 January 2016 9:24 p.m.
To: Sandy Graham; DCC LGOIMA Information Request
Cc: Kristy Rusher; Elizabeth Kerr
Subject: LGOIMA Request – Ref No. 531420Further to my use of the online form at DCC website:
Dear Sandy
LGOIMA Request – South Dunedin mudtanks and stormwater drains
Reference No. 531420I request the following information:
1. Can Dunedin City Council tell me if all mudtanks and stormwater drains in the South Dunedin catchment have been physically cleared in the time elapsed since the 3 June 2015 flood?
2. How many times have these mudtanks and stormwater drains been checked and cleared since the 3 June 2015 flood?
3. Which contractor / subcontractor has been responsible for this monitoring and clearance work since the 3 June 2015 flood?
4. Who (name and staff position) at Dunedin City Council has been directly responsible for checking the contractor / subcontractor work since the 3 June 2015 flood?
5. Are there any items of stormwater infrastructure in the South Dunedin catchment that are known to be blocked or cannot be cleared (if for any reason), since the 3 June 2015 flood?
I look forward to your reply in digital format by email.
Kind regards, Elizabeth
—
New guides to the OIA and LGOIMA for agencies and requesters
were issued by new Chief Ombudsman Judge Peter Boshier on 17 Dec 2015.
EXTENSIONS
An agency may extend the maximum time limit for transferring a request or making a decision and communicating it to you, if:
• your request is for, or requires a search through, a large quantity of information and meeting the original time limit would unreasonably interfere with the agency’s operations; or
• consultations needed to make a decision on your request mean than a proper response cannot be made within the original time limit.
The extension must be for a reasonable period of time in the circumstances.
The agency must notify you of the extension within 20 working days after the day it received your request. The notice must:
• specify the period of the extension;
• give the reasons for the extension; and
● state that you have the right to complain to an Ombudsman about the extension.
While more than one extension may be made within the original 20 working days (if necessary), no further extensions may be made once the original 20 working day maximum time limit has passed.
Source: Making official information requests: A guide for requesters
Download PDF 829 KB | Download DOC 654 KB
—
█ PUBLIC MEETING – SOUTH DUNEDIN FLOOD
South Dunedin MP Clare Curran is convening a public meeting on Monday 7 March at 6:00 p.m. in the Nations Church Auditorium, 334 King Edward Street, to look at why South Dunedin “flooded” on 3 June last year. All Welcome.
Otago Daily Times Published on Jun 4, 2015
Raw aerial video of Dunedin Flooding
Video courtesy One News
—
Related Posts and Comments:
26.2.16 Mudtanks and drains + Notice of Public Meeting #SouthDunedinFlood
21.2.16 DCC infrastructure … report (30.11.15) subject to ‘internal review’ only
13.2.16 South Dunedin Flood (3 June 2015): Bruce Hendry via ODT
4.2.16 2GP commissioner appears to tell Council outcome… #hazardzones
4.2.16 Level responses to Dunedin mayor’s hippo soup #Jun2015flood
30.1.16 DCC Rates: LOCAL CONTEXT not Stats —Delta and Hippopotamuses
25.1.16 DCC: South Dunedin Integrated Catchment Management Plan (ICMP)
19.1.16 Listener 23.1.16 (letter): South Dunedin #Jun2015flood
16.1.16 NZ Listener 16.1.16 (letter): South Dunedin #Jun2015flood
14.1.16 ‘Quaking!’ Dark day$ and tide$ to come #Dunedin #Jun2015flood
10.1.16 Infrastructure ‘open to facile misinterpretation’…. or local ignore
5.1.16 Hammered from all sides #fixit [dunedinflood Jun2015]
● 24.12.15 Site notice: posts removed
3.11.15 South Dunedin Flood | Correspondence & Debriefing Notes released by DCC today #LGOIMA
█ For more, enter the terms *flood*, *hazard* or *south dunedin* in the search box at right.
—
Posted by Elizabeth Kerr