In a perfect world, after the realignment of SH88…
### ODT Online Tue, 30 Aug 2011
Work starts on stadium water traps
Construction of temporary weirs across the lower Water of the Leith next to the Forsyth Barr Stadium has begun. Three weirs are being trialled to improve the look of the concrete flood channel, described by some Otago regional councillors as “appalling”, by preventing the channel completely emptying out.
Read more
—
Posted by Elizabeth Kerr